Progress Report of Road Circle Dumka November 2023

You might also like

Download as pdf or txt
Download as pdf or txt
You are on page 1of 72

DPW-R

ROAD CONSTRUCTION DEPARTMENT, JHARKHAND


(State Highways Wing)
Progress report of On-going works (Roads-Plan)
State Plan Road Works

Month : November, 2023 Amount in Rs. Lakh

Sanctioned Scheme Administrative Approval Agreement


Financial % Physical
Sl. Length % Financial
Progress Name of Contractor Achiev- Scheduled Date
No. (Km) Date/ Ref. Date/ Ref. Achievement
Name Amount Amount Grand Total ement
No. No.

1 2 3 4 5 6 7 8 9 10 11 12

Circle :- Dumka
Div :- Dumka
Name of EE-Sri Harendra Kumar Singh
Joint
Construction of Jama-Barapalsi Secretary,

13.09.2023
Road (Length-7.00 Km) and Jharkand
31.12.19 M/s M & S Co.
High Level Bridge Over Ranchi
1 7.00 6060.20 4322.11 36(SBD)/ 69.41 4871.64 M. S. Tower, 80%
Mayurakshi River. letter no.
2019-20 Dangalpara, Dumka
CW - 7.0 m 4981(S)
Bridge - 8x20.6m Date
10.10.19

Joint
Manoj Kumar
Secretary,
WideningStrerenthening/Reconst Singh,

22.01.2024
Jharkhand,
ruction of Dengidih-Vanvara- 23.07.2022 Vill-Chapariya,
Ranchi
2 Domnadih (NH-l l4A) Road with 13.03 4915.87 3944.19 8(SBD)/ 55.78 3358.18 P.O.-Koiridih, P.S.- 92%
letter No.
Bridge (Length-13.025Km) for 2022-23 Jasidih, Dist-
216(S)
the year202l-22. Deoghar
Date
(Jharkhand)
25.01.2022
State Plan Road Works

Month : November, 2023 Amount in Rs. Lakh

Sanctioned Scheme Administrative Approval Agreement


Financial % Physical
Sl. Length % Financial
Progress Name of Contractor Achiev- Scheduled Date
No. (Km) Date/ Ref. Date/ Ref. Achievement
Name Amount Amount Grand Total ement
No. No.

1 2 3 4 5 6 7 8 9 10 11 12

Joint
Secretary,

19.12.2023
Reconstruction of Rambani More Jharkhand, M/s Hardev
20.06.2022
(NH-114A) - Kadma Road (Total Ranchi Construction Pvt.
3 2.85 753.70 627.63 4(SBD)/ 75.79 517.89 85%
Length-2.850 Km) with Bridge letter No. Ltd.
2022-23
for the year 2021-22 612(S) Station Road,
Date Deoghar
18.02.2022

M/S
Joint
Reconstruction and BALMUKUND
Secretary,
Widening/Strengthening of Road JHA & RAMJEE

20.06.2023
Jharkhand,
from Nonihathwari Bridge- 21.10.2022 SINGH
Ranchi
4 Sitphari (on Sitphari-Sigri-Harko 7.55 3706.02 2035.63 19(SBD)/ 93.21 2870.49 CONSTRUCTION 82%
letter No.
PWD Road) Road (Total Length 2022-23 PVT LTD (JV),
1302(S)
– 7.550 Km) for the year 2022- Rasikpur, Near
Date
23. Basic School,
31.03.2022
Dumka

Joint
Secretary,
Widening and Strenthening of

13.05.2024
Jharkhand, M/s Ganesh Yadav,
Road from Korgha More (NH- 14.06.2023
Ranchi Anand Nagar, PO-
5 133) Champagarh Saraiyahat 13.70 4514.15 3960.41 02(SBD)/ 34.72 2592.75 60%
letter No. ISM, Saraidhella,
(NH-133) Road (Total Length - 2023-24
222(S) Dhanbad
13.695 Km) for the year 2021-22.
Date
25.01.2022
State Plan Road Works

Month : November, 2023 Amount in Rs. Lakh

Sanctioned Scheme Administrative Approval Agreement


Financial % Physical
Sl. Length % Financial
Progress Name of Contractor Achiev- Scheduled Date
No. (Km) Date/ Ref. Date/ Ref. Achievement
Name Amount Amount Grand Total ement
No. No.

1 2 3 4 5 6 7 8 9 10 11 12
Rajbir Construction
Joint
Reconstruction/Widening and Pvt Ltd,
Secretary,
Strengthening Four Lane work of 614, 6th Floor,

15.01.2024
Jharkhand,
Dumka Bypass {on Phulo-Jhano 16.01.2023 Hariom Tower,
Ranchi
6 Chowk, Dumka to Dumka 7.32 7645.45 8999.61 40(SBD)/ 58.957 5572.87 Commercial 75%
letter No.
Rampur Road (NH-114A)} 2022-23 Complex, Circular
3557(S)
(Total Length-7.315 Km) for the Road,
Date
year 2022-23 Lalpur,Ranchi-
07.10.2022
834001
Reconstruction/Widening and
Joint
Strengthening of Ranighghar (on
Secretary,
Gobindpur-Sahebganj Road) to

14.03.2024
Jharkhand, M/s Mohan Lal Jain
Jhagdahi (on Gobra More- 15.03.2023
Ranchi 23, Sahid Surya Sen
7 Shikarpur Road) Road (Munhar 15.36 5678.43 4324.15 67(SBD)/2 83.253 3600.00 98%
letter No. Road, Berhampore,
Chowk to Ashram More Road 022-23
4137(S) Murshidabad, WB
with Link Road Length – 4.360
Date
Km) (Total Length-15.36 Km)
14.11.2022
for the year 2022-23.

Joint
Construction of Baba Basukinath Secretary,
M/s Sakshi

15.03.2024
Ring Road & Approach of Jharkhand,
16.03.2023 Enterprises,
Helipad (with Construction of Ranchi
8 2.98 1491.81 1203.09 69(SBD)/2 6.234 284.97 Sakshi Palace, Near 17%
Inspection Benglow ) (Total letter No.
022-23 Bhojpur Hotel,
Length - 2.975 Km) for the year 4258(S)
Dumka
2022-23. Date
22.11.2022
State Plan Road Works

Month : November, 2023 Amount in Rs. Lakh

Sanctioned Scheme Administrative Approval Agreement


Financial % Physical
Sl. Length % Financial
Progress Name of Contractor Achiev- Scheduled Date
No. (Km) Date/ Ref. Date/ Ref. Achievement
Name Amount Amount Grand Total ement
No. No.

1 2 3 4 5 6 7 8 9 10 11 12

Joint
Secretary,
Improvement of Riding Quality

02.07.2023
Jharkhand, M/s Satya
in Aamjhari to Karmatar Road 03.02.2023
Ranchi Construction,
9 (Ch-0+00 Km to 16+250) (Total 16.25 852.22 745.37 45(SBD)/2 68.423 510.00 80%
letter No. Shastri Nagar,
Length-16.250 km) for the year 022-23
4436(S) Dumka
2022-23.
Date
06.12.2022

Reconstruction and Joint M/s Balmukund Jha


Widening/Strengthening of Road Secretary, (55%)-Ramjee
from Banwara ( on Dengidih- Jharkhand, Singh Construction
18.07.2023
Banwara-Domnadih Road) Ranchi Pvt. Ltd (45%)
10 7.01 2536.82 1861.08 17(SBD)/2 0.000 0.00 9% 17.04.2024
Beldaha-Raikanari(Machkol)( on letter (JV),
023-24
Sahara-Kothia Road) Road (Total No.219(S) Near Basic Govt
Length - 7.006) for the year 2022- Date School, Rasikpur,
23. 19.01.2023 Dumka
State Plan Road Works

Month : November, 2023 Amount in Rs. Lakh

Sanctioned Scheme Administrative Approval Agreement


Financial % Physical
Sl. Length % Financial
Progress Name of Contractor Achiev- Scheduled Date
No. (Km) Date/ Ref. Date/ Ref. Achievement
Name Amount Amount Grand Total ement
No. No.

1 2 3 4 5 6 7 8 9 10 11 12

Widening and
Strengthening/Reconstruction
work of Dumka City Roads
(Dumka West) its (i) Vijaypur to Joint
Muktidham Road Via SSB Camp Secretary, M/s Sakshi
(Length-0.916 Km) (ii) Dudhani Jharkhand, Enterprises,
10.08.2023
to National School Road Via Ranchi Sakshi Palace,
11 6.34 1303.81 1081.13 26(SBD)/2 0.000 0.00 30% 09.01.2024
Bara Talab (Length-0.502 Km) letter Near Bhojpur Hotel,
023-24
(iii) Digghi to Kodaoguhiya Road No.1334(S) Thana Road,
(Length-2.703 Km) and (iv) Date Dumka
Mahudangal to Hizla via Water 18.03.2023
Supply Plant (Length-2.550 Km)
(Total Length-6.341 Km) for the
year 2022-23.

Widening and
Strengthening/Reconstruction Joint
work of Dumka City Roads Secretary, M/S Malti
(Dumka North) its (i) Kusumdih Jharkhand, Enterprises,
28.06.2023
to Airport Road Via Bandarjori Ranchi Nehru Chowk
12 6.73 1402.43 1736.80 4(SBD)/ 23.027 399.93 65% 27.11.2023
Road (Total Length-3.166 Km) letter (Dumka More),
2023-24
(ii) Nakti Chowk to Dighi SRG No.1332(S) Harina, Nawagarh,
Camp Road (Length-3.566 Km) Date Dhanbad
(Total Length-6.732 Km) for the 18.03.2023
year 2022-23.
State Plan Road Works

Month : November, 2023 Amount in Rs. Lakh

Sanctioned Scheme Administrative Approval Agreement


Financial % Physical
Sl. Length % Financial
Progress Name of Contractor Achiev- Scheduled Date
No. (Km) Date/ Ref. Date/ Ref. Achievement
Name Amount Amount Grand Total ement
No. No.

1 2 3 4 5 6 7 8 9 10 11 12
Widening and
Strengthening/Reconstruction Joint
work of Dumka City Roads Secretary, M/S Malti
(Dumka East) its (i) Gidhni Jharkhand, Enterprises,
28.06.2023
Pahari to Baghdubhi, Police Line Ranchi Nehru Chowk
13 6.06 1204.49 1227.61 5(SBD)/ 36.657 450.00 52% 27.11.2023
Road (Total Length-3.25 Km) (ii) letter (Dumka More),
2023-24
Kurwa to Dumka Rampurhat No.1333(S) Harina, Nawagarh,
Bypass Road (Total Length- Date Dhanbad
2.813 Km) (Total Length-6.063 18.03.2023
Km) for the year 2022-23.

Improvement of Riding
Quality/Strengthening Work in Joint
(a) Shriamra to Golpur Road and Secretary, Hari Nandan
Link Road of SKMU (Length- Jharkhand, Choudhary,
28.06.2023
11.2 Km) and (b) Dondia Ranchi Behind Hero Honda
14 28.57 1967.93 1736.80 3(SBD)/ 78.305 1360.00 99% 27.12.2023
(Dumka-Sahebganj Road) to letter Showroom,
2023-24
Gujisimal (Dumka-Rampurhat No.1560(S) Dudhani Bhagalpur
Road) (Length-17.365 Km) Date Road, Dumka
(Total length-28.565 km for the 29.03.2023
year 2022-23.
State Plan Road Works

Month : November, 2023 Amount in Rs. Lakh

Sanctioned Scheme Administrative Approval Agreement


Financial % Physical
Sl. Length % Financial
Progress Name of Contractor Achiev- Scheduled Date
No. (Km) Date/ Ref. Date/ Ref. Achievement
Name Amount Amount Grand Total ement
No. No.

1 2 3 4 5 6 7 8 9 10 11 12

Under
Secretary to
Widening and Strengthening of
the
Road from NH-114A Jarmundi- M/s M & S Co,
Governmen 08.07.2023
Beldaha-Nimanath to NH-133 M.S. Tower
t of India 13MORTH
15 (Total Length-48.890 Km) for 48.89 22132.23 17678.91 1.66 292.81 Khutabandh, 20% 07.07.2025
RW/RANC (SBD)/
the year 2022-23. Dumka
HI/CRF/20 2023-24
Job No. CRF-JHR-2022-23/61.
21-22
Dated
06.02.2023

Improvement of Riding
Quality/Strengthening of (A)
Dumka Hawai Adda to Gandhi
Maidan Vaya Baghmara
Indiranagar Road (Length-7.115
Km) (B) Zila Udayan Kendra
Joint
Karhalbill to Dumka Railway
Secretary,
Station Vaya Polytechnic College
Jharkhand, M/s Chitra
(Length-2.027 Km) (C) S.P. 21.07.2023
Ranchi Construction,
16 College to Dudhani Tower 22.70 1314.16 1146.73 18(SBD)/2 65.403 750.00 99% 20.12.2023
letter Gilanpara, Dumka,
CHowk Road Vaya Rasikpur 023-24
No.2015(S) Jharkhand
(Length-2.825 Km) and (D)
Date
Dumka Town Aria Road (Sarai
10.05.2023
Kuwan to Gandhi Maidan,
Rasikpur Link Road,
Kumharpara to Four Lane etc)
(Length-10.73 Km) (Total
Length-22.697 Km) for the year
2023-24.
State Plan Road Works

Month : November, 2023 Amount in Rs. Lakh

Sanctioned Scheme Administrative Approval Agreement


Financial % Physical
Sl. Length % Financial
Progress Name of Contractor Achiev- Scheduled Date
No. (Km) Date/ Ref. Date/ Ref. Achievement
Name Amount Amount Grand Total ement
No. No.

1 2 3 4 5 6 7 8 9 10 11 12

Joint
Secretary,
Reconstruction / Widening &
Jharkhand, M/s Chitra
Strengthening of Patsra (MDR- 26.09.2023
Ranchi Construction,
17 192) to Kushbad (NH-114A) 2.95 1455.05 784.90 30(SBD)/2 80% 25.01.2024
letter Gilanpara, Dumka,
(Total length-2.948km) for the 023-24
No.3110(S) Jharkhand
year 2023-24.
Date
23.06.2023

Widening &
Joint
Strengthening/Reconstruction of
Secretary,
Kalhakund (on Gardi Sardiha Divya Engicon Pvt
Jharkhand,
Road) to Durga Mandir (on 26.09.2023 Ltd,
Ranchi
18 Basukinath (on Nonihat- 2.17 895.99 562.47 31(SBD)/2 Divya Palace, 30% 25.01.2024
letter
Basukinath Road) Road (Total 023-24 Bhagalpur Road,
No.3171(S)
Length – 2.172 Km) under Road Dumka, Jharkhand
Date
Division Dumka for the year
27.06.2023
2023-24

Joint
Secretary,
Improvement of Riding Quality
Jharkhand,
of Baiganthra - Sarwadham-
Ranchi
19 Mandaldih Road (Length - 22.05 22.05 1382.96
letter
KM ) under Road Division
No.3172(S)
Dumka for the year 2023-24
Date
27.06.2023
State Plan Road Works

Month : November, 2023 Amount in Rs. Lakh

Sanctioned Scheme Administrative Approval Agreement


Financial % Physical
Sl. Length % Financial
Progress Name of Contractor Achiev- Scheduled Date
No. (Km) Date/ Ref. Date/ Ref. Achievement
Name Amount Amount Grand Total ement
No. No.

1 2 3 4 5 6 7 8 9 10 11 12

Joint
Secretary, M/s Siddhartha
Improvement of Riding Quality
Jharkhand, Construction,
of Dalahi to Murgimore Km 0.00 25.10.2023
Ranchi Korambey House,
20 to Km 26.700 (Length - 26.700 26.70 1768.31 1837.32 41(SBD)/2 20% 24.04.2024
letter Near GPO, Zulu
KM ) under Road Division 023-24
No.3718(S) Park, Hazaribag
Dumka for the year 2023-24
Date
01.08.2023

Widening and
Strengthening/Reconstruction Joint
work of Dumka City Roads Secretary,
(Dumka South) its (i) Purana Jharkhand,
Dumka to Hizla Mela, Bal Ranchi
21 6.75 1470.27
Sudhar Grih Road (T Length- letter
5.220 Km) (ii) Disom Guru to No.3646(S)
Mortanga Road (Total Length- Date
1.533 Km) (Cumulative Length - 31.07.2023
6.75 Km) for the year 2023-24.

Joint
Widening, Strengthening/Re- Secretary,
Diwakar Yadav
Construction Work of Mohra Jharkhand,
10.10.2023 At-Noniya, Po-
More Noniya Link Road (Total Ranchi
22 0.56 160.65 157.40 36 F2/2023- Harokha, Ps- 25% 09.02.2024
Length-0.560 Km) under Road letter
24 Saraiyahat, Dumka
Division Dumka for the year No.4162(S)
2023-24 Date
29.08.2023
22 Dumka 273.49 74613.0 0.00 59973.3 0.00 27431.53
State Plan Road Works

Month : November, 2023 Amount in Rs. Lakh

Sanctioned Scheme Administrative Approval Agreement


Financial % Physical
Sl. Length % Financial
Progress Name of Contractor Achiev- Scheduled Date
No. (Km) Date/ Ref. Date/ Ref. Achievement
Name Amount Amount Grand Total ement
No. No.

1 2 3 4 5 6 7 8 9 10 11 12

Circle : Dumka
Div : Deoghar
Name of EE-Sri Manoj Kumar Mahto
1 Widening and Strengthening/ 25.594 7452.90 J.S. RCD 4320.18 26SBD/ 43% 3433.95 Bhupendra-Sinha 43% 24.03.20
Reconstruction of Baratand More LT. No. 2018-19 Joint Venture,
- Kurwa - Rangamatiya - Palojori 891(S), dt- dt.25.09.18 Karnibagh, Deoghar
(on SH-15) (Total Length - 13.02.18
25.594 KM) (including Bridge
Construction)
2 Widening and Strengthening/ 26.222 7583.51 J.S. RCD 6436.77 37SBD/ 91% 7282.59 MKS-SUB JOINT 99% 17.07.20
Reconstruction of Saharjori More LT. No. 2018-19 VENTURE,
(On MDR-222) - Aasanbani- 5072(S), dt- dt.18.01.19 Vill.- Chaparia, PO-
Algabra - Dumdumi - Danarbad- 31.08.18 Koiridih, Deoghar
Karown (On Ranga Sirsa-
Karmatanr Road) (Total Length-
26.222 KM) (Including Bridge
Construction) At Ch: 3+800
(2x12.0m)
3 Widening and Strengthening/ 16.075 4980.16 J.S. RCD 2776.00 41SBD/ 72% 2793.42 Mother India 85% 08.02.21
Reconstruction of Pichhdibaad LT. No. 2018-19 Construction Pvt.
(On MDR-229) - 5104(S), dt- dt.09.02.19 Ltd., Kankarbagh,
Sangramlodhiya-Deosang More 31.08.18 Patna.
(Deoghar) (On Baijnathpur-
Koriyasa Road) (Total Length -
16.075 KM) (Including Bridge
Construction)
State Plan Road Works

Month : November, 2023 Amount in Rs. Lakh

Sanctioned Scheme Administrative Approval Agreement


Financial % Physical
Sl. Length % Financial
Progress Name of Contractor Achiev- Scheduled Date
No. (Km) Date/ Ref. Date/ Ref. Achievement
Name Amount Amount Grand Total ement
No. No.

1 2 3 4 5 6 7 8 9 10 11 12
4 Widening & Strengthening of 18.950 5858.82 J.S. RCD 4348.14 40SBD/ 85% 4633.75 Manoj Kumar 94% 13.11.20
Sikitya (On Bavangama - LT. No. 2019-20 Singh,
Pathroll Road) to Shamalpur - 1245(S), dt- dt-14.09.19 Vill.-Chaparia,
Bonchbandh - Duba -Banvariya - 27.02.19 PO-Koyridih,
Jiyakhara - Manigadhi (On NH- PS-Jasidih,
114A Sarath-Deoghar Road) Deoghar
(Total Length-18.950 KM)
(Including Bridge Construction)
at Ch. 11+700 (1x16m)
5 Widening and Strengthening of 10.753 3663.60 J.S. RCD 2319.41 72SBD/ 43% 1612.54 Bhupendra 50% 22.07.20
Ghiya More (on Sarath-Basti- LT. No. 2019-20 Engineering and
Palojori Road) -Madhupur- 3389(S) dt- dt-23.10.19 Construction Pvt.
Basbutiya -Kunjbona (on MDR- 10.07.19 Ltd., Chitra,
223) (Total Length 10.753 KM) Deoghar

6 Construction of Deoghar Airport 1.030 609.15 J.S. RCD 429.81 49SBD/ 92% 672.02 Sona Lal Mahto, 97% 17.05.22
Approach Road (upto terminal LT. No. 2021-22 Vill.+PO-
building) (Length- 1.03 KM) 2931(S) dt- dt-18.02.22 Katamkuli,
22.09.21 PS- Pithoria, Ranchi
State Plan Road Works

Month : November, 2023 Amount in Rs. Lakh

Sanctioned Scheme Administrative Approval Agreement


Financial % Physical
Sl. Length % Financial
Progress Name of Contractor Achiev- Scheduled Date
No. (Km) Date/ Ref. Date/ Ref. Achievement
Name Amount Amount Grand Total ement
No. No.

