PROJECT : ESP BY-PASS CIVIL WORKS

PO NO. : 3401051425.00
OWNER : NPI, CDO FACTORY, CAGAYAN DE ORO CITY
SUBJECT : WEEK 12 ACCOMPLISHMENT (RESUME)

PROJECTED MAY JUNE JULY SEPTEMBER


ITEM MATERIAL/SERVICE DESCRIPTION AMOUNT %
ACTUAL 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30
A.1 GENERAL REQUIREMENTS / PRELIMINARIES DAYS 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 41 42 43 44 45 46 47 48 49 50 51 52 53 54 55 56 57 58 59 48 49 50 51 52 53 54 55 56 57 58 59 55 56 57 58 59
3.06% 0.05% 0.05% 0.05% 0.05% 0.05% 0.05% 0.05% 0.05% 0.05% 0.05% 0.05% 0.05% 0.05% 0.05% 0.05% 0.05% 0.05% 0.05% 0.05% 0.05% 0.05% 0.05% 0.05% 0.05% 0.05% 0.05% 0.05% 0.05% 0.05% 0.05% 0.05% 0.05% 0.05% 0.05% 0.05% 0.05% 0.05% 0.05% 0.05% 0.05% 0.05% 0.05% 0.05% 0.05% 0.05% 0.05% 0.05% 0.05% 0.05% 0.05% 0.05% 0.05% 0.05% 0.05% 0.05% 0.05% 0.05% 0.05% 0.05%
1.1 Mobilization/Demobilization 118,750.00 3.17%
3.06% 0.05% 0.05% 0.05% 0.05% 0.05% 0.05% 0.05% 0.05% 0.05% 0.05% 0.05% 0.05% 0.05% 0.05% 0.05% 0.05% 0.05% 0.05% 0.05% 0.05% 0.05% 0.05% 0.05% 0.05% 0.05% 0.05% 0.05% 0.05% 0.05% 0.05% 0.05% 0.05% 0.05% 0.05% 0.05% 0.05% 0.05% 0.05% 0.05% 0.05% 0.05% 0.05% 0.05% 0.05% 0.05% 0.05% 0.05% 0.05% 0.05% 0.05% 0.05% 0.05% 0.05% 0.05% 0.05% 0.05% 0.05%

0.83% 0.17% 0.17% 0.17% 0.17% 0.17%


1.2 Bonds & Insurances Fees (CARI) 31,250.00 0.83%
0.83% 0.83%

0.81% 0.01% 0.01% 0.01% 0.01% 0.01% 0.01% 0.01% 0.01% 0.01% 0.01% 0.01% 0.01% 0.01% 0.01% 0.01% 0.01% 0.01% 0.01% 0.01% 0.01% 0.01% 0.01% 0.01% 0.01% 0.01% 0.01% 0.01% 0.01% 0.01% 0.01% 0.01% 0.01% 0.01% 0.01% 0.01% 0.01% 0.01% 0.01% 0.01% 0.01% 0.01% 0.01% 0.01% 0.01% 0.01% 0.01% 0.01% 0.01% 0.01% 0.01% 0.01% 0.01% 0.01% 0.01% 0.01% 0.01% 0.01% 0.01% 0.01%
1.3 Temporary Facilities Requirements 31,250.00 0.83%
0.83% 0.01% 0.01% 0.01% 0.01% 0.01% 0.01% 0.01% 0.01% 0.01% 0.01% 0.01% 0.01% 0.01% 0.01% 0.01% 0.01% 0.01% 0.01% 0.01% 0.01% 0.01% 0.01% 0.01% 0.01% 0.01% 0.01% 0.01% 0.01% 0.01% 0.01% 0.01% 0.01% 0.01% 0.01% 0.01% 0.01% 0.01% 0.01% 0.01% 0.01% 0.01% 0.01% 0.01% 0.01% 0.01% 0.01% 0.01% 0.01% 0.01% 0.01% 0.12%

