Pervious Approval
Email: sameer.altamari@bahra-
cables.com
No. of Pages: 1
We are pleased to advise you that you have been included in Etisalat’s
Prequalified vendors’ list and you will be invited for suitable Tenders, as and
when available.
Your response to our invitations and your participation in our Tenders will be
observed for your continued registration with us.
Regards,
KHALIL SULAIMAN
SENIOR MANAGER/TENDER
From: Mouza Khalfan Saeed Al Mehrezi [mailto:mouza.almehrezi@aam.gov.ae]
Sent: Monday, November 2, 2020 9:41 AM
To: Sameer Fareed AlTamari <Sameer.altamari@bahra-cables.com>
Cc: Anwar Mahmoud Sediqee <Anwar.sediqee@aam.gov.ae>
Subject: RE: تأه ل مصنع حرة لصناعة انظمة التار ض والحما ة من الصواعقpre-qualifying BAHRA Earthing &
lightning protection system
You have fulfilled all the requirements of factory approval to take part in AACM projects. Since we have
not given factory approval letter for to any other Earthing material manufacturer, we advice you to
approach the contractor for taking part in the project provided they propose yo to client
Regard
<3 pbs!
GOVERNMENT OF DUBAI
Bsloyl Guts
(Jo 611337
04 8626265
2990) Bylo! 9 25
(A219 digb
alell 59 Joyo
5819
Go Clie A ym lia
bylat wb
Sud ~~
OF dea
a
ROADS & TRANSPORT AUTHORITY ah 1 Bylo] v
Tel. +971
4444 -Fan+971 4 2065566.
ucts
Scanned by CamScanner
Scanned by CamScanner
MATERIAL SUBMISSION SHEET CONTENTS
A. GENERAL DATA
B. CONFORMITY LIST .
C. PRODUCT DATA ..
Makkah Public Transport Program - MPTP
Bus Network Civil Infrastructure Works Phase - 1
Status N/A
(0 selected)
Revision
File Document No Revision Title Status
Date
ATTRIBUTES
Attribute 1 CMD
Attribute 2 E-Electrical
MESSAGE
The attached documents have completed the "Materials Approval" workflow with the following results :
Review
Doc No Step Participant Comments
Outcome
ZBP- Materials I B- 1. Earthing and Lightning Protection (by Bahra) -sample materials submittal is
NESMA- Review Tarbiyyah Approved ACCEPTABLE, locally available and manufactured in the Kingdom of Saudi
CMD- as Noted Arabia, complying on the Technical Specification Section 16660- EARTHING
https://ksa1.aconex.com/Logon 1/2
8/31/2019 Aconex
https://ksa1.aconex.com/Logon 2/2
1. Earthing and Lightning Protection (by Bahra Cables) -Manufacturer is ACCEPTABLE, locally available and
manufactured in the Kingdom of Saudi Arabia, complying on the Technical Specification Section 16660- EARTHING
SYSTEM and Section 16670- LIGHTNING PROTECTION FARADAY CAGE SYSTEM.
PROJECT : ZAHID BUSINESS PARK
SAHARA BUILDING CONTRACTORS
MATERIAL SUBMITTAL
PURPOSE OF SUBMITTAL
ATTACHEMENTS
F-V3ME/SUB/ZBP/001- Rev. 00
By MMU at 4:13 pm, Nov 05, 2019
52<$/&200,66,21)25-8%$,/$1'<$1%8
52<$/&200,66,21,1-8%$,/
&216758&7,21'(3$570(17
7(&+1,&$/68%0,77$/5(9,(:&RQWUDFWRU&RS\
&RQWUDFW1R $&
&6
X :RUN0D\3URFHHG &6 5HYLVHDQG5HVXEPLW:RUN
&2175$&72568%0,77$/12 'RF1R 0D\1RW3URFHHG
/DUVRQ&KULVWRSKHU
Digitally signed by Christopher Larson
1RWH
Comments must be written on the Comments sheet and attached. Comments which can only be possible on the contractor's
submittal must be indexed on this form
Document status applies to technical content only. Use of foreign materials, equipment and services is subject to royal
commission's approval. Once this technical submittal is given code 1 or 2 status, contractor shall submit vendor approval(with
technical submittal package) for royal commission's review. Procurement prior to this approval is done at the contractor's own risk.