1 2 3 4 5 6 7 8 9 10 11 12
7 Widening & Strengthening/ 11.050 4189.23 J.S. RCD 2659.28 19SBD/ 23- 0% 0.00 Sujata Udit Builders 11% 27.12.24
Reconstruction work of Noniyad Lt. No.- 24 Pvt. Ltd.,
(on Dhamni-Kushmaha Road) to 4134 (S) dt- dt- Tiwari Chowk,
Pandaniya More via 14.11.22 28.06.23 Deoghar College
Margomunda, Giriajori, Road, Nilkath
Simargada Road (Length-9.905 Vihar, Sawera Gali,
KM) & Margomunda Link Road Deoghar
(on MDR-225) (Length-
1.145KM) (Total Length-11.050
KM) (including Bridge
Construction) at Ch. 0.975 (Span -
2x21 M)
8 Strengthening/IRQP work in 19.200 1159.77 J.S. RCD 1047.91 23SBD/ 23- 26% 274.74 CMMM 50% 06.12.23
Pipra- Sakalpur Road under Road Lt. No.- 24 Enterprises,
Division Deoghar (Total Length 4441 (S) dt- dt- Vill.-Chalki,
19.20 km) 06.12.22 07.07.23 Block-Bongaon,
Dist.- North 24
Parganas, West
Bengal
9 Remaining work of 8.525 3804.39 J.S. RCD 2489.72 43SBD/ 23- 0% 0.00 Sri Manoj Kumar 23.07.24
Reconstruction of Karown LT. No. 24 Singh, Vill.-
(Dharmraj Mandir, on Dhiba 1494(S), dt- dt- Chaparia, PO-
karown Road) Chandchaura- 05.03.19 24.11.23 Koiridih, PS-
Kenbaria Asanbani-Budhikura Jasidih, Deoghar
(on Madankatta madhupur Road)
Road (Total Length 8.525 km)
State Plan Road Works

Month : November, 2023 Amount in Rs. Lakh

Sanctioned Scheme Administrative Approval Agreement


Financial % Physical
Sl. Length % Financial
Progress Name of Contractor Achiev- Scheduled Date
No. (Km) Date/ Ref. Date/ Ref. Achievement
Name Amount Amount Grand Total ement
No. No.

1 2 3 4 5 6 7 8 9 10 11 12
10 Construction of Cover Drain with 1.250 1714.00 J.S. RCD
Road from Pandit B. N. Jha Road LT. No.
to Bilasi via Bambam Road 6147(S), dt-
(Total Length-1.250 KM) 09.11.17
(Balance Work)
11 Construction of Cover Drain with 0.900 1064.99 J.S. RCD
Road from Bilasi-Chhatisi- LT. No.
Circular Road (Total Length - 5812(S), dt-
0.900 KM) (Balance Work) 18.10.17
12 Improvement of Riding 5.130 320.71 J.S. RCD
Quality/Strengthening Work of LT. No.
Asana to Dubia (on MDR-222) 3114(S), dt-
Road (Total Length - 5.130 KM.) 23.06.23

13 Widening & Strengthening/ 9.745 2062.89 RW


Reconstruction of Mohanpur Ranchi/
(Jaipur More) to Agriculture CRF/ 2021-
College upto Bihar Border, 22,
including Jhilli link Road. (Total dt-
Length – 9.745 KM) (Job No. 06.02.23
CRF-JHR-2022-23/60)
14 Widening & Strengthening / 10.770 2664.75 J.S. RCD
Reconstruction of Madhupur- LT. No.
Baikunth Dham (on MDR-225) - 3418(S), dt-
Fulchi-Delipather- Dhamni More 18.07.23
(Pandania-Jagdispur Road, on
ODR) Road (Total length -
10.77km) Under Road Division,
Deoghar.
State Plan Road Works

Month : November, 2023 Amount in Rs. Lakh

Sanctioned Scheme Administrative Approval Agreement


Financial % Physical
Sl. Length % Financial
Progress Name of Contractor Achiev- Scheduled Date
No. (Km) Date/ Ref. Date/ Ref. Achievement
Name Amount Amount Grand Total ement
No. No.

1 2 3 4 5 6 7 8 9 10 11 12
15 Improvement of Riding Quality 4.800 299.82 J.S. RCD
work of Deoghar-Satar Road LT. No.
under Road Division, Deoghar 3721(S), dt-
(Total Length-4.80 KM) 01.08.23
16 Improvement of Riding Quality 23.416 1844.52 J.S. RCD
Work in Km 35 to 52(Part), 56 to LT. No.
59, 62(Part) to 63(Part) and 3720(S), dt-
64(Part) of Jama-Jamtara Road 01.08.23
(Part of SH-15) under Road
Division Deoghar (Total Length
23.416 KM).
17 Improvement of Riding 2.500 138.70 J.S. RCD
Quality/Strengthening work of LT. No.
Thadi More (NH-114A) to 3860(S), dt-
Durgapur (MDR-221) via 10.08.23
Thadidulampur (Total Length
2.50 K.M.) under Road Division,
Deoghar
18 Widening and Strengthening of 5.3615 2310.93 J.S., RCD,
Chitra to Uparbandha Road under Lt. No.-
Road Division, Deoghar (Total 4591(S), dt-
Length - 5.3615 Km) 04.10.23
19 Improvement of Riding Quality 14.825 906.29 J.S., RCD,
Work of Chitra (Thadi) to Lt. No.-
Mishradih (Sarath) via Birmati 4592(S), dt-
Road (Total Length-14.825 KM) 04.10.23
under Road Division Deoghar.
State Plan Road Works

Month : November, 2023 Amount in Rs. Lakh

Sanctioned Scheme Administrative Approval Agreement


Financial % Physical
Sl. Length % Financial
Progress Name of Contractor Achiev- Scheduled Date
No. (Km) Date/ Ref. Date/ Ref. Achievement
Name Amount Amount Grand Total ement
No. No.

1 2 3 4 5 6 7 8 9 10 11 12
20 Improvement of Riding Quality 2.500 179.88 J.S., RCD,
of Ghaghra More(NH-133)- Lt. No.-
Bhagmari- Kitta- Kharwa Road 4823(S), dt-
(Total Length-2.50 KM) under 17.10.23
Road Division, Deoghar
21 Improvement of Riding Quality 9.000 732.44 J.S., RCD,
work in Manikpur- Kenmankathi- Lt. No.-
Dardmara Road (Total Length - 4996(S), dt-
9.00 KM) 27.10.23
22 Improvement of Riding Quality 5.375 295.98 J.S., RCD,
Work in Madhupur Thana Lt. No.-
Chowk - Panahakola- Patwabad 4998(S), dt-
Road for the year 2023-24 (Total 27.10.23
Length-5.375 K.M.)

23 Improvement of Riding Quality 3.025 254.31 J.S., RCD,


work of Rousan More to Lt. No.-
Madhupur bypass Road under 4999(S), dt-
(Total Length-3.025 KM) under 27.10.23
Road Division, Deoghar
24 Widenig and Strengthening Work 2.200 551.03 J.S., RCD,
in AIIMS, Deoghar Compound Lt. No.-
Gate No.-1 to Gate No.-3 of 5005(S), dt-
Satsang Nagar- Bhirkhibad Road 27.10.23
(MDR-235) (From KM 10.20 to
KM 12.40) (Total Length -2.20
KM) under Road Division,
Deoghar

24 Deoghar 238.20 54642.8 26827.20 20703.01


State Plan Road Works

Month : November, 2023 Amount in Rs. Lakh

Sanctioned Scheme Administrative Approval Agreement


Financial % Physical
Sl. Length % Financial
Progress Name of Contractor Achiev- Scheduled Date
No. (Km) Date/ Ref. Date/ Ref. Achievement
Name Amount Amount Grand Total ement
No. No.

1 2 3 4 5 6 7 8 9 10 11 12

Circle : Dumka
Div : Godda
Name of EE-Sri Munna Lal
Remaining Work of
Reconstruction of Road
(Including Bridges) (i) Firozpur-
RCD Lt. SBD
Bhagayai & (ii) Meharma-
No. 2459 03/2021-22 M/s S. K. Tekriwal,
1 Wazidpur-Budhasan(Jharkhand- 22.44 7249.10 5956.18 78% 5678.68 75% 25.04.2023
(S) dated Dated:26- Pathargama, Godda
Bihar border) Including Bazidpur-
03.05.17 10-2021
Khirondhi Link road (Total
Length- 22.44 k.m.) Under Road
Division, Godda.

Widening,Strengthening/Reconst RCD Lt.


SBD
ruction of Parasi to Sirsa Road No.
01/2021-22 M/s S. K. Tekriwal,
2 Via Thakurgangti road including 4.91 1217.98 4653(S) 1045.94 79% 826.95 84% 17.10.22
Dated:18- Pathargama, Godda
Bridge (Total Length- 4.910 dated
10-2021
KM). 19.09.19
State Plan Road Works

Month : November, 2023 Amount in Rs. Lakh

Sanctioned Scheme Administrative Approval Agreement


Financial % Physical
Sl. Length % Financial
Progress Name of Contractor Achiev- Scheduled Date
No. (Km) Date/ Ref. Date/ Ref. Achievement
Name Amount Amount Grand Total ement
No. No.

1 2 3 4 5 6 7 8 9 10 11 12

Widening & Strengthening of


Godda City Bypass From RCD Lt. M/s Mitra
Sarkanda Chowk (NH 133) to No. SBD Engineering
Mission Chowk (NH 333A) Road 4225(S) 05/2022-23 Constructions,
3 4.37 1483.47 1516.44 63% 950.00 90% 03.09.2023
including (i) Circular link road dated Dated:04- Ongole, Praksham,
via Residence of DC,SP,DJ 21.11.22 03-2023 Dist.- Andhra
Godda and (ii) Canal Link road Pradesh
(Total Length- 4.37 Km)

Rajbir Construction
Widening, Strengthening and
pvt. Ltd.614,
Reconstruction of Agiya more RCD Lt. SBD
Hariomtower
(on Agiya more-Sundarpahari No. 537 (S) 07/2022-23
4 22.25 7351.99 7423.57 39% 2900.00 Commercial 55% 19.09.2024
Road)- Pargo- Damodih (till dated Dated:20-
Complex,
Garda Pahari) Road (Length- 15.02.22 03-2023
Circular road,
22.253 Km) (Including L.A.)
Lalpur, Ranchi
RCD Lt.
IRQP/Strengthening work of Kumar Aman, S/o-
No. 26F2/2022-
Kargil Chowk to Godda Bus Anuj Kumar Singh,
4444(S) 23
5 Stand Via Sadar Hospital Road 1.00 226.61 171.57 70% 119.82 Kamala Bagh 70% 15.04.2023
dated Dated:14-
(Total Length- 1.00 Km) under Colony, Dumka, Pin
06.12.22 02-2023
Road Division, Godda 814101

Remaining Work of Widening RCD letter


SBD
Strengthening / Re Construction no. -
03/2022-23 M/s Sakshi
6 of Nunajor-Shahpur Beldiha- 16.60 4469.42 8112(S) 851.31 53% 450.00 63% 25.01.2023
Dated:26- Enterprises, Dumka
Parsa (MDR- 206) road (Km dated
07-2022
00.00 to 16.60) 05.09.13
State Plan Road Works

Month : November, 2023 Amount in Rs. Lakh

Sanctioned Scheme Administrative Approval Agreement


Financial % Physical
Sl. Length % Financial
Progress Name of Contractor Achiev- Scheduled Date
No. (Km) Date/ Ref. Date/ Ref. Achievement
Name Amount Amount Grand Total ement
No. No.

1 2 3 4 5 6 7 8 9 10 11 12

Widening & Strengthening of RCD Lt.


SBD
Sarotiya(On MDR- 200) - No. Pancham Kumar
01/2020-21
7 Belari-Pathra (On NH- 133) road 5.72 1207.65 3443(S) 827.54 69% 771.88 Mishra, 76% 07.05.2021
Dated:
(Total Length- 5.718 KM) for dated Purandaha, Deoghar
08-10-2020
the year 2019-20. 15.07.19

Reconstruction of Dumuhi
RCD Lt.
(Veerkunwar Singh Chowk) (NH Manoj Kumar
No. SBD
133) to Chandni Chowk (NH Singh, Vill-
3480(S) 06/2022-23
8 333A) Km 0.00 to 11.05 (Total 11.05 2936.62 2976.43 30% 900.00 Chaparia, PO- 45% 13.01.2024
dated Dated:14-
Length- 11.05 Km) under Road Koiridh, PS-
23.09.22 03-2023
Division, Godda. Jasidih, Deoghar

Widening & Strengthening/ RCD Lt. Rajbir Construction


Reconstruction of Mirzachowki- No. pvt. Ltd.614,
SBD
Boarijore Road (MDR 207) Km 3471(S) Hariomtower
02/2023-24
9 16.60 to 25.060 (Total Length- 8.46 4146.60 dated 3201.51 16% 500.00 Commercial 30% 18.01.2024
Dated:19-
8.46 Km) (Part B) under Road 23.09.22 Complex,
04-2023
Division, Godda. Toal A.A. Circular road,
10783.787 Lalpur, Ranchi
Kandukuri
IRQP/Strengthening work of RCD Lt. Industries Pvt. Ltd.,
Mohanpur-Khairatikar, No. SBD Survery No. 326,
Nayanagar, Parsa, Durgapur, 4430(S) 01/2023-24 Kandukuri Estate,
10 16.07 1120.61 1152.04 90% 1033.48 100% 12.10.2023
Kusmi Road (Total Length- dated Dated:13- Jammalapalem,
16.07 Km) under Road Division, 06.12.22 04-2023 Kavali- 524201,
Godda SPSR Nellore
(Andhra Pradesh).
State Plan Road Works

Month : November, 2023 Amount in Rs. Lakh

Sanctioned Scheme Administrative Approval Agreement


Financial % Physical
Sl. Length % Financial
Progress Name of Contractor Achiev- Scheduled Date
No. (Km) Date/ Ref. Date/ Ref. Achievement
Name Amount Amount Grand Total ement
No. No.

1 2 3 4 5 6 7 8 9 10 11 12
Reconstruction of Simra-
Rajbir Construction
Boarijore-Borio Road Including RCD Lt.
pvt. Ltd.614,
Bridge (MDR-208) (from No. 2917 SBD
Hariomtower
Chainage 4.00 Km to 17.150 (S) dated 05/2023-24
11 13.15 6237.31 6621.17 3% 200.00 Commercial 6% 07.08.2024
Km) (Total Length- 13.150 Km) 04.08.22 Dated:08-
Complex,
under Road Division, Godda for Toal A.A. 06-2023
Circular road,
the year 2022-23. 87044.64
Lalpur, Ranchi

Reconstruction of Mahagama
Classic Engicon
(Kechua Chowk) to Dighi Road RCD Lt.
SBD Pvt. Ltd., 3D Vatika
(MDR-201) (Total Length- No. 2916
7173.34600 06/2023-24 Apartment Line
12 11.597 Km) under Road 11.60 (S) dated 7595.71 4% 16.09.2024
Dated:17- Tank Road, Ranchi,
Division, Godda for the Year 04.08.22
07-2023 Jharkhand
2022-23

Nitesh Kumar
RCD Lt. Singh, S/o- Anil
Strengthening work of
No. SBD Kumar Singh,
Boarijore(MDR- 207)-Bishunpur-
4252(S) 07/2023-24 Girish Talkies,
13 Ghorichak (NH-133) Road (Total 15.47 1050.93 1028.91 0%
dated Dated:21- Kalyanpur, Jamui
Length- 15.466 KM) under Road
22.11.22 11-2023 BO- Hathigarh,
Division, Godda.
Deoghar
(Jharkhand)
RCD Lt.
IRQP/Strengthening work of No. SBD
Ghorichak to Dighi Road (Total 4452(S) 04/2023-24 M/s S. K. Tekriwal,
14 22.30 1430.65 1420.03 65% 922.52 98% 20.12.2023
Length- 22.300 Km) under Road dated Dated:21- Pathargama, Godda
Division, Godda 06.12.22 06-2023
State Plan Road Works

Month : November, 2023 Amount in Rs. Lakh

Sanctioned Scheme Administrative Approval Agreement


Financial % Physical
Sl. Length % Financial
Progress Name of Contractor Achiev- Scheduled Date
No. (Km) Date/ Ref. Date/ Ref. Achievement
Name Amount Amount Grand Total ement
No. No.

1 2 3 4 5 6 7 8 9 10 11 12
Widening,Strengthening/Reconst RCD Lt.
M/s ABC
ruction of Tesobathan No. SBD
Construction,
(atTesobathan- Mahadeobathan 4462(S) 03/2023-24
15 12.00 4665.87 3862.11 12% 474.99 Tarangini Villa 21% 13.05.2024
Road)- Rampur- Simlong (At NH dated Dated:14-
Main Road Bhagat
333A) Road (Total Length- 07.12.22 06-2023
Para Pakur.
12.00KM).

Widening, Strengthening & RCD Lt.


Reconstruction of Godda Dande No. 610(S)
16 road via Dewbandha, Mohani 17.81 7943.78 dated
and Shivnagar road (Total Length- 15.02.23
17.809 Km) for the year 2022-23

Widening & RCD Lt.


Strengthening/Reconstruction of No.
Chandana (Sundarpahari-Agiya 3415(S)
17 17.77 9034.04
more Road)- Damru- Damakol dated
Fall Road (Total Length- 17.766 18.07.23
Km).

Widening & RCD Lt.


Strengthening/Reconstruction of No.
Ghatiyari(on Tesobathan- 4919(S)
18 11.72 5577.24
Mahadeobathan Road)- Ratanpur- dated
Rajpokhar (Sundar dam) Road 19.10.23
(Total Length-11.720 Km.)
State Plan Road Works

Month : November, 2023 Amount in Rs. Lakh

Sanctioned Scheme Administrative Approval Agreement


Financial % Physical
Sl. Length % Financial
Progress Name of Contractor Achiev- Scheduled Date
No. (Km) Date/ Ref. Date/ Ref. Achievement
Name Amount Amount Grand Total ement
No. No.

1 2 3 4 5 6 7 8 9 10 11 12
Widening & RCD Lt.
Strengthening/Reconstruction of No.
Mohanpur (on NH-133) to 4917(S)
19 20.64 6794.33
Karmatanr Road Via Sinni- dated
Imlitanr Road (Total Length- 19.10.23
20.640 Km.)
Widening & RCD Lt.
Strengthening/Reconstruction of No.
Sundarpahari(NH-333A)- 4926(S)
20 24.44 8061.66
Chandana-Dama-Jamkudar- dated
Agiamore Road (Total Length- 20.10.23
24.440 Km.)
20 Godda 279.76 82205.85 45650.45 15728.32

Circle : Dumka
Div : Jamtara
Name of EE-Sri Vijay Kumar Agarwal
01/SBD/18-
W/s of Narayanpur-Tarani-
Lt.No.872 19 M/s Daroga
Jagrudih(Bajraghat) road &
1 21.298 4472.93 (S) 3164.30 Dt. 82.03% 2863.32 Pradhan, Hirapur, 92.00% 08.09.2020
Tarani- Chirudih -Pabia Link
13.02.2018 09.03.19 Dhanbad
road for the Year 2019-20

02/SBD/21-
Widening & Strengtheining of Lt.No.2345 M/s Malti
22
2 Jumman more to Lodharia road 12.010 3992.49 (S) 2856.67 79.30% 3188.23 Enterpirses, 93.00% 16.12.2022
17.01.2022
for the Year 2021-22 12.08.21 Dhanbad
State Plan Road Works

Month : November, 2023 Amount in Rs. Lakh

Sanctioned Scheme Administrative Approval Agreement


Financial % Physical
Sl. Length % Financial
Progress Name of Contractor Achiev- Scheduled Date
No. (Km) Date/ Ref. Date/ Ref. Achievement
Name Amount Amount Grand Total ement
No. No.

1 2 3 4 5 6 7 8 9 10 11 12
IRQP/ Work of
Lt 02/SBD/22- K.K. Builders
Govindpur-Sahebganj Road (Km
3 96.980 6316.01 No.551(S) 5904.19 23 74.52% 4400.00 Pvt. Ltd, 83.00% 27.10.2023
29.020 to 126.00) for the Year
Dt.17.02.22 28.10.2022 Jamshedpur
2021-22
Dated
04/SBD/23-
Construction of ROB in lieu of 16.03.202
24 Velji Ratna Soratia
4 Existing Level Crossing - 7873.00 3 by 4103.60 - - 26.09.2025
Dt. Infra Pvt. Ltd. (Guj)
No.13/B/E in JKL Road MoRT&H,
27.09.23
New Delhi

Dated
05/SBD/23-
Construction of ROB in lieu of
16.03.202 24 Velji Ratna Soratia
5 Existing Level Crossing No.14 - 5146.00 2893.64 - - 26.09.2025
3 by Dt. Infra Pvt. Ltd. (Guj)
A/T in JKL Road
MoRT&H, 27.09.23
New Delhi
Widening & Lt. 06/SBD/23-
Strengthening/Reconst. of No.3248(S) 24 Preeti Enterprises,
6 7.530 3124.10 1830.780 10.11.2024
Laharmore-Koridih-Murlipahari Dt. Dt. Dhanbad
Road 07.01.23 11.11.23
IRQP work in Jamtara-Nirsa Lt.
via Virgram road (Total Length No.4328(S)
7 13.850 796.44 -
13-850 Km) for the year 2023- Dt.
24 08.09.23
7 Jamtara 151.67 31720.97 20753.17 10451.54
State Plan Road Works

Month : November, 2023 Amount in Rs. Lakh

Sanctioned Scheme Administrative Approval Agreement


Financial % Physical
Sl. Length % Financial
Progress Name of Contractor Achiev- Scheduled Date
No. (Km) Date/ Ref. Date/ Ref. Achievement
Name Amount Amount Grand Total ement
No. No.

1 2 3 4 5 6 7 8 9 10 11 12

Circle : Dumka
Div : Pakur
Name of EE-Sri Veer Raghwan
Widening-Strengthening &
Reconstruction Work of Ishakpur
(Saithankhana More) to J/S L. No. 17-SBD/ Spica Projects and
Manirampur Chandpur (on NH- 534(S) 22-23 infrastructure
01 10.15 4151.62 3162.94 34% 1085.37 50% 15.11.2023
133 A) Road & Link Road Dt. Dt. private limited,
(Length –10.145 KM) for the 15.02.22 16.01.2023 Ranchi
Year 2021-22. Under Road
Division, Pakur.

Reconstruction of Khaksa (on 04-SBD/


J/S L. No.
Kajladaha-Pakuria PWD Road) 22-23 M/s ABC
1305(S)
02 to Lakhijol-Jamsol Road (Length 12.43 4179.14 3346.67 (Revised) 68% 2286.66 Construction, 85% 26.05.2023
Dt.
–12.430 KM) for the Year 2022- Dt. Bhagatpara, Pakur
31.03.22
23. Under Road Division, Pakur. 07.10.2023

Widening Strengthening and


Reconstruction of Chengadanga
to Hamirul up to West bangal J/S L. No. 32-SBD/
Sandipan Pramanik
Road (Length 0.00 to 4.178 KM) 3585(S) 22-23
03 4.18 1477.28 1195.56 36% 430.00 Infra Private 40% 20.07.23
Under Road Division, Pakur. Dt. Dt.
Limited, Kolkata
10.10.22 21.03.2023
State Plan Road Works

Month : November, 2023 Amount in Rs. Lakh

Sanctioned Scheme Administrative Approval Agreement


Financial % Physical
Sl. Length % Financial
Progress Name of Contractor Achiev- Scheduled Date
No. (Km) Date/ Ref. Date/ Ref. Achievement
Name Amount Amount Grand Total ement
No. No.

