King Fahd Causeway FM Services Contract (M228)

M228 FACILITY MANAGEMENT HARD SERVICES

Submitted by: Safari Facilities Management.

Submitted to: □ His Excellency Yousef Al-Abdan (KFCA CEO)

□ Engr. Hammad Abdulgaffar (KFCA Maintenance Manager)

□ Engr. Fahad Adel Yusuf (KFCA Inspection Department)

Reporting Period: April, 2023

Report Ref : KFCA-SAFOM-M228-MMR-16-23 Page 1


King Fahd Causeway FM Services Contract (M228)

Table of Contents

1. Executive Summary ...........................................................................................................................…………..3-10


2. Project Information .............................................................................................................................................. ..11
Major Issues…………………………………………………………………………………………….………….…...…...12

Operation & Maintenance Progress…………………………………………………….……………………………..13-16


3. Preventive Maintenance Work Order ………………………………………………….……………….……….……. ...13
4. Reactive Maintenance Work Order…………………………………………………………….….……...….….…….….14
5. Service Request /Call Center Status ……………………….....................................................................................15
5.1 RM/CM Backlog………….……………………………………………………………………………………………...16
6. Quality Audits…………………………………………..………………………………..…………………….………...17-18
7 Asset Failure ……………..……………………………………………………………….…..……………….……..……..19
7.1 Management Challenges……………………………………………………………….………………….…...….19-26

8. Health & Environment Safety.……………………………………………………………………………………….…27-28

9. Utilities Consumption……………………………………………………………………….………………………...…29-32
10. Staffing & Resources………………………………………………………………………………………….…...……33-38
11. Spare Parts & Consumables….………………………………………………….…………………………….…...….39-43
12. Procurement Status Report……………………………………………….……..….……………………………….…44-51
13. Appendix I. Additional Work.………...……………………………………………………………......……………...…52-54
14. Appendix II. Inspection Report ……………………………………………………………….…….…………………55-103

Report Ref : KFCA-SAFOM-M228-MMR-16-23 Page 2


King Fahd Causeway FM Services Contract (M228)

1. Executive Summary
With the combine supervision, monitoring, and excellence commitment to deliver the program with focus efforts and high
standards, our team was able to successfully manage the execution of our tasks and responsibilities for the fulfillment of our
commitment & expectation for the month. As we bring to you our Monthly Report towards our main objective and target
achievement having been delivering the services without no reported minor and major injuries on site. A sustainable
implementation to cope up the backlog as well as the current month targets that leads to our deliverables that will bring the
assets and essential facilities of the KFCA Island in full compliance with it requires serviceability and remains functional as
its best.

Among those services offers under Contract involvement but are limited to the Following under M228 Project code was to
Carry out the operation, maintenance and inspection for the entire King Fahd Causeway and its facilities on both Saudi and
Bahraini sides, including all roads, embankments, Al- Aziziya crossing and the buildings, which includes the facilities for
collecting transit fees on the Saudi and Bahraini Sides

As shown on below table our keys milestone achievement and targets this month from among the services being rendered
in two Categories Preventive Maintenance (PM) and Reactive Maintenance (RM), Our aim to deliver the 100 percent
Efficiency of PM was almost achieved having been gathered a combined percentage of RM & PM of about 92.44% of
closeout over a 7.65% pending job for this month However its combine cumulative target in Maximo Dashboard achieved a
rating of 93.65% over a 6.35% pending job that completes the Q2 for 2023 Achievement where cancel work order has not
been excluded as shown on Fig. 3 Progress chart.

This Month PM Task percentage completion reached an average of about 96.39 % while RM/CM jobs was 84.09%
completion where its overall combined percentage output elevate into 92.44% that indicates a positive response on every
team effort and dedication of each member to meet the target deliverable ahead of its field goal especially the continuing
approach to educate each member through a responsive training and toolbox talk. The overall performance on cumulative
pending is recovering quite during this period as shown on the Backlog Report on page 16.

