PEMERINTAHAN KABUPATEN KARO

DESA BARUS JAHE

RENCANA ANGGARAN BIAYA


) RAB (

SUMBER DANA : ALOKASI DANA DESA


NAMA KEGIATAN : PEMBANGUNAN JALAN USAHA TANI DESA BARUS JAHE KEC. BARUS JAHE

NILAI PAGU : Rp. 549.000.000,00


(Lima Ratus Empat Puluh Sembilan Juta Rupiah)

KABANJAHE
2017
REKAPITULASI
RENCANA ANGGARAN BIAYA

Sumber Dana : ALOKASI DANA DESA


Nama Kegiatan : PEMBANGUNAN JALAN USAHA TANI DESA BARUS JAHE KEC. BARUS JAHE

NO URAIAN KEGIATAN JUMLAH HARGA


(Rp)
I. PEKERJAAN PERSIAPAN 11,950,000.00

II. PEKERJAAN TANAH #REF!

III. PEKERJAAN PERKERASAN #REF!

IV. PEKERJAAN LAIN-LAIN 600,000.00

SUB TOTAL (a) #REF!

PPN 10% (b) #REF!

TOTAL (a + b ) #REF!

DIBULATKAN 549,000,000.00

Terbilang : (Lima Ratus Empat Puluh Sembilan Juta Rupiah)


RENCANA ANGGARAN BIAYA
Sumber Dana : ALOKASI DANA DESA
Kegiatan : PEMBANGUNAN JALAN USAHA TANI DESA BARUS JAHE KEC. BARUS JAHE

Panjang (m) : 1507.00


Lebar (m) : 3.00
Lebar Damija (m) : 5.00

KODE HARGA JUMLAH. HARGA


NO URAIAN PEKERJAAN SATUAN ANALISA VOLUME SATUAN (Rp. ,00)
I PEKERJAAN PERSIAPAN
1 Pematokan / Pengukuran kembali ls ls 1 600,000 600,000.00
2 Pemasangan Papan Nama Proyek ls ls 1 350,000 350,000.00
3 Sewa Pemondokan ls paket 1 1,000,000.00 1,000,000.00
4 Mobilisasi dan Demobilisasi personil / Alat ls ls 2 5,000,000 10,000,000.00
SUB TOTAL - I 11,950,000.00
II PEKERJAAN TANAH
1 Pembersihan Semak / Damija M2 K210 3,014.00 #REF! #REF!
2 Membentuk Badan Jalan / Subgrade M3 K321 a1 1,561.69 #REF! #REF!
SUB TOTAL - II #REF!
III PEKERJAAN PERKERASAN
1 Pemasangan Batu Pecah Ukuran 15-20 cm M2 K516 a 4,521.00 #REF! #REF!
Lebar (m) Panjang (m) Luas (m2)
3.00 1507.00 4521.00
SUB TOTAL - III #REF!
IV PEKERJAAN LAIN-LAIN
1 Foto Dokumentasi ls ls 1 600,000.00 600,000.00
SUB TOTAL - IV 600,000.00
URAIAN ANALISA ALAT
E157

No. URAIAN KODE KOEF. SATUAN KET.

A. URAIAN PERALATAN
1. Jenis Peralatan ASPHALT FINISHER E157
2. Tenaga Pw 47.0 HP
3. Kapasitas Cp 6.0 Liter
4. Alat Baru : a. Umur Ekonomis A 5.0 Tahun
b. Jam Kerja Dalam 1 Tahun W 2,000.0 Jam

5. Alat Yang Dipakai : a. Umur Ekonomis A' 7.0 Tahun


b. Jam Kerja Dalam 1 Tahun W' 1,200.0 Jam
c. Harga Alat (*) B' 277,605,000 Rupiah

B. BIAYA PASTI PER JAM KERJA


1. Nilai Sisa Alat 10 % x B C 27,760,500 Rupiah

2. Faktor Angsuran Modal = i x (1 + i)^A' D 0.24036 -


(1 + i)^A' - 1
3. Biaya Pasti per Jam :
a. Biaya Pengembalian Modal = ( B' - C ) x D E 50,043.93 Rupiah
W'

b. Asuransi, dll = 0.033 x B' F 7,634.14 Rupiah


W'

Biaya Pasti per Jam = (E+F) G 57,678.07 Rupiah

C. BIAYA OPERASI PER JAM KERJA

1. Bahan Bakar = (0.125-0.175 Ltr/HP/Jam) x Pw x Ms H 25,262.50 Rupiah

2. Pelumas = (0.01-0.02 Ltr/HP/Jam) x Pw x Mp I 11,750.00 Rupiah

3. Perawatan dan (12,5 % - 17,5 %) x B' K 28,917.19 Rupiah


perbaikan = W'

Biaya Operasi per Jam = (H+I+K) P 65,929.69 Rupiah

D. TOTAL BIAYA SEWA ALAT / JAM = ( G + P ) S 123,607.75 Rupiah

E. LAIN - LAIN
1. Tingkat Suku Bunga i 15.00 % / Tahun
2. Upah Operator / Sopir U1 7,142.86 Rp./Jam
3. Upah Pembantu Operator / Pmb.Sopir U2 4,285.71 Rp./Jam
4. Bahan Bakar Bensin Mb 4,500.00 Liter
5. Bahan Bakar Solar Ms 4,300.00 Liter
6. Minyak Pelumas Mp 25,000.00 Liter
7. PPN diperhitungkan pada lembar Rekapitulasi
Biaya Pekerjaan
URAIAN ANALISA ALAT
E154

No. URAIAN KODE KOEF. SATUAN KET.

A. URAIAN PERALATAN
1. Jenis Peralatan ASPHALT SPRAYER E154
2. Tenaga Pw 15.0 HP
3. Kapasitas Cp 800.0 Liter
4. Alat Baru : a. Umur Ekonomis A 5.0 Tahun
b. Jam Kerja Dalam 1 Tahun W 200.0 Jam

5. Alat Yang Dipakai : a. Umur Ekonomis A' 6.0 Tahun


b. Jam Kerja Dalam 1 Tahun W' 1,200.0 Jam
c. Harga Alat (*) B' 147,260,000 Rupiah

B. BIAYA PASTI PER JAM KERJA


1. Nilai Sisa Alat 10 % x B C 14,726,000 Rupiah

2. Faktor Angsuran Modal = i x (1 + i)^A' D 0.26424 -


(1 + i)^A' - 1
3. Biaya Pasti per Jam :
a. Biaya Pengembalian Modal = ( B' - C ) x D E 29,183.65 Rupiah
W'

b. Asuransi, dll = 0.033 x B' F 4,049.65 Rupiah


W'

Biaya Pasti per Jam = (E+F) G 33,233.30 Rupiah

C. BIAYA OPERASI PER JAM KERJA

1. Bahan Bakar = (0.125-0.175 Ltr/HP/Jam) x Pw x Ms H 8,062.50 Rupiah

2. Pelumas = (0.01-0.02 Ltr/HP/Jam) x Pw x Mp I 3,750.00 Rupiah

3. Perawatan dan (12,5 % - 17,5 %) x B' K 15,339.58 Rupiah


perbaikan = W'

Biaya Operasi per Jam = (H+I+K) P 27,152.08 Rupiah

D. TOTAL BIAYA SEWA ALAT / JAM = ( G + P ) S 60,385.38 Rupiah

E. LAIN - LAIN
1. Tingkat Suku Bunga i 15.00 % / Tahun
2. Upah Operator / Sopir U1 7,142.86 Rp./Jam
3. Upah Pembantu Operator / Pmb.Sopir U2 4,285.71 Rp./Jam
4. Bahan Bakar Bensin Mb 4,500.00 Liter
5. Bahan Bakar Solar Ms 4,300.00 Liter
6. Minyak Pelumas Mp 25,000.00 Liter
7. PPN diperhitungkan pada lembar Rekapitulasi
Biaya Pekerjaan
URAIAN ANALISA ALAT
E001

No. URAIAN KODE KOEF. SATUAN KET.

A. URAIAN PERALATAN
1. Jenis Peralatan BULLDOZER 100-150 HP E001
2. Tenaga Pw 140.0 HP
3. Kapasitas Cp - -
4. Alat Baru : a. Umur Ekonomis A 5.0 Tahun
b. Jam Kerja Dalam 1 Tahun W 2,000.0 Jam

5. Alat Yang Dipakai : a. Umur Ekonomis A' 8.0 Tahun


b. Jam Kerja Dalam 1 Tahun W' 1,200.0 Jam
c. Harga Alat (*) B' 764,060,000 Rupiah

B. BIAYA PASTI PER JAM KERJA


1. Nilai Sisa Alat 10 % x B C 76,406,000 Rupiah

2. Faktor Angsuran Modal = i x (1 + i)^A' D 0.22285 -


(1 + i)^A' - 1
3. Biaya Pasti per Jam :
a. Biaya Pengembalian Modal = ( B' - C ) x D E 127,703.13 Rupiah
W'

b. Asuransi, dll = 0.033 x B' F 21,011.65 Rupiah


W'

Biaya Pasti per Jam = (E+F) G 148,714.78 Rupiah

C. BIAYA OPERASI PER JAM KERJA

1. Bahan Bakar = (0.125-0.175 Ltr/HP/Jam) x Pw x Ms H 207,042.50 Rupiah

2. Pelumas = (0.01-0.02 Ltr/HP/Jam) x Pw x Mp I 151,442.20 Rupiah

3. Perawatan dan (12,5 % - 17,5 %) x B' K 79,589.58 Rupiah


perbaikan = W'

Biaya Operasi per Jam = (H+I+K) P 438,074.28 Rupiah

D. TOTAL BIAYA SEWA ALAT / JAM = ( G + P ) S 586,789.06 Rupiah

E. LAIN - LAIN
1. Tingkat Suku Bunga i 15.00 % / Tahun
2. Upah Operator / Sopir U1 28,571.43 Rp./Jam
3. Upah Pembantu Operator / Pmb.Sopir U2 20,142.86 Rp./Jam
4. Bahan Bakar Bensin Mb 7,268.00 Liter
5. Bahan Bakar Solar Ms 11,831.00 Liter
6. Minyak Pelumas Mp 108,173.00 Liter
7. PPN diperhitungkan pada lembar Rekapitulasi
Biaya Pekerjaan
URAIAN ANALISA ALAT
E301

No. URAIAN KODE KOEF. SATUAN KET.

A. URAIAN PERALATAN
1. Jenis Peralatan AIR COMPRESSOR E301
2. Tenaga Pw 80.0 HP
3. Kapasitas Cp - -
4. Alat Baru : a. Umur Ekonomis A 5.0 Tahun
b. Jam Kerja Dalam 1 Tahun W 200.0 Jam

5. Alat Yang Dipakai : a. Umur Ekonomis A' 6.0 Tahun


b. Jam Kerja Dalam 1 Tahun W' 1,200.0 Jam
c. Harga Alat (*) B' 147,260,000 Rupiah

B. BIAYA PASTI PER JAM KERJA


1. Nilai Sisa Alat 10 % x B C 14,726,000 Rupiah

2. Faktor Angsuran Modal = i x (1 + i)^A' D 0.26424 -


(1 + i)^A' - 1
3. Biaya Pasti per Jam :
a. Biaya Pengembalian Modal = ( B' - C ) x D E 29,183.65 Rupiah
W'

b. Asuransi, dll = 0.033 x B' F 4,049.65 Rupiah


W'

Biaya Pasti per Jam = (E+F) G 33,233.30 Rupiah

C. BIAYA OPERASI PER JAM KERJA

1. Bahan Bakar = (0.125-0.175 Ltr/HP/Jam) x Pw x Ms H 43,000.00 Rupiah

2. Pelumas = (0.01-0.02 Ltr/HP/Jam) x Pw x Mp I 20,000.00 Rupiah

3. Perawatan dan (12,5 % - 17,5 %) x B' K 15,339.58 Rupiah


perbaikan = W'

Biaya Operasi per Jam = (H+I+K) P 78,339.58 Rupiah

D. TOTAL BIAYA SEWA ALAT / JAM = ( G + P ) S 111,572.88 Rupiah

E. LAIN - LAIN
1. Tingkat Suku Bunga i 15.00 % / Tahun
2. Upah Operator / Sopir U1 7,142.86 Rp./Jam
3. Upah Pembantu Operator / Pmb.Sopir U2 4,285.71 Rp./Jam
4. Bahan Bakar Bensin Mb 4,500.00 Liter
5. Bahan Bakar Solar Ms 4,300.00 Liter
6. Minyak Pelumas Mp 25,000.00 Liter
7. PPN diperhitungkan pada lembar Rekapitulasi
Biaya Pekerjaan
URAIAN ANALISA ALAT
E211

No. URAIAN KODE KOEF. SATUAN KET.

A. URAIAN PERALATAN
1. Jenis Peralatan DUMP TRUCK 3-4 M3 E211
2. Tenaga Pw 115.0 HP
3. Kapasitas Cp 6.0 Ton
4. Alat Baru : a. Umur Ekonomis A 5.0 Tahun
b. Jam Kerja Dalam 1 Tahun W 200.0 Jam

5. Alat Yang Dipakai : a. Umur Ekonomis A' 6.0 Tahun


b. Jam Kerja Dalam 1 Tahun W' 1,300.0 Jam
c. Harga Alat (*) B' 168,300,000 Rupiah

B. BIAYA PASTI PER JAM KERJA


1. Nilai Sisa Alat 10 % x B C 16,830,000 Rupiah

2. Faktor Angsuran Modal = i x (1 + i)^A' D 0.26424 -


(1 + i)^A' - 1
3. Biaya Pasti per Jam :
a. Biaya Pengembalian Modal = ( B' - C ) x D E 30,787.66 Rupiah
W'

b. Asuransi, dll = 0.033 x B' F 4,272.23 Rupiah


W'

Biaya Pasti per Jam = (E+F) G 35,059.90 Rupiah

C. BIAYA OPERASI PER JAM KERJA

1. Bahan Bakar = (0.125-0.175 Ltr/HP/Jam) x Pw x Ms H 170,070.63 Rupiah

2. Pelumas = (0.01-0.02 Ltr/HP/Jam) x Pw x Mp I 124,398.95 Rupiah

3. Perawatan dan (12,5 % - 17,5 %) x B' K 16,182.69 Rupiah


perbaikan = W'

Biaya Operasi per Jam = (H+I+K+L+M) P 310,652.27 Rupiah

D. TOTAL BIAYA SEWA ALAT / JAM = ( G + P ) S 345,712.16 Rupiah

E. LAIN - LAIN
1. Tingkat Suku Bunga i 15.00 % / Tahun
2. Upah Operator / Sopir / Mekanik U1 28,571.43 Rp./Jam
3. Upah Pembantu Operator / Pmb.Sopir / Pmb.Mekanik U2 20,142.86 Rp./Jam
4. Bahan Bakar Bensin Mb 7,268.00 Liter
5. Bahan Bakar Solar Ms 11,831.00 Liter
6. Minyak Pelumas Mp 108,173.00 Liter
7. PPN diperhitungkan pada lembar Rekapitulasi
Biaya Pekerjaan
URAIAN ANALISA ALAT
E212

No. URAIAN KODE KOEF. SATUAN KET.

A. URAIAN PERALATAN
1. Jenis Peralatan DUMP TRUCK E212
2. Tenaga Pw 145.0 HP
3. Kapasitas Cp 8.0 Ton
4. Alat Baru : a. Umur Ekonomis A 5.0 Tahun
b. Jam Kerja Dalam 1 Tahun W 2,000.0 Jam

5. Alat Yang Dipakai : a. Umur Ekonomis A' 6.0 Tahun


b. Jam Kerja Dalam 1 Tahun W' 1,300.0 Jam
c. Harga Alat (*) B' 209,880,000 Rupiah

B. BIAYA PASTI PER JAM KERJA


1. Nilai Sisa Alat 10 % x B C 20,988,000 Rupiah

2. Faktor Angsuran Modal = i x (1 + i)^A' D 0.26424 -


(1 + i)^A' - 1
3. Biaya Pasti per Jam :
a. Biaya Pengembalian Modal = ( B' - C ) x D E 38,394.03 Rupiah
W'

b. Asuransi, dll = 0.033 x B' F 5,327.72 Rupiah


W'

Biaya Pasti per Jam = (E+F) G 43,721.75 Rupiah

C. BIAYA OPERASI PER JAM KERJA

1. Bahan Bakar = (0.125-0.175 Ltr/HP/Jam) x Pw x Ms H 214,436.88 Rupiah

2. Pelumas = (0.01-0.02 Ltr/HP/Jam) x Pw x Mp I 156,850.85 Rupiah

3. Perawatan dan (12,5 % - 17,5 %) x B' K 20,180.77 Rupiah


perbaikan = W'

Biaya Operasi per Jam = (H+I+K) P 391,468.49 Rupiah

D. TOTAL BIAYA SEWA ALAT / JAM = ( G + P ) S 435,190.25 Rupiah

E. LAIN - LAIN
1. Tingkat Suku Bunga i 15.00 % / Tahun
2. Upah Operator / Sopir / Mekanik U1 28,571.43 Rp./Jam
3. Upah Pembantu Operator / Pmb.Sopir / Pmb.Mekanik U2 20,142.86 Rp./Jam
4. Bahan Bakar Bensin Mb 7,268.00 Liter
5. Bahan Bakar Solar Ms 11,831.00 Liter
6. Minyak Pelumas Mp 108,173.00 Liter
7. PPN diperhitungkan pada lembar Rekapitulasi
Biaya Pekerjaan
URAIAN ANALISA ALAT
E020

No. URAIAN KODE KOEF. SATUAN KET.

A. URAIAN PERALATAN
1. Jenis Peralatan EXCAVATOR 80-140 HP E020
2. Tenaga Pw 80.0 HP
3. Kapasitas Cp 0.5 M3
4. Alat Baru : a. Umur Ekonomis A 5.0 Tahun
b. Jam Kerja Dalam 1 Tahun W 200.0 Jam

5. Alat Yang Dipakai : a. Umur Ekonomis A' 8.0 Tahun


b. Jam Kerja Dalam 1 Tahun W' 1,500.0 Jam
c. Harga Alat (*) B' 881,100,000 Rupiah

B. BIAYA PASTI PER JAM KERJA


1. Nilai Sisa Alat 10 % x B C 88,110,000 Rupiah

2. Faktor Angsuran Modal = i x (1 + i)^A' D 0.22285 -


(1 + i)^A' - 1
3. Biaya Pasti per Jam :
a. Biaya Pengembalian Modal = ( B' - C ) x D E 117,811.93 Rupiah
W'

b. Asuransi, dll = 0.033 x B' F 19,384.20 Rupiah


W'

Biaya Pasti per Jam = (E+F) G 137,196.13 Rupiah

C. BIAYA OPERASI PER JAM KERJA

1. Bahan Bakar = (0.125-0.175 Ltr/HP/Jam) x Pw x Ms H 118,310.00 Rupiah

2. Pelumas = (0.01-0.02 Ltr/HP/Jam) x Pw x Mp I 86,538.40 Rupiah

3. Perawatan dan (12,5 % - 17,5 %) x B' K 73,425.00 Rupiah


perbaikan = W'

Biaya Operasi per Jam = (H+I+K+L+M) P 278,273.40 Rupiah

D. TOTAL BIAYA SEWA ALAT / JAM = ( G + P ) S 415,469.53 Rupiah

E. LAIN - LAIN
1. Tingkat Suku Bunga i 15.00 % / Tahun
2. Upah Operator / Sopir U1 28,571.43 Rp./Jam
3. Upah Pembantu Operator / Pmb.Sopir U2 20,142.86 Rp./Jam
4. Bahan Bakar Bensin Mb 7,268.00 Liter
5. Bahan Bakar Solar Ms 11,831.00 Liter
6. Minyak Pelumas Mp 108,173.00 Liter
7. PPN diperhitungkan pada lembar Rekapitulasi
Biaya Pekerjaan
URAIAN ANALISA ALAT
E221

No. URAIAN KODE KOEF. SATUAN KET.

A. URAIAN PERALATAN
1. Jenis Peralatan FLAT BED TRUCK 3-4 M3 E221
2. Tenaga Pw 100.0 HP
3. Kapasitas Cp 4.0 M3
4. Alat Baru : a. Umur Ekonomis A 5.0 Tahun
b. Jam Kerja Dalam 1 Tahun W 2,000.0 Jam

5. Alat Yang Dipakai : a. Umur Ekonomis A' 6.0 Tahun


b. Jam Kerja Dalam 1 Tahun W' 1,300.0 Jam
c. Harga Alat (*) B' 158,400,000 Rupiah

B. BIAYA PASTI PER JAM KERJA


1. Nilai Sisa Alat 10 % x B C 15,840,000 Rupiah

2. Faktor Angsuran Modal = i x (1 + i)^A' D 0.26424 -


(1 + i)^A' - 1
3. Biaya Pasti per Jam :
a. Biaya Pengembalian Modal = ( B' - C ) x D E 28,976.63 Rupiah
W'

b. Asuransi, dll = 0.033 x B' F 4,020.92 Rupiah


W'

Biaya Pasti per Jam = (E+F) G 32,997.55 Rupiah

C. BIAYA OPERASI PER JAM KERJA

1. Bahan Bakar = (0.125-0.175 Ltr/HP/Jam) x Pw x Ms H 147,887.50 Rupiah

2. Pelumas = (0.01-0.02 Ltr/HP/Jam) x Pw x Mp I 108,173.00 Rupiah

3. Perawatan dan (12,5 % - 17,5 %) x B' K 15,230.77 Rupiah


perbaikan = W'

Biaya Operasi per Jam = (H+I+K) P 271,291.27 Rupiah

D. TOTAL BIAYA SEWA ALAT / JAM = ( G + P ) S 304,288.82 Rupiah

E. LAIN - LAIN
1. Tingkat Suku Bunga i 15.00 % / Tahun
2. Upah Operator / Sopir U1 28,571.43 Rp./Jam
3. Upah Pembantu Operator / Pmb.Sopir U2 20,142.86 Rp./Jam
4. Bahan Bakar Bensin Mb 7,268.00 Liter
5. Bahan Bakar Solar Ms 11,831.00 Liter
6. Minyak Pelumas Mp 108,173.00 Liter
7. PPN diperhitungkan pada lembar Rekapitulasi
Biaya Pekerjaan
URAIAN ANALISA ALAT
E052

No. URAIAN KODE KOEF. SATUAN KET.

A. URAIAN PERALATAN
1. Jenis Peralatan WHEEL LOADER E052
2. Tenaga Pw 105.0 HP
3. Kapasitas Cp 1.5 M3
4. Alat Baru : a. Umur Ekonomis A 5.0 Tahun
b. Jam Kerja Dalam 1 Tahun W 2,000.0 Jam

5. Alat Yang Dipakai : a. Umur Ekonomis A' 8.0 Tahun


b. Jam Kerja Dalam 1 Tahun W' 1,500.0 Jam
c. Harga Alat (*) B' 508,880,000 Rupiah

B. BIAYA PASTI PER JAM KERJA


1. Nilai Sisa Alat = 10 % x B C 50,888,000 Rupiah

2. Faktor Angsuran Modal = i x (1 + i)^A' D 0.22285 -


(1 + i)^A' - 1
3. Biaya Pasti per Jam :
a. Biaya Pengembalian Modal = ( B' - C ) x D E 68,042.37 Rupiah
W'

b. Asuransi, dll = 0.033 x B' F 11,195.36 Rupiah


W'

Biaya Pasti per Jam = (E+F) G 79,237.73 Rupiah

C. BIAYA OPERASI PER JAM KERJA

1. Bahan Bakar = (0.125-0.175 Ltr/HP/Jam) x Pw x Ms H 155,281.88 Rupiah

2. Pelumas = (0.01-0.02 Ltr/HP/Jam) x Pw x Mp I 113,581.65 Rupiah

3. Perawatan dan (12,5 % - 17,5 %) x B' K 42,406.67 Rupiah


perbaikan = W'

Biaya Operasi per Jam = (H+I+K) P 311,270.19 Rupiah

D. TOTAL BIAYA SEWA ALAT / JAM = ( G + P ) S 390,507.92 Rupiah

E. LAIN - LAIN
1. Tingkat Suku Bunga i 15.00 % / Tahun
2. Upah Operator / Sopir U1 28,571.43 Rp./Jam
3. Upah Pembantu Operator / Pmb.Sopir U2 20,142.86 Rp./Jam
4. Bahan Bakar Bensin Mb 7,268.00 Liter
5. Bahan Bakar Solar Ms 11,831.00 Liter
6. Minyak Pelumas Mp 108,173.00 Liter
7. PPN diperhitungkan pada lembar Rekapitulasi
Biaya Pekerjaan
URAIAN ANALISA ALAT
E010

No. URAIAN KODE KOEF. SATUAN KET.