1 2 3 4 5 6 7 8 9 10 11 12

IRQP work of Chotta Suraj Bera


J/S L. No.
Kanchan Garh Gupha(0.00KM to
3249(S)
04 0.91 KM) for the year 2023-24. 0.91 70.56
Dt.
Under Road Division, Pakur
06.07.23
(Plan Head).

IRQP work of Gokulpur-


Deewanpir Road (Length - 2.00 J/S L. No.
KM) for the year 2023-24 under 3267(S)
05 2.00 124.58
Road Division, Pakur Dt.
(Plan Head). 17.08.23

IRQP work of Maheshpur-


J/S L. No.
Pakurai Road (MDR-244) from
3717(S)
06 0.00 KM to 23.00 KM, under 23.00 1746.94
Dt.
Road Division, Pakur for the year
01.08.23
2023-24.
IRQP work of Pakuria-
J/S L. No.
Radhanagar-Nalhati Road from
3645(S)
07 0.00 KM to 13.300 KM, under 13.30 765.77
Dt.
Road Division, Pakur for the year
31.07.23
2023-24.
07 Pakur 65.96 12515.89 0.00 7705.17 0.00 3802.03
State Plan Road Works

Month : November, 2023 Amount in Rs. Lakh

Sanctioned Scheme Administrative Approval Agreement


Financial % Physical
Sl. Length % Financial
Progress Name of Contractor Achiev- Scheduled Date
No. (Km) Date/ Ref. Date/ Ref. Achievement
Name Amount Amount Grand Total ement
No. No.

1 2 3 4 5 6 7 8 9 10 11 12

Circle : Dumka
Div : Sahebganj
Name of EE-Sri Ajay Kumar-2
Joint
Widening and Strengthening/
Secretary
Reconstruction of Shivgadi
RCD,
Sanmany More Pwd Road To 07SBD/20
Jharkhand
Dahujor Pwd Road Via Dumaria- 19-20, Dt.
1 23.470 5883.54 , letter no. 4355.56 96.00 5291.91 M/s S.K. Tekriwal 96.00 08.07.2021
Sanmany-Tegra-Amdanda 09.01.202
1500 (S),
(Length 23.470 Km) Under 0
dated
Road Division Sahibganj for the
05.03.201
year 2019-20
9
Joint
Secretary
Reconstruction of Ranga (SH-18)
RCD,
to Simaldhab via Simra – Hiran – 09SBD/20
Jharkhand M/s Sri Ram
Dumil – Srirampur – Ilaki- 23-24, Dt.
2 32.055 11415.52 , letter no. 12617.58 0.00 Enterprises, 6.00 25.09.2025
Bhorbandh Road (Length – 26.09.202
801 (S), Bhagalpur
32.055 km) under Road Division, 3
dated
Sahibganj
02.03.202
2
State Plan Road Works

Month : November, 2023 Amount in Rs. Lakh

Sanctioned Scheme Administrative Approval Agreement


Financial % Physical
Sl. Length % Financial
Progress Name of Contractor Achiev- Scheduled Date
No. (Km) Date/ Ref. Date/ Ref. Achievement
Name Amount Amount Grand Total ement
No. No.

1 2 3 4 5 6 7 8 9 10 11 12
Joint
Secretary
RCD,
Reconstruction work of Simra- 03SBD/20
Jharkhand Velji Ratna
Borio-Boarijore-Road (MDR- 3-24, Dt.
3 22.820 8704.46 , letter no. 4193.48 4.77 200.00 Sorathia Infra Pvt. 25.00 04.05.2024
208) from KM 4.00 to 26.82 05.07.202
2917 (S), Ltd.
under Road Division, Sahibganj 3
dated
04.08.202
2
Joint
Widening and Strengthening
Secretary
/Reconstruction of Mirzachouki
RCD,
to Boarijore from Ch. 0.00 to 05SBD/20
Jharkhand
25+060 (km) (Part A) from Ch. 3-24, Dt. RK Infracorp Pvt.
4 16.600 10783.79 , letter no. 7604.89 2.63 200.00 20.00 24.09.2024
0.00 to 16+600 km and 0+0.00 to 25.07.202 Ltd., Hyderabad
3471 (S),
0+370 (Start Junction) under 3
dated
Road Division, Sahibganj for the
23.09.202
year 2022-23
2

Widening and Joint


Strengthening/Reconstruction Secretary
work of Kitajhore (on Bhognadih- RCD,
01SBD/20
Lakhipur Road)-Paharpur- Jharkhand
23-24, Dt. M/s Sri Ram
5 Talbaria (on Govindpur-Dumka- 10.100 4021.16 , letter no. 3724.63 13.42 500.00 35.00 24.08.2024
25.05.202 Enterprises
Barhait-Sahibganj ADB Road) 4143 (S),
3
Road (Length – 10.100 KM) dated
under Road Division Sahibganj 14.11.202
for the year 2022-23 2
State Plan Road Works

Month : November, 2023 Amount in Rs. Lakh

Sanctioned Scheme Administrative Approval Agreement


Financial % Physical
Sl. Length % Financial
Progress Name of Contractor Achiev- Scheduled Date
No. (Km) Date/ Ref. Date/ Ref. Achievement
Name Amount Amount Grand Total ement
No. No.

1 2 3 4 5 6 7 8 9 10 11 12
Joint
Widening and Strengthening of Secretary
Banjhi Bazar (Durga Mandir) (on RCD,
04SBD/20
Govindpur-Dumka-Sahibganj Jharkhand
23-24, Dt.
6 Road) - Mandwa Karikandar 9.000 4831.99 , letter no. 4203.13 4.76 200.00 ABC Construction 20.00 16.10.2024
17.07.202
Chakri-Daldali-Karasole (on 4130 (S),
3
Maharajpur-Sharmapur Road) dated
(Total Length - 9.00 km) 14.11.202
2
Joint
Secretary
RCD,
14SBD/20
Jharkhand
IRQP work of Pathna to Hiranpur 23-24, Dt. JKA Associate Pvt.
7 17.500 1091.50 , letter no. 862.46 0.00 30.08.2024
Road from KM 0.00 to KM 17.50 01.12.202 Ltd.,
4432 (S),
3
dated
06.12.202
2
Joint
Secretary
Reconstruction work of Atapur to
RCD,
Kelabari Road (NH-80) in 10SBD/20
Jharkhand
missing link of Road part of 23-24, Dt. M/s Bhagwan Stone
8 2.900 775.97 , letter no. 634.87 0.00 35.00 28.06.2024
Udhwa-Sirasin Road under Road 29.09.202 Works, Sahibganj
464 (S),
Division Sahibganj for the year 3
dated
2022-23
06.02.202
3
State Plan Road Works

Month : November, 2023 Amount in Rs. Lakh

Sanctioned Scheme Administrative Approval Agreement


Financial % Physical
Sl. Length % Financial
Progress Name of Contractor Achiev- Scheduled Date
No. (Km) Date/ Ref. Date/ Ref. Achievement
Name Amount Amount Grand Total ement
No. No.

1 2 3 4 5 6 7 8 9 10 11 12
Joint
Secretary
RCD,
IRQP work of Tinpahar Railway 20F2/2023-
Jharkhand
Station Link Road (Length 0.600 24, Dt. Deepak Kumar
9 0.600 64.49 , letter no. 51.80 0.00 03.03.2024
KM) under Road Division, 04.12.202 Choudhary
1875 (S),
Sahibganj 3
dated
28.04.202
3
IRQP/Strengthening of (A)
Subash Chowk (NH-80) to LC
Road (NH-80) via Stadium with
SP office and Helipad link road,
Joint
(B) DC Office to Katerganj
Secretary
Durga mandir (ADB road) via
RCD,
panchgarh with DC awas and 13SBD/20
Jharkhand
JAP-9 link road, (C) Eastern 23-24, Dt. Jai Mata Dee
10 14.080 1055.70 , letter no. 915.30 0.00 40.00 19.02.2024
Railway Fatak (NH-80) to Green 09.11.202 Construction
3983 (S),
Hotel (NH-80) via St. Xavier 3
dated
School and Ganga Ghat Road,
17.08.202
(D) Pokharia (NH-80) to Tamtam
3
Stand via Town Hall road (Total
length-14.080 Km) under Road
Division, Sahibganj for the year
2023-24
State Plan Road Works

Month : November, 2023 Amount in Rs. Lakh

Sanctioned Scheme Administrative Approval Agreement


Financial % Physical
Sl. Length % Financial
Progress Name of Contractor Achiev- Scheduled Date
No. (Km) Date/ Ref. Date/ Ref. Achievement
Name Amount Amount Grand Total ement
No. No.

1 2 3 4 5 6 7 8 9 10 11 12
Joint
Secretary
RCD,
Reconstruction Work of
Jharkhand
Hathmari to Hatigarh Road
11 1.975 929.25 , letter no.
(Total Length-1.975 Km) under
4877 (S),
Road Division, Sahibganj
dated
18.10.202
3
11 Sahebganj 151.10 49557.37 0.00 39163.68 0.00 6391.91
DPW-R
ROAD CONSTRUCTION DEPARTMENT, JHARKHAND
(State Highways Wing)
Progress report of Completed works (Roads-Plan)
State Plan Road Works

Month : November, 2023 Amount in Rs. Lakh

Sanctioned Scheme Administrative Approval Agreement


Financial % Physical
Sl. Length % Financial Scheduled
Progress Grand Name of Contractor Achievemen
No. (Km) Date/ Ref. Date/ Ref. Achievement Date
Name Amount Amount Total t
No. No.

1 2 3 4 5 6 7 8 9 10 11 12

Circle :- Dumka
Div :- Dumka
Name of EE-Sri Harendra Kumar Singh

Joint
Secretary,

20.06.2023
Improvement of Riding Quality Jharkhand, Hari Nandan
21.02.2023
in Tharihat –Sinduria Road (Total Ranchi Choudhary,
1 12.62 735.58 680.63 54(SBD)/ 99.98 680.50 100%
Length-12.620 km) for the year letter No. Bhagalpur Road,
2022-23
2022-23. 4442(S) Dudhani, Dumka
Date
06.12.2022

Joint
Improvement of Riding
Secretary,
Quality/Strengthening Work in Divya Engicon Pvt Ltd,

14.05.2023
Jharkhand,
(a) Kajladaha – Pakuria (Length- 15.02.2023 Divya Palace,
Ranchi
2 5.11 km) and (b) Maluti to 7.43 517.25 394.40 52(SBD)/ 99.38 391.94 Bhagalpur Road, 100%
letter No.
Patranga Road (Length- 2.32 km) 2022-23 Dumka, Jharkhand
4428(S)
(Total length- 7.43 km) for the
Date
year 2022-23.
06.12.2022
State Plan Road Works

Month : November, 2023 Amount in Rs. Lakh

Sanctioned Scheme Administrative Approval Agreement


Financial % Physical
Sl. Length % Financial Scheduled
Progress Grand Name of Contractor Achievemen
No. (Km) Date/ Ref. Date/ Ref. Achievement Date
Name Amount Amount Total t
No. No.

1 2 3 4 5 6 7 8 9 10 11 12
Deputy
Secretary,

23.09.2022
Reconstruction of Gardi to Jharkand
24.12.2021 M/s M & S Co.
Sardiha Road (Total length-8.88 Ranchi
3 8.88 3324.91 3020.91 25(SBD)/ 98.80 3379.68 M. S. Tower, 100%
Km) for the year 2021-22. letter no.
2021-22 Dangalpara, Dumka
(CW-7.0 m) 2339(S)
Date
12.08.21

Joint
Improvement of Riding
Secretary,
Quality/Strengthening Work in

19.09-2023
Jharkhand, M/s Chitra
(a) Asansol to Chakalta Road 20.03.2023
Ranchi Construction,
4 (Length-13.825km) (b) 19.13 1421.13 1190.60 71(SBD)/ 99.95 1190.00 100%
letter No. Gilanpara, Dumka,
Dhadhakia to Baskichak (Length- 2022-23
4435(S) Jharkhand
5.3km) Total length-19.125 km
Date
for the year 2022-23.
06.12.2022

Joint
Secretary,

05.09.2023
Improvement of Riding Quality Jharkhand, Hari Nandan
06.03.2023
in Shivpahar Chowk to Saharjori Ranchi Choudhary,
5 25.70 1639.05 1349.85 62(SBD)/2 99.56 1343.88 100%
Hatiya Road (Length-25.700 Km) letter No. Bhagalpur Road,
022-23
for the year 2022-23. 601(S) Dudhani, Dumka
Date
06.01.2023
State Plan Road Works

Month : November, 2023 Amount in Rs. Lakh

Sanctioned Scheme Administrative Approval Agreement


Financial % Physical
Sl. Length % Financial Scheduled
Progress Grand Name of Contractor Achievemen
No. (Km) Date/ Ref. Date/ Ref. Achievement Date
Name Amount Amount Total t
No. No.

1 2 3 4 5 6 7 8 9 10 11 12

Joint
Secretary,

07.10.2023
Improvement of Riding Quality Jharkhand, M/s Chitra
08.06.2023
in Gopikandar – Pakuria Road Ranchi Construction,
6 13.13 1041.85 973.70 01(SBD)/ 99.95 973.21 100%
(MDR-198) 0.00 Km to 13.125 letter No. Gilanpara, Dumka,
2023-24
Km for the year 2022-23. 4453(S) Jharkhand
Date
06.12.2022

Joint
Secretary,
Construction of Approach Road

13.08.2023
Jharkhand, M/s Chitra
of High Level Bridge over Local 14.02.2023
Ranchi Construction,
7 Nala in 45th KM of Ranibhal 268.83 209.73 50(SBD)/2 95.36 239.17 100%
letter No. Gilanpara, Dumka,
Maheshkhala Road for the year 022-23
3381(S) Jharkhand
2022-23.
Date
16.09.2022

Joint
Secretary,

17.09.2023
Improvement of Riding Jharkhand, Sujata Udit Builders
18.03.2023
Quality/Strengthening Work in Ranchi Pvt. Ltd,
8 20.54 1494.85 1314.99 70(SBD)/ 99.61 1309.81 100%
Sahara – Kothia Road (Length- letter No. Anand Kunj, Williams
2022-23
20.535 km) for the year 2022-23. 4451(S) Town, Deoghar
Date
06.12.2022
State Plan Road Works

Month : November, 2023 Amount in Rs. Lakh

Sanctioned Scheme Administrative Approval Agreement


Financial % Physical
Sl. Length % Financial Scheduled
Progress Grand Name of Contractor Achievemen
No. (Km) Date/ Ref. Date/ Ref. Achievement Date
Name Amount Amount Total t
No. No.

1 2 3 4 5 6 7 8 9 10 11 12

Joint
Reconstruction of Gandhi Chowk Secretary, Kamac Engineers

29.02.2024
Kathikund (Govindpur-Sahebganj Jharkhand, Private Ltd,
30.08.2022
Road)-Karbindha (MDR-191) Ranchi 40/107, Ramkrishna
9 22.27 6825.37 6055.39 10(SBD)/ 96.61 6963.34 100%
Road (Total Length-22.265 Km) letter No. Building, Panitanki
2022-23
with Bridge for the year 2021- 528(S) More, Sevoke Road,
22. Date Silliguri, West Bengal
15.02.2022

Joint
Reconstruction/Widening and
Secretary,
Strengthening of Gobra More

15.02.2024
Jharkhand,
Nayadih (on Gobindpur- 16.02.2023 Mini Construction,
Ranchi
10 Sahebganj Road) to Shikarpur 15.58 5884.29 5031.00 53(SBD)/ 91.83 5913.38 Church Road, 100%
letter No.
(on MDR-193) Road (Total 2022-23 Daltonganj
3997(S)
Length -15.58 Km) for the year
Date
2022-23
04.11.2022
10 Dumka 145.26 23153.11 0.00 20221.19 0.00 22384.92

Circle : Dumka
Div : Deoghar
Name of EE-Sri Manoj Kumar Mahto
State Plan Road Works

Month : November, 2023 Amount in Rs. Lakh

Sanctioned Scheme Administrative Approval Agreement


Financial % Physical
Sl. Length % Financial Scheduled
Progress Grand Name of Contractor Achievemen
No. (Km) Date/ Ref. Date/ Ref. Achievement Date
Name Amount Amount Total t
No. No.

1 2 3 4 5 6 7 8 9 10 11 12
1 Improvement of Riding 14.39 632.24 J.S. RCD 628.57 48SBD /22- 99% 621.82 C M M M Enterprises, 100% 20.04.23
Quality/Strengthening work in LT. No. 23 Vill.-Chalki, Block-
Pandaniya (on MDR-225) to 811 (S) dt- dt-21.12.22 Bongaon, Dist.- North
Jagdishpur (on NH-114A) road 02.03.22 24 Parganas,
from KM 0.00 to 14.390 (Total West Bengal, PIN-
Length -14.390 KM) 743235
2 Construction of Bypass in 10.00 6926.69 J.S. RCD 3774.84 01SBD/ 98% 6961.85 M/s Manisha 100% 26.03.23
Satsangnagar-Bhirkhibad (MDR- LT. No. 2022-23 Construction,
235) road at Rohini, Nawadih, 4410(S) dt- dt-27.04.22 At+PO-Dobhi, Dist.-
Tiljori, Devipur and 05.09.19 Gaya, Bihar
Choudharidih (Total Length -
10.00 KM)
3 Strengthening / IRQP work in 9.90 801.35 J.S. RCD 882.18 01SBD/ 100% 881.96 M/s Manisha 100% 14.07.23
Deoghar- Dardmara Road (MDR- Lt. No. 23-24 Construction,
220) (Total Length-9.90 KM) 3379 (S) dt- dt-15.04.23 At+PO-Dobhi, Dist.-
under Road division Deoghar for 06.09.22 Gaya, Bihar
the year 2022-23
4 Strengthening work in Sarath - 27.50 1781.84 J.S. RCD 1679.65 02SBD/ 99% 1661.95 Mother India 100% 30.11.22
Basti Palajori via Kukraha - LT. No. 2022-23 Construction Pvt. Ltd.,
Chitra Road (Total Length 27.50 46(S) dt- dt-01.06.22 Road No.-3, Sanjay
K.M.) under Road Division, 07.01.22 Gandhi Nagar,
Deoghar Kankarbagh, Patna
5 Improvement of Riding 4.88 338.15 J.S. RCD 337.68 03SBD/ 100% 336.18 M/s Manisha 100% 31.08.23
Quality/Strengthening work in Lt. No. 940 23-24 Construction,
Jasidih(Kalipur) - Kushmaha (S) dt- dt-01.06.23 At+PO-Dobhi, Dist.-
Road (Total Length-4.88 KM) 24.02.23 Gaya, Bihar
under Road Division, Deoghar.
State Plan Road Works

Month : November, 2023 Amount in Rs. Lakh

Sanctioned Scheme Administrative Approval Agreement


Financial % Physical
Sl. Length % Financial Scheduled
Progress Grand Name of Contractor Achievemen
No. (Km) Date/ Ref. Date/ Ref. Achievement Date
Name Amount Amount Total t
No. No.

1 2 3 4 5 6 7 8 9 10 11 12
6 Strengthening work of 30.15 1490.213 J.S. RCD 1608.04 65SBD/ 75% 1198.29 C M M M Enterprises, 100% 26.08.23
Rangasirsa- Dhiba-Kukraha- Lt. No. 22-23 Vill.-Chalki, Block-
Karown-Karmatand Road in KM 1963 (S) dt- dt-27.02.23 Bongaon, Dist.- North
0.00 to KM 31.00 (Excluding 31.05.22 24 Parganas, West
CH. 22.955 to CH. 23.805, Bengal
Length-0.805KM) (Total Length-
30.150 KM
7 Improvement of Riding 12.90 817.97 J.S. RCD 843.39 20SBD/ 23- 100% 841.60 M/s Manisha 100% 03.11.23
Quality/Strengthening work in LT. No. 24 Construction,
Sarwan to Ghormara (Tirnagar) 562(S), dt- dt- Vill.+PO- Dobhi, Dist.-
Road under Road Division 13.02.23 04.07.23 Gaya, Bihar
Deoghar (Total Length 12.900
KM).
8 Improvement of Riding 4.03 457.48 J.S. RCD 374.11 04SBD/ 31% 117.61 M/s Manisha 100% 11.10.23
Quality/Strengthening work in Lt. No.-191 23-24 Construction,
Rohini (Parmeshwar Chowk) to (S) dt- dt-12.06.23 At+PO-Dobhi, Dist.-
Sahid Dwar Daburgram Road 18.01.23 Gaya, Bihar
(Total Length-4.025 KM) under
Road Division, Deoghar.
9 Improvement of Riding 19.18 1240.22 J.S. RCD 1090.85 25SBD/ 23- 46% 500.00 M/s Manisha 93% 01.12.23
Quality/Strengthening work in LT. No. 24 Construction,
Babhangama to Pathroll Road 461(S), dt- dt- Vill.+PO- Dobhi, Dist.-
under Road Division Deoghar 06.02.23 02.08.23 Gaya, Bihar
(Total Length 19.175 km)
9 Deoghar 132.92 12995.95 11219.30 13121.25
State Plan Road Works

Month : November, 2023 Amount in Rs. Lakh

Sanctioned Scheme Administrative Approval Agreement


Financial % Physical
Sl. Length % Financial Scheduled
Progress Grand Name of Contractor Achievemen
No. (Km) Date/ Ref. Date/ Ref. Achievement Date
Name Amount Amount Total t
No. No.