Also listed below are the following factors affecting to attain our target objective:

❖ Bridge inspection painting affects the inspection schedule of activity so all related painting works not done will be
rescheduled to align with the completion of Bridge inspection schedule.
❖ An additional manpower training is necessary for the sustainability and new approach prior to target the work
deliverables.
❖ Additional works that hinder to complete the program task such as:

• Re-installation of Two (2) units split A/C that dismantled by SRACO company @ M228-SA-ZN4-SICD Immigration
Cabin Departure-WO19000167
• Expansion of the entrance to the parking spaces of the private track entrance at M228-SA-ZN3 Parking VIP Zone 3 -
WO19100226
• Provide Power Supply to the Screen TV at Main Toll Gate at M228-SA-ZN1-SAG2 Gate No.2 Branch Toll Gate-
WO19144428
• Installation of 2 units cladding at M228-BA-ZN2-BA7C Gate Coast Guard New Building - WO18337415
• Installation of Security Fence from shipping gate to cabin Arrival # 2 at M228-SA-ZN3 Custom & VIP Area-Zone SA3-
WO19261000
• Leaking in the wall from the toilet at M228-SA-ZN3-S124 Custom Security Building New-124 - WO19323422
• AC Issue at M228-SA-ZN4-SA03 Custom Department- WO19323401
• Paint floor lines at the cabins at M228-SA-ZN4-SICD New immigration Departure Cabin - WO19325922
• Fabrication of parking signpost (2 ea.) at M228-SA-ZN2-SA01 KFCA Administration Building Parking - WO19341702
• Installation Split Type A/C Unit @ M228-SA-ZN4-SA9B Clearance Agents Building- WO15401990
Report Ref : KFCA-SAFOM-M228-MMR-16-23 Page 3
King Fahd Causeway FM Services Contract (M228)

Currently OA & QC Inspection Report gathered a 13.74% & 25.84 % respectively for the RM & PM inspection Items with
a total of 1060 Work orders. However, Client Managing agent issued an Observation of about 26 items this month with
an overall cumulative status to date of about 2416 total items. The Percentage rating of April Month Joint Audit
Inspection per department was quite impressive where Civil received an approval Rating of 85 %, Electrical Department
received a 96.43% approval rating and 91.43% Approval Rating for Mechanical Department while 100% Audit Score on
Bridge Inspection being published by OA during this month reporting period.

Month of April 2023 Status

As shown on below Maximo dashboard where there is discrepancy on percentage of accomplishment due to cancel
work order are not excluded on the consideration.

Fig. 1

Fig. 2
Report Ref : KFCA-SAFOM-M228-MMR-16-23 Page 4
King Fahd Causeway FM Services Contract (M228)

Cumulative Status as to date as per MAXIMO DASHBOARD ( Fig. 3)

Considering Safety point of view, the Average HSE audit garnered by the Hard Services during the April 2023-month Period
where PPE score got 85.69%, WMS got 79.15% & no score rating for Chemical Storage. As Traffic Safety is concerned,
there were nine (9) reported accidents on Saudi Side and eight (8) reported-on Bahrain side, concerning with major injury
there were three (3) safari employees passed away involved on road vehicular incidents.

Furthermore, one (1) Technical Report in Bahrain and five (5) in Saudi issued with three (3) Incident reports been generated
in Saudi Side and none in Bahrain Side during the current month.

Moreover, Pending Activity due to out of Material stock and wait of Procurements delivery were almost 84 Total items of
pending Work order under WPLAN / WMAT that corresponds on this reporting month. While the procurement status served
a 25 PR raised has been a delivered during this month and 28 items remain under process as an achievement for the
reporting current month period.

