1 Lake Plaza Updated Load Shadule

You might also like

Download as pdf or txt
Download as pdf or txt
You are on page 1of 1

DB-FC 22

PROJECT: 1 LAKE PLAZA PLOT NO.: BV


DB No.: OFFICE 503 PROPOSED LAOD SCHADULE LOAD DISTRIBUTION SCHEDULE LOCATION: 5TH FLOOR
FEED FROM : SMDB-T(2F TO 15F) (3 - PHASE) PAGE : 1/1

RATING OF RATING OF MCB RTG. CCT ECC CONNECTED LOADS/POINTS WATT / LOAD PER CIRCUIT- W REMARKS
INCOMER ELCB IN AMP WIRE WIRE
LTG PANT COVE HANGIN G 13A 13A T W/H 15A 13A Floor box 20A Outlet FCU W/H ISO OTHE R UNIT
SL NO CIRNo. SIZE SIZE ROOM / AREA DENT LIGHT LTG S/O D//O S/O FLEX D/S +DP
mm2 mm2 O/L SWITCH
R Y B

1 R1 10 2.5 2.5 WORK STATION 10 30 300


2 Y1 10 2.5 2.5 MEETING ROOM 14 25 350
40A
100mA 3 B1 10 2.5 2.5 MANAGER ROOM 8 25 200
ELCB-1 4 R2 10 2.5 2.5 Emergency lighting 3 50 150
5 Y2 10 2.5 2.5 SPARE
6 B2 10 2.5 2.5 SPARE
7 R3 20 4.0 4.0 RECIPTION 4 200 800
40A TP ISOLATOR

RING
8 Y3 20 4.0 4.0 MEETING ROOM 4 200 800
40A
9
B3 20
20
4.0
4.0
4.0
4.0
MANAGER ROOM 4 ` 200 800
100mA
ELCB-2 10 R4 20 4.0 4.0 WORKSTATION 4 200 800 RING
11 Y4 20 4.0 4.0 WORKSTATION 4 200 800 RING
12 B4 20 4.0 4.0 SPARE 800 RING

40A
10 R5 20 4.0 4.0 WATER HEATER 1 1200 1200 RING

30mA 11 Y5 20 4.0 4.0 FCU 1 350 350


ELCB-3
12 B5 20 4.0 4.0 PANTRY 800
3250 2300 2600
TOTAL 8150
CABLE SIZE:1x4Cx 10mm2 CU.PVC/XLPE/SWA/LSF + 1x1C x25mm2 CU.PVC.ECC C.FAN=Ceiling fan, EX. FAN=Exhaust Fan, SH. S/O='shaver socket outlet
W/H=water heater, H/D=Hand Dryer, 'W'=Window type & 'S' = Split type, T= Twin Socket