1 2 3 4 5 6 7 8 9 10 11 12

Circle : Dumka
Div : Godda
Name of EE-Sri Munna Lal
Reconstruction to 2 Lane of
Rajbir Construction pvt.
Taljhari-Poriyahat-Dande RCD Lt. SBD
Ltd.614, Hariomtower
More upto PWD road in No. 1545 02/2019-20
1 31.00 12051.75 10123.83 110% 11598.05 Commercial Complex, 100% 29/04/21
Godda District (Total Length- (S) dated Dated:
Circular road, Lalpur,
31.00 Km) for the year 2018- 06.03.19 30-07-2019
Ranchi
19.
Widening and Strengthening/
Reconstruction of
Meharma(NH- 133)Tetaria- RCD Lt. SBD
Parasi Sahebganj via No. 1251 03/2019-20 M/s S. K. Tekriwal,
2 19.01 4786.25 3514.74 99% 3786.44 99% 08/02/21
Tharkurgangati Road (Total (S) dated Dated: Pathargama, Godda
Length- 19.010km) for the 27.02.19 09-08-2019
year 2018-19.

IRQP/Strengthening work of
Godda-Ramgarh-Guhiyajori RCD Lt. SBD
Road (Total Length- 35.254 No. 47 (S) 04/2022-23 M/s Om Prakash Bajaj, 21.01.202
3 35.25 2102.72 2195.36 109% 2391.25 100%
Km) under Road Division, dated Dated:22- Laheri Tola, Godda. 3
Godda 07.01.22 07-2022
State Plan Road Works

Month : November, 2023 Amount in Rs. Lakh

Sanctioned Scheme Administrative Approval Agreement


Financial % Physical
Sl. Length % Financial Scheduled
Progress Grand Name of Contractor Achievemen
No. (Km) Date/ Ref. Date/ Ref. Achievement Date
Name Amount Amount Total t
No. No.

1 2 3 4 5 6 7 8 9 10 11 12
Reconstruction of (I) Khutahri
more (On Doe-Diyajori road)-
Sarotiya (On Ghorichak-Dighi
road) road (Length- 1.95 K.M.) RCD Lt. SBD
Pancham Kumar
& (II) Sonagugi more- No. 545 02/2018-19
4 2.43 713.52 415.15 97% 527.11 Mishra, 98% 28.02.19
Madhura tikar road (Length- (S) dated Dated:29-
Purandaha, Deoghar
0.475 K.M.) (Overall length - 25.01.18 08-2018
2.425 K.M.) Under Road
Division, Godda.

4 Godda 87.69 19654.24 16249.07 4.14 18302.85

Circle : Dumka
Div : Jamtara
Name of EE-Sri Vijay Kumar Agarwal

IRQP Work in Murgabani- Lt No.44(S) 01/SBD/22-


Koleshwari Infracons 12.10.202
1 Kundhit -Rajnagar road for the 40.71 1959.82 Dt.07.01.20 2014.25 23 99.23% 1998.82 100.00%
Pvt. Ltd, Charta 2
Year 2021-22 22 13.04.22

Widening & Strengtheining


Lt.No2351 03/SBD/21-
/Reconst. of Nala (Chalepara M/s Rajvir Construction 25.05.202
2 20.35 6375.77 (S) 6011.01 22 99.10% 6309.89 99.00%
more) Afjalpur road for the Year Ranchi 3
12.08.21 21.01.2022
2021-22
State Plan Road Works

Month : November, 2023 Amount in Rs. Lakh

Sanctioned Scheme Administrative Approval Agreement


Financial % Physical
Sl. Length % Financial Scheduled
Progress Grand Name of Contractor Achievemen
No. (Km) Date/ Ref. Date/ Ref. Achievement Date
Name Amount Amount Total t
No. No.

1 2 3 4 5 6 7 8 9 10 11 12

01/SBD/21-
Widening & Strengtheining Lt.No.4217 22
Manoj Kumar Singh, 07.10.202
3 /Reconst. of Mohnabank to Nala 14.20 4187.66 (S) 2925.24 Dt. 82.30% 2707.65 97.00%
Deoghar 2
road for the Year 2021-22 21.08.19 08.10.2021

IRQP Work in Jamtara


03/SBD/23-
–Karmatarn via Combined 4439(S)
24 Manoj Kumar Singh, 14.10.202
4 Building Road under Road 22.47 1297.63 Dt. 1262.56 99.28% 1261.13 100.00%
Dt. Deoghar 3
Division, Jamtara for the Year 06.12.22
15.05.23
2022-23

02/SBD/23-
IRQP (Work in Bewa-Bypass
4257(S) 24 Maa Ambey Infra, 28.06.202
5 Road under Road Division, 3.13 253.32 262.43 99.96% 262.33 100.00%
22.11.22 Dt. Chatra 3
Jamtara for the Year 2022-23
15.05.23

IRQP Work in Vidyasagar


–Karmatarn via Narayanpur - 4438(S) 03/SBD/22-
Preety Entperprises, 24.07.202
6 Kalipahari Road under Road 18.98 1106.50 Dt. 1150.97 23 99.40% 1142.96 100.00%
Dhanbad 3
Division, Jamtara for the Year 06.12.22 25.03.2023
2022-23
State Plan Road Works

Month : November, 2023 Amount in Rs. Lakh

Sanctioned Scheme Administrative Approval Agreement


Financial % Physical
Sl. Length % Financial Scheduled
Progress Grand Name of Contractor Achievemen
No. (Km) Date/ Ref. Date/ Ref. Achievement Date
Name Amount Amount Total t
No. No.

1 2 3 4 5 6 7 8 9 10 11 12

IRQP ( Work in Jamtara


4253(S) 01/SBD/23-
(Tilabag) to Lodhna Dam Road Maa Ambey Infra, 11.07.202
7 11.50 398.51 Dt. 409.84 24 91.67% 375.71 100.00%
under Road Division, Jamtara for Chatra 3
22.11.22 12.04.23
the Year 2022-23

7 Jamtara 131.32 15579.22 14036.29 14058.48

Circle : Dumka
Div : Pakur
Name of EE-Sri Veer Raghwan
Widening Strengthening and
Reconstruction of Rajdaha (MDR-
198) to Phuljhijhr Ganpura
J/S L. No.
(Kajladaha More to Pakuria 04-SBD/
2364(S) M/s ABC Construction,
01 Road) PWD Road (Length 0.00 11.26 4164.08 3258.22 21-22 Dt. 119% 3873.87 100% 07.09.22
Dt. Bhagatpara, Pakur
to 11.264 KM) Under Road 08.11.2021
12.08.21
Division, Pakur ( Revised.
Length-11.656 Km.)

Strengthening Work of Amrapara- 15-SBD/


J/S L. No.
Maheshpur-Muraroi Road from 21-22 Dt.
3200(S) CMMM Enterprises,
02 (0.00 to 17.00 Km) for the Year 17.00 1171.85 1001.05 22.01.2022 100% 997.26 100% 22.12.22
Dt. Kolkata
2021-22. Under Road Division, Revised Dt.-
18.10.21
Pakur. 28.09.22
State Plan Road Works

Month : November, 2023 Amount in Rs. Lakh

Sanctioned Scheme Administrative Approval Agreement


Financial % Physical
Sl. Length % Financial Scheduled
Progress Grand Name of Contractor Achievemen
No. (Km) Date/ Ref. Date/ Ref. Achievement Date
Name Amount Amount Total t
No. No.

1 2 3 4 5 6 7 8 9 10 11 12

Strengthening Work of Hiranpur- J/S L. No.


01-SBD/ IA Engicons Private
Kotalpokhar Road from (0.00 to 4059(S)
03 15.50 651.66 757.99 22-23 Dt. 103% 781.98 Limited, Barharwa, 100% 22.12.22
15.50 Km) for the Year 2021-22. Dt.
03.06.2022 Sahibganj
Under Road Division, Pakur. 23.12.21

IRQP work of Govindpur- J/S L. No. 06-SBD/


M/s Chitra
Sahibganj Road (Total 26.45 2195(S) 22-23
04 26.45 1611.96 1473.22 100% 1472.77 Construction, 100% 10.05.23
KM) for the year 2022-23 under Dt. Dt.
Gilanpara, Dumka
Road Division, Pakur. 14.06.22 11.11.22

Widening Strengthening /
Reconstruction of Simpur (on
MDR-245) Radhanagar (Nalhati- J/S L. No. 13-SBD/
Pakuria Road ODR) (upto West 2356(S) 21-22 Rajbir Construction
05 23.41 7805.53 8071.17 108% 8712.97 100% 20.07.23
Bengal Border) Road (Length Dt. Dt. Private Limited, Ranchi
0.00 to 23.406KM for the Year 12.08.21 21.01.22
2021-22. Under Road Division,
Pakur.
Re-Construction of Paydapur
J/S L. No. 01-SBD/
(MDR-241)-Heeranandpur (NH- Sandipan Pramanik
4196(S) 23-24
06 133A) (Length-3.20 Km) Under 3.20 706.77 627.08 98% 612.02 Infra Private Limited, 100% 03.08.23
Dt. Dt.
Road Division, Pakur for the year Kolkata
18.11.22 04.05.2023
22-23.
06 Pakur 96.82 16111.85 0.00 15188.74 0.00 16450.86

Circle : Dumka
Div : Sahebganj
Name of EE-Sri Ajay Kumar-2
State Plan Road Works

Month : November, 2023 Amount in Rs. Lakh

Sanctioned Scheme Administrative Approval Agreement


Financial % Physical
Sl. Length % Financial Scheduled
Progress Grand Name of Contractor Achievemen
No. (Km) Date/ Ref. Date/ Ref. Achievement Date
Name Amount Amount Total t
No. No.

1 2 3 4 5 6 7 8 9 10 11 12
Joint
Secretary
IRQP/Strengthening work of RCD,
24SBD/20
Govindpur Sahibganj Road SH- Jharkhand 11.07.2022
21-22, Dt. M/s Sri Ram
1 18 (251.00 KM to 309.860 KM) 58.26 4620.58 , letter no. 4824.90 5067.89 96.00 /
12.01.202 Enterprises
under Road Division, Sahibganj 2892 (S), 20.04.2023
2
for the year 2021-2022. dated
21.09.202
1
Deputy
Secretary
Reconstruction of Udhwa (NH-
RCD, 25
80) to Sirasin (NH-80) via
Jharkhand SBD/2018- 10.08.2020
Radhanagar and Attapur M/s M & S Co.,
2 23.80 8903.62 , letter no. 6442.52 19, Dt. 98% 7346.95 100.00 /
Kathalbari Link Road, Total Dumka
3800 (S), 11.02.201 30.08.2021
Length - 23.80 KM under Road
dated 9
Division, Sahibganj
29.06.201
8
Joint
Secretary
IRQP/Strengthening work of RCD,
31SBD/20
Borio-Tinpahar-Rajmahal Road Jharkhand 28.07.2022
21-22, Dt. M/s Bhagwan Stone
3 (mdr-210) (0.00 Km. to 28.00 28.00 1879.81 , letter no. 1960.79 100% 2238.49 100.00 /
29.01.202 Works
Km.) under Road Division 3182 (S), 27.07.2022
2
Sahibganj. dated
18.10.202
1
State Plan Road Works

Month : November, 2023 Amount in Rs. Lakh

Sanctioned Scheme Administrative Approval Agreement


Financial % Physical
Sl. Length % Financial Scheduled
Progress Grand Name of Contractor Achievemen
No. (Km) Date/ Ref. Date/ Ref. Achievement Date
Name Amount Amount Total t
No. No.

1 2 3 4 5 6 7 8 9 10 11 12
Joint
Secretary
IRQP/Strengthening work of RCD,
33SBD/20
Barhet - Barharwa Road MDR- Jharkhand 03.08.2022
21-22, Dt. M/s Bhagwan Stone
4 211 (0.00 Km to 21.00 Km) 21.00 1365.72 , letter no. 1432.38 100% 1635.51 100.00 /
04.02.202 Works
Under Road Division Sahibganj 3183 (S), 01.08.2022
2
for the Year 2021-22. dated
18.10.202
1
Joint
Secretary
Reconstruction of road from RCD,
29SBD/20
Kothalpokhar (MDR-212) to Jharkhand 18.07.2022
21-22, Dt.
5 Bengal Border (Total Length- 3.80 1323.13 , letter no. 846.80 68% 954.28 CMMM Enterprises 100.00 /
19.01.202
3.795 KM) under Road Division, 2370 (S), 05.02.2023
2
Sahibganj for the year 2021-22 dated
12.08.202
1
Joint
Secretary
Strengthening/IRQP of RCD,
02SBD/20
Mangalhat-Taljhari Road (MDR- Jharkhand
22-23, Dt. M/s Sri Ram
6 217) in KM 0.00 to 4.65 under 4.65 258.38 , letter no. 265.58 100% 265.50 100.00 11.12.2022
12.08.202 Enterprises
Road Division, Sahibganj for the 4064 (S),
2
year 2021-2022 dated
23.12.202
1
State Plan Road Works

Month : November, 2023 Amount in Rs. Lakh

Sanctioned Scheme Administrative Approval Agreement


Financial % Physical
Sl. Length % Financial Scheduled
Progress Grand Name of Contractor Achievemen
No. (Km) Date/ Ref. Date/ Ref. Achievement Date
Name Amount Amount Total t
No. No.

1 2 3 4 5 6 7 8 9 10 11 12
Joint
Secretary
Improvement of Riding
RCD,
Quality/Strengthening work of 02SBD/20
Jharkhand
Borio Bazar Link Road (Length 23-24, Dt. M/s Sri Ram
7 1.93 285.81 , letter no. 283.64 283.28 100.00 24.08.2023
0.00 km to 1.927 km) under Road 25.05.202 Enterprises
4328 (S),
Division, Sahibganj for the year 3
dated
2022-2023
25.11.202
2
Joint
Secretary
of
Widening and Strengthening of Jharkhand
13
Mogalpara (NH-80)-Maharajpur- R.C.D.
SBD/2018-
Bindupara-Faridpur (West Jharkhand
8 10.86 3044.39 2720.10 19, Dt. 72% 2966.14 S.K. Tekriwal 100.00 29.04.2020
Bengal Border) Road (Total , Ranchi
30.10.201
Length-10.860 KM) under Road Letter No.
8
Division, Sahibganj 3591 (S)
dt.
27.06.201
7
8 Sahebganj 152.29 21681.44 18776.71 20758.04
DPW-B
ROAD CONSTRUCTION DEPARTMENT, JHARKHAND
(State Highways Wing)
Progress report of On-going works (Bridges-Plan)
State Plan Bridge Works

Month : November, 2023 Amount in Rs. Lakh

Sanctioned Scheme Administrative Approval Agreement


Financial
Sl. Length % Financial % Physical
Progress Grand Name of Contractor Scheduled Date
No. (m) Achievement Achievement
Name Amount Date/ Ref. No. Amount Date/ Ref. No. Total

1 2 3 4 5 6 7 8 9 10 11 12

Circle :- Dumka
Div :- Dumka
Name of EE-Sri Harendra Kumar Singh

(A) Construction of H.L


bridge over local nala at ch.
5th km of Surichawa-Maluti
Joint
Road (1x12.6m), (B)
Secretary,
Construction of H.L bridge
Jharkhand,
over Local river at Ch. 7th km 16.03.2023 M/s Ajay Singh,
Ranchi
1 of Surichawa-Maluti Road 54.40 581.28 504.06 68(SBD)/20 10.80 54.44 Chas Road, Jaina 42% 15.05.2024
letter No.
(2x14.6m), (C) Construction 22-23 More, Bokaro
2824(S)
of H.L. bridge over 7th Km
Date
nala at Ch. 6.513 Km of
02.08.2022
Dalahi to Murgi More Road
(1x12.6m) for the year 2022-
23.
1 Dumka 54.40 581.28 0.00 504.06 0.00 10.80 54.44

Circle : Dumka
Div : Deoghar
Name of EE-Sri Manoj Kumar Mahto

NIL

0 Deoghar 0.00 0.00 0.00 0.00


Month : November, 2023 Amount in Rs. Lakh

Sanctioned Scheme Administrative Approval Agreement


Financial
Sl. Length % Financial % Physical
Progress Grand Name of Contractor Scheduled Date
No. (m) Achievement Achievement
Name Amount Date/ Ref. No. Amount Date/ Ref. No. Total

1 2 3 4 5 6 7 8 9 10 11 12

Circle : Dumka
Div : Godda
Name of EE-Sri Munna Lal

1 Remaining work of
Construction of H.L. Bridge
with approch road in 24th Km RCD SBD No.
of Sahebganj- Mirjachowki 6734(S) 06/2013-14 Om Prakash Bajaj,
65.00 216.04 277.86 63% 175.00 85% 03.03.15
Boarijore road over Sariya WE dated dated Laheri Tola, Godda
river (2x21.6)+(1x18.6) Year 22.11.10 04.03.14
2010-11

1 Godda 65.00 0.00 277.86 175.00

Circle : Dumka
Div : Jamtara
Name of EE-Sri Vijay Kumar Agarwal

NIL
0 Jamtara 0.00 0.00 0.00 0.00

Circle : Dumka
Div : Pakur
Name of EE-Sri Veer Raghwan
Month : November, 2023 Amount in Rs. Lakh

Sanctioned Scheme Administrative Approval Agreement


Financial
Sl. Length % Financial % Physical
Progress Grand Name of Contractor Scheduled Date
No. (m) Achievement Achievement
Name Amount Date/ Ref. No. Amount Date/ Ref. No. Total

1 2 3 4 5 6 7 8 9 10 11 12
Construction of H.L. Bridge
(Including Approach Road)
J/S L. No.
over Tarpatia River at 16 th 03-SBD/22-
392 (S) M/s Singh Construction,
01 Km (3 x 20m) of Kajaladaha- 3x 20 488.553 402.02760 23 34% 60.00 48% 17.06.2024
Dt. Deopur, Pakur
Pakuria Road, Under Road Dt. 18.06.22
07.02.2022
Division, Pakur for the year
2021-22
Construction of Bridge over
Bansloi River in 2nd Km of
Amrapara Pakur Bazar Road
(Link road Dumka-Sahebganj CE (Comm)
SH-18) under Road Division, . L. No.
02 6x24.6 833.000
Pakur in the State of 733 (Encl).
Jharkhand. Dt. 20.04.23
(Job No. CRF-JHR-2022-
23/54)

02 Pakur 0.00 1321.55 402.03 60.00

Circle : Dumka
Div : Sahebganj
Name of EE-Sri Ajay Kumar-2

Joint
Secretary
Construction of H.L. bridge RCD,
01SBD/2021-
over Morang Nala at 2nd KM Jharkhand,
1 681.95 582.60 22, Dt. 46% 265.15 I.A. Engicons Pvt. Ltd. 95 09.02.2023
of Borio Bazar Link Road in letter no.
10.05.2021
Sahibganj District. 4980 (S),
dated
10.10.2019
Month : November, 2023 Amount in Rs. Lakh

Sanctioned Scheme Administrative Approval Agreement


Financial
Sl. Length % Financial % Physical
Progress Grand Name of Contractor Scheduled Date
No. (m) Achievement Achievement
Name Amount Date/ Ref. No. Amount Date/ Ref. No. Total

1 2 3 4 5 6 7 8 9 10 11 12

Joint
(i) Construction of Box culvert
Secretary
over local nala at Ch. 11+225
RCD,
Km, (ii) Ch. 11+375 km (iii) 21SBD/2023-
Jharkhand,
2 ch. 20+420 km (iv) Ch 6+490 666.20 623.39 24, Dt. M/s S.K. Tekriwal 03.03.2025
letter no.
km (v) Ch. 11+475 km of 04.12.2023
2014 (S),
Barhait-Barharwa (MDR-211)
dated
Road
10.05.2023

Joint
Construction of HL Bridge
Secretary
over Telo River (with
RCD,
approach road) at Chainage
Jharkhand,
3 279 km (new chainage 255 398.87
letter no.
km) of Govindpur Sahibganj
3257 (S),
Road under Road Division,
dated
Sahibganj
07.07.2023

3 Sahebganj 1747.02 1205.99 265.15


DPW-B
ROAD CONSTRUCTION DEPARTMENT, JHARKHAND
(State Highways Wing)
Progress report of Completed works (Bridges-Plan)
State Plan Bridge Works

Month : November, 2023 Amount in Rs. Lakh

Administrative
Sanctioned Scheme Agreement
Approval Financial
Sl. Length % Financial % Physical
Progress Grand Name of Contractor Scheduled Date
No. (m) Date/ Ref. Date/ Ref. Achievement Achievement
Name Amount Amount Total
No. No.
1 2 3 4 5 6 7 8 9 10 11 12

Circle :- Dumka
Div :- Dumka
Name of EE-Sri Harendra Kumar Singh

Joint
Secreta
ry,
Jharkha
Construction of High level nd,
20.10.21
Bridge over Bhurbhuri River at 124.84 Ranchi Rajbir Construction
1 1101.34 1196.47 12(SBD)/ 96.38 1153.20 100% 19.10.2023
12th km of Dumka-Hansdiha m letter Pvt Ltd
2021-22
Road for the year 2021-22. No.
2371(S)
Date
12.08.2
021
1 Dumka 0.0 1101.34 0.00 1196.47 0.00 1153.20

Circle : Dumka
Div : Deoghar
Name of EE-Sri Manoj Kumar Mahto
Month : November, 2023 Amount in Rs. Lakh

Administrative
Sanctioned Scheme Agreement
Approval Financial
Sl. Length % Financial % Physical
Progress Grand Name of Contractor Scheduled Date
No. (m) Date/ Ref. Date/ Ref. Achievement Achievement
Name Amount Amount Total
No. No.
1 2 3 4 5 6 7 8 9 10 11 12

NIL
0 Deoghar 0.00 0.00 0.00 0.00

Circle : Dumka
Div : Godda
Name of EE-Sri Munna Lal
NIL
0 Godda 0.00 0.00 0.00 0.00

Circle : Dumka
Div : Jamtara
Name of EE-Sri Vijay Kumar Agarwal

NIL
0 Jamtara 0.00 0.00 0.00 0.00

Circle : Dumka
Div : Pakur
Name of EE-Sri Veer Raghwan
Month : November, 2023 Amount in Rs. Lakh