A. URAIAN PERALATAN
1. Jenis Peralatan MOTOR GRADER E010
2. Tenaga Pw 100.0 HP
3. Kapasitas Cp
4. Alat Baru : a. Umur Ekonomis A 5.0 Tahun
b. Jam Kerja Dalam 1 Tahun W 2,000.0 Jam

5. Alat Yang Dipakai : a. Umur Ekonomis A' 8.0 Tahun


b. Jam Kerja Dalam 1 Tahun W' 1,500.0 Jam
c. Harga Alat (*) B' 700,920,000 Rupiah

B. BIAYA PASTI PER JAM KERJA


1. Nilai Sisa Alat 10 % x B C 70,092,000 Rupiah

2. Faktor Angsuran Modal = i x (1 + i)^A' D 0.22285 -


(1 + i)^A' - 1
3. Biaya Pasti per Jam :
a. Biaya Pengembalian Modal = ( B' - C ) x D E 93,720.05 Rupiah
W'

b. Asuransi, dll = 0.033 x B' F 15,420.24 Rupiah


W'

Biaya Pasti per Jam = (E+F) G 109,140.29 Rupiah

C. BIAYA OPERASI PER JAM KERJA

1. Bahan Bakar = (0.125-0.175 Ltr/HP/Jam) x Pw x Ms H 147,887.50 Rupiah

2. Pelumas = (0.01-0.02 Ltr/HP/Jam) x Pw x Mp I 108,173.00 Rupiah

3. Perawatan dan (12,5 % - 17,5 %) x B' K 58,410.00 Rupiah


perbaikan = W'

Biaya Operasi per Jam = (H+I+K) P 314,470.50 Rupiah

D. TOTAL BIAYA SEWA ALAT / JAM = ( G + P ) S 423,610.79 Rupiah

E. LAIN - LAIN
1. Tingkat Suku Bunga i 15.00 % / Tahun
2. Upah Operator / Sopir U1 28,571.43 Rp./Jam
3. Upah Pembantu Operator / Pmb.Sopir U2 20,142.86 Rp./Jam
4. Bahan Bakar Bensin Mb 7,268.00 Liter
5. Bahan Bakar Solar Ms 11,831.00 Liter
6. Minyak Pelumas Mp 108,173.00 Liter
7. PPN diperhitungkan pada lembar Rekapitulasi
Biaya Pekerjaan
URAIAN ANALISA ALAT
E080

No. URAIAN KODE KOEF. SATUAN KET.

A. URAIAN PERALATAN
1. Jenis Peralatan THREE WHEEL ROLLER 6=10 TON E080
2. Tenaga Pw 55.0 HP
3. Kapasitas Cp 8.0 Ton
4. Alat Baru : a. Umur Ekonomis A 5.0 Tahun
b. Jam Kerja Dalam 1 Tahun W 2,000.0 Jam

5. Alat Yang Dipakai : a. Umur Ekonomis A' 10.0 Tahun


b. Jam Kerja Dalam 1 Tahun W' 1,500.0 Jam
c. Harga Alat (*) B' 536,810,000 Rupiah

B. BIAYA PASTI PER JAM KERJA


1. Nilai Sisa Alat 10 % x B C 53,681,000 Rupiah

2. Faktor Angsuran Modal = i x (1 + i)^A' D 0.19925 -


(1 + i)^A' - 1
3. Biaya Pasti per Jam :
a. Biaya Pengembalian Modal = ( B' - C ) x D E 64,176.30 Rupiah
W'

b. Asuransi, dll = 0.033 x B' F 11,809.82 Rupiah


W'

Biaya Pasti per Jam = (E+F) G 75,986.12 Rupiah

C. BIAYA OPERASI PER JAM KERJA

1. Bahan Bakar = (0.125-0.175 Ltr/HP/Jam) x Pw x Ms H 88,068.75 Rupiah

2. Pelumas = (0.01-0.02 Ltr/HP/Jam) x Pw x Mp I 78,870.00 Rupiah

3. Perawatan dan (12,5 % - 17,5 %) x B' K 57,259.73 Rupiah


perbaikan = W'

Biaya Operasi per Jam = (H+I+K+L+M) P 224,198.48 Rupiah

D. TOTAL BIAYA SEWA ALAT / JAM = ( G + P ) S 300,184.60 Rupiah

E. LAIN - LAIN
1. Tingkat Suku Bunga i 15.00 % / Tahun
2. Upah Operator / Sopir U1 21,375.00 Rp./Jam
3. Upah Pembantu Operator / Pmb.Sopir U2 17,250.00 Rp./Jam
4. Bahan Bakar Bensin Mb 7,300.00 Liter
5. Bahan Bakar Solar Ms 9,150.00 Liter
6. Minyak Pelumas Mp 71,700.00 Liter
7. PPN diperhitungkan pada lembar Rekapitulasi
Biaya Pekerjaan
URAIAN ANALISA ALAT
E081

No. URAIAN KODE KOEF. SATUAN KET.

A. URAIAN PERALATAN
1. Jenis Peralatan TANDEM ROLLER 6-8 T. E081
2. Tenaga Pw 50.0 HP
3. Kapasitas Cp 8.0 Ton
4. Alat Baru : a. Umur Ekonomis A 5.0 Tahun
b. Jam Kerja Dalam 1 Tahun W 2,000.0 Jam

5. Alat Yang Dipakai : a. Umur Ekonomis A' 10.0 Tahun


b. Jam Kerja Dalam 1 Tahun W' 1,500.0 Jam
c. Harga Alat (*) B' 409,940,000 Rupiah

B. BIAYA PASTI PER JAM KERJA


1. Nilai Sisa Alat 10 % x B C 40,994,000 Rupiah

2. Faktor Angsuran Modal = i x (1 + i)^A' D 0.19925 -


(1 + i)^A' - 1
3. Biaya Pasti per Jam :
a. Biaya Pengembalian Modal = ( B' - C ) x D E 49,008.83 Rupiah
W'

b. Asuransi, dll = 0.033 x B' F 9,018.68 Rupiah


W'

Biaya Pasti per Jam = (E+F) G 58,027.51 Rupiah

C. BIAYA OPERASI PER JAM KERJA

1. Bahan Bakar = (0.125-0.175 Ltr/HP/Jam) x Pw x Ms H 73,943.75 Rupiah

2. Pelumas = (0.01-0.02 Ltr/HP/Jam) x Pw x Mp I 54,086.50 Rupiah

3. Perawatan dan (12,5 % - 17,5 %) x B' K 34,161.67 Rupiah


perbaikan = W'

Biaya Operasi per Jam = (H+I+K) P 162,191.92 Rupiah

D. TOTAL BIAYA SEWA ALAT / JAM = ( G + P ) S 220,219.43 Rupiah

E. LAIN - LAIN
1. Tingkat Suku Bunga i 15.00 % / Tahun
2. Upah Operator / Sopir U1 28,571.43 Rp./Jam
3. Upah Pembantu Operator / Pmb.Sopir U2 20,142.86 Rp./Jam
4. Bahan Bakar Bensin Mb 7,268.00 Liter
5. Bahan Bakar Solar Ms 11,831.00 Liter
6. Minyak Pelumas Mp 108,173.00 Liter
7. PPN diperhitungkan pada lembar Rekapitulasi
Biaya Pekerjaan
URAIAN ANALISA ALAT
E084

No. URAIAN KODE KOEF. SATUAN KET.

A. URAIAN PERALATAN
1. Jenis Peralatan P. TIRE ROLLER 6-10 T. E084
2. Tenaga Pw 60.0 HP
3. Kapasitas Cp 10.0 Ton
4. Alat Baru : a. Umur Ekonomis A 5.0 Tahun
b. Jam Kerja Dalam 1 Tahun W 2,000.0 Jam

5. Alat Yang Dipakai : a. Umur Ekonomis A' 10.0 Tahun


b. Jam Kerja Dalam 1 Tahun W' 1,500.0 Jam
c. Harga Alat (*) B' 593,020,000 Rupiah

B. BIAYA PASTI PER JAM KERJA


1. Nilai Sisa Alat 10 % x B C 59,302,000 Rupiah

2. Faktor Angsuran Modal = i x (1 + i)^A' D 0.19925 -


(1 + i)^A' - 1
3. Biaya Pasti per Jam :
a. Biaya Pengembalian Modal = ( B' - C ) x D E 70,896.27 Rupiah
W'

b. Asuransi, dll = 0.033 x B' F 13,046.44 Rupiah


W'

Biaya Pasti per Jam = (E+F) G 83,942.71 Rupiah

C. BIAYA OPERASI PER JAM KERJA

1. Bahan Bakar = (0.125-0.175 Ltr/HP/Jam) x Pw x Ms H 88,732.50 Rupiah

2. Pelumas = (0.01-0.02 Ltr/HP/Jam) x Pw x Mp I 64,903.80 Rupiah

3. Perawatan dan (12,5 % - 17,5 %) x B' K 49,418.33 Rupiah


perbaikan = W'

Biaya Operasi per Jam = (H+I+K) P 203,054.63 Rupiah

D. TOTAL BIAYA SEWA ALAT / JAM = ( G + P ) S 286,997.35 Rupiah

E. LAIN - LAIN
1. Tingkat Suku Bunga i 15.00 % / Tahun
2. Upah Operator / Sopir U1 28,571.43 Rp./Jam
3. Upah Pembantu Operator / Pmb.Sopir U2 20,142.86 Rp./Jam
4. Bahan Bakar Bensin Mb 7,268.00 Liter
5. Bahan Bakar Solar Ms 11,831.00 Liter
6. Minyak Pelumas Mp 108,173.00 Liter
7. PPN diperhitungkan pada lembar Rekapitulasi
Biaya Pekerjaan
URAIAN ANALISA ALAT
E082

No. URAIAN KODE KOEF. SATUAN KET.

A. URAIAN PERALATAN
1. Jenis Peralatan VIBRATORY ROLLER 51 HP E082
2. Tenaga Pw 51.0 HP
3. Kapasitas Cp 7.0 Ton
4. Alat Baru : a. Umur Ekonomis A 5.0 Tahun
b. Jam Kerja Dalam 1 Tahun W 2,000.0 Jam

5. Alat Yang Dipakai : a. Umur Ekonomis A' 8.0 Tahun


b. Jam Kerja Dalam 1 Tahun W' 1,500.0 Jam
c. Harga Alat (*) B' 455,710,000 Rupiah

B. BIAYA PASTI PER JAM KERJA


1. Nilai Sisa Alat 10 % x B C 45,571,000 Rupiah

2. Faktor Angsuran Modal = i x (1 + i)^A' D 0.22285 -


(1 + i)^A' - 1
3. Biaya Pasti per Jam :
a. Biaya Pengembalian Modal = ( B' - C ) x D E 60,933.01 Rupiah
W'

b. Asuransi, dll = 0.033 x B' F 10,025.62 Rupiah


W'

Biaya Pasti per Jam = (E+F) G 70,958.63 Rupiah

C. BIAYA OPERASI PER JAM KERJA

1. Bahan Bakar = (0.125-0.175 Ltr/HP/Jam) x Pw x Ms H 75,422.63 Rupiah

2. Pelumas = (0.01-0.02 Ltr/HP/Jam) x Pw x Mp I 55,168.23 Rupiah

3. Perawatan dan (12,5 % - 17,5 %) x B' K 37,975.83 Rupiah


perbaikan = W'

Biaya Operasi per Jam = (H+I+K) P 168,566.69 Rupiah

D. TOTAL BIAYA SEWA ALAT / JAM = ( G + P ) S 239,525.32 Rupiah

E. LAIN - LAIN
1. Tingkat Suku Bunga i 15.00 % / Tahun
2. Upah Operator / Sopir U1 28,571.43 Rp./Jam
3. Upah Pembantu Operator / Pmb.Sopir U2 20,142.86 Rp./Jam
4. Bahan Bakar Bensin Mb 7,268.00 Liter
5. Bahan Bakar Solar Ms 11,831.00 Liter
6. Minyak Pelumas Mp 108,173.00 Liter
7. PPN diperhitungkan pada lembar Rekapitulasi
Biaya Pekerjaan
URAIAN ANALISA ALAT
0

No. URAIAN KODE KOEF. SATUAN KET.