The following key maintenance activities were carried out during reporting period;
SAUDI Side
❖ Installation of New Sample LED Lights in Flyover Bridge.
❖ Straighten the Decorative lighting pole fixture bent by Heavy Wind in front of SA 01.
❖ Installed New LED Lights in Main Toll Gate High Mast pole.
❖ Adjust the direction of the speed signboard on the bridge.
❖ Replace the short, circuited cable feeding Decorative pole.
❖ Replace burned ballast, connectors and load Balancing of the cable feeding all Decorative poles.
❖ Refixing of split A/C unit dismantled by SRACO at SA02 immigration departure new Cabin.
❖ Painting of internal wall of SICD Immigration Departure Cabin 26/27
Report Ref : KFCA-SAFOM-M228-MMR-16-23 Page 5
King Fahd Causeway FM Services Contract (M228)

❖ Repair & replacement defective door hardware & accessories at SICD Immigration Departure Cabin 26/27
❖ Replacement of damaged floor tiles at SICD Immigration Departure Cabin 26/27
❖ Replacement of damaged acoustic ceiling tiles at SICD Immigration Departure Cabin 26/27
❖ Repair asphalt on barrier Sensor loop at SA02 arrival cabin A2 & B3 -SR1293779
❖ installation new door closer at SICA Saudi Immigration Ladies Inspection arrival Cabin
❖ Main toll gate water Leak check
❖ Main toll gate Change door stopper for all cabins
❖ Installed New Sample LED Down Light at Main Toll Gate
❖ Fixed back the Hanging Signal Light beside SA 01
❖ Installation of New RGB LED Lights at Flyover Bridge
❖ Replaced the Float Switch of Portable water tank at Ro plant.
❖ Replacement of Defective Sewer Pump Contactor at SA 02
❖ Provided Power Supply with Additional 6pcs 10A single pole Breaker According to The Requirement of New Installed TV
SCREEN AT Main Toll gate.
❖ Main toll gate Pavement paint
❖ SR1295835 Main toll gate repair steel pole
❖ Straighten the Decorative lighting pole fixture bent by Heavy Wind in front of SA 01.
❖ Replacement of 2 split unit at SA02 Immigration Server Room
❖ Interlock repair at SH1 Outside Truck Holding
❖ Repair defective door at SA01 Admin Building Roof Top
❖ Check/Repair Water leakage at SAG-1 Saudi Main Toll Gate
❖ Replacement of defective door stopper & hardware for All Cabins at SAG1 Saudi Main Toll Gate Cabins
❖ Installation of LED Lights facing the New Cabins in Immigration Departure
❖ Installed Temporary Barrier in New Cabins fixed by SRACO at Immigration Departure
❖ Laid Safety Loop Cable in Immigration Departure New Cabins
❖ Replacement of High mast Lamp besides SA 04
❖ Replaced defective WC flush valves in SA -15 ladies’ toilets.
❖ Cleaned all AC units’ ducts in SA 12 cargo.
❖ Replaced defective sewer pump #2 in SA 05 lift station and kept in auto mode.
❖ Replaced defective wash basin tap sensor type in SA 100
❖ Provided water connection to VIP South Security gate.
❖ Installed float switch and adjusted level, then started New RO by auto mode.
❖ Replacement of Niagara bidet spray in toilets -Work is under progress.
❖ Repaired water leakage in SA-02 arrival gent’s toilet
❖ Repaired and replaced defective bolts in RO feed pump.
❖ Installation of New Heater of Doosan Generator at Main Toll Gate.
❖ Replace the Defective Heater Hose of Doosan Generator at Main Toll Gate.
❖ Replacement of Defective Controller in Immigration Arrival Cabins.A1 And B4
❖ Replacement of Busted High Mast Lamp at Cargo Area.
❖ Installation of padlock for the generator door at SATG-1 Main toll gate
❖ Repainting of all cabins at SCCA Customs Cargo arrival
❖ Installing a new mirror at SA10 Main gate Cargo
❖ Installation of new drawer lock at SAG1 Main toll gate first floor Supervisor office - WO17562397
❖ Repainting of water pump at SAG2 Branch toll gate.
❖ Replacement of damaged crush barrier at Causeway Bridge # 1North side
❖ Sewer pump 2&3 fixed in SA 05 lift station presently 1&2 working in auto mode & 3 is in manual mode.
❖ Potable water pumps are fixed auto function in branch tollgate.
❖ The sewer pump is fixed in auto function in SA 02
❖ Replaced defective WC flush valves in SA 15 masjid.

Report Ref : KFCA-SAFOM-M228-MMR-16-23 Page 6


King Fahd Causeway FM Services Contract (M228)

❖ Fixed AC drain tray in SA 09 building.