1.93% 0.03% 0.03% 0.03% 0.03% 0.03% 0.03% 0.03% 0.03% 0.03% 0.03% 0.03% 0.03% 0.03% 0.03% 0.03% 0.03% 0.03% 0.03% 0.03% 0.03% 0.03% 0.03% 0.03% 0.03% 0.03% 0.03% 0.03% 0.03% 0.03% 0.03% 0.03% 0.03% 0.03% 0.03% 0.03% 0.03% 0.03% 0.03% 0.03% 0.03% 0.03% 0.03% 0.03% 0.03% 0.03% 0.03% 0.03% 0.03% 0.03% 0.03% 0.03% 0.03% 0.03% 0.03% 0.03% 0.03% 0.03% 0.03% 0.03%
1.4 Site Management and Supervision 75,000.00 2.00%
1.93% 0.03% 0.03% 0.03% 0.03% 0.03% 0.03% 0.03% 0.03% 0.03% 0.03% 0.03% 0.03% 0.03% 0.03% 0.03% 0.03% 0.03% 0.03% 0.03% 0.03% 0.03% 0.03% 0.03% 0.03% 0.03% 0.03% 0.03% 0.03% 0.03% 0.03% 0.03% 0.03% 0.03% 0.03% 0.03% 0.03% 0.03% 0.03% 0.03% 0.03% 0.03% 0.03% 0.03% 0.03% 0.03% 0.03% 0.03% 0.03% 0.03% 0.03% 0.03% 0.03% 0.03% 0.03% 0.03% 0.03% 0.03%

1.06% 0.02% 0.02% 0.02% 0.02% 0.02% 0.02% 0.02% 0.02% 0.02% 0.02% 0.02% 0.02% 0.02% 0.02% 0.02% 0.02% 0.02% 0.02% 0.02% 0.02% 0.02% 0.02% 0.02% 0.02% 0.02% 0.02% 0.02% 0.02% 0.02% 0.02% 0.02% 0.02% 0.02% 0.02% 0.02% 0.02% 0.02% 0.02% 0.02% 0.02% 0.02% 0.02% 0.02% 0.02% 0.02% 0.02% 0.02% 0.02% 0.02% 0.02% 0.02% 0.02% 0.02% 0.02% 0.02% 0.02% 0.02% 0.02% 0.02%
1.5 As-Built Plans and Shop Drawings 41,250.00 1.10%
1.06% 0.02% 0.02% 0.02% 0.02% 0.02% 0.02% 0.02% 0.02% 0.02% 0.02% 0.02% 0.02% 0.02% 0.02% 0.02% 0.02% 0.02% 0.02% 0.02% 0.02% 0.02% 0.02% 0.02% 0.02% 0.02% 0.02% 0.02% 0.02% 0.02% 0.02% 0.02% 0.02% 0.02% 0.02% 0.02% 0.02% 0.02% 0.02% 0.02% 0.02% 0.02% 0.02% 0.02% 0.02% 0.02% 0.02% 0.02% 0.02% 0.02% 0.02% 0.02% 0.02% 0.02% 0.02% 0.02% 0.02% 0.02%

1.6 Quality Control Test

0.29% 0.06% 0.06% 0.06% 0.06% 0.06%


1.6.1 Rebar Tensile and Bending Test 10,740.00 0.29% 100.00%
0.29% 0.29% 99.51%
1.00% 0.08% 0.08% 0.08% 0.08% 0.08% 0.08% 0.08% 0.08% 0.08% 0.08% 0.08% 0.08%
1.6.2 Structural Steel Dye Penetrants Test 37,500.00 1.00%
0.83% 0.83%

0.09% 0.02% 0.02% 0.02% 0.02% 0.02% 0.02%


1.6.3 Field Density Test/Compaction 3,420.00 0.09%
0.09% 0.02% 0.02% 0.02% 0.02% 0.02% 0.02%

0.11% 0.02% 0.02% 0.02% 0.02% 0.02% 0.02%


1.6.4 Compressive Strength Test 4,050.00 0.11%
0.11% 0.11%
92.85%

91.41%
A.2 SAFETY, HEALTH & ENVIRONMENT
0.22% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%
90.38%
0.00% 0.00% 0.00%
White Board, Formica on 12mm thk plywood back-board on alum. framed with casters
2.1 8,656.25 0.23%
(Dimension: 4 ft. x 8 ft) 0.23% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.03%