A. URAIAN PERALATAN
1. Jenis Peralatan ASPHALT MIXING PLANT 0
2. Tenaga Pw 150.0 HP
3. Kapasitas Cp 30.0 Ton/Jam
4. Alat Baru : a. Umur Ekonomis A 10.0 Tahun
b. Jam Kerja Dalam 1 Tahun W 1,500.0 Jam

5. Alat Yang Dipakai : a. Umur Ekonomis A' 10.0 Tahun


b. Jam Kerja Dalam 1 Tahun W' 1,500.0 Jam
c. Harga Alat (*) B' 1,214,100,000 Rupiah

B. BIAYA PASTI PER JAM KERJA


1. Nilai Sisa Alat 10 % x B C 121,410,000 Rupiah

2. Faktor Angsuran Modal = i x (1 + i)^A' D 0.19925 -


(1 + i)^A' - 1
3. Biaya Pasti per Jam :
a. Biaya Pengembalian Modal = ( B' - C ) x D E 145,147.16 Rupiah
W'

b. Asuransi, dll = 0.033 x B' F 26,710.20 Rupiah


W'

Biaya Pasti per Jam = (E+F) G 171,857.36 Rupiah

C. BIAYA OPERASI PER JAM KERJA

1. Bahan Bakar = (0.125-0.175 Ltr/HP/Jam) x Pw x Ms H1 93,750.00 Rupiah


Bahan Bakar pemanasan Material 12 x 0.7 Cp x Ms H2 1,260,000.00

2. Pelumas = (0.01-0.02 Ltr/HP/Jam) x Pw x Mp I 60,000.00 Rupiah

3. Perawatan dan (12,5 % - 17,5 %) x B' K 101,175.00 Rupiah


perbaikan = W'

4. Operator 1 Org 7,142.86


Pembantu Operator 3 Org 12,857.14

Biaya Operasi per Jam = (H+I+K) P 1,534,925.00 Rupiah

D. TOTAL BIAYA SEWA ALAT / JAM = ( G + P ) S 1,706,782.36 Rupiah

E. LAIN - LAIN
1. Tingkat Suku Bunga i 15.00 % / Tahun
2. Upah Operator / Sopir U1 7,142.86 Rp./Jam
3. Upah Pembantu Operator / Pmb.Sopir U2 4,285.71 Rp./Jam
4. Bahan Bakar Bensin Mb 5,200.00 Liter
5. Bahan Bakar Solar Ms 5,000.00 Liter
6. Minyak Pelumas Mp 40,000.00 Liter
7. PPN diperhitungkan pada lembar Rekapitulasi
Biaya Pekerjaan
URAIAN ANALISA ALAT
E12

No. URAIAN KODE KOEF. SATUAN KET.

A. URAIAN PERALATAN
1. Jenis Peralatan GENERATOR SET E12
2. Tenaga Pw 175.0 HP
3. Kapasitas Cp 125.0 KVA
4. Alat Baru : a. Umur Ekonomis A 5.0 Tahun
b. Jam Kerja Dalam 1 Tahun W 2,000.0 Jam

5. Alat Yang Dipakai : a. Umur Ekonomis A' 5.0 Tahun


b. Jam Kerja Dalam 1 Tahun W' 2,000.0 Jam
c. Harga Alat (*) B' 153,000,000 Rupiah

B. BIAYA PASTI PER JAM KERJA


1. Nilai Sisa Alat 10 % x B C 15,300,000 Rupiah

2. Faktor Angsuran Modal = i x (1 + i)^A' D 0.29832 -


(1 + i)^A' - 1
3. Biaya Pasti per Jam :
a. Biaya Pengembalian Modal = ( B' - C ) x D E 20,539.03 Rupiah
W'

b. Asuransi, dll = 0.033 x B' F 2,524.50 Rupiah


W'

Biaya Pasti per Jam = (E+F) G 23,063.53 Rupiah

C. BIAYA OPERASI PER JAM KERJA

1. Bahan Bakar = (0.125-0.175 Ltr/HP/Jam) x Pw x Ms H 94,062.50 Rupiah

2. Pelumas = (0.01-0.02 Ltr/HP/Jam) x Pw x Mp I 43,750.00 Rupiah

3. Perawatan dan (12,5 % - 17,5 %) x B' K 9,562.50 Rupiah


perbaikan = W'

Biaya Operasi per Jam = (H+I+K) P 147,375.00 Rupiah

D. TOTAL BIAYA SEWA ALAT / JAM = ( G + P ) S 170,438.53 Rupiah

E. LAIN - LAIN
1. Tingkat Suku Bunga i 15.00 % / Tahun
2. Upah Operator / Sopir U1 7,142.86 Rp./Jam
3. Upah Pembantu Operator / Pmb.Sopir U2 4,285.71 Rp./Jam
4. Bahan Bakar Bensin Mb 4,500.00 Liter
5. Bahan Bakar Solar Ms 4,300.00 Liter
6. Minyak Pelumas Mp 25,000.00 Liter
7. PPN diperhitungkan pada lembar Rekapitulasi
Biaya Pekerjaan
URAIAN ANALISA ALAT
E12

No. URAIAN KODE KOEF. SATUAN KET.

A. URAIAN PERALATAN
1. Jenis Peralatan Concrete vibrator E12
2. Tenaga Pw 10.0 HP
3. Kapasitas Cp 0.0 KVA
4. Alat Baru : a. Umur Ekonomis A 4.0 Tahun
b. Jam Kerja Dalam 1 Tahun W 1,000.0 Jam

5. Alat Yang Dipakai : a. Umur Ekonomis A' 4.0 Tahun


b. Jam Kerja Dalam 1 Tahun W' 1,000.0 Jam
c. Harga Alat (*) B' 8,000,000 Rupiah

B. BIAYA PASTI PER JAM KERJA


1. Nilai Sisa Alat 10 % x B C 800,000 Rupiah

2. Faktor Angsuran Modal = i x (1 + i)^A' D 0.35027 -


(1 + i)^A' - 1
3. Biaya Pasti per Jam :
a. Biaya Pengembalian Modal = ( B' - C ) x D E 2,521.91 Rupiah
W'

b. Asuransi, dll = 0.033 x B' F 264.00 Rupiah


W'

Biaya Pasti per Jam = (E+F) G 2,785.91 Rupiah

C. BIAYA OPERASI PER JAM KERJA

1. Bahan Bakar = (0.125-0.175 Ltr/HP/Jam) x Pw x Ms H 5,375.00 Rupiah

2. Pelumas = (0.01-0.02 Ltr/HP/Jam) x Pw x Mp I 2,500.00 Rupiah

3. Perawatan dan (12,5 % - 17,5 %) x B' K 1,000.00 Rupiah


perbaikan = W'

Biaya Operasi per Jam = (H+I+K) P 8,875.00 Rupiah

D. TOTAL BIAYA SEWA ALAT / JAM = ( G + P ) S 11,660.91 Rupiah

E. LAIN - LAIN
1. Tingkat Suku Bunga i 15.00 % / Tahun
2. Upah Operator / Sopir U1 7,142.86 Rp./Jam
3. Upah Pembantu Operator / Pmb.Sopir U2 4,285.71 Rp./Jam
4. Bahan Bakar Bensin Mb 4,500.00 Liter
5. Bahan Bakar Solar Ms 4,300.00 Liter
6. Minyak Pelumas Mp 25,000.00 Liter
7. PPN diperhitungkan pada lembar Rekapitulasi
Biaya Pekerjaan
TENAGA KAP. ALAT YANG DIPAKAI
ALAT ALAT JAM
UMUR KERJA HARGA
ALAT 1 TAHUN ALAT

(HP) - (Tahun) (Jam) (Rp.) X 1000


No. JENIS PERALATAN KODE
ALAT

HP Cp A W B
1 2 2a 3 4 6 7 8

1 ASPHALT MIXING PLANT (AMP) E 155 150.0 30.00 10.0 1,200.0 2,957,623
2 ASPHALT FINISHER E157 30.0 1.82 7.0 1,200.0 355,510
3 ASPHALT SPRAYER 1000 l E153 25.0 1,000.0 6.0 1,200.0 188,390
4 ASPHALT SPRAYER 400 l E154 6.0 400.0 6.0 750.0 55,647
5 BULLDOZER 100-150 HP E001 110.0 8.0 1,200.0 1,007,278
6 AIR COMPRESSOR 4000-5500LM E301 35.0 210.0 8.0 750.0 118,303
7 DUMP TRUCK 3 - 4 M3 E211 115.0 3.50 6.0 1,300.0 216,000
8 DUMP TRUCK 5 M3 E212 145.0 5.00 6.0 1,300.0 270,000
9 EXAVATOR 80 - 140 HP E020 90.0 1.00 8.0 1,500.0 1,185,030
10 FLAT BED TRUCK 3-4 M3 E221 115.0 3.50 6.0 1,300.0 178,200
11 GENERATOR SET E331 10.0 3.50 8.0 600.0 20,974
12 MOTOR GRADER E010 100.0 8.0 1,500.0 900,623
13 WHEEL LOADER 1,0 - 1.6 M3 E052 115.0 1.50 8.0 1,500.0 651,769
14 THREE WHEEL ROLLER 6 - 10 TON E080 37.0 8.00 10.0 1,500.0 302,400
15 TANDEM ROLLER 6-8 T E081 40.0 10.00 10.0 1,500.0 524,357
16 P. TIRE ROLLER 8-10 TON E084 95.0 15.00 10.0 1,500.0 757,399
17 VIBRATORY ROLLER 5-8 T E082 51.0 7.00 8.0 1,500.0 582,617
18 CONCRETE VIBRATOR E089 4.0 5.0 1,500.0 11,853
19 CONCRETE MIXER E251 6.0 0.13 4.0 600.0 15,098
20 WATER PUMP E341 8.0 30.00 4.0 1,500.0 9,288
21

KETERANGAN : 1. Tingkat Suku Bunga


2. Upah Operator / Sopir / Mekanik
3. Upah Pembantu Operator/Sopir/Mekanik
4. Harga Bahan Bakar Bensin
5. Harga Bahan Bakar Solar
6. Minyak Pelumas
7. Pajak Pertambahan Nilai (PPN) diperhitungkan pada Lemb
ANALISA BIAYA SEWA PERALATAN PER JAM KERJA

ANALISA BIAYA SEWA PERALATAN PER JAM KERJA

NILAI FAKTOR BIAYA PASTI PER JAM BIAYA OPERASI PER JAM K
SISA PENGEM- BIAYA ASURANSI TOTAL BAHAN BAKAR & PELUMAS WORKSHOP PERBAIKAN &
ALAT BALIAN PENGEM- DAN BIAYA BAHAN MINYAK
MODAL BALIAN LAIN-LAIN PASTI / JAM BAKAR PELUMAS BIAYA KOEF. BIAYA KOEF.
MODAL
(Rp.) - (Rp.) (Rp.) (Rp.) Lt/HP/Jam Ltr/HP/Jam (Rp.) - (Rp.) -
f1 x HP x
i(1+i)^A (B - C) x D 0.033 x B 0.125 0.01 Harga BBM 0.0625 (g1 x B') 0.125
(10% X B) ----------- ----------- ----------- (e1 + e2) s/d s/d + s/d ----- s/d
(1+i)^A-1 W W 0.175 0.02 f2 x HP x 0.0875 W 0.175
Harga Olie
C D e1 e2 E f1 f2 F g1 G g1
9 10 11 12 13 14 15 16 17 18 17

295,762,320 0.19925 441,984.39 81.33 442,065.73 0.150 0.015 1,462,500.00 0.0000 #REF! 0.1500
35,550,960 0.24036 64,087.81 9.78 64,097.59 0.150 0.015 40,500.00 0.0000 #REF! 0.1500
18,838,980 0.26424 37,334.65 5.18 37,339.83 0.150 0.015 33,750.00 0.0000 #REF! 0.1500
5,564,700 0.26424 17,644.79 2.45 17,647.24 0.150 0.015 8,100.00 0.0000 #REF! 0.1500
100,727,820 0.22285 168,354.03 27.70 168,381.73 0.150 0.015 148,500.00 0.0000 #REF! 0.1500
11,830,320 0.22285 31,636.65 5.21 31,641.86 0.150 0.015 47,250.00 0.0000 #REF! 0.1500
21,600,000 0.26424 39,513.58 5.48 39,519.06 0.150 0.015 155,250.00 0.0000 #REF! 0.1500
27,000,000 0.26424 49,391.98 6.85 49,398.83 0.150 0.015 195,750.00 0.0000 #REF! 0.1500
118,503,000 0.22285 158,450.42 26.07 158,476.50 0.150 0.015 121,500.00 0.0000 #REF! 0.1500
17,820,000 0.26424 32,598.70 4.52 32,603.23 0.150 0.015 155,250.00 0.0000 #REF! 0.1500
2,097,360 0.22285 7,010.95 1.15 7,012.11 0.150 0.015 13,500.00 0.0000 #REF! 0.1500
90,062,280 0.22285 120,422.32 19.81 120,442.14 0.150 0.015 135,000.00 0.0000 #REF! 0.1500
65,176,920 0.22285 87,148.09 14.34 87,162.43 0.150 0.015 155,250.00 0.0000 #REF! 0.1500
30,240,000 0.19925 36,152.29 6.65 36,158.95 0.150 0.015 49,950.00 0.0000 #REF! 0.1500
52,435,680 0.19925 62,687.50 11.54 62,699.04 0.150 0.015 54,000.00 0.0000 #REF! 0.1500
75,739,860 0.19925 90,547.94 16.66 90,564.60 0.150 0.015 128,250.00 0.0000 #REF! 0.1500
58,261,680 0.22285 77,901.72 12.82 77,914.54 0.150 0.015 68,850.00 0.0000 #REF! 0.1500
1,185,300 0.29832 2,121.56 0.26 2,121.82 0.150 0.015 5,400.00 0.0000 #REF! 0.1500
1,509,840 0.35027 7,932.67 0.83 7,933.50 0.150 0.015 8,100.00 0.0000 #REF! 0.1500
928,800 0.35027 1,951.96 0.20 1,952.16 0.150 0.015 10,800.00 0.0000 #REF! 0.1500

= 15.00 % per-tahun
= 7,143 Rupiah per-orang/jam
= 4,286 Rupiah per-orang/jam
= 5,200 Rupiah per-liter
= 5,000 Rupiah per-liter
= 40,000 Rupiah per-liter
Lembar Rekapitulasi Biaya Pekerjaan
KERJA TOTAL
& PERAWATAN OPERATOR/ TOTAL BIAYA
OPERATOR/ PEMBANTU BIAYA SEWA ALAT
BIAYA SUPIR OPERATOR/ OPERASI PER
SUPIR / JAM JAM KERJA
(Rp.) (Rp.) (Rp.) (Rp.) (Rp.) KET.