Administrative
Sanctioned Scheme Agreement
Approval Financial
Sl. Length % Financial % Physical
Progress Grand Name of Contractor Scheduled Date
No. (m) Date/ Ref. Date/ Ref. Achievement Achievement
Name Amount Amount Total
No. No.
1 2 3 4 5 6 7 8 9 10 11 12
J/S L.
Construction of High Level No. 11-F2/19-
Bridge in 8th KM of Hiranpur- 4582(S) 20 M/s Ajay Singh, Jaina
01 1 x 12.6 207.64 178.53 91% 162.51 100% 24.10.2020
Kotalpokhar Road (With Dt. Dt. More Bokaro
Approach road) 14.09.20 25.10.2019
19
Construction of High Level
J/S L.
Bridge (Including Approach
No. 02-F2/22-
Road) over Dheba River at 14 th
371 (S) 23 Punam Singh, Hehal,
02 Km of Kajaladaha- Pakuria 2x12 148.86 136.09 100% 135.97 100% 02.06.2023
Dt. Dt. Ranchi
Road, Under Road Division,
04.02.20 03.06.22
Pakur for the year 2021-22
22
(Plan Head)
02 Pakur 0.00 356.49 314.62 298.48

Circle : Dumka
Div : Sahebganj
Name of EE-Sri Ajay Kumar-2
Month : November, 2023 Amount in Rs. Lakh

Administrative
Sanctioned Scheme Agreement
Approval Financial
Sl. Length % Financial % Physical
Progress Grand Name of Contractor Scheduled Date
No. (m) Date/ Ref. Date/ Ref. Achievement Achievement
Name Amount Amount Total
No. No.
1 2 3 4 5 6 7 8 9 10 11 12

Joint
Secreta
ry RCD,
Jharkha
Construction of H.L. bridge over nd,
18SBD/20
Gumani River at 6th KM of letter
1 591.03 580.186 20-21, Dt. 96% 659.48 M/s ABC Construction 100 03.07.2022
Pathna-Hiranpur Road in no.
04.01.2021
Sahibganj District. 3688
(S),
dated
24.07.2
019
1 Sahebganj 0.00 591.03 580.19 659.48
DPW-N
ROAD CONSTRUCTION DEPARTMENT, JHARKHAND
(State Highways Wing)
Progress report of On-going works(Non-Plan)
State Non-Plan Works

Month : November, 2023 Amount in Rs. Lakh

Sanctioned Scheme Sanctioned Agreement


Financial
Sl. Length % Financial % Physical
Progress Name of Contractor Sched-uled Date
No. Name (KM) Amount Date/ Ref. No. Amount Date/ Ref. No. Achievement Achiev-ement
Grand Total

1 2 3 4 5 6 7 8 9 10 11 12

Circle :- Dumka
Div :- Dumka
Name of EE-Sri Harendra Kumar Singh
Ideal Infrastructure
Rehabilitation of Residence cum office of Construction Pvt Ltd.
EIC, RCD, Ranchi letter
Assistant Engineer Road Sub Division, 19.03.2021 2A/34-2A Test Book
1 35.00 no. 261 (S) Date 22.72 22.66 99.72 100% 18.09.21
Hansdiha in the campus of Hansdiha IB 58F2/2020-21 Colony, Indrapuri,
27.01.2021
under Non Plan 2020-21 Phulwari, Patna - 800024
(Bihar)
Construction Work of Bathroom of Mens and
M/s Samriddhi,
Ladies, Care Taker Room, Driver Room,
At-Kewatpaa, Mortanga
Approach Road and external Electrification EIC, RCD, Ranchi letter
07.02.2023 Road,
2 in under Constructed Inspection Benglow in 70.00 no. 3457(S) Date 55.66 55.29 99.33 100% 06.06.2023
46F2/2022-23 PO+PS- Dumka, Dist-
the campus of Executive Engineer, Road 22.09.2022
Dumka, Jharkhand
Division, Dumka under Non Plan for the year
2022-23.

Special Repair of Water Park Link Road &


EIC, RCD, Ranchi letter Mahesh Kumar Daruka,
Paver Block work in 1st and 2nd Km of 31.03.2023
3 150.00 no. 3457(S) Date 105.37 104.89 99.54 Bhagalpur Road, Near 100% 30.07.2023
Asansol(Dumka Airport Road) to Chakaltta 74F2/2022-23
22.09.2022 Tata Showroom, Dumka
Road under Non Plan for the year 2022-23.

M/s AMD Construction


Special Repair of Missing Link Road of EIC, RCD, Ranchi letter
01.02.2023 At-Nonia, PO-Harokha, PS-
4 Beganthara-Sarwadham Road under Non 99.00 no. 3457(S) Date 98.89 98.55 99.66 100% 02.07.2023
44F2/2022-23 Saraiyahat, Dumka
Plan for the year 2022-23. 22.09.2022

Rehabilitation of 6 Nos Full Gantry work (1.


S.D. Enterprises, B-2, CTI
Dumka Airport Roa d-2 Nos, 2. Dumka Ring EIC, RCD, Ranchi letter
13.03.2023 Colony, HEC Township,
5 Road – 2 Nos, 3. Nonihat – Basukinath – 102.00 no. 3457(S) Date 63.03 63.03 99.99 100% 12.07.2023
66F2/2022-23 Dhurwa, Ranchi,
Kairabani Road – 2 Nos, Total – 6 Nos) 22.09.2022
Jharkhand
under Non Plan for the year 2022-23.

Pat Repiar Work in Eighteen Difference EIC, RCD, Ranchi letter


31.03.2023 Tara Chand More
6 Road (Total Length – 238.422 Km) of Road 60.00 no. 3457(S) Date 31.15 25.41 81.58 100% 30.06.2023
72F2/2022-23 Gilan Para, Dumka
Division, Dumka for the year 2022-23. 22.09.2022
Month : November, 2023 Amount in Rs. Lakh

Sanctioned Scheme Sanctioned Agreement


Financial
Sl. Length % Financial % Physical
Progress Name of Contractor Sched-uled Date
No. Name (KM) Amount Date/ Ref. No. Amount Date/ Ref. No. Achievement Achiev-ement
Grand Total

1 2 3 4 5 6 7 8 9 10 11 12
Special Repair Work in Link Road of
EIC, RCD, Ranchi letter
Butberia to Kulkulidangal (Bengal Sima) 13.03.2023 M/s Rakesh Kumar Singh,
7 125.00 no. 3457(S) Date 91.87 91.65 99.76 100% 12.07.2023
Road and Haripur Asanbani Road under 65F2/2022-23 Shikaripara, Dumka
22.09.2022
Non Plan for the year 2022-23.

Special Repair in Approach Road of Dumka EIC, RCD, Ranchi letter M/s Gupta Construction,
31.03.2023
8 Police Line and Pariad Ground Road under 150.00 no. 3457(S) Date 115.08 115.08 100.00 At-Rakhabani, Po+Dist- 100% 30.07.2023
ŀ

75F2/2022-23
Non Plan for the year 2022-23. 22.09.2022 Dumka, Jharkhand

Construction of Men and Women Bathroom


and approach road, establishment of water
EIC, RCD, Ranchi letter Lakhi Chand Mandal,
resources and outer electrification work in 13.02.2023
9 30.00 no. 3457(S) Date 29.96 29.94 99.94 Taijor, PO-Daldali, PS- 100% 12.06.2023
office cum Rest House of Junior Engineer of 48F2/2022-23
22.09.2022 Gopikandar, Dist-Dumka
Road Section, Gopikandar under Non Plan
for the year 2022-23.
Construction Men and Women Bathroom,
Md. Jawed Ali,
Approach Road, Boundary Wall in the office EIC, RCD, Ranchi letter
14.02.2023 Indra Nagar, Purana
10 of advance planning building field survey 30.00 no. 3457(S) Date 22.80 22.79 99.96 100% 13.06.2023
49F2/2022-23 Dumka, PO+PS-Dumka,
Division, Dumka under Non Plan for the year 22.09.2022
Dist-Dumka, Jharkhand
2022-23.
Repair and Rehabilitation of fourth grade
EIC, RCD, Ranchi letter
quarter, approach road and establishment of 13.03.2023 Uma Shankar Singh,
11 30.00 no. 3457(S) Date 22.36 22.26 99.55 100% 12.07.2023
water resource under Non Plan for the year 64F2/2022-23 Naya Para, Dumka
22.09.2022
2022-23.
Construction of Boundary Wall, Deep boring Ravindra Chandra Singh
EIC, RCD, Ranchi letter
and other miscellaneous work in office cum 03.01.2023 Vill-Khurdbelauma, PO-
12 20.00 no. 3457(S) Date 15.22 14.56 95.66 100% 02.05.2023
campus of Assistant Engineer under Non 32F2/2022-23 Basukinath, PS-Jarmundi,
22.09.2022
Plan for the year 2022-23. Dist-Dumka
Akshay Kumar Mandal
Special Repair of Boundary Wall and EIC, RCD, Ranchi letter
16.01.2023 Gram-Mathakesho,
13 approach road of IB Hansdiha under Non 30.00 no. 3457(S) Date 29.92 29.88 99.87 100% 15.05.2023
39F2/2022-23 Bhurkuriya, Saraiyahat,
Plan for the year 2022-23. 22.09.2022
Dumka

Construction of RCC Culvert (3mx3m) in Kalan Das,


EIC, RCD, Ranchi letter
Bagnal to Maheshkhala via Jeevanpur, 23.02.2023 Bazar Rahmatganj, PO-
14 30.00 no. 3457(S) Date 23.69 23.48 99.10 100% 22.06.2023
Kalakata Road under Non Plan for the year 61F2/2022-23 Kumrabad, PS+Dist-
22.09.2022
2022-23. Dumka

EIC, RCD, Ranchi letter 07.01.2023 Pooja Kumari


Repair Bridge/Culvert in Nawadih to Haripur
15 30.00 no. 3457(S) Date 29.98 29.96 99.94 Basukinath, Jarmundi, 100% 06.04.2023
Road under Non Plan for the year 2022-23.
22.09.2022 34F2/22-23 Dumka, Jharkhand

Shakti Enterprises,
Ordinary Repair of Jama Jamtara Road SH- EIC, RCD, Ranchi letter
31.03.2023 Laxmi Nagar, Near Anand
16 17 (Length-18.690km) under Nonplan for 36.00 no. 3457(S) Date 26.60 26.25 98.71 100% 30.06.2023
76F2/2022-23 Bhawan, Hehal, Ranchi,
the year 2022-23. 22.09.2022
Jharkhand
Month : November, 2023 Amount in Rs. Lakh

Sanctioned Scheme Sanctioned Agreement


Financial
Sl. Length % Financial % Physical
Progress Name of Contractor Sched-uled Date
No. Name (KM) Amount Date/ Ref. No. Amount Date/ Ref. No. Achievement Achiev-ement
Grand Total

1 2 3 4 5 6 7 8 9 10 11 12
M/s Bhabya Construction
Ordinary Repair Bagnal to Maheshkhala Via
EIC, RCD, Ranchi letter Shiv Pahar, Sri Ram
Jivanpur, Kalakata Road from 0.00 Km to 23.02.2023
17 30.00 no. 3457(S) Date 22.63 22.49 99.37 Keshri Path, 100% 22.06.2023
30.80 Km under Non Plan for the year 2022- 73F2/2022-23
22.09.2022 PO+PS+Dist-Dumka,
23.
Jharkhand
Construction of Drain, Paver Block and
EIC, RCD, Ranchi letter Jaykant Prasad Mandal,
Footpath in 13th, 14th and 15th (Masanjore 13.02.2023
ŀ

18 50.00 no. 3457(S) Date 37.00 37.00 100.00 Vill-Thari, PS-Jarmundi, 100% 12.05.2023
Dam) in Pattabari-Masanjore Road under 47f2/2022-23
22.09.2022 Chamra Bahiar, Dumka
Non Plan for the year 2022-23.
Approach Road of Bridge in 7.3 km and
Construction of Drain & Paver Block in Kalan Das,
EIC, RCD, Ranchi letter
Raghunathpur-Barmasia Road of 1st (Part), 06.03.2023 Bazar Rahmatganj, PO-
19 50.00 no. 3457(S) Date 37.33 36.15 96.83 100% 05.06.2023
11th & 12th (Part) (Asanbani Gramin 63F2/2022-23 Kumrabad, PS+Dist-
22.09.2022
Market) under Non Plan for the year 2022- Dumka
23.
Fllowing Roads Rajkiya Hizla Mela in Year
2023
(i) Dumka Hawai Adda to Gandhi Maidan
Vaya Baghmara Indira Nagar (L-7.115 Km)
(ii) Dangalpara Shiv Mandir to Hizla Circular
EIC, RCD, Ranchi letter
Road (L-2.50 Km)
20 13.64 no. 1248(S) Date 0.00
(iii) Nagapalika Chowk to Dangalpara Shiv
16-03-2023
Mandir (L-0.75 Km)
(iv) Mahudangal to Hizla Approch Road (L-
3.277 Km) (Total Length - 13.642 Km) of
Maintenance & Painting with exra safety
work.
Manish Kumar Yadav,
Paver Block Work at Bogli Chowk to Nonihat
EIC, RCD, Ranchi letter Behind National High
in Nonihat-Basukinath-Kairabani Shrawani 04.08.2023
21 100.00 no. 2831(S) Date 64.43 58.14 90.23 School, Dudhani, 100% 03.10.2023
Mela 2023 under Non Plan for the year 2023- 24F2/2023-24
06-06-2023 Dumka, Jharkhand
24.

Annpurna Civil Tech Pvt


Paver Block Work, Construction of Drain &
EIC, RCD, Ranchi letter Ltd,
Tiels Work in Different Road of Basukinath 01.08.2023
22 190.00 no. 2831(S) Date 129.56 99.31 76.65 Annpurna Kunj, 100% 30.09.2023
Religious Area Shrawani Mela 2023 under 23F2/2023-24
06-06-2023 Shivsundari Road, Dumka
Non Plan for the year 2023-24.

PQC Work in Part of Approach Road Tara Manish Kumar Yadav,


Mandir, Retaining Wall Work of Bridge & EIC, RCD, Ranchi letter Behind National High
30.08.2023
23 Paver Block Work in Basukinath Shrawani 125.00 no. 2831(S) Date 81.85 15.46 18.89 School, Dudhani, 100% 29.10.2023
29F2/2023-24
Mela 2023 under Non Plan for the year 2023- 06-06-2023 Dumka, Jharkhand
24.
Construction of One Yatri Shade & Paver Annpurna Civil Tech Pvt
EIC, RCD, Ranchi letter Ltd,
Block Work, Special Repair of Culvert of 24.07.2023
24 110.00 no. 2831(S) Date 75.01 52.53 70.03 Annpurna Kunj, 100% 23.09.2023
Nunbil Shrawani Mela 2023 under Non Plan 19F2/2022-23
06-06-2023 Shivsundari Road, Dumka
for the year 2023-24.
Month : November, 2023 Amount in Rs. Lakh

Sanctioned Scheme Sanctioned Agreement


Financial
Sl. Length % Financial % Physical
Progress Name of Contractor Sched-uled Date
No. Name (KM) Amount Date/ Ref. No. Amount Date/ Ref. No. Achievement Achiev-ement
Grand Total

1 2 3 4 5 6 7 8 9 10 11 12

Repair work of Yatri Shade and Flank Sharma Construction,


Repair and maintenance of Electric Works, Vill-Porejor, Dighi,
EIC, RCD, Ranchi letter 10.07.2023
Jhari Katai, Colour in Dumka Hansdiha 41.76 21.00 50.29 Saraiyahat, Dumka, 100% 09.09.2023
25 44.00 75.00 no. 2831(S) Date 14F2/2023-24
Road (L-44.00 Km) Shrawani Mela 2023 Jharkhand
06-06-2023
under Non Plan for the year 2023-24.
Maintenance of Electric Works ŀ
33.24
Construction of Yatri Shade with Toilet &
Water 1 Nos ADB Road and Karudih-
Pakuria Road of Junction at, 1 Nos in
Krisna Nand Jha,
Banskuli-Diguli Road of Diguli (Bengal EIC, RCD, Ranchi letter
10.08.2023 At+Po-Shivpahar, PS-
26 Border), 1 Nos of Ranibhal-Maheshkhalla 80.00 no. 2831(S) Date 63.92 63.53 99.39 100% 09.10.2023
25F2/2023-24 Dumka, Dist-Dumka
Road of Mahesh Khalla Bengal Border 06-06-2023
(Tarpith Road) 1 Nos of Masanjore (Total-
4Nos) Shrawani Mela 2023 under Non Plan
for the year 2023-24.
Nischitpur-Amrapara(ADBroad,SH-18) N R INFRA,
(Length-65.00 KM) Trees, Poles, Gantry EIC, RCD, Ranchi letter Vill-Aamgachi, Post-Bara
01.07.2023
27 Poles dyeing painting, Shrub cutting and old 25.00 no. 2831(S) Date 13.73 13.73 100.00 Narganj, Ps-Kathikund, 100% 15.07.2023
9F2/2023-24
yatri shed repairing, for Shrawani Mela 2023 06-06-2023 Dumka
under Non-Plan for the year 2023-24.

Pattabari-Masanjore-Ranibahal-Maheskhala Amrendra Kumar Dubey,


EIC, RCD, Ranchi letter
Road (Bengal Border) Tree and Poles 01.07.2023 Grant Estate, Lalpokhra,
28 6.00 no. 2831(S) Date 3.24 3.24 100.00 100% 15.07.2023
Painting (Length-35 Km) for Shrawani Mela 7F2/2023-24 Dumka, Jharkhand
06-06-2023
2023 under Non-Plan for the year 2023-24.
Painting & Bush Cutting Work in Nonihat- Amrendra Kumar Dubey,
EIC, RCD, Ranchi letter
Basukinath–Kairabani (L-30.00 Km) Road 01.07.2023 Grant Estate, Lalpokhra,
29 5.00 no. 2831(S) Date 2.70 2.69 99.75 100% 15.07.2023
under Shrawani Mela 2023 under Non-Plan 6F2/2023-24 Dumka, Jharkhand
06-06-2023
for the year 2023-24.
Ashish Kumar Bhandari,
Painting & Bush Cutting Work in Godda -
EIC, RCD, Ranchi letter Vill-Sanpdahar, Post-
Ramgarh - Guhiyajori Road (L-30.676 Km) 01.07.2023
30 5.00 no. 2831(S) Date 3.40 2.80 82.42 Satpahari, PS-Talmati, Dist- 100% 15.07.2023
Shrawani Mela 2023 under Non-Plan for the 8F2/2023-24
06-06-2023 Dumka
year 2023-24.
Painting & Bush Cutting Work in Jama- AB Enterprises,
EIC, RCD, Ranchi letter
Jamtara Road (19.00 Km) for Shrawani 03.07.2023 Professor Colony, Aam
31 6.00 no. 2831(S) Date 3.43 3.43 100.00 100% 17.07.2023
Mela 2023 under Non-Plan for the year 10F2/2023-24 Bagan,
06-06-2023
2023-24. Rasikpur, Dumka,
Painting & Bush Cutting Work in Vijaypur - AB Enterprises,
EIC, RCD, Ranchi letter
Lakarjoriya Road (L-10.00 Km) Shrawani 03.07.2023 Professor Colony, Aam
32 4.00 no. 2831(S) Date 2.27 2.27 99.87 100% 17.07.2023
Mela 2023 under Non-Plan for the year 11F2/2023-24 Bagan,
06-06-2023
2023-24. Rasikpur, Dumka,
Meera Traders,
EIC, RCD, Ranchi letter
foÙkh; o"kZ 2023&24 ds xSj ;kstuk en varxZr fujh{k.k Hkou] 17.07.2023 Bhagalpur Road, Dudhani,
33 50.00 no. 2831(S) Date 48.72 48.72 100.00 100% 16.09.2023
nqedk ds uofufeZr Hkouksa esa miLdj] tsujsVj] tsujsVj 'ksM 16F2/2023-24 Dumka
06-06-2023
bR;kfn dk;ZA
Month : November, 2023 Amount in Rs. Lakh

Sanctioned Scheme Sanctioned Agreement


Financial
Sl. Length % Financial % Physical
Progress Name of Contractor Sched-uled Date
No. Name (KM) Amount Date/ Ref. No. Amount Date/ Ref. No. Achievement Achiev-ement
Grand Total

1 2 3 4 5 6 7 8 9 10 11 12
Geeta Devi
Construction of Hansdiha Shivir Campus in EIC, RCD, Ranchi letter
05.07.2023 At-Noniya, Po-Harokha,
34 Dumka-Hansdiha Road Under Non Plan 2.50 no. 2831(S) Date 2.49 2.49 99.85 100% 11.07.2023
12F2/2023-24 PS-Saraiyahat, Dist-
Head for the Year 2023-24. 06-06-2023
Dumka, Jharkhand

foÙkh; o"kZ 2023&24 ds xSj ;kstuk en varxZr iFk ize.My] EIC, RCD, Ranchi letter
35 nqedk varxZr Black Spot Removal & lM+d lqj{kk ŀ
30.00 no. 4009(S) Date
dk;Z] 'kq: ,oa vafre pSust esa Yellow Blinker with 18.08.2023
Voice dk dqy 100 vnn vf/k"Bkiu dk;Z
H N Construction Private
Special Repair of Internal Roads of Circuit EIC, RCD, Ranchi letter Limited
29.09.2023
36 House and Paver Block Work under Non- 50.00 no. 4009(S) Date 49.82 25.00 50.18 Opposite of Hero Honda 100% 28.01.2024
34F2/2023-24
Plan for the year 2023-24. 18.08.2023 Showroom, Bhagalpur
Road, Dudhani, Dumka
foÙkh; o"kZ 2023&24 ds xSj ;kstuk en varxZr dk;Zikyd EIC, RCD, Ranchi letter
37 vfHk;ar ds vkoklh; ifjlj esa pkgj fnokjh dk jax jksxu 30.00 no. 4009(S) Date
rFkk ifjlj fodkl dk;Z ,oa uofufeZr fujh{k.k Hkou ds 18.08.2023
ifjlj esa isHkj dk;ZA
foÙkh; o"kZ 2023&24 ds xSj ;kstuk en varxZr lgk;d EIC, RCD, Ranchi letter
38 vfHk;ark] iFk voj ize.My la[;k&1 ,oa 2 ds dk;kZy; ,oa 30.00 no. 4009(S) Date
vkoklh; ifjlj esa xSjst dh O;oLFkk ,oa pkgjfnokjh dk 18.08.2023
ejEefr ,oa jax jksxu rFkk fodkl dk;ZA
Painting of Boundary Wall and Arrangement
of Water in the Residential Campus of EIC, RCD, Ranchi letter Aashish Kumar Bhandari
31.10.2023
39 Superintending Engineer Road Circle 10.00 no. 4009(S) Date 6.91 0.00 0.00 Sanpadhar, Satpahari, 20% 30.01.2024
44F2/2023-24
Dumka under Non-Plan for the year 2023- 18.08.2023 Dumka
24.
Painting of Boundary Wall and Campus
Vikash Kumar,
Development Work in Road Section, EIC, RCD, Ranchi letter
28.10.2023 Birajpur, Jarmundi,
40 Ranieshwar with Inspection Benglow, 10.00 no. 4009(S) Date 6.78 0.00 0.00 30% 27.01.2024
43F2/2023-24 Dumka
Ranieshwar under Non-Plan for the year 18.08.2023
2023-24.
EIC, RCD, Ranchi letter
foÙkh; o"kZ 2023&24 ds xSj ;kstuk en varxZr iFk iz'kk[kk]
41 10.00 no. 4009(S) Date
g¡lMhgk lg fujh{k.k Hkou dk pkgjfnokjh ,oa jax jksxu
18.08.2023
ifjlj fodkl dk;ZA
EIC, RCD, Ranchi letter
foÙkh; o"kZ 2023&24 ds xSj ;kstuk en varxZr iFk iz'kk[kk]
42 5.00 no. 4009(S) Date
xksihdkanj dk;kZy; ,oa fujh{k.k Hkou dk pkgjfnokjh ,oa jax
18.08.2023
jksxu ifjlj fodkl dk;ZA
Jitendra Kumar Dutta
Link Road of Dumka Block Office form EIC, RCD, Ranchi letter
29.09.2023 S/o Dwijendra Kumar
43 Dumka Sahebganj Road for the year of 30.00 no. 4009(S) Date 29.89 15.00 50.18 100% 28.01.2024
33F2/2023-24 Dutta, Baghnocha
2023-24. 18.08.2023
Rakhabani, Dumka
EIC, RCD, Ranchi letter
44 foÙkh; o"kZ 2023&24 ds xSj ;kstuk en varxZr vfxze ;kstuk 15.00 no. 4009(S) Date
{ks= losZ{k.k ize.My] nqedk ds dk;kZy; ,oa prqFkZoxhZ; 18.08.2023
deZpkjh ds vkoklh; ifjlj th.kksZ}kj ,oa fodkl dk;ZA
Month : November, 2023 Amount in Rs. Lakh