Provision of Approved Personal Protective Equipment, Safety 2.32% 0.04% 0.04% 0.04% 0.04% 0.04% 0.04% 0.04% 0.04% 0.04% 0.04% 0.04% 0.04% 0.04% 0.04% 0.04% 0.04% 0.04% 0.04% 0.04% 0.04% 0.04% 0.04% 0.04% 0.04% 0.04% 0.04% 0.04% 0.04% 0.04% 0.04% 0.04% 0.04% 0.04% 0.04% 0.04% 0.04% 0.04% 0.04% 0.04% 0.04% 0.04% 0.04% 0.04% 0.04% 0.04% 0.04% 0.04% 0.04% 0.04% 0.04% 0.04% 0.04% 0.04% 0.04% 0.04% 0.04% 0.04% 0.04% 0.04%
2.2 89,937.50 2.40%
Equipment/Devices 2.32% 0.04% 0.04% 0.04% 0.04% 0.04% 0.04% 0.04% 0.04% 0.04% 0.04% 0.04% 0.04% 0.04% 0.04% 0.04% 0.04% 0.04% 0.04% 0.04% 0.04% 0.04% 0.04% 0.04% 0.04% 0.04% 0.04% 0.04% 0.04% 0.04% 0.04% 0.04% 0.04% 0.04% 0.04% 0.04% 0.04% 0.04% 0.04% 0.04% 0.04% 0.04% 0.04% 0.04% 0.04% 0.04% 0.04% 0.04% 0.04% 0.04% 0.04% 0.04% 0.04% 0.04% 0.04% 0.04% 0.04% 0.04%

Provision of Construction Signages, Barricades, Railings, Floor Opening 0.09% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%
2.3 3,462.50 0.09%
Cover. 0.09% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%

Provision of Scaffolding System with Complete Accessories. 1.48% 0.03% 0.03% 0.03% 0.03% 0.03% 0.03% 0.03% 0.03% 0.03% 0.03% 0.03% 0.03% 0.03% 0.03% 0.03% 0.03% 0.03% 0.03% 0.03% 0.03% 0.03% 0.03% 0.03% 0.03% 0.03% 0.03% 0.03% 0.03% 0.03% 0.03% 0.03% 0.03% 0.03% 0.03% 0.03% 0.03% 0.03% 0.03% 0.03% 0.03% 0.03% 0.03% 0.03% 0.03% 0.03% 0.03% 0.03% 0.03% 0.03% 0.03% 0.03% 0.03% 0.03% 0.03% 0.03% 0.03% 0.03% 0.03% 0.03% 0.00% 0.00% 0.00% 0.00% 0.00%
2.4 57,348.00 1.53%
(Compliant to Standards: OSHC, DO-13, NPI & OSHA) ; Rental only. 1.53% 0.03% 0.03% 0.03% 0.03% 0.03% 0.03% 0.03% 0.03% 0.03% 0.03% 0.03% 0.03% 0.03% 0.03% 0.03% 0.03% 0.03% 0.03% 0.03% 0.03% 0.03% 0.05% 0.05% 0.05% 0.05% 0.05% 0.05% 0.05% 0.05% 0.05% 0.05% 0.05% 0.05% 0.05% 0.05% 0.05% 0.05% 0.05% 0.05% 0.05% 0.00% 0.00% 0.00% 0.00% 0.00%

1.45% 0.03% 0.03% 0.03% 0.03% 0.03% 0.03% 0.03% 0.03% 0.03% 0.03% 0.03% 0.03% 0.03% 0.03% 0.03% 0.03% 0.03% 0.03% 0.03% 0.03% 0.03% 0.03% 0.03% 0.03% 0.03% 0.03% 0.03% 0.03% 0.03% 0.03% 0.03% 0.03% 0.03% 0.03% 0.03% 0.03% 0.03% 0.03% 0.03% 0.03% 0.03% 0.03% 0.03% 0.03% 0.03% 0.03% 0.03% 0.03% 0.03% 0.03% 0.03% 0.03% 0.03% 0.03% 0.03% 0.03% 0.03% 0.03% 0.03%
2.5 SHE Practitioner (Minimum 1 Personnel) 56,250.00 1.50% 80.93%
1.45% 0.03% 0.03% 0.03% 0.03% 0.03% 0.03% 0.03% 0.03% 0.03% 0.03% 0.03% 0.03% 0.03% 0.03% 0.03% 0.03% 0.03% 0.03% 0.03% 0.03% 0.03% 0.03% 0.03% 0.03% 0.03% 0.03% 0.03% 0.03% 0.03% 0.03% 0.03% 0.03% 0.03% 0.03% 0.03% 0.03% 0.03% 0.03% 0.03% 0.03% 0.03% 0.03% 0.03% 0.03% 0.03% 0.03% 0.03% 0.03% 0.03% 0.03% 0.03% 0.03% 0.03% 0.03% 0.03% 0.03% 0.03%