(g1 x B') 1 Org/ Jam 1 Org/ Jam


----------- x x F+G+H+I E+J
W U1 = U2= i x (1 + i)^A'
7,142.86 4,285.71 (1 + i)^A' - 1
G H I J K L
18 19 20 21 22 23 I
0.15
369,702.90 8,571.43 16,714.29 1,857,488.62 2,299,554.35 0.15 0.6068 3.0 0.1992521
44,438.70 8,571.43 5,571.43 99,081.56 163,179.15 0.15 0.3990 1.7 0.2403604
23,548.73 8,571.43 16,714.29 82,584.45 119,924.28 0.15 0.3470 1.3 0.2642369
11,129.40 8,571.43 5,571.43 33,372.26 51,019.50 0.15 0.3470 1.3 0.2642369
125,909.77 8,571.43 5,571.43 288,552.63 456,934.36 0.15 0.4589 2.1 0.2228501
23,660.64 8,571.43 5,571.43 85,053.50 116,695.36 0.15 0.4589 2.1 0.2228501
24,923.08 8,571.43 5,571.43 194,315.94 233,835.00 0.15 0.3470 1.3 0.2642369
31,153.85 8,571.43 5,571.43 241,046.71 290,445.54 0.15 0.3470 1.3 0.2642369
118,503.00 8,571.43 5,571.43 254,145.86 412,622.36 0.15 0.4589 2.1 0.2228501
20,561.54 8,571.43 5,571.43 189,954.40 222,557.63 0.15 0.3470 1.3 0.2642369
5,243.40 8,571.43 5,571.43 32,886.26 39,898.37 0.15 0.4589 2.1 0.2228501
90,062.28 8,571.43 5,571.43 239,205.14 359,647.28 0.15 0.4589 2.1 0.2228501
65,176.92 8,571.43 5,571.43 234,569.78 321,732.21 0.15 0.4589 2.1 0.2228501
30,240.00 8,571.43 5,571.43 94,332.86 130,491.81 0.15 0.6068 3.0 0.1992521
52,435.68 8,571.43 5,571.43 120,578.54 183,277.58 0.15 0.6068 3.0 0.1992521
75,739.86 8,571.43 5,571.43 218,132.72 308,697.32 0.15 0.6068 3.0 0.1992521
58,261.68 8,571.43 5,571.43 141,254.54 219,169.08 0.15 0.4589 2.1 0.2228501
1,185.30 8,571.43 5,571.43 20,728.16 22,849.98 0.15 0.3017 1.0 0.2983156
3,774.60 8,571.43 5,571.43 26,017.46 33,950.96 0.15 0.2624 0.7 0.3502654
928.80 8,571.43 5,571.43 25,871.66 27,823.82 0.15 0.2624 0.7 0.3502654
2,464,686 1
296,258 2
156,992 3
46,373
839,399 4
98,586 5
180,000 6
225,000 7
987,525 8
148,500 9
17,478 10
750,519 11
543,141 12
252,000 13
436,964 14
631,166 15
485,514 16
9,878
12,582
7,740
#REF! #REF! #REF!
#REF! #REF! #REF!
#REF! #REF! #REF!
#REF! #REF! #REF!
#REF! #REF! #REF!
#REF! #REF! #REF!
#REF! #REF!
Kondisi Alat #REF!
Nilai B' dari #REF!
Depresiasi #REF!

E07 #REF! 0 #REF!


#REF! 1 #REF!
#REF! 2 #REF!
#REF! 3 #REF!
#REF! 4 #REF!
#REF! 5 #REF!
#REF! 6 #REF!
#REF! 7 #REF!
#REF! 8 #REF!
#REF! 9 #REF!
#REF! 10 #REF!
#REF! 11 #REF!
#REF! 12 #REF!
#REF! 13 #REF!
#REF! 14 #REF!
#REF! #REF!
Kondisi Alat #REF!
Nilai B' dari #REF!
Depresiasi #REF!

E08 #REF! 0 #REF!


#REF! 1 #REF!
#REF! 2 #REF!
#REF! 3 #REF!
#REF! 4 #REF!
#REF! #REF! #REF!
#REF! #REF! #REF!
#REF! #REF! #REF!
#REF! #REF! #REF!
#REF! #REF! #REF!
#REF! #REF! #REF!
#REF! #REF! #REF!
#REF! #REF!
Kondisi Alat #REF!
Nilai B' dari #REF!
Depresiasi #REF!

E09 #REF! 0 #REF!


#REF! 1 #REF!
#REF! 2 #REF!
#REF! 3 #REF!
#REF! 4 #REF!
#REF! 5 #REF!
#REF! 6 #REF!
#REF! 7 #REF!
#REF! 8 #REF!
#REF! 9 #REF!
#REF! 10 #REF!
#REF! 11 #REF!
#REF! 12 #REF!
#REF! 13 #REF!
#REF! 14 #REF!
#REF! #REF!
Kondisi Alat #REF!
Nilai B' dari #REF!
Depresiasi #REF!

E10 #REF! 0 #REF!


#REF! 1 #REF!
#REF! 2 #REF!
#REF! 3 #REF!
#REF! 4 #REF!
#REF! 5 #REF!
#REF! 6 #REF!
#REF! 7 #REF!
#REF! 8 #REF!
#REF! 9 #REF!
#REF! 10 #REF!
#REF! 11 #REF!
#REF! 12 #REF!
#REF! 13 #REF!
#REF! 14 #REF!
#REF! #REF!
Kondisi Alat #REF!
Nilai B' dari #REF!
Depresiasi #REF!

E11 #REF! 0 #REF!


#REF! 1 #REF!
#REF! 2 #REF!
#REF! 3 #REF!
#REF! 4 #REF!
#REF! #REF! #REF!
#REF! #REF! #REF!
#REF! #REF! #REF!
#REF! #REF! #REF!
#REF! #REF! #REF!
#REF! #REF! #REF!
#REF! #REF! #REF!
#REF! #REF!
Kondisi Alat #REF!
Nilai B' dari #REF!
Depresiasi #REF!

E12 #REF! 0 #REF!


#REF! 1 #REF!
#REF! 2 #REF!
#REF! 3 #REF!
#REF! 4 #REF!
#REF! 5 #REF!
#REF! 6 #REF!
#REF! #REF! #REF!
#REF! #REF! #REF!
#REF! #REF! #REF!
#REF! #REF! #REF!
#REF! #REF! #REF!
#REF! #REF! #REF!
#REF! #REF! #REF!
#REF! #REF! #REF!
#REF! #REF! #REF!
#REF! #REF! #REF!
#REF! #REF! #REF!
#REF! #REF!
Kondisi Alat #REF!
Nilai B' dari #REF!
Depresiasi #REF!

E22 #REF! 0 #REF!


#REF! 1 #REF!
#REF! 2 #REF!
#REF! 3 #REF!
#REF! 4 #REF!
#REF! 5 #REF!
#REF! 6 #REF!
#REF! 7 #REF!
#REF! 8 #REF!
#REF! 9 #REF!
#REF! 10 #REF!
#REF! 11 #REF!
#REF! 12 #REF!
#REF! 13 #REF!
#REF! 14 #REF!
#REF! #REF!
Kondisi Alat #REF!
Nilai B' dari #REF!
Depresiasi #REF!

E23 #REF! 0 #REF!


#REF! #REF! #REF!
#REF! #REF! #REF!
#REF! #REF! #REF!
#REF! #REF! #REF!
#REF! #REF! #REF!
#REF! #REF! #REF!
#REF! #REF! #REF!
#REF! #REF! #REF!
#REF! #REF! #REF!
#REF! #REF! #REF!
#REF! #REF! #REF!
#REF! #REF!
Kondisi Alat #REF!
Nilai B' dari #REF!
Depresiasi #REF!
E24 4 0 18,500,000
3 1 11,100,000
2 2 5,550,000
1 3 1,850,000
0 4 0
-1 5 0
-2 6 1,850,000
-3 7 5,550,000
-4 8 11,100,000
-5 9 18,500,000
-6 10 27,750,000
-7 11 38,850,000
-8 12 51,800,000
-9 13 66,600,000
-10 14 83,250,000
10 > 15th ?
Kondisi Alat #REF!
Nilai B' dari #REF!
Depresiasi #REF!

E25 4 0 3,000,000
3 1 1,800,000
2 2 900,000
1 3 300,000
0 4 0
-1 5 0
-2 6 300,000
-3 7 900,000
-4 8 1,800,000
-5 9 3,000,000
-6 10 4,500,000
-7 11 6,300,000
-8 12 8,400,000
-9 13 10,800,000
-10 14 13,500,000
10 > 15th ?
Kondisi Alat #REF!
Nilai B' dari #REF!
Depresiasi #REF!

#REF! #REF! #REF!


#REF! #REF! #REF!
#REF! #REF! #REF!
#REF! #REF! #REF!
#REF! #REF! #REF!
#REF! #REF! #REF!
#REF! #REF! #REF!
#REF! #REF! #REF!
#REF! #REF! #REF!
#REF! #REF! #REF!
#REF! #REF! #REF!
#REF! #REF! #REF!
#REF! #REF!
Kondisi Alat #REF!
Nilai B' dari #REF!
Depresiasi #REF!
E27 5 0 46,000,000
4 1 30,666,667
3 2 18,400,000
2 3 9,200,000
1 4 3,066,667
0 5 0
-1 6 0
-2 7 3,066,667
-3 8 9,200,000
-4 9 18,400,000
-5 10 30,666,667
-6 11 46,000,000
-7 12 64,400,000
-8 13 85,866,667
-9 14 110,400,000
15 > 15th ?
Kondisi Alat #REF!
Nilai B' dari #REF!
Depresiasi #REF!

E28 5 0 46,000,000
4 1 30,666,667
3 2 18,400,000
2 3 9,200,000
1 4 3,066,667
0 5 0
-1 6 0
-2 7 3,066,667
-3 8 9,200,000
-4 9 18,400,000
-5 10 30,666,667
-6 11 46,000,000
-7 12 64,400,000
-8 13 85,866,667
-9 14 110,400,000
15 > 15th ?
Kondisi Alat #REF!
Nilai B' dari #REF!
#REF! #REF! #REF!
#REF! #REF! #REF!
#REF! #REF! #REF!
#REF! #REF! #REF!
#REF! #REF! #REF!
#REF! #REF! #REF!
#REF! #REF! #REF!
#REF! #REF! #REF!
#REF! #REF! #REF!
#REF! #REF! #REF!
#REF! #REF! #REF!
#REF! #REF! #REF!
#REF! #REF! #REF!
#REF! #REF! #REF!
#REF! #REF!
Kondisi Alat #REF!
Nilai B' dari #REF!
Depresiasi #REF!

E30 5 0 46,000,000
4 1 30,666,667
3 2 18,400,000
2 3 9,200,000
1 4 3,066,667
0 5 0
-1 6 0
-2 7 3,066,667
-3 8 9,200,000
-4 9 18,400,000
-5 10 30,666,667
-6 11 46,000,000
-7 12 64,400,000
-8 13 85,866,667
-9 14 110,400,000
15 > 15th ?
Kondisi Alat #REF!
Nilai B' dari #REF!
Depresiasi #REF!