Sanctioned Scheme Sanctioned Agreement


Financial
Sl. Length % Financial % Physical
Progress Name of Contractor Sched-uled Date
No. Name (KM) Amount Date/ Ref. No. Amount Date/ Ref. No. Achievement Achiev-ement
Grand Total

1 2 3 4 5 6 7 8 9 10 11 12

Pot Patch Repair of Dumka Masaliya EIC, RCD, Ranchi letter Devnandan Prasad Sah
29.09.2023
45 Kundhait Nala Road Under Non Plan Head 40.00 no. 4009(S) Date 39.55 20.00 50.57 Bhagalpur Road, Tower 100% 28.01.2024
35F2/2023-24
for the year 2023-24. 18.08.2023 Chowk, Dudhani, Dumka

EIC, RCD, Ranchi letter


foÙkh; o"kZ 2023&24 ds xSj ;kstuk en varxZr ,0Mh0ch0 iFk
46 30.00 no. 4009(S) Date
esa fot;iqj [ksy ifjlj ds lkeus vo'ks"k yEckbZ esa isHkj ŀ

18.08.2023
CykWd dk;ZA
EIC, RCD, Ranchi letter
47 25.00 no. 4009(S) Date
foÙkh; o"kZ 2023&24 ds xSj ;kstuk en varxZr j?kqukFkiqj
18.08.2023
cjefl;k iFk esa fo'ks"k ejEefr dk;ZA
Paver Block and Repair Drain in Dumka EIC, RCD, Ranchi letter Deepak Kumar Kewat
29.09.2023
48 Rampurhat Road to Dumka Sahebganj 25.00 no. 4009(S) Date 24.93 13.00 52.16 At-Rasikpur, Kewatpara, 100% 28.12.2023
32F2/2023-24
Road Via LIC Colony year of 2023-24. 18.08.2023 Dumka

EIC, RCD, Ranchi letter


49 20.00 no. 4009(S) Date
foÙkh; o"kZ 2023&24 ds xSj ;kstuk en varxZr [kjkSuh pkSd
18.08.2023
ls nqxkZiqj iFk dk lk/kkj.k ejEefr dk;ZA
EIC, RCD, Ranchi letter
50 15.00 no. 4009(S) Date
foÙkh; o"kZ 2023&24 ds xSj ;kstuk en varxZr eqM+kcgky ls
18.08.2023
edjeiqj iFk dk lk/kkj.k ejEefr dk;ZA
Special Repair Work of Tongra to Mahesh EIC, RCD, Ranchi letter
26.10.2023 KRISHNA NAND JHA,
51 Bathan Road under Non-Plan for the year 20.00 no. 4009(S) Date 19.79 0.00 0.00 30% 25.01.2024
42F2/2023-24 Shiv Pahar, Dumka
2023-24. 18.08.2023

EIC, RCD, Ranchi letter


Ordinary Repair of Shikaripara- Rajbhand 11.10.2023 Surendra Prasad Singh,
52 10.00 no. 4009(S) Date 9.90 0.00 0.00 10% 10.01.2024
Road under Non-Plan for the year 2023-24. 39F2/2023-24 Shikaripara, Dumka
18.08.2023

EIC, RCD, Ranchi letter


53 10.00 no. 4009(S) Date
foÙkh; o"kZ 2023&24 ds xSj ;kstuk en varxZr pdyÙkk ls
18.08.2023
HkkyigkM+h iFk dk lk/kkj.k ejEefr dk;ZA
EIC, RCD, Ranchi letter
foÙkh; o"kZ 2023&24 ds xSj ;kstuk en varxZr egqvkMaxky
54 10.00 no. 4009(S) Date
pkSd ls us'kuy Ldwy iFk Hkk;k ckmjhikM+k iFk dh fo'ks"k
18.08.2023
ejEefr ejEefr dk;ZA
Drain Repair Work & Paver Block in Indoor EIC, RCD, Ranchi letter 31.10.2023 M/s Samriddhi,
55 Stadium to SBI Main Branch under Non- 20.00 no. 4009(S) Date 12.97 0.00 0.00 Kewatpara, Mortanga 50% 30.01.2024
45F2/2023-24
Plan for the year 2023-24. 18.08.2023 Road, Dumka
Month : November, 2023 Amount in Rs. Lakh

Sanctioned Scheme Sanctioned Agreement


Financial
Sl. Length % Financial % Physical
Progress Name of Contractor Sched-uled Date
No. Name (KM) Amount Date/ Ref. No. Amount Date/ Ref. No. Achievement Achiev-ement
Grand Total

1 2 3 4 5 6 7 8 9 10 11 12

EIC, RCD, Ranchi letter


56 20.00 no. 4009(S) Date
18.08.2023
foÙkh; o"kZ 2023&24 ds xSj ;kstuk en varxZr dpgjh ls ŀ

[qkVkck¡/k Hkk;k nqedk ou ize.My dk;kZy; rd iFk dk fo'ks"k


ejEefr dk;ZA
Five Half Nos Gantry and Road Safety Work
(Hizla Mela-1Nos, Chowk of Histroical
Ganderva Village in ADB Road-Nos, Chowk
EIC, RCD, Ranchi letter N R Infra,
of Pandeshwarnath of Sahara-Kothiya Road- 11.10.2023
57 30.00 no. 4009(S) Date 17.37 0.00 0.00 Aamgachi, Kathikund, 30% 10.02.2024
1Nos, Chowk of Nimanath in the same road - 38F2/2023-24
18.08.2023 Dumka
1Nos, Chowk of Sumbheshwarnath of in the
same road-1Nos) under Non-Plan for the
year 2023-24.

Four Nos Full Gantry and Road Safety Work


(1 Nos on Border Jamtara-Dumka in ADB
Koushal Kumar Bhagat,
Road, 1 Nos Dumka-Masalia-Kundhit-Nala- EIC, RCD, Ranchi letter
11.10.2023 Gilan Para, Dumka,
58 Dumka-Jamatara Road, 1 Nos Santhal Kata 80.00 no. 4009(S) Date 43.80 0.00 0.00 20% 10.02.2024
37F2/2023-24 814101
Pond of Banskuli-Diguli Road, 1 Nos 18.08.2023
between Bedia-Nonihathwari Road) under
Non Plan for the year 2023-24.

EIC, RCD, Ranchi letter


foÙkh; o"kZ 2023&24 ds xSj ;kstuk en varxZr mik;qDr ,oa
59 40.00 no. 4009(S) Date
iqyhl v/kh{kd] nqedk ds vkoklh; ifjljksa esa fyad iFkksa dk
18.08.2023
dk;ZA
60 foosdk/khu 17.74
60 Dumka 2569.14 1679.49 1384.64

Circle : Dumka
Div : Deoghar
Name of EE-Sri Manoj Kumar Mahto
Non-Plan (Shrawani Mela)
1 Surface Renewal & Other work in Link Road 30.00 EIC, Ranchi Lt. no.- 29.96 15F2/23-24 29.96 100% M/s Giriraj Construction, 100% 25.06.23
from Jasidih – Deopura Road to Sports Complex 2831(S)/ 16.06.23 Srikant Road, Ward No.-3,
(Kumaitha) under Shrawani Mela for the year 06.06.23 Kalibari, Bela Bagan, Dist.-
2023-24 (Total Length 0.700 KM) Deoghar

2 Surface Renewal work in Ambedkar Chowk to 30.00 EIC, Ranchi Lt. no.- 29.98 14F2/23-24 29.91 100% Suman Kumar Deo, Vill.- 100% 28.06.23
VIP Chowk under Shrawani Mela for the year 2831(S)/ 19.06.23 Kushmaha, Sarsa, PO-
2023-24 (Total Length-0.650 KM) 06.06.23 Deopur, Amarpur, Deoghar
Month : November, 2023 Amount in Rs. Lakh

Sanctioned Scheme Sanctioned Agreement


Financial
Sl. Length % Financial % Physical
Progress Name of Contractor Sched-uled Date
No. Name (KM) Amount Date/ Ref. No. Amount Date/ Ref. No. Achievement Achiev-ement
Grand Total

1 2 3 4 5 6 7 8 9 10 11 12
3 Painting and other work in Deoghar - Dardamara 5.00 EIC, Ranchi Lt. no.- 3.43 11F2/23-24 3.43 100% M/s Sandeep Enterprises, 100% 23.06.23
Road under Shrawani Mela for the year 2023-24. 2831(S)/ 17.06.23 Vill.- Singhjori, PO- Punasi, PS-
06.06.23 Jasidih, Deoghar
4 Painting and Crash Barrier work in Satsang 25.00 EIC, Ranchi Lt. no.- 25.00 12F2/23-24 24.95 100% Niraj Kumar Modi, SR Dalmia 100% 23.06.23
Nagar- Bhirkhibad Road in KM 0.00 to 31.75 2831(S)/ 17.06.23 Road, Near HanumanMandir,
under Shrawani Mela for the year 2023-24. 06.06.23 PO- Madhupur, PS-
ŀ

Madhupur, Dist.- Deoghar

5 Ordinary Repair, Painting & Other Works in 10.00 EIC, Ranchi Lt. no.- 10.00 06F2/23-24 10.00 100% Sourav Suman, 100% 26.06.23
Hindolavaran to Kunda via Tapovan Road under 2831(S)/ 17.06.23 23 Gram-Bara Nokhil, Punasi,
Shrawani Mela for the year 2023-24 06.06.23 eoghar
6 Painting & Other Works in Baijnathpur-Koriyasa 5.00 EIC, Ranchi Lt. no.- 4.88 08F2/23-24 4.49 92% Dilkhush Kumar, 100% 23.06.23
Road under Shrawani Mela for the year 2023-24 2831(S)/ 17.06.23 Williams Town, Krishnapuri,
06.06.23 Deoghar
7 Road Marking & Others work in different roads 15.00 EIC, Ranchi Lt. no.- 14.54 05F2/23-24 14.54 100% Laxmi Kant Jha, 100% 26.06.23
under Shrawani Mela for the year 2023-24 2831(S)/ 17.06.23 Beside Saraswati Kunj
06.06.23 Apartment, Deputy Para,
Near Katchery Chowk, Ranchi

8 Ordinary Repair and Other Work in 1st Km of 25.00 EIC, Ranchi Lt. no.- 24.88 07F2/23-24 24.87 100% Sanjay Kumar Rai, 100% 01.07.23
Satsangh Chowk Baijnathpur More via Rikhiya 2831(S)/ 17.06.23 Ward No.-04, Behind B. ED.
(Circular Path) under Shrawani Mela for the year 06.06.23 College, Williams Town,
2023-24 Deoghar
9 Repairing of Sign boards and other Works in 50.00 EIC, Ranchi Lt. no.- 48.98 13F2/23-24 48.98 100% Laxmi Kant Jha, 100% 28.06.23
different roads under Road Division Deoghar for 2831(S)/ 19.06.23 Beside Saraswati Kunj
the year 2023-24 06.06.23 Apartment, Deputy Para,
Near Katchery Chowk, Ranchi

10 Ordinary Repair and Construction of Drain in 25.00 EIC, Ranchi Lt. no.- 24.92 10F2/23-24 22.97 92% Nandkishor Singh, 100% 01.07.23
Jatahi More to Gidhni Road under Shrawani 2831(S)/ 17.06.23 H. No.-33, Near SBI Training
Mela for the year 2023-24 06.06.23 Centre,
Salonatand, Deoghar
11 Crash barrier work in Rikhia Asharam to Bihar 5.00 EIC, Ranchi Lt. no.- 4.97 09F2/23-24 4.97 100% Mountain Mercantile, 100% 23.06.23
Border Road under Shrawani Mela for the 2831(S)/ 17.06.23 (Dinesh Kumar Barnawal) A-
year 2023-24. 06.06.23 11, Saket Vihar, Opp-Sankat
Mochan Mandir, Harmu, PS-
12 Surface Renewal and other work in 170.00 EIC, Ranchi Lt. no.- 168.96 33F2/23-24 0.00 0% Rinki Devi, 100% 09.11.2023
Samharanalya (Deoghar) to Kumaitha via 2831(S)/ 31.10.2023 Vill.-Kushmaha, Deopur,
Singhwa Road under Shrawani Mela for the year 06.06.23 Jasidih, Deoghar
2023-24 (Total Length – 5.065 KM)
13 Surface Renewal & Other work in Kothia More 65.00 EIC, Ranchi Lt. no.- 58.42 21F2/23-24 58.37 100% M/s Manisha Construction, 100% 05.07.23
to Dumma Border Link Road under Shrawani 2831(S)/ 26.06.23 PO+PS- Dobhi, Gaya, Bihar
Mela for the year 2023-24. (Total Length -2.10 06.06.23
KM)
14 Surface Renewal & Other work in Kunda More 150.00 EIC, Ranchi Lt. no.- 142.31 22F2/23-24 142.17 100% Rinki Devi, 100% 05.07.23
to New Samaharnalay under Shrawani Mela for 2831(S)/ 26.06.23 Vill.-Kushmaha, Deopur,
the year 2023-24 (Total Length 2.50 KM) 06.06.23 Jasidih, Deoghar
Month : November, 2023 Amount in Rs. Lakh

Sanctioned Scheme Sanctioned Agreement


Financial
Sl. Length % Financial % Physical
Progress Name of Contractor Sched-uled Date
No. Name (KM) Amount Date/ Ref. No. Amount Date/ Ref. No. Achievement Achiev-ement
Grand Total

1 2 3 4 5 6 7 8 9 10 11 12
15 Temporary work of Sand Laying, Kaccha drain, 99.79 EIC, Ranchi Lt. no.- 99.42 18F2/23-24 89.96 90% Satish Kumar, 100% Complete upto
Hume Pipe and other miscellaneous Work for 2831(S)/ 24.06.23 Krishnapuri, Williams Town, 01.07.23
Kawariya Road under Shrawani Mela (Ch. 0.00 06.06.23 Deoghar Maintenance upto
to 2.30 KM) for the Year 2023-24 31.08.23

16 Temporary work of Sand Laying, Kaccha drain, 99.59 EIC, Ranchi Lt. no.- 99.43 17F2/23-24 81.96 82% Vishwanath Associate, 100% Complete upto
Hume Pipe and other miscellaneous Work for ŀ

2831(S)/ 24.06.23 Sarbmangla Tower 201, Near 01.07.23


Kawariya Road under Shrawani Mela (Ch. 2.30 06.06.23 VIP Chowk, Sahebpokhar, Maintenance upto
to 4.60 KM) for the Year 2023-24 Deoghar 31.08.23

17 Temporary work of Sand Laying, Kaccha drain, 96.81 EIC, Ranchi Lt. no.- 96.66 16F2/23-24 80.14 83% Vishwanath Associate, 100% Complete upto
Hume Pipe and other miscellaneous Work for 2831(S)/ 24.06.23 Sarbmangla Tower 201, Near 01.07.23
Kawariya Road under Shrawani Mela (Ch. 4.60 06.06.23 VIP Chowk, Sahebpokhar, Maintenance upto
to 6.90 KM) for the Year 2023-24 Deoghar 31.08.23

18 Surface Renewal and other work in Jasidih 190.00 EIC, Ranchi Lt. no.- 167.17 29F2/23-24 167.11 100% Kamal Kishor Singh, At- 100% 15.10.2023
(Kalipur) – Deopura Road under Shrawani Mela 2831(S)/ 06.10.23 Manju Niwas, Near D.C.
for the year 2023-24 (Total Length 4.68 KM) 06.06.23 Residence, Indira Nagar,
Deoghar
19 Paver Blok work in Deoghar-Dardmara Road 200.00 EIC, Ranchi Lt. no.- 0.00 #DIV/0!
from Km 0.00 to 2.00 under Road Division, 2831(S)/
Deoghar 06.06.23
NON-PLAN ( Other)
20 Painting, Road Marking, Sign Board, Tree 11.00 EIC, Ranchi Lt. no.- 11.00 28F2/23-24, dt- 11.00 100% M/s Sharma Construction, 100% 23.05.2023
Painting & Removal of excess soil from roads & 4009(S)/ 21.09.23 (Rahul Kumar Sharma) Latma
shoulder of Different Road under Non-Plan for 18.08.23 (Work Start dt- Bazar, Oberiya Road,
the year 2023-24 20.05.23) Mahima Nagar, Hatia, Ranchi.

21 Painting & Other Work Of Road Sub-Division 5.00 EIC, Ranchi Lt. no.- 3.14 31F2/23-24 0.00 0% Rameshwar Singh, AT- 30.11.2023
Office Deoghar -1 Under Non- Plan for the Year 4009(S)/ 31.10.23 Nandan Pahar, Near Devan
2023-24 18.08.23 Baba, Civil Line, Deoghar
22 Repairing of Cross Drain of Pandania-Jagdishpur 3.00 EIC, Ranchi Lt. no.- 1.88 32F2/23-24 0.00 0% Sanjay Kumar Yadav, 30.11.2023
Road in 1st, 7th & 12th km under Non Plan for 4009(S)/ 31.10.23 Vill.+Panchayat- Banka, PO-
the Year 2023-24 18.08.23 Mohanpur, PS- Mohanpur,
Dist.-Deoghar
23 Ordinary Repair & Other Work in Rousan more 10.00 EIC, Ranchi Lt. no.- 8.61 34F2/23-24 0.00 0% Sourav Suman, 10% 14.12.2023
to Madhupur bypass Road under Non-Plan for 4009(S)/ 31.10.23 23 Gram-Bara Nokhil, Punasi,
the year 2023-24 (Total Length - 3.025 KM) 18.08.23 Deoghar

24 Construction of RCC drain in km 53 & 54 in Jama- 26.00 EIC, Ranchi Lt. no.- 18.19 35F2/23-24 0.00 0% Vishwanath Associate, 06.02.2024
Jamtara Road (SH-15) under Non-Plan for the 4009(S)/ 07.11.23 Sarbmangla Tower 201, Near
year 2023-24. 18.08.23 VIP Chowk,
Sahebpokhar Road, Deoghar
Month : November, 2023 Amount in Rs. Lakh

Sanctioned Scheme Sanctioned Agreement


Financial
Sl. Length % Financial % Physical
Progress Name of Contractor Sched-uled Date
No. Name (KM) Amount Date/ Ref. No. Amount Date/ Ref. No. Achievement Achiev-ement
Grand Total

1 2 3 4 5 6 7 8 9 10 11 12
25 Ordinay repair work in KM 0.00 to 6.00 of 40.00 EIC, Ranchi Lt. no.- 29.98 36F2/23-24 0.00 0% Vishwanath Associate, 10.02.2024
Roshan more to Madhupur via Saptar Ghat road 4009(S)/ 11.11.23 Sarbmangla Tower 201, Near
under Non- Plan for the year 2023-24. 18.08.23 VIP Chowk,
Sahebpokhar Road, Deoghar

26 Ordinay repair work in KM 10 & 11 of Roshan 25.00 EIC, Ranchi Lt. no.- 17.50 38F2/23-24 0.00 0% Vishwanath Associate, 32% 15.01.2024
more to Madhupur via Saptar Ghat road under ŀ

4009(S)/ 16.11.23 Sarbmangla Tower 201, Near


Non- Plan for the year 2023-24 18.08.23 VIP Chowk,
Sahebpokhar Road, Deoghar

27 Ordinary Repair Work in Madhupur-Laharjori 100.00 EIC, Ranchi Lt. no.- 74.34 39F2/23-24 0.00 0% Vishwanath Associate, 5% 20.02.2024
Road for the year 2023-24 under Non Plan 4009(S)/ 21.11.23 Sarbmangla Tower 201,
Under Road division Deoghar (Total Length - 18.08.23 Near VIP Chowk,
21.643 KM)) Sahebpokhar, Deoghar
28 Construction of drain at 13th km of Ranga Sirsa 12.00 EIC, Ranchi Lt. no.- 8.55 40F2/23-24 0.00 0% Niraj Kumar Modi, S.R. 22.01.2024
Karown Karmatand Road under Non Plan for the 4009(S)/ 23.11.23 Dalmia Road, Near Hunman
Year 2023-24 18.08.23 Mandir, PO +PS- Madhupur,
Dist.-Deoghar
29 Construction of Approach road AIIMS Deoghar -- -- 26.73 41F2/23-24 0.00 0% Nandkishor Singh, H. No.-33, 22.01.2024
Gate no- 03 to Satsang nagar Bhirkhibad (MDR 23.11.23 Near SBI Training Centre,
235) road including RCC Cross drain work. Salonatand, Deoghar