❖ Replaced defective PCB in custom building packaged unit.
❖ Serviced foot valve of branch tollgate irrigation pump.
❖ De-clogged concealed unit AC drain in SA 01
❖ NIAGARA bidet spray replacement work is under progress.
❖ Carried out PM Activity generated during the week.
❖ Carried out rectification work on every RM Issues requested by the client.

BAHRAIN Side:

❖ Repaint curbstones at Causeway crossing road BRD3, Exit Road BRD2 & Entry Road BRD3.
❖ Repaint internal walls at BA10 ground floor.
❖ Repaint curbstones at Bahrain Exit Borders crossing road, BRD4.
❖ Repair raised flooring tiles in Coast Guard New Bldg. control room, BA7C.
❖ Repair cracks of the main entrance concrete slope & external walkways in Clinic Bldg., BA6B.
❖ Replace damaged roofing sheets of the NVIP spaceframe shed.
❖ Install window curtains in the security cabin of Coast Guard new bldg. BA7C.
❖ Adjust all signboards and signages at the bridge & embankments.
❖ Repair cracks & repaint the external concrete frames of windows in BA7B.
❖ Repaint the curbstones of Public Security Bldg. BA07.
❖ Repaint rusted manhole cover near BA7A.
❖ Restore fallen concrete base and repair the interlock pavement in NVIP crossing road.
❖ Replace defected over-head door closer in BA02.
❖ Replace damaged door cylinder lock in BA03 X-Ray Bldg.
❖ Replace damaged hinges of kitchen cabinet in K9 staff cabin.
❖ Dismantle & Remove traffic delineator posts in Custom Arrival Inspection area.
❖ Fabricate & install wooden box, with lock, for the electric sliding gate control panel in custom arrival lane.
❖ Repaint all interior walls in BA10A.
❖ Replace damaged tissue dispenser in Toll Gate new Bldg. BTG2.
❖ Clean & repainted rusted steel fence of custom departure public parking, BCDP.
❖ Replace door cylinder locks in office & in prayer room in BA02.
❖ Repair the pat hole in the asphalt pavement of Exit Road BRD2 lane, near Traffic light.
❖ Repair cracked concrete tiles near BA7A, Coast Guard Tower external walkway.
❖ Replace defected door closer & cylinder lock of truck cabin in the new Toll Gate exit lane.
❖ Replace Tissue dispenser in BA15.
❖ Replace missing door cylinder lock in Coast Guard workshop, BA16.
❖ Repair the defected tissue dispenser in BA06.
❖ Fabricate & Install steel bracket frame for the flood lights of Saudi Embassy in Embankment #4.
❖ Retouch & repaint the interior walls of Ladies Mosque, BA15.
❖ Install signage on cladding & paint the logo on the pavement for the disabled parking in BA04 supermarket.
❖ Repaint the Electric Transformer panel in BA24.
❖ Replace defected door handle in BA04 first floor.
❖ Replace door cylinder lock in BA10.
❖ Install floor carpet in BA07.
❖ Rectified the short circuit in transformer 14 streetlights.
❖ Installed new power supply for new UPS 5 KVA custom departure.
❖ Replaced the old enclosure for the control of sliding gate BA04.
❖ Installed new additional focus lights for the signboard.
❖ Rectified the issues in the tollgate Southside irrigation pump.
❖ Replaced defective hand spray hose in BA15.
❖ Fixed water flushing continuously on BA07.
❖ Rectify water leak in toilet in BA18.
❖ Replaced defective water heater thermostat in toll gate new building.
Report Ref : KFCA-SAFOM-M228-MMR-16-23 Page 7
King Fahd Causeway FM Services Contract (M228)

❖ Replaced defective bidet spray in BA18 toilet departure cabin.