31 5 0 46,000,000
4 1 30,666,667
3 2 18,400,000
2 3 9,200,000
1 4 3,066,667
0 5 0
-1 6 0
-2 7 3,066,667
-3 8 9,200,000
-4 9 18,400,000
-5 10 30,666,667
-6 11 46,000,000
-7 12 64,400,000
-8 13 85,866,667
-9 14 110,400,000
15 > 15th ?
Kondisi Alat #REF!
Nilai B' dari #REF!
#REF! #REF! #REF!
#REF! #REF! #REF!
#REF! #REF! #REF!
#REF! #REF! #REF!
#REF! #REF! #REF!
#REF! #REF! #REF!
#REF! #REF! #REF!
#REF! #REF! #REF!
#REF! #REF! #REF!
#REF! #REF! #REF!
#REF! #REF! #REF!
#REF! #REF! #REF!
#REF! #REF! #REF!
#REF! #REF! #REF!
#REF! #REF!
Kondisi Alat #REF!
Nilai B' dari #REF!
Depresiasi #REF!
DAFTAR HARGA DASAR SATUAN UPAH

NO URAIAN KODE SATUAN HARGA SATUAN


(Rp)

1 Mandor L061 HOK 165,000.00


2 Masinis Mesin Gilas HOk 141,000.00
3 Kepala Tukang L073 HOK 165,000.00
4 Tukang L079 HOK 143,000.00
5 Operator Terlatih L081 HOK 200,000.00
6 Operator Semi Terlatih L082 HOK 147,000.00
7 Pembantu Operator L083 HOK 141,000.00
8 Supir L091 HOK 140,000.00
9 Pembantu Supir L099 HOK 130,000.00
10 Buruh Tak Terlatih L101 HOK 99,000.00
11 Buruh Semi Terlatih L103 HOK 104,000.00
12 Buruh Terlatih L106 HOK 143,000.00
13 Jaga Malam L106 HOK 100,000.00

DAFTAR HARGA DASAR SATUAN BAHAN

NO URAIAN KODE SATUAN HARGA SATUAN


(Rp)

A. Harga Material Di Quarry


1 Batu Pecah 15 - 20 cm M020 m³
2 Batu Pecah 10 - 15 cm M015 m³
3 Batu Pecah 5 - 7 cm M022 m³ 284,600.00
4 Pasir Urug / Gunung M040 m³ 79,000.00

B. Harga Material Di Kabanjahe


1 Batu Pecah 15 - 20 cm M020 m³ 253,500.00
2 Batu Pecah 10 - 15 cm M015 m³ 253,550.00
3 Batu Pecah 5 - 7 cm M022 m³ 343,700.00
4 Sirtu ( Kelas C ) m³ 163,400.00
5 Pasir Urug / Gunung M040 m³ 163,400.00
6 Minyak Solar M183 liter 5,803.00
7 Minyak Solar Industri liter 11,831.00
8 Minya Bensin M184 liter 7,268.00
9 Minyak Selinder liter 18,592.00
10 Minyak Gerdang liter 161,696.00
11 Gemuk/pemeliharan liter 45,072.00
12 Pelumas M185 liter 108,173.00
13 Cangkul + Gagang bh 120,000.00
14 Pelengki bh 23,000.00
15 Sekop + Gagang bh 66,000.00
16 Beko Sorong Unit 560,000.00
ANALISA HARGA SATUAN
PENGUPASAN TANAH DAN PEMBERSIHAN SEMAK PADA DAMIJA KODE
( MENGGUNAKAN ALAT ) K- 210

Propinsi : Sumatera Utara Lokasi : Jalan Juma Karang Kuda Desa Suka Disiapkan Oleh : Konsultan Perencana
Kode : Kab. : Karo Tanggal :
PROSES : ANGGAPAN :
1. Menggunakan alat berat
1. Buldozer Mengupas dan membuang semak-semak dari damija 2. Tidak ada pohon besar pada DAMIJA ( hanya semak )
( Daerah Milik Jalan ) 3. DAMIJA 12 m
4. Pembersihan DAMIJA 200 m per hari

JUMLAH HARI TOTAL VOL. UPAH BIAYA SUB TOTAL


PEKERJA KODE
ORANG ( Orang hari ) ( Rp. /Orang/Hari ) ( Rp. ) ( Rp. )
P
E Mandor 1.0 1.0 L 061 1.0 - -
K
E Operator Telatih 1.0 1.0 031 1.0 200,000.00 200,000.00

R Buruh tak terampil 2.0 1.0 L 101 2.0 99,000.00 198,000.00


J
A
PEKERJA : 398,000.00
JUMLAH SATUAN TOTAL HARGA BIAYA
MATERIAL KODE
MATERIAL VOL. ( Rp. / Unit ) ( Rp. )
M
A
T
E
R Alat bantu ( set @ 3 alat ) 1.0 set M 170 - -
I
A
L
MATERIAL : -
JUMLAH JUMLAH JAM HARGA BIAYA
PERALATAN KODE
ALAT HARI KERJA ( Rp. / jam ) ( Rp. )
P
E Buldozer 110 hp 1.0 1 E 001 5.00 586,789.06 2,933,945.31
R
A
L
A
T
A
N PERALATAN : 2,933,945.31

JUMLAH HARGA PEKERJA, MATERIAL DAN PERALATAN TOTAL Rp. 3,331,945.31

Volume : 2400.0 Satuan : m2 Harga Satuan 1,388.31 Per : m2


ANALISA HARGA SATUAN
PENGURUGAN TANAH KODE
( MENGGUNAKAN BURUH ) K- 310

Propinsi : Sumatera Utara Lokasi : Jalan Juma Karang Kuda Desa Suka Disiapkan Oleh : Konsultan Perencana
Kode : Kab. : Karo Tanggal :
PROSES : ANGGAPAN :

1. Penggalian dan pemuatan ke truk dengan 1. Menggunakan Tenaga Manusia ( 60 m3 / hari )


tenaga manusia. 2. Dipakai material dari penggalian di daerah jln/lokasi lain yang diijinkan
2. Tanah diambil di sekitar lokasi pekerjaan 3. Pemadatan menggunakan mesin gilas tandem
3. Membongkar dan meratakan dengan 4. Kapasitas pemadatan 60 m3 per hari
tenaga manusia. 5. Tidak termasuk penyiapan tanah dasar jalan
4. Meratakan dan memadatkan lapis demi lapis 6. Umur alat bantu rata-rata 1 bulan/orang/set @ 3 alat
tebal tiap lapis 10 cm.

JUMLAH HARI TOTAL VOL. UPAH BIAYA SUB TOTAL


PEKERJA KODE
ORANG ( Orang hari ) ( Rp. /Orang/Hari ) ( Rp. ) ( Rp. )
P
E Mandor 1.0 1.0 L 02 1.0 - -
K Operator terampil 1.0 1.0 L 12 1.0 - -
E Supir terampil 1.0 1.0 L 10 1.0 140,000.00 140,000.00
R Pembantu supir 1.0 1.0 L 11 1.0 130,000.00 130,000.00
J Buruh tak terampil 40.0 1.0 L 15 29.0 99,000.00 2,871,000.00
A
PEKERJA : 3,141,000.00
JUMLAH SATUAN TOTAL HARGA BIAYA
MATERIAL KODE
MATERIAL VOL. ( Rp. / Unit ) ( Rp. )
M
A
T
E
R Alat bantu ( set @ 3 alat ) set M 19 1.2 - -
I
A
L
MATERIAL : -
JUMLAH JUMLAH JAM HARGA BIAYA
PERALATAN KODE
ALAT HARI KERJA ( Rp. / jam ) ( Rp. )
P
E Mesin gilas Tandem Roller 1.0 1.0 E 081 5.00 - -
R 6 - 10 ton
A
L Truk Tangki Air 115 HP 1.0 1.0 E 182 5.0 - -
A
T
A
N PERALATAN : -

JUMLAH HARGA PEKERJA, MATERIAL DAN PERALATAN TOTAL Rp. 3,141,000.00

Volume : 60.0 Satuan : m3 Harga Satuan 52,350.00 Per : m3


ANALISA HARGA SATUAN
KONSTRUKSI SISIP TELFORD ( BATU 15/20 ) KODE
( MENGGUNAKAN BURUH ) K- 516

Propinsi : Sumatera Utara Lokasi : Jalan Juma Karang Kuda Desa Suka Disiapkan Oleh : Konsultan Perencana
Kode : Kab. : Karo Tanggal :

PROSES : ANGGAPAN :
1. Material dsiapkan di lokasi pekerjaan 1 Menggunakan Tenaga Manusia 1200 m2 per hari
2. Batu pecah yang lebih kecil mengisi rongga di 2 Material dikirim ke tempat pekerjaan
atasnya sehingga rata kemudian dipadatkan oleh Leveransir
/ digilas dengan mesin gilas 3 Batu 15/20 dan pasir sudah terpasang
4 Dihampar dan dipadatkan sampai tebal 5 cm dengan tangan dan digilas
JUMLAH HARI TOTAL VOL. UPAH BIAYA SUB TOTAL
PEKERJA KODE
ORANG ( Orang hari ) ( Rp. / Orang / Hari ) ( Rp. ) ( Rp. )
P Mandor 3.0 1.0 L 02 3.0 - -
E Operator terampil 1.0 1.0 L 12 1.0 200,000.00 200,000.00
K Buruh tak terlatih 99.0 1.0 L 15 99.0 99,000.00 9,801,000.00
E
R
J
A
PEKERJA : 10,001,000.00
SATUAN TOTAL HARGA BIAYA
MATERIAL KODE
VOL. ( Rp. / Unit ) ( Rp. )
M
A Batu belah 15-20 cm m3 M 020 50.00 253,500.00 12,675,000.00
T Sirtu m3 M 022 20.00 163,000.00 3,260,000.00
E Pasir urug m3 M 040 30.00 163,000.00 4,890,000.00
R Alat bantu Set M 170 4.00 - -
I
A
L MATERIAL : 20,825,000.00
JUMLAH JUMLAH JAM HARGA BIAYA
PERALATAN KODE
ALAT HARI KERJA ( Rp. / Jam ) ( Rp. )

P Mesin Gilas roda besi


E 6 - 8 ton 1.0 1.0 E 080 5.0 256,277.07 1,281,385.37
R
A
L
A
T
A PERALATAN : 1,281,385.37
N

JUMLAH HARGA PEKERJA, MATERIAL DAN PERALATAN TOTAL Rp. 32,107,385.37

Volume : 400.0 Satuan : m2 Harga Satuan 80,268.46 Per : m2


DAFTAR ANALISA B O W

Kecamatan : #NAME?
Desa : #NAME?
Kegiatan : PEMBANGUNAN JALAN USAHA TANI DESA BARUS JAHE KEC. BARUS JAHE
0

Analisa W.4a
Untuk 1 unit mesin gilas tiap bulan (25 hari) di perlukan :

Pekerjan Satuan Koefisien Harga Upah Biaya (Rp)

Sewa Mesin Gilas hr 20.00 48,400.00 968,000.00


Masinis hr 20.00 141,000.00 2,820,000.00
Jaga Malam hr 25.00 100,000.00 2,500,000.00
Minyak Solar ltr 500.00 11,831.00 5,915,500.00
Minyak Gerdang ltr 12.00 161,696.00 1,940,352.00
Minyak Gemuk kg 3.00 45,072.00 135,216.00
Pemeliharaan 100,000.00 100,000.00
Jumlah 14,379,068.00
Biaya Umum dan Keuntungan 10% 1,437,906.80
Total Biaya Satuan 15,816,974.80

Analisa W.2a
BATU PENGUNCI
Batu pengunci sebagai batu penahan sisi kiri-kanan badan jalan dihitung berdasarkan Anl W.2a
Material digunakan batu pecah/batu gunung ukuran 15-20 cm

Pekerjan Satuan Koefisien Harga Upah Biaya (Rp)

Pekerja HOK 0.3750 99,000.00 37,125.00


Mandor HOK 0.0190 165,000.00 3,135.00
Batu 15/20 M3 0.2000 #REF! #REF!
Biaya Gilas 0.0001 14,379,068.00 1,917.21
Jumlah #REF!

