BASIC QUOTATION

COST: 1900/-

SPECIFICATION

DESIGN & DRAWINGS

G+2 FLOOR PLANS

BASIC ELEVATION & SECTIONS

STRUCTURE

STEEL – MEENAKSHI OR EQUIVALENT

AGGREGATES – 20mm & 40mm

BLOCK- OUTER 6” INNER 4”

CEMENT

1. CONCRETE WORK –ULTRA TECH OR EQUIVALENT

2. REMAINING WORK – KCP OR EQUIVALENT

MSAND FOR BRICKWORK, PLASTERING AND CONCRETE

RCC DESIGN MIX – M20

Dr. FIXIT WTERPROOFING

CEILING HEIGHT – 10 FEET

KITCHEN

CERAMIC WALL TILES, 2 FEET ABOVE KITCHEN SLAB (UPTO Rs40/ sqft including
laying charge)

MAIN SINK FAUCET – UPTO 3000/-

ANY OTHER FAUCET & ACCESSORIES – ISI MARKED

KITCHEN SINK – STAINLESS STEEL SINGLE

KITCHEN GRANITE 30mm THICK


BATHROOM

BATHROOM CERAMIC WALL TILES WITH 7 FEET HEIGHT – UPTO Rs40/sqft including
laying charge.

SANITARY WARE & CP FITTINGS- UPTO 3500/-

CPVC PIPE – ASTRAL OR ISI MARKED

BATHROOM ACCESSORIES – EWC, HEALTH FAUCET, WASIN BASIN WITH


ACCESSORIES, 2 IN 1 WALL MIXER, OVERHEAD SHOWER

BATHROOM DOORS – PVC DOORS

DOORS & WINDOWS

MAIN DOOR – AS PER CLIENT REQUIREMENT UPTO 50000/-(including main door frame,
main door, doors fittings, locks,etc.,)

INTERNAL DOORS – VENEERED FLUSH DOOR WITH LAMINATES. NEEM WOOD


FRAME OF 4 INCH BY 3 INCH

WINDOWS – UPVC WINDOWS WITH GLASS SHUTTERS OR MESH SHUTTERS (2.5


TRACK).

PAINTING

INTERIOR PAINTING – NIPPON PUTTY + EMULSION

EXTERIOR PAINTING – ASIAN PRIMER+ EMULSION

FLOORING

LIVING & DINING FLOORING – TILES OF VALUE UPTO Rs 60/sqft including laying
charge

ROOMS & KITCHEN FLOORING - TILES OF VALUE UPTO Rs 60/sqft including laying
charge

BALCONY & OPEN AREAS FLOORING – ANTI SKID TILES OF VALUE UPTO Rs 40/sqft
including laying charge

STAIRCASE FLOORING – GRANITE OR TILES OF VALUE UPTO Rs 60/sqft including


laying charge

PARKING TILES - ANTI SKID TILES OF VALUE UPTO Rs 40/sqft including laying charge
ELECTRICAL WIRES – FIREPROOF WIRES, SWITCHES & SOCKETS BY ISI
STANDARDS

MISSCELLANEOUS

OVERHEAD TANK (1000 LT)

STAIRCASE RAILING – MS

PARAPET WALL OF 3 FEET HEIGHT

WEATHER ROOF COURSE (chips concrete)

ELECTRICAL POINTS
HALL – 2 FAN POINTS
2 LIGHT POINTS
1 TV UNIT POINT
4 SPOT LIGHT
1 MAIN SWITCH BOX
2 BULB SOCKET
BED ROOM - 1 MAIN SWITCH BOX
1 TWO WAY SWITCH BOX
1 FAN POINT
1 TUBELIGHT POINT
1 BULB SOCKET
KITCHEN - 1 FAN POINT
1 TUBELIGHT POINT
1 CHIMNEY POINT
1 MIXEY POINT
1 R.O POINT
1 MAIN SWITCH BOX INCLUDING FRIDGE SOCKET
NOTE: FANS, UPS, CORPORATION PLAN, ELECTRIC METER, AC POINT, WATER &
TEMPORARY ELECTRIC CONNECTION & ROAD CUTTING, DRAINAGE & PIT
CONNECTION SHALL BE PROVIDED BY YOUR SIDE & ANY DISPUTE SHALL BE
SETTLED BY YOUR SIDE.

WE WORK DEDICATEDLY TOWARDS MAINTAINING HIGH QUALITY STANDARDS


IN ALL ASSETS. WE ASSURE ENTIRE SATISFACTION TO THE CLIENTS IN ALL
AREA OF WORK & OUT EFFORTS HAVE ALWAYS BEET A WORK WITHIN THE
TIGHT SCHEDULE OF TIME & COST OF WORK UPTO YOUR EXPECTION WITH
COMPETITIVE RATES AND ENSURE OUR SINCERE CO OPERATION AND POSITIVE
ATTITUDE.

CLEANING OF DEBRIS IN THE SITE SHOULD BE CLIENT RESPONSIBILITY

ANY CHANGES OCCURES IN THIS QUOTE DIFFRENCE AMOUNT SHOULD BE PAID


BY CLIENT SIDE.