30 Ordinary Repair work in Budhai to Bihar Border 90.00 EIC, Ranchi Lt. no.- 69.60 42F2/23-24 0.00 0% Vishwanath Associate, 22.02.2024
via Jamua road under Non- Plan for the year 4009(S)/ 23.11.23 Sarbmangla Tower 201,
2023-24 18.08.23 Near VIP Chowk,
Sahebpokhar, Deoghar
31 Ordinary Repair, Painting & Other work in 60.00 EIC, Ranchi Lt. no.- 46.17 44F2/23-24 0.00 0% Vishwanath Associate, 27.02.2024
Chanddih (PWD Road-MDR 229) to Tilona (PWD 4009(S)/ 28.11.23 Sarbmangla Tower 201,
Road - MDR 235) Total Length-21.45 KM) for the 18.08.23 Near VIP Chowk,
year 2023-24 Sahebpokhar, Deoghar
32 Repairing of Expansion Joint of Bridges and 50.00 EIC, Ranchi Lt. no.-
Wearing Course work situated in Deoghar 4009(S)/
Madhupur road under Non plan for the year 18.08.23
2023-24
32 Deoghar Non Plan 0.00 1728.18 1369.61 0.00 849.77

SPILL OVER
1 Repairing & Reconstruction of Boundry wall of 20.00 EIC, Ranchi Lt. no.- 19.99 39F2/ 16.75 84% Niraj Kumar Modi, 84% 15.02.22
Encroached Land at Sarath under Non-Plan for 3138(S)/ 21-22 S. R. Dalmia Road, Near
year 2021-22 08.10.21 dt.-16.12.21 Hanuman Mandir, PO-
Madhupur, PS- Madhupur,
Dist.-Deoghar
Month : November, 2023 Amount in Rs. Lakh

Sanctioned Scheme Sanctioned Agreement


Financial
Sl. Length % Financial % Physical
Progress Name of Contractor Sched-uled Date
No. Name (KM) Amount Date/ Ref. No. Amount Date/ Ref. No. Achievement Achiev-ement
Grand Total

1 2 3 4 5 6 7 8 9 10 11 12
2 Ordinary Repair Work in Asna to Dubia Road 20.00 EIC Lt. No.- 3457(S), dt- 15.75 42F2/22-23, dt- 15.66 99% Vishwanath Associate, 100% 30.12.22
Under Non plan for the year 2022-23. 22.09.22 16.11.22 Sarbmangla Tower 201, Near
VIP Chowk, sahebpokhar
Road, Deoghar

3 Ordinary Repair and Drain Construction Work in 25.00 EIC Lt. No.- 3457(S), dt- 19.74 41F2/22-23, dt- 19.74 100% Vishwanath Associate, 100% 15.01.23
Madhupur Thana to Patwabad Road under Non- ŀ

22.09.22 16.11.22 Sarbmangla Tower 201, Near


Plan for the year 2022-23. VIP Chowk, sahebpokhar
Road, Deoghar

4 Ordinary Repair in Chitra Duldulai Road under 20.00 EIC Lt. No.- 3457(S), dt- 15.65 43F2/22-23, dt- 15.55 99% Vishwanath Associate, 100% 30.12.22
Non-Plan for the year 2022–23 22.09.22 16.11.22 Sarbmangla Tower 201, Near
VIP Chowk, sahebpokhar
Road, Deoghar

5 Ordinary Repair in Dhiba Karown Road under 25.00 EIC Lt. No.- 3457(S), dt- 19.31 44F2/22-23, dt- 18.76 97% Vishwanath Associate, 100% 21.12.22
Non-Plan for the year 2022 – 23 22.09.22 22.11.22 Sarbmangla Tower 201, Near
VIP Chowk, sahebpokhar
Road, Deoghar

6 Contruction of 1 No. Full Gantry and 1 No. Half 27.00 EIC Lt. No.- 3457(S), dt- 13.45 39F2/22-23, dt- 13.45 100% Vishwanath Associate, 100% 06.12.22
Gantry at Sarath, Narangi More, Basti Palojori of 22.09.22 07.11.22 Sarbmangla Tower 201, Near
Sarath Chitra Basti Palojori Road under Non-Plan VIP Chowk, sahebpokhar
for the year 2022 – 23 Road, Deoghar

7 Installation of Yellow Blinkers With Sound Work 3.00 EIC Lt. No.- 3457(S), dt- 2.24 38F2/22-23, dt- 2.24 100% M/s Giriraj Construction, 100% 18.11.22
of Different Road Under R.C.D Division Deoghar 22.09.22 20.10.22 Srikant Road, Ward No.-3,
under Non-Plan for the year 2022-23 Kalibari, Belabagan, Deoghar

8 Ordinary repair & Construction of Drain work in 50.00 EIC Lt. No.- 3457(S), dt- 39.64 52F2/22-23, dt- 26.76 68% Binod Kumar Singh, 68% 16.03.23
Bavangama-pathrol road for the year 2022-23 22.09.22 16.01.23 Village- Noniyatanr, PO-
under RCD Road Division Deoghar. (Total Sikatia,
Length 19.175 km) PS- Chitra, Deoghar
9 Ordinary repair & Construction of Drain work in 40.00 EIC Lt. No.- 3457(S), dt- 39.69 55F2/22-23, dt- 27.50 69% Suman Kumar Deo, 71% 16.03.23
Pipra-Sakalpur road for the year 2022-23 under 22.09.22 17.01.23 Vill.- Kushmaha, Sarsa, PO-
RCD Road Division Deoghar. (Total Length 19.20 Deopur,
km) Amarpur, Deoghar

10 Ordinary repair work in Madhupur- Laharjori 60.00 EIC Lt. No.- 3457(S), dt- 56.57 58F2/22-23, dt- 56.07 99% S.D. Enterprises, (Ashish 100% 15.03..23
road for the year 2022-23 under RCD Road 22.09.22 30.01.23 Kumar)
Division Deoghar. (Total Length 21.643 km) B2, CTI Colony, HEC
Township,
Dhurwa, Dist.-Ranchi
Month : November, 2023 Amount in Rs. Lakh

Sanctioned Scheme Sanctioned Agreement


Financial
Sl. Length % Financial % Physical
Progress Name of Contractor Sched-uled Date
No. Name (KM) Amount Date/ Ref. No. Amount Date/ Ref. No. Achievement Achiev-ement
Grand Total

1 2 3 4 5 6 7 8 9 10 11 12
11 Ordinary Repair Work & construction of RCC 90.00 EIC Lt. No.- 3457(S), dt- 66.68 56F2/22-23, dt- 66.31 99% Amar Engicon and 100% 04.03.23
drain in km 38, 58 & 59 in Jama Jamtada Road 22.09.22 19.01.23 Construction Private
(SH15) under Non-Plan for the year 2022-2023. Limited, PanchvaƟ Tower,
Barmasia Chowk,
Deoghar

12 Ordinary repair work of Roshan more to ŀ

60.00 EIC Lt. No.- 3457(S), dt- 43.35 57F2/22-23, dt- 43.09 99% Amar Engicon and 100% 04.03.23
Madhupur Via Saptar Ghat under Road Division 22.09.22 19.01.23 Construction Private
Deoghar under Non Plan for the year 2022-23 Limited, PanchvaƟ Tower,
Barmasia Chowk,
Deoghar

13 Construction of 3rd Grade Staff Quarter 30.00 EIC Lt. No.- 3457(S), dt- 19.24 62F2/22-23 5.00 26% Rakesh Kumar, 100% 22.08.23
situated on old Staff Quarter and one number 22.09.22 dt-23.02.23 Ward No.-17, Thari
boring work at Baidyanath Dham Station Road Dulampur,
Staff Quarter at Deoghar under Non-Plan for the Shastri Nagar, Deoghar
year 2022-23
14 Renovation work of office of Road Sub division 10.00 EIC Lt. No.- 3457(S), dt- 6.58 61F2/22-23 6.32 96% Shiva Construction, 100% 14.04.23
Madhupur for the year 2022-23. 22.09.22 dt-14.02.23 (Dhananjay Singh)
Vill.- Bawangama, PO-
Bawangama, PS- Sarath, Dit.-
Deoghar
15 Ordinary repair work of Satsang chowk to 80.00 EIC Lt. No.- 3457(S), dt- 79.79 64F2/22-23 79.79 100% M/s Vijay Kumar, 100% 26.04.23
Baijnathpur Road via Rikhiya more (Circular 22.09.22 dt-27.02.23 At- Srikant Road, Belabagan,
Road) under Road division Deoghar under Non Deoghar
Plan head for the year 2022-23
16 Ordinary Repair Work of Deoghar College road 25.00 EIC Lt. No.- 1248(S), dt- 25.00 02F2/23-224 24.95 100% Vishwanath Associate 100% 16.06.23
under road Division Deoghar under Non- Plan 16.03.23 dt-17.05.23 (Vishwanath Prasad),
for the year 2023-24 Sarbmangla Tower 201, Near
VIP Chowk, Sahebpokhar
Road, Deoghar

16 Deoghar Spill Over 585.00 0.00 482.68 0.00 437.93

VIVEKADHIN
1 Restoration of Paver Block and other Works 2.33 24F2/23-24 2.33 100% Pahuja Engineering 100% 25.07.23
in different roads for Shrawani mela under dt-19.07.23 Works,
Vivekadhin for the year 2023-24 H. No.-140, Castiar Town,
Deoghar
2 Emergent Repair work at Bherwa in 11th 2.20 26F2/23-24 2.20 100% Bishwajeet Kumar Singh, 100% 17.08.23
KM (P) of Roshan More to Madhupur Via dt-11.08.23 Vill.- Murgabani, Dist.-
Sapter Ghat Road under Vivekadhin Head Deoghar,
for the year 2023-24. Jharkhand
Month : November, 2023 Amount in Rs. Lakh

Sanctioned Scheme Sanctioned Agreement


Financial
Sl. Length % Financial % Physical
Progress Name of Contractor Sched-uled Date
No. Name (KM) Amount Date/ Ref. No. Amount Date/ Ref. No. Achievement Achiev-ement
Grand Total

1 2 3 4 5 6 7 8 9 10 11 12
3 Emergent repair work of Budhai to Bihar 2.46 27F2/23-24 2.46 100% Jagjit Singh Yadav, 100% 03.09.23
Border via Jamua road under Vivekadhin dt-28.08.23 Vill.- Banarnacha, PO-
head for the year 2023-24 Kairabani Mission,
PS- Fatehpur, Jamtara,
Jharkhand
4 Emergent work for cleaning Drainage 2.49 30F2/23-24 0.00 0% Dinesh Kumar Ranjan, 100% 01.11.23
Spouts & Bush Cutting in Different Road ŀ
dt-26.10.23 Vill.-Baswaria, PO-
Under Sub Division madhupur under Sabaijor, PS-Sarwan, Dist.-
vivekadhin for the year 2023-24. Deoghar
5 Flank Repair,Bush Cutting & Painting of 2.46978 37F2/23-24 0.00 0% Pahuja Engineering 100% 20.11.23
Parapet work in Maniyarpur More- dt-14.11.23 Works,
jhumarbad-devipur (on MDR-235) road H. No.-140, Castair Town,
under vivekadhin for the year 2023-24. Deoghar
5 Total 11.94 6.98

Circle : Dumka
Div : Godda
Name of EE-Sri Munna Lal
NON PLAN (SPILL OVER)
Mks;&uokMhg iFk ds fd0eh0 13-900 ls 18-350 esa fo”ks’k Sunil Kumar Tekriwal, Post
ejEefr dk;ZA Eng.in Chief Lt. no. 21F2/2022-23 Office Road, Chaprasi Tola,
1 150.00 146.38 123.91 85% 100.00% 10.03.2023
3457(S) dated 22.09.2022 Dated 11.01.2023 Godda, Jharkhand.

nqeqgh ls clarjk; Hkk;k& egs”kiqj iFk ds 15osa fd0eh0 esa 3 M/s Vijay Kumar, Srikant
Boxcell Culvert dk fuekZ.k dk;Z ¼Size 3x 3x 3½ ¼27-00 Eng.in Chief Lt. no. Road Bela Bagan Behind
2 eh0½A 65.00 64.42 Dated 15.02.2023 30.00% 30.04.2023
3457(S) dated 22.09.2022 Navjivan Hospital Kalibari,
Deoghar Jharkhand

NON PLAN (2023-24)


u;kuxj ls guokjk IkFk dh lk/kkj.k ejEefr ¼21-10 fd0eh0½ Eng.in Chief Lt. no. M/s Krishna Enterprises,
dk;ZA 12F2/2023-24
1 50.00 4009(S)WE dated 5.53 Banshipur Mohanpur, 0.00% 24.12.2023
Dated 10.11.2023
18.08.2023 Mahagama, Godda 814154.
Vs”kkscFkku ls egknsocFkku iFk ds 34osa fd0eh0 ,oa 28osa Eng.in Chief Lt. no. M/s Baba Baidyanath
fd0eh0 esa vofLFkr Irrigation Canal ds ig¡qp iFk dk 13F2/2023-24
2 7.50 4009(S)WE dated 5.53 Enterprises, Thakurgangti, 0.00% 01.01.2024
fuekZ.k dk;Z Dated 02.11.2023
18.08.2023 Godda- 813208
iFkjxkek&clarjk;&dksfj;kuk iFk esa lk/kkj.k ejEefr dk;ZA
Eng.in Chief Lt. no. M/s Prabhakar Jha,
14F2/2023-24
3 20.00 4009(S)WE dated 15.53 Dumariya, Chapri, 0.00% 01.01.2024
Dated 02.11.2023
18.08.2023 Thakurgangti, Godda 813208
Xkk¡/khxzke ls pk¡nuh pkSd iFk esa lk/kkj.k ejEefr dk;ZA Arayaraj Const. Pvt. Ltd.,
Eng.in Chief Lt. no.
7F2/2023-24 Baliya (Kurma), PO-
4 15.00 4009(S)WE dated 10.50 0.00% 01.01.2024
Dated 02.11.2023 Dubrajpur, PS- Godda, Dist.
18.08.2023
Godda, Jharkhand- 814133
Month : November, 2023 Amount in Rs. Lakh

Sanctioned Scheme Sanctioned Agreement


Financial
Sl. Length % Financial % Physical
Progress Name of Contractor Sched-uled Date
No. Name (KM) Amount Date/ Ref. No. Amount Date/ Ref. No. Achievement Achiev-ement
Grand Total

1 2 3 4 5 6 7 8 9 10 11 12
iFkjxkek ls jktkfHkëk iFk esa lk/kkj.k ejEefr dk;ZA Eng.in Chief Lt. no. MD. Akram, AT- New
11F2/2023-24
5 10.00 4009(S)WE dated 7.49 Dangal Para, Dumka, 0.00% 01.01.2024
Dated 02.11.2023
18.08.2023 Jharkhand- 814101
xksìk&jkex<+&xqfg;ktksjh iFk ¼MDR 191½ ds 16osa fd0eh0 Magil Construction, Mathura
esa vkj0lh0lh0 ukyk fuekZ.k dk;ZA Eng.in Chief Lt. no. Mahto, Panchayat- Thadhyara
8F2/2023-24
6 25.00 4009(S)WE dated 15.80 Vill- Chihutiya, Chulhiya, 0.00% 31.12.2023
Dated 01.11.2023
ŀ

18.08.2023 Mohanpur, Deoghar,


Jharkhand 814157
iFk voj izeaMy] egkxkek ds dk;kZy; ifjlj esa dejk ,oa Eng.in Chief Lt. no.
7 'kkSpky; fuekZ.k dk;ZA 10.00 4009(S)WE dated
18.08.2023
iFk voj izeaMy] egkxkek pkSd fLFkr iFk fuekZ.k foHkkx ds Eng.in Chief Lt. no.
8 LokfeRo Hkwfe ij lgk;d vfHk;ark ,oa duh; vfHk;ark ds 35.00 4009(S)WE dated
vkokl dk fuekZ.k dk;ZA 18.08.2023
iFkjxkek&clarjk;&dksfj;kuk ,oa uwuktksj &”kkgiqj&csyMhgk Magil Construction, Mathura
iFk ds 1ysa fd0eh0 esa Half Gantry Repair ,oa Road Eng.in Chief Lt. no. Mahto, Panchayat- Thadhyara
Safety dk;Z rFkk dYHkVZ ,oa fd0eh0 iksLV dks jaxjksxu 09F2/2023-24
9 22.00 4009(S)WE dated 12.97 Vill- Chihutiya, Chulhiya, 0.00% 01.01.2024
dk;ZA Dated 02.11.2023
18.08.2023 Mohanpur, Deoghar,
Jharkhand 814157
iFk iz”kk[kk] xksìk& 1] duh; vfHk;ark vkokl esa xSjst dk
fuekZ.k ,oa ikuh gsrq cksfjax dk;Z rFkk ckm.Mªh oky ejEefr Eng.in Chief Lt. no. M/s MD. Zafar Ansari, At-
03F2/2023-24
10 dk;ZA 8.00 4009(S)WE dated 5.68 Hospital Road, Asanbani, 100.00% 20.11.2023
Dated 06.10.2023
18.08.2023 PO+ PS- Godda, Jhr. 814133
iFk voj izeaMy la0& 1 xksìk varxZr pkSdhnkj vkokl esa
cksfjax] fctyh ok;fjax] ckWmMªh ejEefr dk;Z Eng.in Chief Lt. no. M/s MD. Zafar Ansari, At-
04F2/2023-24
11 10.00 4009(S)WE dated 7.11 Hospital Road, Asanbani, 100.00% 20.11.2023
Dated 06.10.2023
18.08.2023 PO+ PS- Godda, Jhr. 814133
izeaMyh; dk;kZy; varxZr ikuh vkiwfrZ gsrq cksfjax dk;ZA Eng.in Chief Lt. no.
12 5.00 4009(S)WE dated
18.08.2023
lgk;d vfHk;ark] iFk voj izeaMy] la0& 2 xksìk ds fy, Eng.in Chief Lt. no.
13 Double Storage vkokl fuekZ.k dk;ZA 80.00 4009(S)WE dated
18.08.2023
duh; vfHk;arkvksa ds fy, Double Storage vkokl fuekZ.k Eng.in Chief Lt. no.
14 dk;ZA 80.00 4009(S)WE dated
18.08.2023
r`rh; oxhZ; dehZ ds fy, nkseaftyk vkokl fuekZ.k dk;ZA Eng.in Chief Lt. no.
15 80.00 4009(S)WE dated
18.08.2023
lgk;d vfHk;ark] iFk voj izeaMy] la0& 1 xksìk ds vkokl Amitabh Bhushan,
dk lk/kkj.k ejEefr fuekZ.k dk;ZA Eng.in Chief Lt. no. S/o- Brajbhushan Dubey, H.
10F2/2023-24
16 5.00 4009(S)WE dated 4.99 No.-12, Ward No.- 11, 70.00% 16.12.2023
Dated 02.11.2023
18.08.2023 Baghmara Jasidih, Deoghar,
Jharkhand- 814142.
lqUnjigkM+h&vfx;keksM+ iFk ds iw.kZ yackbZ esa ekStwn o`{k dk Eng.in Chief Lt. no.
17 Painting dk;ZA 15.00 4009(S)WE dated
18.08.2023
Month : November, 2023 Amount in Rs. Lakh

Sanctioned Scheme Sanctioned Agreement


Financial
Sl. Length % Financial % Physical
Progress Name of Contractor Sched-uled Date
No. Name (KM) Amount Date/ Ref. No. Amount Date/ Ref. No. Achievement Achiev-ement
Grand Total

1 2 3 4 5 6 7 8 9 10 11 12

VIVEKADHIN
Emergent Construction of RCC Cross Drain in
Ch. 2.300 Km (Total Length- 10 m) Mohanpur 01F2/2023-24 Ramesh Kumar Jha, Ward
1 1.56 0.00 0% 100% 11.08.2023
Khairatikar Road for the year 2023-24 Dated 05.08.2023 No.- 13, Lohiyanagar, Godda

Traffic Restoration of Nayanagar- Hanwara Road


Manoj Kumar Singh, S/o-
ŀ

at Ch.- 15.700 to 15.915 Km under Road


02F2/2023-24 Hriday Narayan Singh, Vill.-
2 Division, Godda (Vivekadhin head) for the year 2.45 0.00 0% 100% 17.08.2023
Dated 11.08.2023 Bagh Jhakhra, PO- Dighi
2023-24.
Simanpur, Godda, Jharkhand
Eng.in Chief Lt. no.
Construction of RCC Cross Drain in 9th km 25.00
3037(S) dated 19.06.2023 Vijay Kumar Sharma, S/o-
(Total Length- 8.5 M) Mohanpur Anjana More
05F2/2023-24 Manohar Sharma, AT + PO-
3 via Bhandaridih Road for the Year 2023-24 2.30 0.00 0% 100% 23.11.2023
Dated 25.10.2023 Samri, PS- Mahagama, Dist.-
Godda, Jhrkhand 814155
Construction of RCC Cross Drain in 12th km
Vijay Kumar Sharma, S/o-
(Total Length- 8.7 M) Mohanpur Anjana More
06F2/2023-24 Manohar Sharma, AT + PO-
4 via Bhandaridih Road for the Year 2023-24 1.82 0.00 0% 100% 28.11.2023
Dated 30.10.2023 Samri, PS- Mahagama, Dist.-
Godda, Jhrkhand 814155
23 Godda 0.00 717.50 310.07 123.91