- Untuk batu pengunci dengan batu pecah ukuran 15/20 cm diperoleh panjang pasangan :
1 m2
= = 6.67 m'
0.150 m

=- Jadi biaya batu pengunci per m' pasangan sisi kanan-kiri adalah :
#REF! m2
= x 2 = Rp #REF! /m' (a)
6.67 m
- Biaya umum dan Keuntungan 10 % = Rp #REF! /m' (b)

- Total biaya satuan (a+b) = Rp #REF! /m'


PERHITUNGAN ONGKOS ANGKUT BAHAN

Jenis Bahan : Batu 15-20 cm


Lokasi Asal / Quarry : #REF!
Lokasi Proyek : Desa Dokan

HARGA
No URAIAN KODE KOEFISIEN SATUAN SATUAN
(Rp)
I. ASUMSI
1 Bahan diterima di lokasi pekerjaan dengan
angkutan : - truck
- kereta lembu
- tenaga manusia (pikul)
2 Jarak asal/quarry ke lapangan :
- jarak angkut truck L1 #REF! km
- jarak angkut kereta lembu L2 km
L3 m
3 Jam kerja efektif per hari Tk 7.00 jam
4 Alat yang digunakan Dump Truck
5 Kapasitas Dump Truck Cp 4.0 m3
6 Faktor efisiensi alat Fa 0.70
7 Kecepatan rata - rata bermuatan v1 25.0 km/jam
8 Kecepatan rata - rata kosong v2 35.0 km/jam
9 Kebutuhan - Supir L091 1.0 orang
- Kernek L099 1.0 orang
10 Berat jenis bahan agregat Batu 15-20 cm D1 1,800.00 kg/m3
11 Harga satuan dasar Batu 15-20 cm Rp1 1.00 M3 253,500.00
12 Harga satuan dasar Dump Truck (E212) Rp2 1.0 jam 292,943.31
13 Harga satuan dasar Supir Rp3 1.0 hari 140,000.00
1.0 jam 20,000.00
14 Harga satuan dasar Kernek/Pembantu Supir Rp4 1.0 hari 130,000.00
1.0 jam 18,571.43
15 Harga Satuan Dasar Pekerja Rp5 1.00 orang -
16 Harga Satuan Dasar Kereta Lembu Rp6 1.00 hari -

II PERHITUNGAN
1 DUMP TRUCK
Biaya Dump Truck / jam (Rp2 + Rp3 + Rp4) Rp7 331,514.74 Rp/Jam

Waktu siklus :
- Muat T1 25.00 menit
- Membongkar T2 10.00 menit
- Mengangkut : (L1 : v1) x 60 T3 #REF! menit
- Kembali : ( L1 : v2) x 60 T4 #REF! menit
Ts1 #REF! menit

Kapasitas produksi / jam : Cp x Fa x 60 Q1 #REF! m3/jam


Ts1
Biaya Dump Truck / m3= (1 : Q1) x Rp7 Rp8 #REF! rupiah
2 KERETA LEMBU
Daya angkut kereta lembu V - kg
Faktor kondisi jalan Fa 0.50
Kecepatan rata - rata bermuatan v1 2.00 km/jam
Kecepatan rata - rata kosong v2 2.50 km/jam
Waktu siklus :
- Muat T1 10.00 menit
- Membongkar T2 10.00 menit
- Mengangkut : (L2 : v1) x 60 T3 - menit
- Kembali : (L2 : v2) x 60 T4 - menit
- Lain - lain T5 - menit
Ts2 - menit
Kapasitas angkut / jam : V x Fa x 60 Q1 - Kg/jam
Ts2 -
Kapasitas Produksi : Tk x Q1 Q2 - Kg/Hari
Kapasitas Angkut Gereta Lembu/m3 : (Q2/D1) Q3 - m3/Hari
Biaya angkut kereta lembu/m3 (Rp6 : Q3) Rp9 - rupiah/m3

3 TENAGA MANUSIA (PIKUL)


Daya pikul per orang V 20.00 kg
Faktor kondisi jalan Fa 0.25
Kecepatan rata - rata bermuatan v1 1.00 km/jam
Kecepatan rata - rata kosong v2 1.50 km/jam
Waktu siklus :
- Mengangkut : (L3 : v1) x 60 T3 - menit
- Kembali : (L3 : v2) x 60 T4 - menit
- Lain - lain T5 2.00 menit
Ts3 2.00 menit

Kapasitas angkut / jam : V x Fa x 60 Q2 150.00 m3/jam


Ts3
Kapasitas Produksi : Tk x Q2:D1 Q3 0.5833 m3
Biaya tenaga pikul/Kg (1 : Q3) x Rp5 Rp10 - rupiah

III HARGA SATUAN DASAR BATU 15 - 20 cm


DILAPANGAN
( Rp1+ Rp8 +Rp9 + Rp10) #REF! rupiah
Dibulatkan #REF! rupiah/m3
PERHITUNGAN ONGKOS ANGKUT BAHAN

Jenis Bahan : Batu 10-15 cm


Lokasi Asal / Quarry : #REF!
Lokasi Kegiatan : Desa Dokan

HARGA
No URAIAN KODE KOEFISIEN SATUAN SATUAN
(Rp)
I. ASUMSI
1 Bahan diterima di lokasi pekerjaan dengan
angkutan : - truck
- kereta lembu
- tenaga manusia (pikul)
2 Jarak asal/quarry ke lapangan :
- jarak angkut truck L1 #REF! km
- jarak angkut kereta lembu L2 - km
L3 - m
3 Jam kerja efektif per hari Tk 8.00 jam
4 Alat yang digunakan Dump Truck
5 Kapasitas Dump Truck Cp 3.5 m3
6 Faktor efisiensi alat Fa 0.75
7 Kecepatan rata - rata bermuatan v1 25.0 km/jam
8 Kecepatan rata - rata kosong v2 35.0 km/jam
9 Kebutuhan - Supir L091 1.0 orang
- Kernek L099 1.0 orang
10 Berat jenis bahan agregat Batu 10-15 cm D1 1,800.00 kg/m3
11 Harga satuan dasar Batu 10-15 cm Rp1 1.00 M3 -
12 Harga satuan dasar Dump Truck (E212) Rp2 1.0 jam 292,943.31
13 Harga satuan dasar Supir Rp3 1.0 hari 140,000.00
1.0 jam 17,500.00
14 Harga satuan dasar Kernek/Pembantu Supir Rp4 1.0 hari 130,000.00
1.0 jam 16,250.00
15 Harga Satuan Dasar Pekerja Rp5 1.00 orang -
16 Harga Satuan Dasar Kereta Lembu Rp6 1.00 hari -

II PERHITUNGAN
1 DUMP TRUCK
Biaya Dump Truck / jam (Rp2 + Rp3 + Rp4) Rp7 326,693.31 Rp/Jam

Waktu siklus :
- Muat T1 10.00 menit
- Membongkar T2 5.00 menit
- Mengangkut : (L1 : v1) x 60 T3 #REF! menit
- Kembali : ( L1 : v2) x 60 T4 #REF! menit
Ts1 #REF! menit

Kapasitas produksi / jam : Cp x Fa x 60 Q1 #REF! m3/jam


Ts1
Biaya Dump Truck / m3= (1 : Q1) x Rp7 Rp8 #REF! rupiah
2 KERETA LEMBU
Daya angkut kereta lembu V - kg
Faktor kondisi jalan Fa 0.50
Kecepatan rata - rata bermuatan v1 2.00 km/jam
Kecepatan rata - rata kosong v2 2.50 km/jam
Waktu siklus :
- Muat T1 10.00 menit
- Membongkar T2 10.00 menit
- Mengangkut : (L2 : v1) x 60 T3 - menit
- Kembali : (L2 : v2) x 60 T4 - menit
- Lain - lain T5 - menit
Ts2 - menit
Kapasitas angkut / jam : V x Fa x 60 Q1 - Kg/jam
Ts2 -
Kapasitas Produksi : Tk x Q1 Q2 - Kg/Hari
Kapasitas Angkut Gereta Lembu/m3 : (Q2/D1) Q3 - m3/Hari
Biaya angkut kereta lembu/m3 (Rp6 : Q3) Rp9 - rupiah/m3

3 TENAGA MANUSIA (PIKUL)


Daya pikul per orang V 20.00 kg
Faktor kondisi jalan Fa 0.25
Kecepatan rata - rata bermuatan v1 1.00 km/jam
Kecepatan rata - rata kosong v2 1.50 km/jam
Waktu siklus :
- Mengangkut : (L3 : v1) x 60 T3 - menit
- Kembali : (L3 : v2) x 60 T4 - menit
- Lain - lain T5 2.00 menit
Ts3 2.00 menit

Kapasitas angkut / jam : V x Fa x 60 Q2 150.00 m3/jam


Ts3
Kapasitas Produksi : Tk x Q2:D1 Q3 0.6667 m3
Biaya tenaga pikul/Kg (1 : Q3) x Rp5 Rp10 - rupiah

III HARGA SATUAN DASAR BATU 10 - 15 cm


DILAPANGAN
( Rp1+ Rp8 +Rp9 + Rp10) #REF! rupiah
Dibulatkan #REF! rupiah/m3
PERHITUNGAN ONGKOS ANGKUT BAHAN

Jenis Bahan : Batu 5-7 cm


Lokasi Asal / Quarry : #REF!
Lokasi Proyek : Desa Dokan

HARGA
No URAIAN KODE KOEFISIEN SATUAN SATUAN
(Rp)
I. ASUMSI
1 Bahan diterima di lokasi pekerjaan dengan
angkutan : - truck
- kereta lembu
- tenaga manusia (pikul)
2 Jarak asal/quarry ke lapangan :
- jarak angkut truck L1 #REF! km
- jarak angkut kereta lembu L2 - km
L3 - m
3 Jam kerja efektif per hari Tk 7.00 jam
4 Alat yang digunakan Dump Truck
5 Kapasitas Dump Truck Cp 3.5 m3
6 Faktor efisiensi alat Fa 0.70
7 Kecepatan rata - rata bermuatan v1 25.0 km/jam
8 Kecepatan rata - rata kosong v2 35.0 km/jam
9 Kebutuhan - Supir L091 1.0 orang
- Kernek L099 1.0 orang
10 Berat jenis bahan agregat Batu 5 - 7 cm D1 1,800.00 kg/m3
11 Harga satuan dasar Batu 5-7 cm Rp1 1.00 M3 284,600.00
12 Harga satuan dasar Dump Truck (E212) Rp2 1.0 jam 292,943.31
13 Harga satuan dasar Supir Rp3 1.0 hari 140,000.00
1.0 jam 20,000.00
14 Harga satuan dasar Kernek/Pembantu Supir Rp4 1.0 hari 130,000.00
1.0 jam 18,571.43
15 Harga Satuan Dasar Pekerja Rp5 1.00 orang -
16 Harga Satuan Dasar Kereta Lembu Rp6 1.00 hari -

II PERHITUNGAN
1 DUMP TRUCK
Biaya Dump Truck / jam (Rp2 + Rp3 + Rp4) Rp7 331,514.74 Rp/Jam

Waktu siklus :
- Muat T1 25.00 menit
- Membongkar T2 10.00 menit
- Mengangkut : (L1 : v1) x 60 T3 #REF! menit
- Kembali : ( L1 : v2) x 60 T4 #REF! menit
Ts1 #REF! menit

Kapasitas produksi / jam : Cp x Fa x 60 Q1 #REF! m3/jam


Ts1
Biaya Dump Truck / m3= (1 : Q1) x Rp7 Rp8 #REF! rupiah
2 KERETA LEMBU
Daya angkut kereta lembu V - kg
Faktor kondisi jalan Fa 0.50
Kecepatan rata - rata bermuatan v1 2.00 km/jam
Kecepatan rata - rata kosong v2 2.50 km/jam
Waktu siklus :
- Muat T1 10.00 menit
- Membongkar T2 10.00 menit
- Mengangkut : (L2 : v1) x 60 T3 - menit
- Kembali : (L2 : v2) x 60 T4 - menit
- Lain - lain T5 - menit
Ts2 - menit
Kapasitas angkut / jam : V x Fa x 60 Q1 - Kg/jam
Ts2 -
Kapasitas Produksi : Tk x Q1 Q2 - Kg/Hari
Kapasitas Angkut Gereta Lembu/m3 : (Q2/D1) Q3 - m3/Hari
Biaya angkut kereta lembu/m3 (Rp6 : Q3) Rp9 - rupiah/m3

3 TENAGA MANUSIA (PIKUL)


Daya pikul per orang V 20.00 kg
Faktor kondisi jalan Fa 0.25
Kecepatan rata - rata bermuatan v1 1.00 km/jam
Kecepatan rata - rata kosong v2 1.50 km/jam
Waktu siklus :
- Mengangkut : (L3 : v1) x 60 T3 - menit
- Kembali : (L3 : v2) x 60 T4 - menit
- Lain - lain T5 2.00 menit
Ts3 2.00 menit

Kapasitas angkut / jam : V x Fa x 60 Q2 150.00 m3/jam


Ts3
Kapasitas Produksi : Tk x Q2:D1 Q3 0.5833 m3
Biaya tenaga pikul/Kg (1 : Q3) x Rp5 Rp10 - rupiah

III HARGA SATUAN DASAR 5 - 7 cm


DILAPANGAN
( Rp1+ Rp8 +Rp9 + Rp10) #REF! rupiah
Dibulatkan #REF! rupiah/m3
PERHITUNGAN ONGKOS ANGKUT BAHAN
Jenis Bahan : Pasir Urug
Lokasi Asal / Quarry : #REF!
Lokasi Proyek : Desa Dokan