1.51% 0.03% 0.03% 0.03% 0.03% 0.03% 0.03% 0.03% 0.03% 0.03% 0.03% 0.03% 0.03% 0.03% 0.03% 0.03% 0.03% 0.03% 0.03% 0.03% 0.03% 0.03% 0.03% 0.03% 0.03% 0.03% 0.03% 0.03% 0.03% 0.03% 0.03% 0.03% 0.03% 0.03% 0.03% 0.03% 0.03% 0.03% 0.03% 0.03% 0.03% 0.03% 0.03% 0.03% 0.03% 0.03% 0.03% 0.03% 0.03% 0.03% 0.03% 0.03% 0.03% 0.03% 0.03% 0.03% 0.03% 0.03% 0.03% 0.03%
2.6 Provision for Fall Protection Installations 58,418.75 1.56%
1.51% 0.03% 0.03% 0.03% 0.03% 0.03% 0.03% 0.03% 0.03% 0.03% 0.03% 0.03% 0.03% 0.03% 0.03% 0.03% 0.03% 0.03% 0.03% 0.03% 0.03% 0.03% 0.03% 0.03% 0.03% 0.03% 0.03% 0.03% 0.03% 0.03% 0.03% 0.03% 0.03% 0.03% 0.03% 0.03% 0.03% 0.03% 0.03% 0.03% 0.03% 0.03% 0.03% 0.03% 0.03% 0.03% 0.03% 0.03% 0.03% 0.03% 0.03% 0.03% 0.03% 0.03% 0.03% 0.03% 0.03% 0.03%

B BOM CIVIL WORKS


1.0 Demolition and Removal Works
0.19% 0.02% 0.02% 0.02% 0.02% 0.02% 0.02% 0.02% 0.02% 0.02% 0.02% 0.02%
1.1 Existing Pavement 7,115.63 0.19%
0.19% 0.02% 0.01% 0.01% 0.01% 0.02% 0.02% 0.02% 0.02% 0.01% 0.02% 0.02% 0.02% 0.02%

0.17% 0.03% 0.03% 0.03% 0.03% 0.03% 0.03%


1.2 Existing Zocalo 6,468.75 0.17%
0.17% 0.03% 0.03% 0.03% 0.03% 0.03% 0.03%

0.55% 0.05% 0.05% 0.05% 0.05% 0.05% 0.05% 0.05% 0.05% 0.05% 0.05% 0.05% 0.05%
1.3 Existing Ducting 20,700.00 0.55% 68.60%
0.55% 0.28% 0.28%

2.0 Earthworks
1.26% 0.07% 0.07% 0.07% 0.07% 0.07% 0.07% 0.07% 0.07% 0.07% 0.07% 0.07% 0.07% 0.07% 0.07% 0.07% 0.07% 0.07% 0.07%
2.1 Ordinary Excavation 47,221.88 1.26%
1.26% 0.07% 0.07% 0.07% 0.07% 0.07% 0.07% 0.07% 0.14% 0.14% 0.07% 0.07% 0.04% 0.04% 0.04% 0.04% 0.04% 0.04% 0.04% 0.04% 0.07%

1.21% 0.07% 0.07% 0.07% 0.07% 0.07% 0.07% 0.07% 0.07% 0.07% 0.07% 0.07% 0.07% 0.07% 0.07% 0.07% 0.07% 0.07% 0.07%
2.2 Compaction and Backfilling 45,410.63 1.21%
1.21% 0.07% 0.07% 0.07% 0.07% 0.07% 0.07% 0.07% 0.07% 0.07% 0.07% 0.07% 0.07% 0.07% 0.07% 0.07% 0.07% 0.14%

0.80% 0.04% 0.04% 0.04% 0.04% 0.04% 0.04% 0.04% 0.04% 0.04% 0.04% 0.04% 0.04% 0.04% 0.04% 0.04% 0.04% 0.04% 0.04%
2.3 Equipments (Plate compactor) 30,000.00 0.80%
0.80% 0.27% 0.18% 0.18% 0.18%