❖ Replaced defective bidet spray in BA03.
❖ Rectify water leak from angle valve in BAPSB.
❖ Replaced defective bidet spray in BA15 ladies & gents’ toilet.
❖ Replaced missing shower hose in BA12 toilet.
❖ Replaced defective bidet spray in BA12.
❖ Replaced defective water heater in BA25
❖ Rectify A/C Not Working/No Power in BAPC.
❖ Replaced defective hands spray in BA15.
❖ Replaced defective hands spray in BA03.
❖ Replaced defective hands spray in BA05.
❖ Installed water line for cleaning purposes in BA03.
❖ Replaced defective thermostat for water heater in BA07C.
❖ Installed wash basin mixer & replaced angle valve in the staff toilet.
❖ Replaced defective flushing mechanism of WC in BA07.
❖ Replaced defective angle valve in NVIP staff toilet.
❖ Replaced defective water heater in BA09 dog cabin.
❖ Repair the emergency exit door in BA25A warehouse.
❖ Proceed to paint the steel fence in custom departure public parking.
❖ Repair the steel cover of the access manhole on BA04 roof.
❖ Repaint the exterior walls of security cabin and its toilet cabin at SVIP entrance gate.
❖ Repaint the irrigation & booster bumps at Toll Gate old building.
❖ Seal the joints of the roofing sheets to repair rain-water leak in BA25A.
❖ Repair cracks of the concrete pavement in BA98A sea-side walkway.
❖ Repair door handle of BA03 main door.
❖ Repair the steel frame brackets of the fence in BA99.
❖ Complete painting of the interior walls in BA10A.
❖ Clean the storm drain manholes in BA98.
❖ Repair cracks of granite tiles in the external walkway of NVIP Bldg.
❖ Repaint rusted roofing sheets in BA16 parking shed.
❖ Repainted internal walls at ground floor in BA6B clinic building.
❖ Repaint rusted roofing sheets of BA01 car parking shed.
❖ Repair cracks and pat holes in the asphalt pavement in NVIP & Truck entry & exit road.
❖ Repaint dirty ceiling in departure gent’s public toilet.
❖ Repaint curbstones in BA07 & BA7B car parks.
❖ Repaint rusted electric transformers, panels & camera poles on Bridge & embankments.
❖ Repainting defective walls in BA04 first floor.
❖ Clean & repaint rusted electric distribution panel in cargo arrival procedure area.
❖ Repair (welding works) the issue of the swing gate of KFCA scrap yard.
❖ Repair & Re-install fallen Bahrain flag in BA01.
❖ Relocate convex mirror at BA10A security cabin.
❖ Construct floor sill to prevent rainwater leak in immigration arrival cabin.
❖ Repair water-leaking windows in BA7C, coast guard security cabin.
❖ Repair & adjust misaligned signboards at Bridge #5.
❖ Repair settlement of interlock pavement in BA98 exterior walkway.
❖ Remove traffic delineator posts & steel posts at Toll gate old truck lanes.
❖ Install Bahrain flag in BA07.
❖ Repair the door hinges of office door in BA02.
❖ Repaint the Electric Transformer panel in BA24.
❖ Replace defected door handle in BA04 first floor.
❖ Replace door cylinder lock in BA10.
❖ Install floor carpet in BA07.
❖ Rectified the short circuit in transformer 14 streetlights.
❖ Installed new power supply for new UPS 5 KVA custom departure.
❖ Replaced the old enclosure for the control of sliding gate BA04.
❖ Installed new additional focus lights for the signboard.
❖ Repaint rusted irrigation pump & tank at Toll Gate south landscaped area.
Report Ref : KFCA-SAFOM-M228-MMR-16-23 Page 8
King Fahd Causeway FM Services Contract (M228)

