CDSP - JSA - Piling Activity
CDSP - JSA - Piling Activity
Job Title: CDSP Project, Coker B: Pilling activity. JSA done by:
SN. Name & Designation Signature
1. Velpuri Balasubrahmanyam, SM- TEIL
2. Angad Prasad, Civil Engineer-TEIL
3. Bhupendra K Singh, HSE-TEIL
Job to be Executed By: 4. Rakesh Kumar, Engineer-EIL
PJ Consultant Contractor 5. A L Tondan, HSE Mgr-EIL
Shailesh Kumar, Rakesh Kumar, Angad, Engineer, M/s 6. Shailesh Kumar, AM PJ
AM PJ M/s EIL TEIL 7. Arvind Kumar, SPJM PJ
8. Kunal Kishore, (F&S)
9.
10.
11.
JSA Reviewed By (HOD’s Name & Name Designation Department Signature
Designation)
RCM of Consultant Mr. Manash Sarkar RCM EIL(Consultant)
HOD of receiving (Executing) Department Mr. M K Sahu DGM-PJ PJ
9 Concreting of pile/ Rotating part of Provide and maintain guard for rotating
Pouring and the machine. parts of equipment. Engage experience
pumping concrete operator. Don't allow personnel with
Skin diseases loose clothes.
with chemical/ Use appropriate hand gloves during
cement. cement/ concrete handling.
4
Poor ensured.
illumination. Adequate illumination shall be ensured
at work area. Proper lighting
arrangement to be available at work
area. Illumination level to be checked by
Improper slope
lux meter.
& loose soil of
Ensure proper slope of excavated pit. No
excavated pit.
materials kept at edges of excavated pit.
Ensure no undercut of excavation. No
person shall be allowed inside the
excavated pit in case of any chances
observe of soil collapse.
Improper Proper access/egress shall be ensured.
access/egress for Ensure access ladder shall be properly
kentledge. secured & free from obstruction. Only
one person to be use access ladder for
access/egress at a time.
19 Load Testing Noise Ear plug must be used by working crew.
(Tension) Pinching of Training shall be provided to working
leg /hands. crew. Ensure all unauthorized workmen
keep away from noisy area.
Flying objects. Ensure the workmen if their hands / legs
away from pinching points. Use hand
gloves during material handling. Use
Vibration any hand tools to avoid direct contact
with pinch point.
Hammer and other accessories to be
Inadequate
robust and healthy. Use safety goggles
support.
at work area. Ensure work away from
hammering area. Regular checking to be
Failure of lifting done before the start of the work. All
arrangements. people must be aware of the assembly
point & Emergency contact no.
Ensure work away from hammering
area. All fixing to be checked randomly.
Electrical Ensure work away from hammering
hazards. area.
Proper support of platform & whole
arrangement to be ensured before start
hammering. Load & jerking to be
considered during providing of support.
Ensure TPI should be available for all
Lifting accessories like D shackle, Wire
8
1. To make JSA process effective, the defined job shall be broken down into sequential
steps. Actions / activities for each step shall be logical & linked with previous & forward
action steps. All possible hazards associated with each job step shall be deliberated
among team members and recorded carefully. JSA recommendations / control measures
for each hazard / job step should be validated by team members & recorded in the Part-A
of JSA sheet. Use additional JSA sheets as per requirements.
2. Review of JSA shall be done by HOD of respective Operation Department and HOD of
Concerned Department. After review, respective HOD to put his signature with name &
date.
3. The Job shall be carried out with safety precautions as per JSA recommendations. HODs/
Fire & Safety & higher management personnel may also check compliance of JSA
recommendations while doing visit & checking of hot jobs during schedule visit to the
unit / area.