I. MANPOWER:
1. FOREMAN – 1
2. LABORS- 4
LEGEND
ESTABLISHED GRADE
V. MATERIAL DELIVERY:
1. 10MM DIA REBAR
VII. REMARKS:
GENERAL OVERVIEW OF TARGET WORKS LAST WEEK BY THE CONTRACTOR:
1. To start the excavation of column footings
2. To start the fabrication of rebar
ASSESSMENTS:
1. Already established the grade of the site
2. Started the staking and layouting of column grids
CONFORME:
I. MANPOWER:
1. FOREMAN – 1
2. LABORS- 5
LEGEND
ESTABLISHED GRADE
2. MATERIAL DELIVERY:
1. 10MM DIA REBAR
V. REPRESENTATIVE ON SITE:
1. ENGR. BRYAN MENDOZA
VI. REMARKS:
GENERAL OVERVIEW OF TARGET WORKS LAST WEEK BY THE CONTRACTOR:
1. To start the excavation of column footings
2. To start the fabrication of rebar
ASSESSMENTS:
1. Started the fabrication of rebars
2. Started the staking and layouting of column grids
CONFORME:
I. MANPOWER:
1. FOREMAN – 1
2. LABORS- 6
LEGEND
ESTABLISHED GRADE
V. MATERIAL DELIVERY:
1. H-FRAMES
2. SHORING JACKS
3. GI PIPES
VII. REMARKS:
GENERAL OVERVIEW OF TARGET WORKS LAST WEEK BY THE CONTRACTOR:
1. To start the excavation of column footings
2. To start the fabrication of rebar
ASSESSMENTS:
1. Checked the layout
CONFORME:
I. MANPOWER:
1. FOREMAN – 1
2. LABORS- 5
LEGEND
ESTABLISHED GRADE
V. MATERIAL DELIVERY:
1. H-FRAMES
2. SHORING JACKS
3. GI PIPES
VI. REPRESENTATIVE ON SITE:
1. ENGR. RAJ DEEP SINGH
2. ENGR. BERNIE
VII. REMARKS:
1. SCHEDULED THE MATERIAL TEST FOR REBARS
GENERAL OVERVIEW OF TARGET WORKS LAST WEEK BY THE CONTRACTOR:
1. To start the excavation of column footings
2. To start the fabrication of rebar
ASSESSMENTS:
1. Started the fabrication of rebars
2. Continued the staking and layouting of column grids
CONFORME:
I. MANPOWER:
1. FOREMAN – 1
2. LABORS- 6
LEGEND
ESTABLISHED GRADE
EXCAVATED COLUMN FOOTING
V. MATERIAL DELIVERY:
VII. REMARKS:
GENERAL OVERVIEW OF TARGET WORKS LAST WEEK BY THE CONTRACTOR:
1. To start the excavation of column footings
2. To start the fabrication of rebar
ASSESSMENTS:
1. Started the excavation for column footing
CONFORME: