Download as pdf or txt
Download as pdf or txt
You are on page 1of 1

www.safetyvantage.

com
Contact us!
info@safetyvantage.com

Optimize your schedule


to reduce fatigue!
It doesn’t matter what
employees do in their
off-work hours if their
work schedule doesn’t
When designing schedules, always allow for sufficient
consider the off-work time people sleep.
need to: It’s not
ju
sleep, it st the length
Manage responsibilities (home happens ’s when sleep of
or family commitments) Sleeping that ma
tter
for hum night is na s.
at
Relax, socialize, exercise nighttim ans, which m tural
e
sleep de rests enable eans
Complete doctors’ appointments than tryeper and for loyou to
and other errands ing to nger
daytime sleep during
hours.

Examine your schedule


for hazards by asking:

Are there Are tasks Are complex


consecutive requiring physical or mental
8-12 hour sustained physical tasks taken on
night shifts or mental effort night shift?
worked? undertaken on
night shift?

>12 >48
Do one or more Are there
Do hours of active
shifts exceed 12 irregular and
hours in a 24 unplanned work exceed 48
hours/5 days, or
hour period? schedules as a
60 hrs/7 days?
result of call outs?

<10
Are complex, Is the break
<12 Is there less
difficult, or between shifts that 12 hours
strenuous tasks (turnover time) undisturbed
required at the less than 10 rest after a
start or end of hours? night shift?
split shifts?

Does work Do changes to Is significant travel


interfere with shift assignments to and from work
the ability for occur with little necessary, and
workers to notification (less does it occur on
take breaks to than 2-3 weeks)? non-duty time,
rest, recharge, affecting available
or re-nourish? sleep time?

Are long-distance
commutes
<2 Is there less than
12 AM - 6 AM
Do any shifts start
necessary at the 2 consecutive or finish between
beginning of a nighttime sleep 12 AM and 6 AM?
work cycle? opportunities
every 7 days?

The more you check off,


the higher the risk your
schedule presents.

You might also like