6DWXUGD\0DUFK
52<$/&200,66,21)25-8%$,/$1'<$1%8
52<$/&200,66,21,1-8%$,/
&216758&7,21'(3$570(17
7(&+1,&$/68%0,77$/5(9,(:&RQWUDFWRU&RS\
&RQWUDFW1R &&
&6
X :RUN0D\3URFHHG &6 5HYLVHDQG5HVXEPLW:RUN
&2175$&72568%0,77$/12 'RF1R 0D\1RW3URFHHG
1RWH
Comments must be written on the Comments sheet and attached. Comments which can only be possible on the contractor's
submittal must be indexed on this form
Document status applies to technical content only. Use of foreign materials, equipment and services is subject to royal
commission's approval. Once this technical submittal is given code 1 or 2 status, contractor shall submit vendor approval(with
technical submittal package) for royal commission's review. Procurement prior to this approval is done at the contractor's own risk.
:HGQHVGD\6HSWHPEHU
Scanned with CamScanner
TCES-GEN-TRA-MAT-000-EL-EG-00011
da I Contractor :
...-...-----
ConsultA!nt: Tunnels & Culverts Connecting Electrical Substations
Supplying Third Saudi Extension of Makkah Haram
Surrounding Areas ·rcES" -
CONTRACTOR: SAUDI BINLADIN GROUP (HARAMAIN DIVISION) Date : 28-Jan-2020
Sample Board 0
2. Submittal Description: EARTHING SYSTEM catalogue 0
s ] ,.
0
" · Sign
Product Warranty
Test Report
Tech. Data
Company Profile
--
10
0
0
0
~.... l!ml CJt Compliance Statement
-
0
~~ ~ Previous Approvals 0
' 2 OcT 'T'a\ \,\ -
Area Of Appbtlon : TCES Project Wherever needed •t 6~ t Reply of comments 0
o.--.w. No. : As per Project Design I Approved Shop Drawings. Certificates 0
-
Spedfbtion Ref. : 260526 Method Statement 0
AttKhed MAT Approwl Copy : NIA Code: NIA Others ~
Original allached 0 0
3. MANUFACTURER I SUPPUER:
Menufacturer & Addre11 BAHRA ADVANCED CABLE MANUFACTURE Co. Ltd. , 84thr'11J ·J;:.sA •
Suppi!M & Addrna BAHRA ADVANCED CABLE MANUFACTURE Co. Ltd ..J '6"1'-A ~ }:::s A .
4. SBG Comments: • Please proceed • Refer to .U.c:hed sheet
18/?/?0?0
- - - -- - - -- - - - - - -- - - - - - - - - - - - - - - --IC). Revise & Rnubmlt 0
------------ - - -- --·----..---·-----·------1 0
----------------------------------~0).
,.,.... ,..... R~c:ted
On behalf of
Ezzat A.Halim 17/06/2020
Scanned with CamScanner
Code B
3-5-2020
BSS JV - King Faisal Air Academy
Description: Material Submittal for Earthing & Lightning Protection System by BAHRA
Item No. Doc. No. Rev Title Issued for Status Reviewed By Date
Note:
Disclaimer:
1- Review & Approval are for conformance with information given and the design concept of the project as expressed in the contract documents
2- Dar Al Riyadh Review & Approval of the Contractor's Submittals shall not relieve the contractor from any obligation contained in the contract documents
3- no responsibility is assumed for accuracy or completeness of submittal dimension, quantity or details.
4- Corrdinate with the other contractor and field verfiy all dimensions perior to fabrication, construction or installation
5- Coordinate with the other contractor for all adjacent and/or related disciplines, equipment and materials
Code A = Approved, Code B = Approved With Comment, Code C = Revise & Resubmit, Code D = Rejected, Code E = Review Not Required
SN Comment
Description Status
by
The copper-bonded earth rod shall comply with the project’s technical specification
section 16161-1: 2.02 “not less than 20mm in diameter, 3m long and the thickness
of the copper sheath shall be approximately 10% of the overall rod diameter.
1. Therefore, propose in the re-submittal copper bond earth rods with the greatest Kh.S CLOSED
possible copper thickness that the manufacturer can produce.
Complied with 20 mm x 3 m un-threaded Copper Bonded Earth
Rod with 400μm Copper Coating maximum.
Provide a complete tabulated list and highlight those materials in the catalogue/data
2. sheet scheduled to be used in the project under the section “Proposed product Kh.S CLOSED
material schedule/variation”.
3. Comply with section 16161-1: 2.02.A (noted is not accepted) Kh.S CLOSED
Resubmit the draft Warranty Certificate of this material for product performance
4. and durability starting date on handover date. For strict compliance on the next Kh.S CLOSED
submittal.
Submit the tabulated list of proposed material with the following information as
follows; item no., location of usage, material description, proposed product photo,
5. JM CLOSED
manufacturer/ brand, technical specs, complying standard test, warranty, origin
(with stamp).
Submit installation details, schematic diagram and method statement for each
6. JM CLOSED
system.
Submit the grounding materials for equipment for item Part-2 Product item 2.01.C.
7. JM OPEN
For compliance, on the next submittal.
1|Page
King Faisal Air Force Academy Project
DAR‐KFAA‐QMS‐DC‐FRM‐05‐R00
Submittal Comments Review
Form
King Faisal Air Academy Project
Royal Saudi Air Force
Kingdom of Saudi Arabia
Disclaimer: Dar Al Riyadh review and approval of the Contractor’s submittals shall not relieve the Contractor from any obligation contained in the Contract
Documents. Permission to proceed shall not constitute acceptance or approval of design details, calculations, analyses, test methods, or materials developed or
selected by the Contractor.
2|Page
King Faisal Air Force Academy Project
DAR‐KFAA‐QMS‐DC‐FRM‐05‐R00
HOLD POINT RELEASE
10
Consultant
11 Notes
1-For
12 grounding and lightning system the supplier should submit calculation according to
The13 actual soil resistivity
2-All
14
materials used should be according to the approved design.
3-The approval certification for the mentioned suppliers should be provided
15
16
17
18
19
20
21
Eng.
Ibrahim Shafay Eng. Ahmed hegazy
11 Regional Infrastructure
Regional Infrastructure
NEOM
Saudi Arabia
Status N/A
(0 selected)
Revision
File Document No Revision Title Status
Date
MESSAGE
1 of 2 10-Dec-20, 1:10 PM
Firefox https://ksa1.aconex.com/rsrc/20201124.0430/en_AU_DOC/mail/view/in...
2 of 2 10-Dec-20, 1:10 PM
SAPL RECEIVED, 19 Aug 2020 "NHC Approval not Required"
20 Aug 2020
4JHOBUVSF
Arnel A. Morillo
6HHFRPPHQWVRQWKHQH[WSDJH
PHG$O $KPDGL
$KPHG$O$KPDGL
The Procurement of TBC’s Schools Infrastructure Program
Wave 1
REVIEWER COMMENT
Item
No.
WOPC COMMENT
1. The BC to comply with the following
a. Procurer/ FM requirements “Design and construction requirements” (Section/Clause) under the Building Contract.
b. Annex 4 schedule one, Regulations, Guidelines Standard and Building Code Under the Building Contract
c. Design drawings RIBA stage 4 _ '' LEGEND & GENERAL NOTES'' SL# EG002 REV.00
d. Design and construction Proposal DCR/ # Section 26 05 26- Grounding and Bonding for Electrical Systems
e. K&As’ Comments mentioned in Submittal Review Comments Sheet
2. The BC to provide the following for further review
a. Hand Hole Cover for Earth Pit where the Rod will be inside should be included in the system
b. Samples, are to be provided and kept in the project sample room for further inspection
c. MTC Material Test Certificate as per Factory standard and County of Origin Certificates CCO upon delivery
3. Following materials NOT complying with Construction Proposal /Outline Specification, BC to submit it for further review and approval
a. Air terminals shall be solid copper minimum 16mm diameter a minimum of 500mm long
b. Buried Earth Conductors Barer annealed copper strip conductor 25x3 mm or annealed stranded copper conductor 95 mm2 cross-section.
Note:
The Review or Comment by the Contractor to the Submittals shall not relieve the Building Contractor of its obligations and liabilities under the Building Contract nor
is it an acknowledgment by the Contractor that the Building Contractor has complied with such obligations. Such Review shall not in any way affects or reduce the
Building Contractor's obligations and liabilities to complete the Works under the Building Contract, or be construed as approval or acceptance of the Works. The
Contractor shall not be liable for any inaccuracy or insufficiency in the information given to or used by the Building Contractor
REVIEWER SIGNATURES
NAME: Ahmed Al Ahmadi
DATE : 17-10-21
SIGNATURE:
Page 1 of 1
12/14/21, 7:30 AM Aconex
14 Outer Regions
Riyadh, KSA
Riyadh
Saudi Arabia
Status N/A
(0 selected)
Revision
Document No Revision Title Status
Date
MESSAGE
The attached documents have completed the "14-4800000322/000-IN-Project Management - IFR-PQD" workflow with the following results :
https://ksa1.aconex.com/Logon 1/2
12/14/21, 7:30 AM Aconex
MOB-ELE-PQD-000010
14-662000-4800000322-
NEOM/AECOM_Review M Shafique A - Work May Proceed
MOB-ELE-CRS-000039
https://ksa1.aconex.com/Logon 2/2
Page 1 NEOM CRS Template
PMC/Design Reviewer CRS Reviewed by: Name of PMC Individual (Single Person) who reviews the overall CRS comments and codes allocated by Lead Author/s