HARGA
No URAIAN KODE KOEFISIEN SATUAN SATUAN
(Rp)
I. ASUMSI
1 Bahan diterima di lokasi pekerjaan dengan
angkutan : - truck
- kereta lembu
- tenaga manusia (pikul)
2 Jarak asal/quarry ke lapangan :
- jarak angkut truck L1 #REF! km
- jarak angkut kereta lembu L2 - km
L3 - m
3 Jam kerja efektif per hari Tk 7.00 jam
4 Alat yang digunakan Dump Truck
5 Kapasitas Dump Truck Cp 3.5 m3
6 Faktor efisiensi alat Fa 0.70
7 Kecepatan rata - rata bermuatan v1 25.0 km/jam
8 Kecepatan rata - rata kosong v2 35.0 km/jam
9 Kebutuhan - Supir L091 1.0 orang
- Kernek L099 1.0 orang
10 Berat jenis bahan agregat pasir urug D1 1,600.00 kg/m3
11 Harga satuan dasar pasir urug Rp1 1.00 M3 79,000.00
12 Harga satuan dasar Dump Truck (E212) Rp2 1.0 jam 292,943.31
13 Harga satuan dasar Supir Rp3 1.0 hari 140,000.00
1.0 jam 20,000.00
14 Harga satuan dasar Kernek/Pembantu Supir Rp4 1.0 hari 130,000.00
1.0 jam 18,571.43
15 Harga Satuan Dasar Pekerja Rp5 1.00 orang -
16 Harga Satuan Dasar Kereta Lembu Rp6 1.00 hari -

II PERHITUNGAN
1 DUMP TRUCK
Biaya Dump Truck / jam (Rp2 + Rp3 + Rp4) Rp7 331,514.74 Rp/Jam

Waktu siklus :
- Muat T1 20.00 menit
- Membongkar T2 10.00 menit
- Mengangkut : (L1 : v1) x 60 T3 #REF! menit
- Kembali : ( L1 : v2) x 60 T4 #REF! menit
Ts1 #REF! menit

Kapasitas produksi / jam : Cp x Fa x 60 Q1 #REF! m3/jam


Ts1
Biaya Dump Truck / m3= (1 : Q1) x Rp7 Rp8 #REF! rupiah
2 KERETA LEMBU
Daya angkut kereta lembu V - kg
Faktor kondisi jalan Fa 0.50
Kecepatan rata - rata bermuatan v1 2.00 km/jam
Kecepatan rata - rata kosong v2 2.50 km/jam
Waktu siklus :
- Muat T1 10.00 menit
- Membongkar T2 10.00 menit
- Mengangkut : (L2 : v1) x 60 T3 - menit
- Kembali : (L2 : v2) x 60 T4 - menit
- Lain - lain T5 - menit
Ts2 - menit
Kapasitas angkut / jam : V x Fa x 60 Q1 - Kg/jam
Ts2 -
Kapasitas Produksi : Tk x Q1 Q2 - Kg/Hari
Kapasitas Angkut Gereta Lembu/m3 : (Q2/D1) Q3 - m3/Hari
Biaya angkut kereta lembu/m3 (Rp6 : Q3) Rp9 - rupiah/m3

3 TENAGA MANUSIA (PIKUL)


Daya pikul per orang V 20.00 kg
Faktor kondisi jalan Fa 0.25
Kecepatan rata - rata bermuatan v1 1.00 km/jam
Kecepatan rata - rata kosong v2 1.50 km/jam
Waktu siklus :
- Mengangkut : (L3 : v1) x 60 T3 - menit
- Kembali : (L3 : v2) x 60 T4 - menit
- Lain - lain T5 2.00 menit
Ts3 2.00 menit

Kapasitas angkut / jam : V x Fa x 60 Q2 150.00 m3/jam


Ts3
Kapasitas Produksi : Tk x Q2:D1 Q3 0.6563 m3
Biaya tenaga pikul/Kg (1 : Q3) x Rp5 Rp10 - rupiah

III HARGA SATUAN DASAR PASIR URUG


DILAPANGAN
( Rp1+ Rp8 +Rp9 + Rp10) #REF! rupiah
Dibulatkan #REF! rupiah/m3
BIAYA ALAT UNTUK PERHITUNGAN KODE
ANALISA BIAYA PEKERJAAN
E 010

PROPINSI KODE KABUPATEN KODE DISIAPKAN OLEH : TANGGAL :


SUMATERA UTARA #REF! KARO #REF! #REF!

JENIS ALAT = Grader 115 HP


TENAGA = 115 HP CRF : 0.20483
HARGA ( Rp ) = 1,275,000,000 ( PADA 12.5 % )
UMUR KERJA = 8 Tahun 12,000 jam
( 1 Tahun = 300 Hari Kerja )

A. BIAYA PEMILIKAN ( OWNERSHIP COST ) : ( Rp / Jam )

1. Depresiasi = 90% x Harga Alat x CRF x 1


Jam / Tahun

= 0.90 x 1,275,000,000 x 0.20483 = Rp. 156,694.95


1,500

2. Lain-Lain = 0.03 x Harga


Angsuran 3% per tahun Jam/Tahun

= 0.03 x 1,275,000,000 = Rp. 25,500.00


1,500.00

Sub Total = Rp. 182,194.95

B. BIAYA OPERASI ( OPERATION COSTS ) : ( Rp / JAM )

Kebutuhan Bahan bakar dan Pelumas tiap HP :

Diesel = 0.160 Ltr/HP/Jam


Bensin = 0.170 Ltr/HP/Jam
Pelumas = 0.006 Ltr/HP/Jam

Harga : Solar/Minyak Diesel Non Subsidi = Rp 11,831.00 /Ltr


Bensin = Rp 7,268.00 /Ltr
Pelumas = Rp 108,173.00 /Ltr

Bahan Bakar = 0.160 x 115.00 x 11,831.00 = Rp. 217,690.40


Pelumas = 0.006 x 115.00 x 108,173.00 = Rp. 74,639.37
Perbaikan & Spareparts = 0.600 x 156,694.95 = Rp. 94,016.97
( 60% x depresiasi )
Sub Total = Rp. 386,346.74

TOTAL BIAYA PEMILIKAN DAN BIAYA OPERASI ALAT :


A+B = Rp. 182,194.95 + 386,346.74
= Rp. 568,541.69 / Jam
BIAYA ALAT UNTUK PERHITUNGAN KODE
E080
ANALISA BIAYA PEKERJAAN

PROPINSI KODE KABUPATEN KODE DISIAPKAN OLEH TANGGAL


SUMATERA UTARA KARO

Jenis Alat : Roller 3 Whell 8-10 ton

Tenaga : 51 HP

Harga : 654,8 Juta CRF : 0,18062

Umur Kerja : 10 Tahun : 15.000 jam (Pada 12,5%)

( 1 Tahun : 300 hari Kerja)

A. BIAYA PEMILIKAN (OWNERSHIP COSTS) : ( Rp / jam )

1. Depreasi = 90% x harga alat x (CRF)


Jam / tahun

= 0,9 x 654.800.000,00 x 0,18062


15.000,00
= 70,961.99 (a)

2. Lain-lain
Asuransi 3% thn + PPN 10% 3.30% x Harga
Jam/Thn

= 0.03 x 654,800,000
1,500.00
= 13,096.00 (b)

Sub Total (a+b) Rp = 84,057.99

B. Biaya Operasi ( Operating Cost) : ( Rp/Jam )

Kebutuhan bahan bakar dan pelumas tiap HP :


Diesel = 0,160 liter/HP/Jam
Bensin = 0,160 liter/HP/Jam
Pelumas = 0,006 liter/HP/Jam

Harga : Solar / Minyak Diesel Non Subsidi = Rp 11,831.00 /ltr


: Bensin = Rp 7,268.00 /ltr
: Pelumas = Rp 108,173.00 /ltr

Bahan Bakar = 0.16 x 51.00 x 11,831.00 = 96,540.96


Pelumas = 0.01 x 51.00 x 108,173.00 = 33,100.94
Perbaikan & Spare part 0.60 x 70,962.0 = 42,577.19
( 60% x depresiasi ) (Rp) 172,219.09

Total Biaya Pemilikan Dan Biaya Operasi Alat:


(A + B) Rp = 84,058.0 + 172,219.09 = 256,277.07 Per Jam
BIAYA ALAT UNTUK PERHITUNGAN KODE
ANALISA BIAYA PEKERJAAN
E 212

PROPINSI KODE KABUPATEN KODE DISIAPKAN OLEH : TANGGAL :


SUMATERA UTARA #REF! KARO #REF! #REF!

JENIS ALAT = Dump Truck 5 Ton/145 HP


TENAGA = 145 HP CRF 0.24668
HARGA ( Rp ) = 250,000,000 ( Pada 12.5 % )
UMUR KERJA = 6.00 Thn 9,000 Jam
( 1 Tahun = 300 Hari Kerja )

A. BIAYA PEMILIKAN ( OWNERSHIP COST ) : ( Rp / Jam )

1. Depresiasi = 90% x Harga Alat x CRF x 1


Jam / Tahun

= 0.90 x 250,000,000 x 0.24668 = Rp. 37,002.00


1,500

2. Lain-Lain = 0.03 x Harga


Angsuran 3% per tahun Jam/Tahun

= 0.03 x 250,000,000 = Rp. 5,000.00


1,500.00

Sub Total = Rp. 42,002.00

B. BIAYA OPERASI ( OPERATION COSTS ) : ( Rp / JAM )

Kebutuhan Bahan bakar dan Pelumas tiap HP :

Diesel = 0.160 Ltr/HP/Jam


Bensin = 0.170 Ltr/HP/Jam
Pelumas = 0.006 Ltr/HP/Jam

Harga : Solar/Minyak Diesel = Rp 5,803.00 /Ltr


Bensin = Rp 7,268.00 /Ltr
Pelumas = Rp 108,173.00 /Ltr

Bahan Bakar = 0.160 x 145.00 x 5,803.00 = Rp. 134,629.60


Pelumas = 0.006 x 145.00 x 108,173.00 = Rp. 94,110.51
Perbaikan & Spareparts = 0.600 x 37,002.00 = Rp. 22,201.20
( 60% x depresiasi )
Sub Total = Rp. 250,941.31

TOTAL BIAYA PEMILIKAN DAN BIAYA OPERASI ALAT :


A+B = Rp. 42,002.00 + 250,941.31
= Rp. 292,943.31 / Jam
RENCANA ANGGARAN BIAYA
DESA KUTA GALUH KECAMATAN TIGANDERKET
TAHUN ANGGARAN 2021

1. Bidang : Pelaksanaan Pembangunan Desa


2. Kegiatan : Perkerasan Telford Jalan Juma Ciger
3. Volume : 2.5 x 455 M
4. Waktu Pelaksanaan : Juni s/d Desember 2021
5. Rincian Pendanaan : Dana Desa

HARGA
NO URAIAN VOLUME SATUAN JUMLAH (Rp)
SATUAN (Rp)
1 2 3 4 5 6
Perkerasan Telford Jalan Juma
1 Karang Kuda
A Belanja Barang dan Jasa
1. Upah Tukang Dan Pekerja 41,283,000
- Pekerja 397 HOK 99,000 39,303,000
- Mandor 12 HOK 165,000 1,980,000

2. Upah Masinis Mesin Gilas 2 OH 141,000 282,000

3. Sewa Peralatan 24,755,000


- Mobilisasi Dan Demobilisasi 2 Trip 5,000,000 10,000,000
- Mesin Gilas 15 Jam 317,000 4,755,000
- Buldozer 2 Hari 5,000,000 10,000,000

4. Honor Tim Pelaksana Kegiatan 1 Paket 2,547,454 2,547,454

5. Operasional Tim Pelaksana


1 Paket 1,273,727
Kegiatan 1,273,727

6. Peralatan 1,624,000
- Cangkul + Gagang 2.00 Bh 120,000.00 240,000
- Beko Sorong 2.00 Bh 560,000.00 1,120,000
- Sekop + Gagang 4.00 Bh 66,000.00 264,000

7. Biaya Perencanaan 1 Paket 1,273,727 1,273,727

Jumlah Belanja Barang Dan Jasa 73,038,908


B Belanja Modal
1. Bahan 59,453,300
- Batu Belah 15-20 cm 143.00 M³ 253,500.00 36,250,500
- Sirtu (Kelas C) 57.00 M³ 163,400.00 9,313,800
- Pasir Gunung 85.00 M³ 163,400.00 13,889,000

Jumlah Belanja Modal 59,453,300


Jumlah A + B 132,492,208

Disetujui / Mengesahkan Kuta Galuh, April 2021


Kepala Desa Tim Penyusun RKP