❖ Repair defected gypsum ceiling due to previous water leak in BA15 gent’s toilet.
❖ Repair broken plastic at the corner of counter in BA03.
❖ Replace defected over-head door closer to BA02 main door.
❖ Repair defective door in Coast Guard new Bldg. BA7C.
❖ Repaint concrete base of Cargo Immigration departure cabin.
❖ Cut the torn parts of damaged fabric in Immigration arrival Umbrella tent.
❖ Replace damaged traffic delineator posts at UM NAASAN entry road.
❖ Check & clean the roof of SVIP security cabins to repair rainwater leak.
❖ Repair & Repaint curbstones in Cargo Departure Road (BRD5) and Cargo BA-SA crossing road (BRD4).
❖ Install reflectors on the crash barriers at Toll Gate new truck exit lane, BTG3.
❖ Repaint curbstones at the causeway entry & exit roads, near the traffic signal light.
❖ Repair damaged sofa chair in BA03 first floor office.
❖ Repaint all curbstones at Toll Gate new cabins, BTG2.
❖ Continue painting the steel fence at custom departure public parking.
❖ Repaint rusted manhole cover in NVIP Bahrain & Saudi Crossing Road, BRD3.
❖ Install Bahrain Flags on roof and on the perimeter fence of BA07.
❖ Replace defected door lock in BA06.
❖ Rectification of the unbalancing load transformer 13.
❖ Rectification of the streetlights on VIP Road.
❖ Replaced tri-proof led lights 14 pic car parking of BA06.
❖ Rectification of the loose cable for the traffic signal lights.
❖ Installed new selector switch for marina pump.
❖ Replaced the elevator lop fixture in ba25.
❖ Rectify A/C Not Working/No Power in BAPC.
❖ Replaced defective hands spray in BA15.
❖ Replaced defective hands spray in BA03.
❖ Replaced defective hands spray in BA05.
❖ Installed water line for cleaning purposes in BA03.
❖ Replaced defective thermostat for water heater in BA07C.
❖ Installed wash basin mixer & replaced angle valve in the staff toilet.
❖ Replaced defective flushing mechanism of WC in BA07.
❖ Replaced defective angle valve in NVIP staff toilet.
❖ Replaced defective water heater in BA09 dog cabin.
❖ Rectify the garden light issues at BA15.
❖ Rectify the short circuit in decorative streetlights at the SVIP road.
❖ Rectify accident damage gate barrier and replace arm BA Immigration arrival B11.
❖ Rectify accident damage gate barrier and replace arm custom departure NVIP.
❖ Connect power supply for KFCA cabin signboard at VIP line
❖ Replace defected door lock in BA06.
❖ Rectification of the unbalancing load transformer 13.
❖ Rectification of the streetlights on VIP Road.
❖ Replaced tri-proof led lights 14 pic car parking of BA06.
❖ Rectification of the loose cable for the traffic signal lights.
❖ Installed new selector switch for marina pump.
❖ Replaced the elevator lop fixture in ba25.
❖ Rectify A/C Not Working/No Power in BAPC.
❖ Replaced defective bidet spray in BA10A.
❖ Rectify defective flushing lever in the toilet.
❖ Replaced defective garden hose adaptor in coast guard marina.
❖ Replaced defecate 9v battery in BA15 ablution area.
❖ Rectify defective flushing mechanism of ladies’ toilet in BA05.
❖ Modify three urinal flushing mechanisms in BA98.
❖ Rectify water leak from water supply line in BA24.
❖ Replaced bearing & mechanical seal for one portable water pump in BA24.
❖ PPM as per schedule

Report Ref : KFCA-SAFOM-M228-MMR-16-23 Page 9


King Fahd Causeway FM Services Contract (M228)

The following key Bridge Inspection activities were carried out during reporting month.

