Download as docx, pdf, or txt
Download as docx, pdf, or txt
You are on page 1of 4

Name of Candidate / Designation

CURRICULUM VITAE (CV)


Assistant Resident Engineer (M&R Works) -8
1. Position: ___________________________________

2. Personal Details:
Name of the Firm Rehman Habib Consultants (Pvt) Limited
Name of the Staff Abdul Ghani
Father Name Ghulam Akhbar
Date of Birth October 20, 1991
Nationality Pakistani
CNIC 32103-3423927-7
Address 160-Airline Society, Khayaban-e-Jinnah, Lahore
Email
Mobile no.
Additional Landline

3. Education:
Degree Title Major Institution Year
B.Sc. Civil University of Engineering &
Civil Engineering 09/2015
Engineering Technology, Taxila

4. Membership in Professional Societies:


Name of the Body/Society Membership/Registration Number
Pakistan Engineering Council PEC-CIVIL-32825

5. Other Trainings: N/A

6. Language:
Level of Proficiency
Language
Speaking Reading Writing
English Good Excellent Excellent
Urdu Good Excellent Excellent
Punjabi Good Good Good
Saraiki Good Good Good

7. Countries of Work Experience: Pakistan

8. Employment Record:
Total Experience: 7 Years & 3 Months

Employer Name Position Title From To


Rehman Habib Consultants Pvt. Ltd. Assistant Resident Engineer 03/2018 Present
Rehman Habib Consultants Pvt. Ltd. Site Engineer 02/2016 2/2018
9. Project details and work undertaken that best illustrate the capabilities to handle
the tasks assigned:
Name of the Project Detailed Design, Procurement of Contractor, Construction
Supervision and Contract Management of Garuk Storage Dam,
District Kharan
Project Cost
Tenure (from / to) Jan, 2021 to-date
Location Kharan, Baluchistan
Employer Rehman Habib Consultants Pvt. Ltd.
Client Irrigation Department, Government of Balochistan
Main Project Features  Earth Core Rock Fill Dam embankment, Fine & Coarse Filters,
Page 1 of 4
Name of Candidate / Designation

U/S & D/S Rock Fill, Rip Rap and Impervious Clay Blanket.
 Labyrinth Type Concrete Spillway with Side Channel.
 Intake Tower with Irrigation Channel
 Project Colony (Servant Quarters, Guest House, Office Buildings,
Mosque, Sub Engineer and SDO Residence)
45 km long, conveyance pipeline and water supply network for
Kharan City.
Position Held Assistant Resident Engineer
Activities Performed /  Construction Supervision and Quality Control of the project
JD’s activities as per approved drawing and specification.
 Verification of IPC's and Price Adjustment bills.
 Review of Shop drawings submitted by the contractor.
 Correspondence with contractor according to contract
Agreement.
 Preparing daily and monthly progress reports
 Hydraulic design of main canals and distribution network
 Design and supervision of hydraulic structures such as head
regulators, canal falls, cross drainage structures on the hill
torrents such as aqueducts and siphons, bridges, outlets,
drainage culverts etc.
 Preparation of construction drawings of the Irrigation network and
structures
 Quantity estimation and cost calculations for different
components
 Coordination with the Client regarding any site queries
 Review and verify of IPC, submitted by the contractor for
recommendation
Preparation of variation order for the project component
Employer Reference
(Name, Designation,
Contact #)

Name of the Project Design Review & Construction Supervision of 100 Dams in
Baluchistan Package-III (20 Dams) Project Baluchistan
Project Cost
Tenure (from / to) Mar, 2018 to Dec, 2020
Location Baluchistan
Employer Rehman Habib Consultants Pvt. Ltd.
Client Irrigation Department, Government of Balochistan
Main Project Features  Embankment Dam & Gravity Dam (20 No.)
 Different Type of Spillway Such as Labyrinth Type, Open Cut
Channel, Stepped Spillway
 Intake Structure with Access Bridge
 Irrigation conveyance system with outlets.
Road and inspection huts, rest houses.
Position Held Assistant Resident Engineer
Activities Performed /  Assist to Resident Engineer and Design Team Regarding Project,
JD’s activities
 Calculate Quantity of all components of Project, activities
 Preparation of Variation Order of Dams.
 Construction Supervision of all the components of dam including
Embankment, Spillway, Intake, Rest House, road as per drawing
and specifications.
 Verification of Contractor IPC / Final bills and recommend to RE.
 Modification of Drawing as per instructions of Resident Engineer
due to site condition.
 Preparation of monthly and daily progress reports.
 Verification of Shop Drawings and BBS submitted by the
Contractor.

Page 2 of 4
Name of Candidate / Designation

 Attend Monthly Meetings with Client Regarding Project Progress


and Issue.
 Check and Verification of Surveyor Work at site using Level
Machine.
 Plot Survey Data (Total Station) in Civil 3D and AutoCAD.
 Checked all surveys and benchmarks established.
 Checked Layout of works at site relevant to the drawings.
 Test and inspect construction material both on and off site.
 Compiled monthly progress reports pertaining to his section.
 Verified contractors' payment certificates as per standard format
pertaining to his section and forward to RE.
 Review contractors' claims considering recorded facts and
forward his assessment to RE
 Implement Quality Assurance & Control Procedures
Employer Reference
(Name, Designation,
Contact #)

(Contact Information: Email:______________________Phone #____________________)

Name of the Project Design Review & Construction Supervision of 100 Dams in
Baluchistan Package-II (26 Dams) Project Baluchistan
Project Cost
Tenure (from / to) Feb, 2016 to Feb, 2018
Location Baluchistan
Employer Rehman Habib Consultants Pvt. Ltd.
Client Irrigation Department, Government of Balochistan
Main Project Features  Embankment Dam (26 No.)
 Different Type of Spillway Such as Open Cut Channel, Stepped
Spillway, Baffled Chute Spillways.
 Intake Structure with Access Bridge
 Irrigation conveyance system with outlet structures.
 Road and inspection huts, rest houses.
Position Held Site Engineer
Activities Performed /  Assist to Resident Engineer and Design Team Regarding
JD’s Project.
 Calculate Quantity of all components of Project, activities
 Construction Supervision of all the components of dam including
Embankment, Spillway, Intake, Rest House, road as per drawing
and specifications.
 Preparation of monthly and daily progress reports.
 Review of Shop Drawings and BBS submitted by the Contractor.
 Check and Verification of Surveyor Work at site using Level
Machine.
 Checked all surveys and benchmarks established.
 Prepared Layout of works at site relevant to the drawings.
 Test and inspect construction material both on and off site.
 Compiled monthly progress reports pertaining to his section.
 Verified contractors' payment certificates as per standard format
pertaining to his section and forward to RE.
Implement Quality Assurance & Control Procedures
Employer Reference
(Name, Designation,
Contact #)

Page 3 of 4
Name of Candidate / Designation

10. CERTIFICATION:
I, the undersigned, certify that to the best of my knowledge and belief, this CV correctly describes
myself, my qualifications, and my experience. I understand that any willful misstatement
described herein may lead to my disqualification or dismissal, if engaged.

__ __________________
(Signature of Candidate) Date (Day/Month/Year)

Page 4 of 4

You might also like