Observation Report 18-07-2018 Updated On 25th July 2018

You might also like

Download as xlsx, pdf, or txt
Download as xlsx, pdf, or txt
You are on page 1of 2

RPA Project– Daily Observation Report

Western Region Al Safa Palace Makkah

Date Location Work Type Description Quality Comments

Tunnel 3
Civil Work is required Near
Parkig Area Observation In Progress
Electrical Room 002
A

Covers are Missing for Street


Bld# T-02 Observation In Progress
Lights

Basement No any PPM for Electrical Panel


Inspection Accepted Work completed.
B1 Bld#05 #2A-TL SS 1.1

No any PPM for Electrical Panel


Inspection Accepted Work completed.
#2A-TD 1.1

First Floor
Bld#05 No any PPM for Electrical
Inspection Panel #2C-TD 1.1 & Ladder is Accepted Work completed.
Inside Panel
For Speakers Wires are Under
Inspection the table not in a proper way Accepted Work completed.
Near Room 1086
No any PPM for Electrical
Inspection Accepted Work completed.
Panel #2A-TD 2.1
No any PPM for Electrical
2nd Fllor Inspection Panel #2A-TD 3.1
Accepted Work completed.
Bld#05
No any PPM for Electrical
Inspection Panel #2A-TK 3.1 & FCL lights Accepted Work completed.
are Inside Panel

No any PPM for Electrical


Inspection Accepted Work completed.
Panel #2A-TD 4.1
4th Floor
18-Jul-18

Bld#05

No any PPM for Electrical


Observation Accepted Work completed.
Panel #2A-Tk 4.1

Ground
No any PPM for Electrical
Floor Bld# Inspection Accepted Work completed.
Panel #2A-TD RC2
06
No any PPM for Electrical
Inspection Accepted Work completed.
Basement Room#0042
B1 Bld#06
Lighting Fixture is missing Near
Inspection Accepted Work completed.
Room# 0041
Basement No any PPM for Electrical Room
Inspection Accepted Work completed.
B2 Bld#06 CGS(Riyadh/Dammam/Jed)
Leakage of Water from Chilled
Basement
Observation Water Pipes near Electrical Work In Progress
B1 Bld#06
Room#0042
No any PPM for Electrical
Panel #2B-Tk 1.1, Kitchen
Inspection Accepted Work completed.
Material Inside Electrical Panel
First Floor Room
Bld#06 Inspection No any PPM for Electrical
Panel #2B-TD 1.2, Garbage and
Accepted Work completed.
Kitchen Material Inside
Electrical Panel Room
2nd Fllor Fire Extinguisher last Checked Checked By HSE
Inspection Work completed.
Bld#06 08-04-2018 Engr.
No any PPM for Electrical
Inspection Accepted Work completed.
Room#3030
3rd Floor
Bld#06 Inspection Sound Distribution Panel
Accepted Work completed.
Showing Error

Yasir Liaquat
Hard Services Supervisor

You might also like