0.61% 0.03% 0.03% 0.03% 0.03% 0.03% 0.03% 0.03% 0.03% 0.03% 0.03% 0.03% 0.03% 0.03% 0.03% 0.03% 0.03% 0.03% 0.03%
2.4 Base Course ( Compacted Subgrade @ 95% MDD compaction) 22,705.31 0.61%
57.73%
0.61% 0.17% 0.17% 0.17% 0.11%

0.37% 0.02% 0.02% 0.02% 0.02% 0.02% 0.02% 0.02% 0.02% 0.02% 0.02% 0.02% 0.02% 0.02% 0.02% 0.02% 0.02% 0.02% 0.02%
2.5 Gravel Bedding (Aggregate (G-1) and preparation) 13,972.50 0.37%
0.33% 0.02% 0.02% 0.02% 0.02% 0.02% 0.02% 0.02% 0.02% 0.02% 0.02% 0.02% 0.02% 0.02% 0.02% 0.02% 0.02%

3.86% 0.16% 0.16% 0.16% 0.16% 0.16% 0.16% 0.16% 0.16% 0.16% 0.16% 0.16% 0.16% 0.16% 0.16% 0.16% 0.16% 0.16% 0.16% 0.16% 0.16% 0.16% 0.16% 0.16% 0.16%
2.6 Earth Moving Equipments - For Disposal 144,576.56 3.86%
3.86% 0.32% 0.16% 0.16% 0.16% 0.16% 0.16% 0.16% 0.16% 0.16% 0.16% 0.16% 0.16% 0.16% 0.16% 0.16% 0.16% 0.16% 0.16% 0.16% 0.16% 0.16% 0.16% 0.16%

3.0 Concreting Works

3.37% 0.19% 0.19% 0.19% 0.19% 0.19% 0.19% 0.19% 0.19% 0.19% 0.19% 0.19% 0.19% 0.19% 0.19% 0.19% 0.19% 0.19% 0.19%
3.1 Concrete @ 3,000 psi 7D 126,101.81 3.37%
3.27% 0.37% 0.19% 0.19% 0.19% 0.19% 0.19% 0.19% 0.19% 0.19% 0.19% 0.19% 0.19% 0.19% 0.19% 0.19% 0.19% 0.09%

1.36% 0.08% 0.08% 0.08% 0.08% 0.08% 0.08% 0.08% 0.08% 0.08% 0.08% 0.08% 0.08% 0.08% 0.08% 0.08% 0.08% 0.08% 0.08%
3.2 10mmØ x 6.0 m. DSB 50,859.90 1.36% 47.67%
47.36%
1.33% 0.23% 0.15% 0.15% 0.15% 0.15% 0.15% 0.15% 0.15% 0.05%

5.91% 0.33% 0.33% 0.33% 0.33% 0.33% 0.33% 0.33% 0.33% 0.33% 0.33% 0.33% 0.33% 0.33% 0.33% 0.33% 0.33% 0.33% 0.33%
3.3 16mmØ x 6.0 m. DSB 221,420.46 5.91%
5.91% 0.99% 1.31% 1.31% 1.31% 1.31% 1.31% -2.63% 0.49% 0.49%

1.28% 0.07% 0.07% 0.07% 0.07% 0.07% 0.07% 0.07% 0.07% 0.07% 0.07% 0.07% 0.07% 0.07% 0.07% 0.07% 0.07% 0.07% 0.07%
3.4 Formworks using 1/2" thk phenolic board with metal frame 48,030.47 1.28%
1.28% 0.21% 0.07% 0.07% 0.14% 0.14% 0.07% 0.07% 0.04% 0.04% 0.04% 0.04% 0.04% 0.04% 0.04% 0.04% 0.04% 0.04% 0.04% 0.04% 0.04% 0.03%

5.80% 41.58% 0.32% 0.32% 0.32% 0.32% 0.32% 0.32% 0.32% 0.32% 0.32% 0.32% 0.32% 0.32% 0.32% 0.32% 0.32% 0.32% 0.32% 0.32% 0.04% 0.04% 0.04% 0.04% 0.04%
4.0 Painting Works (3 Coats QDE w/ primer metallic paints) 217,447.03 5.80%
3.97% 0.32% 0.32% 0.32% 0.32% 0.32% 0.32% 0.32% 0.32% 0.32% 0.42% 0.16% 0.16% 0.16% 0.16%