PMC/Design Reviewer CRS Approved by: Name of PMC Individual (Single Person) who Approves the CRS. Sign
Discipline(s) involved ELE - Electrical Mr. XX - Position = xxx Date
Location NEOM - D & B Truck Services Center Name of NEOM Individual (NEOM PTS Design Manager) who concurs with the code allocated by PMC. Sign
NEOM No Objection :
Transmittal received date by NEOM 06-Dec-21 Mr. XX - Position = xxx Date
Disclaimer : Permission to proceed shall not constitute acceptance or approval of design details, calculations, analyses, test methods or materials developed or selected by the Contractor and shall not relieve the Contractor from full compliance with Contractual obligations and NEOM requirements
Status Codes: All codes must be as per NEOM Documents NEOM-NPR-PLN-101 (Design Management Plan) & N E O M - N E N - P R C - 030 (Project Document Numbering and Revision Procedure)
A = Work may proceed , B = Incorporate Comments - Proceed , C = Revise & Resubmit - Do not Proceed , D= Rejected, E = Review not required - Proceed
Responded
No. Doc/Section/ Page NEOM`s Design Reviewer/PMC Comments Comments made by Initial Status NEOM`s Designer Response Revised Status
By
Relevant Discipline No:1
1
Contractor MOBCO
Document 14-662000-4800000322-MOB-ELE
submittal no. -PQD-000010
Contract no. 4800000322/000 Date 06-12-2021
To PMC AECOM
Approval Comments
Information Other
Approval Comments
Information Other
Signature
PMC’s comments
Signature
Received by Contractor
Name Date
Signature
Page 1 of 2
14-66200-4800000322-MOB-PMN-CVS-000001
14-662000-4800000322-MOB-ELE-PQD-000010
Document history
Document approval
14-662000-4800000322-MOB-ELE-PQD-000008
14-662000-4800000322-MOB-ELE-PQD-000010
�wte EVN Group
Transmittal
Transmittal Ref. No. 446-02-476-TX-01003-21 29 December 2021
Project Umm Al Hayman Wastewater Project Project No. SE/171
Client Ministry of Public Works
Project Company Umm Al Hayman for Wastewater Treatment Company K.S.P.C.
Contract Plant EPC Sub-Contract
To Teixeira Duarte Engenharia e Construcoes, S.A.
Mazaya Tower, Tower 2, 8th Floor Street Khalid lbn Al Waleed, Block 3 Mirqab, Kuwait City
Attention Mr. Carlos Alberto Lopes Timoteo
Project Manager
Reference 476-02-446-TX-02063-21
Comments
Geitzenauer, Dieter
O&ddi
�im Kerstein
MEP Manager Technical Project Director
'
RECEIVED BY
°Key: MT - Material/Equipment Approval Request SC/ SP - Subcontractor/ Supplier Approval Request RI - Request for Information
Ml - Material/Equipment Receiving Inspection Request IR - Work Inspection Request MS - Method Statement
► Cc (26) Mr Mohammed AfHuihay"li - Pulllic Invest Fu:nd -AMAALA. (+25 more ... )
status NIA
□ e 1 Al10080-000C01-RBU-MAT-
ELa0025
01
Malerial Submittal fm Insulated Copper
Tape - Batira
Acoepted 11,ii!h
Comments
v MESSAGE
LTAC
DETAILS OF : PURCHASE REQUEST
Details Date Discipline MAR No.
FINAL RESULT
Approved As Noted & Closed
CONSULTANTS COMMENTS
CLIENT COMMENTS
21-Jun-2022
Mahmoud Shadfan
Consultant PM
Client Representative
Approval of the adoption of the above works does not relieve the Contractor of his responsibilities under the contract
MATERIAL SUBMITTAL FORM
Material Details
Material Name Earthing & Lightning Protection
Specifications
( 26 05 26 ) & ( 26 41 13 )
Reference
Manufacturer
Bahra – Electric House Location
Name
Contractor PM
Validated/
☐ Validated
Rejected Name: Signature: Date:
by PMO ☐ Rejected
☐ Final
Approved
Approved Name: Signature: Date:
by KSPF
☐ Rejected
Received by
Signature Date
Contractor
Cc (8) NEOM Quality & Excellence Document Control - NEOM - Engineering & Technical Services Dept (+7 more...)
Status N/A
(0 selected)
Revision
File Document No Revision Title Status
Date
B-
03-150000- 4800000378/000-Material Submittal from Bahra
Incorporate
4800000378-SOM- 01 09/08/2022 Advanced Cable Manufacture Co. Ltd. for Supplying
Comments -
ELE-MAT-000014 Earthing System for Street Lighting
Proceed
MESSAGE
The attached documents have completed the "4800000378/000-Material Submittal from Bahra Advanced Cable Manufacture Co. Ltd. for
Supplying Earthing System for Street Lighting" workflow with the following results :