PROPOSAL

4. Codificación de planos y documentación. PHASE


Listado de entregables.

Vendor Project Manager Vendor


BIM Manager
- Basic layouts 2D and 3D
- Technical information as required - Final proposal amended
including list of consumption and - Validation / List of comments
service estimates and requirements to amend
- Financial and legal information

- Revision of drawings and


- 2D and 3D Layouts and PID documentation and
as required - Technical revision of the
ENGINEERING
validation AND
in DESIGN
terms ofPHASE
- Ports, services consumptions, modelling requirements and equipment drawing and
instrumentation,… listings documental organization. listings, indicating required
- Set up of the models on changes
Vendor the BIM Manager
general layout and
Plant´s Project
ports, services Management Team
consumptions and
instrumentation listings

Required changes
Project Manager

Validation

- The BIM Manager will share a procedure - Revised drawings will shoe the changes
in the equipment, his auxiliar elements
WORK
for revision and monitoring MONITORING
the changes AND AS BUILT
made at work site and the position at work site.
- Revised drawings will show as well the
work advanced at site, so it facilitates the
BIM Manager / Project Manager monitoring theVendor
work status. The BIM
Manager will share a listing template to
complete in coordination with the drawings

- A final folder with the complete Project will be delivered


by the Vendor, including all the deliverables listed in the
FINAL AS BUILT PROJECT
next chapter and updated to the end of work status
descritos en el presente documento, actualizados a estado