5.0 Structural Works


9.29% 0.77% 0.77% 0.77% 0.77% 0.77% 0.77% 0.77% 0.77% 0.77% 0.77% 0.77% 0.77%
5.1 W8x13 347,915.25 9.29% 37.00%
9.29% 0.26% 0.13% 0.13% 0.13% 0.13% 0.13% 4.64% 1.16% 1.16% 0.58% 0.84%

8.56% 0.71% 0.71% 0.71% 0.71% 0.71% 0.71% 0.71% 0.71% 0.71% 0.71% 0.71% 0.71%
5.2 W6x15 320,808.60 8.56%
8.56% 0.26% 0.13% 0.13% 0.13% 0.13% 0.13% 0.71% 0.71% 0.36% 0.36% 0.36% 0.36% 0.36% 0.36% 0.36% 0.36% 3.38%

16.86% 1.40% 1.40% 1.40% 1.40% 1.40% 1.40% 1.40% 1.40% 1.40% 1.40% 1.40% 1.40%
5.3 W4x13 631,557.00 16.86%
16.36% 0.26% 0.13% 0.13% 0.13% 0.13% 0.13% 32.26% 1.40% 1.40% 0.70% 0.70% 0.70% 0.70% 0.70% 0.70% 0.70% 0.70% 0.70% 0.70% 0.70% 0.70% 1.40% 1.40% 1.40%

1.04% 0.06% 0.06% 0.06% 0.06% 0.06% 0.06% 0.06% 0.06% 0.06% 0.06% 0.06% 0.06% 0.06% 0.06% 0.06% 0.06% 0.06% 0.06%
5.4 Bolts A 325 (U- bolts 20mmø) 39,123.00 1.04%
1.04% 0.12% 0.12% 0.12% 0.12% 30.11% 0.12% 0.12% 0.12% 0.12% 0.12%

0.96% 0.05% 0.05% 0.05% 0.05% 0.05% 0.05% 0.05% 0.05% 0.05% 0.05% 0.05% 0.05% 0.05% 0.05% 0.05% 0.05% 0.05% 0.05%
5.5 M.S. Plate 4'x8'x12mm thk 35,979.19 0.96%
0.85% 0.21% 0.21% 0.21% 0.21%

0.03% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%
5.6 High strength non shrink grout 1,117.80 0.03%
0.02% 0.00% 0.00% 0.00% 0.00% 0.00% 0.01%

25.08%
6.0 Maintainance Platform
3.01% 0.25% 0.25% 0.25% 0.25% 0.25% 0.25% 0.25% 0.25% 0.25% 0.25% 0.25% 0.25% 0.17% 0.17% 0.17% 0.17% 0.17% 0.17%
6.1 Channel 4"x2"x6mm thk 112,653.28 3.01%
2.00% 21.89% 0.75% 0.75% 0.25% 0.25%

0.34% 0.03% 0.03% 0.03% 0.03% 0.03% 0.03% 0.03% 0.03% 0.03% 0.03% 0.03% 0.03% 0.04% 0.04% 0.04% 0.04% 0.04% 0.04%
6.2 Angle Bar 1"x1"x4mm thk 12,659.09 0.34%
0.13% 0.01% 0.01% 0.01% 0.01% 0.01% 0.01% 0.01% 0.01% 0.01% 0.01% 0.01% 0.01% 0.01% 0.01%

3.91% 0.33% 0.33% 0.33% 0.33% 0.33% 0.33% 0.33% 0.33% 0.33% 0.33% 0.33% 0.33% 0.06% 0.06% 0.06% 0.06% 0.06% 0.06%
6.3 Railing 1 1/2" dia. Sched 40 146,379.40 3.91%
3.58% 0.08% 0.08% 0.08% 0.08% 0.08% 0.08% 0.08% 0.08% 0.33% 0.33% 0.33% 0.33% 0.33% 0.33% 0.33% 0.33% 0.33%