Circle : Dumka
Div : Jamtara
Name of EE-Sri Vijay Kumar Agarwal

0 Jamtara

Circle : Dumka
Div : Pakur
Name of EE-Sri Veer Raghwan
Ordinary Repair of Gopikandar-Pakuria Road
EIC, RCD LETTER No.
(from 13.125 Km to 20.195 Km) Total Km - 7- 12-F2/22-23 Dt. -
01 7.07 25.00 3457 (S) 25.00 24.98 100% Sharma Construction, Dumka 100% 08.02.2023
07 Km for the year 2022-23 Under Road 09.01.23
Dt,. 22.09.2022
Division, Pakur (Non Plan)
Pot-Patch work of Amrapara Bypass Link Road EIC, RCD LETTER No.
13-F2/22-23 Dt. -
02 (3.00 Km) for the year 2022-23 Under Road 3.00 15.00 3457 (S) 14.19 14.18 100% Jayant Kumar Mandal, Pakur 100% 08.02.2023
09.01.23
Division, Pakur (Non Plan) Dt,. 22.09.2022
Ordinary Repair of Kajladaha-Pakuria Road EIC, RCD LETTER No.
14-F2/22-23 Dt. -
03 (5.10 to 16.44 Km.) for the year 2022-23 Under 11.34 25.00 3457 (S) 24.90 24.89 100% Ehasan Ansari, Pakur 100% 08.02.2023
09.01.23
Road Division, Pakur (Non Plan) Dt,. 22.09.2023
Month : November, 2023 Amount in Rs. Lakh

Sanctioned Scheme Sanctioned Agreement


Financial
Sl. Length % Financial % Physical
Progress Name of Contractor Sched-uled Date
No. Name (KM) Amount Date/ Ref. No. Amount Date/ Ref. No. Achievement Achiev-ement
Grand Total

1 2 3 4 5 6 7 8 9 10 11 12

Pot-Patch & Flank Repariing work of Fatehpur- EIC, RCD LETTER No.
28-F2/22-23 Dt. - Chauhan Constrution,
04 Singarshi-Simlong Road (36.01 Km) for the year 36.01 70.00 3457 (S) 66.35 66.35 100% 100% 08.04.2023
09.02.23 Deoghar
2022-23 Under Road Division, Pakur (Non Plan) Dt,. 22.09.2023
Ordinary Repair of PWD Pakur-Malpahari Road EIC, RCD LETTER No.
15-F2/22-23 Dt. -
05 (0.00 to 9.00 Km.) for the year 2022-23 Under 9.00 25.00 3457 (S) 25.00 24.92 100% Md. Jawed Ansari, Pakur 100% 08.02.2023
09.01.23
Road Division, Pakur (Non Plan) ŀ

Dt,. 22.09.2023
Ordinary Repair of Amrapara-Maheshpur- EIC, RCD LETTER No.
19-F2/22-23 Dt. -
06 Muraroi Road (17.00 to 30.00 Km.) for the year 13.00 30.00 3457 (S) 26.52 26.34 99% Sahid Eqbal, Pakur 100% 28.02.2023
09.01.23
2022-23 Under Road Division, Pakur (Non Plan) Dt,. 22.09.2023
a) Road Safety and Widening work in Govindpur-
Sahibganj Road (SH-18) in CH. 196.00
b) Road Safety work in Maheshpur Chowk & EIC, RCD LETTER No.
23-F2/22-23 Dt. -
07 Talwa More c) Installation in Curved Mirror & 30.00 3457 (S) 22.42 22.40 100% Ehasan Ansari, Pakur 100% 03.04.2023
06.02.23
Signage in Main Place in Pakur District. for the Dt,. 22.09.2023
year 2022-23 Under Road Division, Pakur (Non
Plan)
Construction of 140m Length Guard Wall in
EIC, RCD LETTER No.
22th KM & 36th KM Bridge in Fathepur- 18-F2/22-23 Dt.
08 36.01 45.00 3457 (S) 34.78 34.78 100% Baby Devi, Sahebganj. 100% 26.04.2023
Simlong- Singrashi Road for the year 2022-23 27.01.23
Dt,. 22.09.2023
Under Road Division, Pakur (Non Plan)
Construction of 10m Length Guard Wall in 12th EIC, RCD LETTER No.
11-F2/22-23 Dt. -
09 of Hiranpur-Kotalpokhar Road for the year 2022- 15.50 3.50 3457 (S) 3.46 3.43 99% Sanjay Saha, Rajapara, Pakur 100% 25.02.2023
26.12.22
23 Under Road Division, Pakur (Non Plan) Dt,. 22.09.2023
Construction of 120m Length Retaining Wall &
EIC, RCD LETTER No.
Metal Crash Barrier in 8th of Hiranpur- 25-F2/22-23 Dt. - India Traders, Rahaspur,
10 15.50 60.00 3457 (S) 58.56 58.18 99% 100% 05.04.2023
Kotalpokhar Road for the year 2022-23 Under 06.02.23 Pakur
Dt,. 22.09.2023
Road Division, Pakur (Non Plan)
Construction of Drain with cover of Gokulpur- EIC, RCD LETTER No.
34-F2/22-23 Dt. - Nader Khan, Manirampur,
11 Deewanpir Road for the year 2022-23 Under 30.00 3457 (S) 22.18 22.13 100% 100% 30.04.2023
31.03.23 Pakur
Road Division, Pakur (Non Plan) Dt,. 22.09.2023
Construction of 2m Height Guard Wall in Ch.
EIC, RCD LETTER No.
0+500 (100.00m), Ch. 1+600 (14.00m) 29-F2/22-23 Dt. -
12 23.00 45.00 3457 (S) 31.27 31.17 100% Sharma Construction, Dumka 100% 15.03.2023
of Maheshpur-Pakuria Road for the year 2022-23 14.02.23
Dt,. 22.09.2023
Under Road Division, Pakur (Non Plan)
Work of Metal Crash Barrier of 2nd (200 m),
EIC, RCD LETTER No.
14th (120 m), 16th (120 m) & 21st (120 m) of 16-F2/22-23 Dt. -
13 17.00 3457 (S) 16.95 16.95 100% Sharma Construction, Dumka 100% 28.01.2023
Ranipur-Puchaibera Road for the year 2022-23 09.01.23
Dt,. 22.09.2023
Under Road Division, Pakur (Non Plan)
Construction of 2 Nos. Culvert in 13th KM of
EIC, RCD LETTER No.
Ranipur-Puchaibera Road for the year 2022-23 27-F2/22-23 Dt. -
14 21.80 60.00 3457 (S) 50.32 50.10 100% Sahid Eqbal, Pakur 100% 28.02.2023
for the year 2022-23 Under Road Division, Pakur 09.02.23
Dt,. 22.09.2023
(Non Plan)
Month : November, 2023 Amount in Rs. Lakh

Sanctioned Scheme Sanctioned Agreement


Financial
Sl. Length % Financial % Physical
Progress Name of Contractor Sched-uled Date
No. Name (KM) Amount Date/ Ref. No. Amount Date/ Ref. No. Achievement Achiev-ement
Grand Total

1 2 3 4 5 6 7 8 9 10 11 12
Laying Boundary Piller in different Raods for EIC, RCD LETTER No.
26-F2/22-23 Dt. - Abhay Kumar, Hiranpur,
15 the year 2022-23 Under Road Division, Pakur 22.34 3457 (S) 22.32 22.32 100% 100% 25.02.2023
06.02.23 Pakur
(Non Plan) Dt,. 22.09.2023
Mastic Asphalt work in different bridges for the EIC, RCD LETTER No.
22-F2/22-23 Dt. - Khudi Ram Saha, Hatkati,
16 year 2022-23 Under Road Division, Pakur (Non 100.00 3457 (S) 99.95 99.47 100% 100% 03.04.23
04.02.23 Hiranpur, Pakur
Plan) Dt,. 22.09.2023
191.23ŀ

602.84 544.16 542.59

Construction of Two Full gantry and One Half


EIC, RCD LETTER No.
gantry in Ranipur- Puchaibera Road in 1st, 6th
01 40.00 4009(S)
and 22nd km under Road Division, Pakur for the
Dt,. 18.08.23
year 2023-24. (Non Plan Head)
Construction of Two Half Gantry in Fatehpur-
EIC, RCD LETTER No.
Singarasi-Simlong Road in 19th KM & 36th KM
02 20.00 4009(S)
under Road Division, Pakur for the year 2023-24.
Dt,. 18.08.23
(Non Plan Head)
Construction of Guard Wall, 40m Long (3.0 m
EIC, RCD LETTER No.
Height) at Ch. 24th Km of Amrapara-Maheshpur-
03 15.00 4009(S)
Muraroi Road under Road Division, Pakur for
Dt,. 18.08.23
the year 2023-24 (Non Plan Head)
Construction of 40m Guard Wall (1.50 m
EIC, RCD LETTER No.
Height) in 2nd Km. of Hiranpur-Kotalpokhar
04 15.00 4009(S)
Road under Road Division, Pakur for the year
Dt,. 18.08.23
2023-24 (Non Plan Head)
Construction of 100m Guard Wall (2.0 m
EIC, RCD LETTER No.
Height) in 8th Km. of Hiranpur-Kotalpokhar
05 40.00 4009(S)
Road under Road Division, Pakur for the year
Dt,. 18.08.23
2023-24 (Non Plan Head)
Construction of 100m Guard Wall (1.5m Height)
EIC, RCD LETTER No.
in 18th Km. of Ranipur-Puchaibera Road under
06 35.00 4009(S)
Road Division, Pakur for the year 2023-24. (Non
Dt,. 18.08.23
Plan Head)
Construction of Metal Beam Crash Barrier of
EIC, RCD LETTER No.
100m long in Amrapara-Maheshpur-Muraroi
07 4.00 4009(S)
Road at Ch. 24th Km under Road Division,
Dt,. 18.08.23
Pakur for the year 2023-24. (Non Plan Head)
Repair of pakuriya Sub Division Office and
EIC, RCD LETTER No.
Construction of Inspection Bungalow at Pakur
08 60.00 4009(S)
Jharkhand for the year of 2023-24 under Road
Dt,. 18.08.23
Division, Pakur. (Non Plan Head)
229.00

VIVEKADHIN
Month : November, 2023 Amount in Rs. Lakh

Sanctioned Scheme Sanctioned Agreement


Financial
Sl. Length % Financial % Physical
Progress Name of Contractor Sched-uled Date
No. Name (KM) Amount Date/ Ref. No. Amount Date/ Ref. No. Achievement Achiev-ement
Grand Total

1 2 3 4 5 6 7 8 9 10 11 12

Construction of Gate Paver Block work and Nader Khan,


01F2/2023-24
painting of boundary wall in Road Division Vill-Manirampur,Po-
1 2.48 Lt. 765(WE) 0.00 100 19.10.2023
campus of Road Division,Pakur for the Year Manirampur,
Dt. 05.10.2023
2023-24 PS-Pakur,Dist-Pakur,816107
2.48 0.00
ŀ

25 Pakur 191.23 831.84 546.65 542.59

Circle : Dumka
Div : Sahebganj
Name of EE-Sri Ajay Kumar-2
Non-Plan FY 2021-22 (SPILL OVER)
Ordinary repair of Pathna-Hiranpur road from EIC, RCD, Jharkhand
10F2/2022-23, Dt.
1 Km 0.00 to 17.00 40.00 Letter. No. 226 (S), Dt. 32.00 32.00 Sakir Hussain 100% 19.04.2023
20.01.2023
25.01.2022
Construction of box culvert size 2 x 8m x 5m at EIC, RCD, Jharkhand
01F2/2022-23, Dt.
2 1st km of Shobhanpur bhatta-Rajgaon Road 70.00 Letter. No. 226 (S), Dt. 69.36 42.77 Mukesh Kumar 60% 07.06.2022
08.04.2022
25.01.2022
110.00 101.36 74.76

Non-Plan FY 2022-23
'kksHkuiqj HkV~Bk&jktxk¡o iFk ds 'ks"k Hkkx esa iquLFkkZiu dk;ZA

19F2/2022- 16F2/2022- 18F2/2022-23,

11.03.2023 21.02.2023 28.02.2023


EIC, RCD, Jharkhand

Dt.
1 10.00 Letter. No. 3457 (S), Dt. 9.99 9.99 Sri Vikesh Kumar Yadav 100% 27.03.2023
22.09.2022

cjgsV ls yyefV;k Hkk;k HkksxukMhg iFk esa lk/kkj.k ejEefŸk


dk;ZA EIC, RCD, Jharkhand
23, Dt.

2 15.00 Letter. No. 3457 (S), Dt. 11.40 11.35 Sri Pankaj Kumar 100% 20.04.2023
22.09.2022

xksfoUniqj&lkgscxat iFk ds 306osa fdŒehŒ ¼tysfc;k ?kkVh½ esa


iqfy;k dk pkSM+hdj.k dk;ZA EIC, RCD, Jharkhand
23, Dt.

3 40.00 Letter. No. 3457 (S), Dt. 29.08 17.90 Shamshad Alam 100% 10.06.2023
22.09.2022
Month : November, 2023 Amount in Rs. Lakh

Sanctioned Scheme Sanctioned Agreement


Financial
Sl. Length % Financial % Physical
Progress Name of Contractor Sched-uled Date
No. Name (KM) Amount Date/ Ref. No. Amount Date/ Ref. No. Achievement Achiev-ement
Grand Total

1 2 3 4 5 6 7 8 9 10 11 12
xksfoUniqj&lkgscxat iFk ds 305osa fdŒehŒ ¼tysfc;k ?kkVh½ esa

21F2/2022- 11F2/2022-23, 12F2/2022- 17F2/2022- 14F2/2022- 15F2/2022- 22F2/2022-23,

23.03.2023 20.01.2023 20.01.2023 21.02.2023 07.02.2023 21.02.2023 23.03.2023


iqfy;k dk pkSM+hdj.k dk;ZA
EIC, RCD, Jharkhand

Dt.
4 10.00 Letter. No. 3457 (S), Dt. 7.00 0.00 Sri Rakesh Kumar Jaiswal 60% 22.05.2023
22.09.2022

xksfoUniqj&lkgscxat iFk ds 301osa fdŒehŒ esa xkMZoky dk


fuekZ.k dk;ZA EIC, RCD, Jharkhand

23, Dt.
ŀ

5 40.00 Letter. No. 3457 (S), Dt. 27.53 27.53 Sri Pankaj Kumar 100% 20.04.203
22.09.2022

cjgsV ls yyefV;k Hkk;k HkksxukMhg iFk ds ¶ySad dk


EIC, RCD, Jharkhand

23, Dt.
paving with PCC dk;ZA
6 75.00 Letter. No. 3457 (S), Dt. 58.04 58.04 Samim Alam 100% 06.05.2023
22.09.2022
iFk ize.My] lkgscxat varxZr fujh{k.k Hkou] jktegy ds
kitchen, store room and dinning hall dk EIC, RCD, Jharkhand

23, Dt.
7 furnishing ,oa th.kksZa)kj dk;ZA 15.00 Letter. No. 3457 (S), Dt. 10.30 10.14 Sri Manoj Kumar Sah 100% 24.04.2023
22.09.2022

egkjktiqj&'kekZiqj iFk 260osa fdŒehŒ esa rhuigkM+ jsyos


lkbZfMax ds ikl 150-00 ehVj yEch ,oa 4-00 ehŒ Å¡ph EIC, RCD, Jharkhand

23, Dt.
8 vkjŒlhŒlhŒ xkMZoky dk fuekZ.kA 50.00 Letter. No. 3457 (S), Dt. 38.88 36.88 Sri Aashish Ranjan 100% 19.04.2023
22.09.2022

gfj.kpjk eksM+ ls cjgsV ,oa [ksjok ls f'koxknh ¼dqy 27-20


fdŒehŒ½ ds fofHk™k iFkka'k esa fo'ks"k ejEefŸk dk;ZA
EIC, RCD, Jharkhand

Dt.
9 75.00 Letter. No. 3457 (S), Dt. 61.92 61.92 Sri Shankar Prasad Sah 100% 19.04.2023
22.09.2022

egkjktiqj&'kekZiqj iFk ds fofHk™k iFkka'kksa ls lk/kkj.k ejEefŸk


dk;zA EIC, RCD, Jharkhand

23, Dt.
10 60.00 Letter. No. 3457 (S), Dt. 50.03 50.02 Sakir Hussain 100% 22.06.2023
22.09.2022

390.00 304.19 283.77

Non-Plan FY 2023-24
gfj.kpjk&cjgsV iFk ,oa [ksjok f'koxknh fyad
iFk ds vo'ks"k iFkka'k 1(P), 2(P), 4(P), 9(P), EIC, RCD, Jharkhand
1 50.00 Letter. No. 4009 (S), Dt.
10(P) ,oa 15(P) ,oa fyad iFk ds 15(P) esa 18.08.2023
lk/kkj.k ejEefŸk dk;ZA
egkjktiqj ls 'kekZiqj iFk ds vo'ks"k iFkka'k EIC, RCD, Jharkhand
2 1(P), 2(P), 4(P), 28(P), 29(P) ,oa 30(P) 40.00 Letter. No. 4009 (S), Dt.
esa fo'ks"k ejEefŸk dk;ZA 18.08.2023
ckcqiqj iafMrVksyk ls pqfV;k iFk ds fdŒehŒ esa EIC, RCD, Jharkhand
Baby Devi, Borio,
3 lk/kkj.k ejEefŸk dk;ZA 15.00 Letter. No. 4009 (S), Dt.
Sahibganj
18.08.2023
Month : November, 2023 Amount in Rs. Lakh

Sanctioned Scheme Sanctioned Agreement


Financial
Sl. Length % Financial % Physical
Progress Name of Contractor Sched-uled Date
No. Name (KM) Amount Date/ Ref. No. Amount Date/ Ref. No. Achievement Achiev-ement
Grand Total

1 2 3 4 5 6 7 8 9 10 11 12
cjgjok gkbZ Ldwy fyad iFk esa lk/kkj.k ejEefŸk EIC, RCD, Jharkhand
4 dk;ZA 2.50 Letter. No. 4009 (S), Dt.
18.08.2023
ykycU/k ls ekguiqj Hkk;k ckcqiqj ,oa tksadk fyad EIC, RCD, Jharkhand
Baby Devi, Borio,
5 iFk dk lk/kkj.k ejEefŸk dk;ZA 10.00 Letter. No. 4009 (S), Dt.
Sahibganj
18.08.2023
cjgsV&yyefV;k Hkk;k HkksxukMhg iFk dk ŀ
EIC, RCD, Jharkhand
Manoj Kumar saha,
6 lk/kkj.k ejEefŸk dk;ZA 15.00 Letter. No. 4009 (S), Dt.
Sahibganj
18.08.2023
eaxygkV&rky>kjh iFk ds fdŒehŒ 3js fdŒehŒ
esa iFk ds fdukjs 750 ehΠyEch 600mm x EIC, RCD, Jharkhand
7 50.00 Letter. No. 4009 (S), Dt.
450mm vkdkj RCC ds ukyh dk fuekZ.k 18.08.2023
dk;ZA
eaxygkV&rky>kjh iFk ds 2js fdŒehŒ fLFkr EIC, RCD, Jharkhand
Thakur Jwala Prasad,
8 iqfy;k dh lk/kkj.k ejEefŸk dk;ZA 15.00 Letter. No. 4009 (S), Dt.
Sahibganj
18.08.2023
cjgsV&cjgjok iFk ds 1ys fdŒehŒ esa RCC EIC, RCD, Jharkhand
9 ukyh fuekZ.k dk;ZA 27.00 Letter. No. 4009 (S), Dt.
18.08.2023
cjgsV&yyefV;k Hkk;k HkksxukMhg iFk ds 1yss EIC, RCD, Jharkhand
10 fdŒehŒ esa RCC ukyh dk fuekZ.k dk;ZA 20.00 Letter. No. 4009 (S), Dt.
18.08.2023
cjgsV&yyefV;k Hkk;k HkksxukMhg esa RCC EIC, RCD, Jharkhand
M/s Aryaraj Construction,
11 iqfy;k pkSM+hdj.k dk;ZA 36.00 Letter. No. 4009 (S), Dt.
Godda
18.08.2023
QkWflYl ikdZ iFk ds 4Fks fdŒehŒ esa xkMZoky EIC, RCD, Jharkhand
Md. Salauddin Ansari,
12 fuekZ.k dk;ZA 10.00 Letter. No. 4009 (S), Dt.
Madansahi, Sahibganj
18.08.2023
'kksHkuiqj HkV~Bk&jktxk¡o iFk ds 1ys fdŒehŒ esa EIC, RCD, Jharkhand
13 RCC ukyh dk fuekZ.k dk;ZA 25.00 Letter. No. 4009 (S), Dt. Naveen Yadav, Sahibganj
18.08.2023
eaxygkV&rky>kjh iFk ds eaxygkV taD'ku ds EIC, RCD, Jharkhand
M/s Bishwakarma
14 ikl over head full gantry dk LFkkiuk 15.00 Letter. No. 4009 (S), Dt.
Construciton, Dumka
dk;ZA 18.08.2023
jktegy iFk voj ize.My ,oa fujh{k.k Hkou ds EIC, RCD, Jharkhand
15 pkgjfnokjh dh lk/kkj.k ejEefŸk ,oa ukyh dk 10.00 Letter. No. 4009 (S), Dt. Anuraj Anand, Sahibganj
fuekZ.k dk;ZA 18.08.2023
ize.My dk;kZy; ifjlj dk pkgjfnokjh fuekZ.k EIC, RCD, Jharkhand
16 ,oa vU; dk;ZA 30.00 Letter. No. 4009 (S), Dt.
18.08.2023
iFk voj ize.My cksfj;ks varxZr fujh{k.k Hkou EIC, RCD, Jharkhand
17 cjgsV dk ejEefŸk ,oa lkt&lTtk dk;ZA 10.00 Letter. No. 4009 (S), Dt. Praveen Sah, Sahibganj
18.08.2023
Month : November, 2023 Amount in Rs. Lakh

Sanctioned Scheme Sanctioned Agreement


Financial
Sl. Length % Financial % Physical
Progress Name of Contractor Sched-uled Date
No. Name (KM) Amount Date/ Ref. No. Amount Date/ Ref. No. Achievement Achiev-ement
Grand Total

1 2 3 4 5 6 7 8 9 10 11 12
iFk ize.My lkgscxat varxZr fofHk™k iFkksa esa
metal beam crash barrier dk LFkkiu ,oa EIC, RCD, Jharkhand
Baby Devi, Borio,
18 20.00 Letter. No. 4009 (S), Dt.
{kfrxzLr metal beam crash barrier dk 18.08.2023
Sahibganj
ejEefŸk dk;ZA
400.50 0.00 0.00
30 Sahebganj ŀ

900.50 405.55 358.53