9.00% 0.75% 0.75% 0.75% 0.75% 0.75% 0.75% 0.75% 0.75% 0.75% 0.75% 0.75% 0.75% 0.84% 0.84% 0.84% 0.84% 0.84% 0.84%
6.4 Checkered Plate 6mm thk 336,999.23 9.00%
15.87%
3.94% 0.19% 0.19% 0.19% 0.19% 0.19% 0.19% 0.19% 0.19% 0.19% 0.19% 0.19% 0.19% 0.19% 0.19% 0.19% 0.19% 0.19% 0.19% 0.19% 0.19% 0.19%

1.57% 0.13% 0.13% 0.13% 0.13% 0.13% 0.13% 0.13% 0.13% 0.13% 0.13% 0.13% 0.13% 0.03% 0.03% 0.03% 0.03% 0.03% 0.03%
6.5 Flat Bar 150mm x 3mm thk - Toe Board 58,632.10 1.57%
1.37% 0.01% 0.01% 0.01% 0.01% 0.01% 0.01% 0.01% 0.01% 0.01% 0.01% 0.13% 0.13% 0.13% 0.13% 0.13% 0.13% 0.13% 0.13% 0.13% 0.13%
13.29%
0.23% 0.02% 0.02% 0.02% 0.02% 0.02% 0.02% 0.02% 0.02% 0.02% 0.02% 0.02% 0.02% 0.02% 0.02% 0.02% 0.02% 0.02% 0.02%
6.6 Flat Bar 40mm x3mm thk - For Cage 8,614.05 0.23%
0.11% 0.01% 0.01% 0.01% 0.01% 0.01% 0.01% 0.01% 0.01% 0.01% 0.01% 0.01% 0.01% 0.01% 0.01% 0.01% 0.01% 0.01% 0.01%

1.52% 0.30% 0.30% 0.30% 0.30% 0.30%


7.0 Temporary Enclosure (Rib-type sheet and Steel pipe framing) 56,850.61 1.52%
1.52% 0.30% 0.30% 0.91%

8.0 OTHERS
7.26%
0.03% 6.28% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%
8.1 1 1/2" dia. Elbow 951.88 0.03%
0.02% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%

0.15% 0.01% 0.01% 0.01% 0.01% 0.01% 0.01% 0.01% 0.01% 0.01% 0.01% 0.01% 0.01%
8.2 4" x 4" x 1/4" Angle Bar ( Shear Angle ) 5,744.44 0.15% 3.62%
0.15% 0.01% 0.01% 0.01% 0.01% 0.01% 0.01% 0.01% 0.01% 0.04%

0.02%
2.37% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%
8.3 M10 Chemical Bolt 663.69 0.02%
0.01% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%

3,745,962.5 100.00%

Week 1 Week 2 Week 3 Week 4 Week 5 Week 6 Week 7 Week 8 Week 9 Week 10 Week 11 Week 12 Week 13 Week 14

PROJECTED WEEKLY ACCOMPLISHMENT 2.37% 3.91% 7.02% 8.59% 8.22% 6.89% 10.37% 21.24% 22.80% 8.10% 0.49% 0.00% 1.16% 0.08%

PROJECTED WEEKLY ACCUMULATED ACCOMPLISHMENT 2.37% 6.28% 13.29% 21.89% 30.11% 37.00% 47.36% 68.60% 91.41% 99.51% 100.00% 100.00% 101.16% 101.24%

ACTUAL WEEKLY ACCOMPLISHMENT 3.62% 3.64% 8.62% 9.21% 7.18% 9.32% 6.08% 10.06% 23.21% 9.45% 0.00% 0.10% 6.94% 0.21%

ACTUAL WEEKLY ACCUMULATED ACCOMPLISHMENT 3.62% 7.26% 15.87% 25.08% 32.26% 41.58% 47.67% 57.73% 80.93% 90.38% 92.75% 92.85%

VARIANCE 1.25% 0.98% 2.58% 3.20% 2.15% 4.59% 0.30% -10.88% -10.47% -9.13% -7.25% -7.15%

PREPARED BY: CHECKED BY: RECEIVED BY: NOTED BY:

EUGENE B. DELOS REYES ISRAEL S. GARGAR, CE SHELLA MAE GALICIA RYAN ADRIAN D. YPARRAGUIRRE
(Name & Signature) (Name & Signature) (Name & Signature) (Name & Signature)
OGBI-PROJECT ENGINEER OGBI-PROJECT MANAGER TBMC-PROJECT ENGINEER NPI-PROJECT ENGINEER