❖ RWA 008 Inspection of concrete superstructure, edge beam, expansion joints, pavement bitumen, steel drainage &
guardrail all above Flyover SA FO-1 N&S.
❖ RWE003 Inspection of slope protection @ EMB 02 south side
❖ RWB 002 Inspection Piers, Decks and Elastomeric above pier @ Aziziya Fly over.
❖ RWE003 Inspection of Bitumen / Guardrail N&S @ EMB 04
❖ Repainting of guardrail with defects/scratched due to accident & curb stone approached B5 N/S.
❖ Inspection of Guardrails/Crash Barrier at Embankment, E6 S&N/ E7 S & N
❖ Repair of concrete surface crack CONS-CR RWA07 @ Aziziya fly over/ SA FLY OVER SA FO-1
❖ Repair works outside girder as per inspection results deficiency, (under RI 011-RI 015, B4&B5, N&S).
❖ Painting of guardrail-scratched cause by accident & curb stone approached over pass-UN-S / UN-N
❖ Inspection of guardrails/crash barrier at BATG-S, /N embankment, E5
❖ Inspection of slope protection at E6 / E7
❖ Cleaning with high pressure and Inspection of expansion joint @ B1, B2&B3 N&S.
❖ Inspection of Pile/Pier-Foundation Grid @ B3 N&S and MS-Grid # 45
❖ Rust removal and touch-up paint of rusted steel enclosure Boat #1 generator
❖ Replacement of damaged lateral friction roller guide main platform for Moog#5.
❖ Repair works outside girder as per inspection results deficiency, (under RI 011-RI 015, B4&B5, N&S);
❖ PM for Expansion joint, Cleaning with air compressor, (EJ1-EJ12), N&S, (EJ1-EJ4), N&S
❖ Repair of concrete surface crack CONS-CR RWA07@ Aziziya fly over.
❖ Repair works outside girder as per inspection results deficiency, (under RI 011-RI 015, B4&B5, N&S)
❖ PM for Expansion joint, Cleaning with air compressor, EJ1-EJ4.
❖ PM for greasing of guardrail moving joint, (guardrail joint-outside & median) B4N.
❖ Repair of girder-inside with deficiency-(CONS-CR>=0.20mm).
❖ Inspection of Pile/Pier, P2-19, RB 004-Completed 15-3-2023.
❖ Inspection of equipment Maintenance Moog & Boat for Saudi & Bahrain Side

_________________________

YOUSEF OMAR
TREVOR WIGHTON
General Supervisor
Project Manager
Report Ref : KFCA-SAFOM-M228-MMR-16-23 Page 10
King Fahd Causeway FM Services Contract (M228)

2. Project Information
2.a The contractor shall be responsible of carrying out the operation, maintenance and inspection for the entire King Fahd

Causeway and its facilities on both Saudi and Bahraini sides, including all roads, embankments, Al- Aziziyah crossing and

the buildings, provided that it shall include the facilities for collecting transit fees on the Saudi and Bahraini Sides, and the

following works are included in the operation, maintenance and inspection activities that the contractor shall carry out:

1. A total length of (25km) of causeways and embankments between Saudi and Bahrain, including road works,

protective rails, lighting fixtures and all other related accessories,

2. All buildings, towers, roads, and squares located on the island including all services, canopies and the public

utilities contained in the buildings schedule annex, excluding what is under rehabilitation or implementation which

shall be included in the scope of work after its official hander over by the authority,

3. Transit fees collection facilities and the surrounding area on the Saudi and Bahraini both sides and the roads

leading to the entrances as well as vehicles’ insurance facilities on the Bahraini side,

4. Inside the bridges, the side of the embankments, Umm Al-Nassan Island Tunnel and the surrounding areas,

5. Electric power supply station for all bridges, roads, the border island located north of Aziziyah bridge intersection as

well as the service stations in various locations,

6. Marine Inspections for all five bridges, seven embankments, four test columns and its accessories,

7. The two areas of trucks gathering before entering the causeway for each side.

2.b. Area of Liability:

Maintenance and comprehensive inspection for all facilities, bridges, general site and the infrastructure, as the

names of buildings clarified in Annex No.3.

2.c. General Requirements:

This section articulates the overall requirements in relation to the management of health, safety, environment and

quality measures, as well as the general service requirements for each service. Performance is measured at the

service level and according to the criteria mentioned throughout the competition document

Report Ref : KFCA-SAFOM-M228-MMR-16-23 Page 11


King Fahd Causeway FM Services Contract (M228)

Major Issues and Concerns:

❖ As-built Drawings for most of building mechanical system, building electrical, panel single line diagram underground networks
piping system and manuals (not available).
❖ To clarify the Damaged Cabin Fabric Tent around KSA & BA side Custom & Immigration Area (joint report sent to KFCA)
❖ To clarify the existing Building that currently no Fire alarm system or Fire alarm system not in services such asSA-06 Civil
Defense, Sa16 Reception Building & Sa101 Archive (condition survey sent to KFCA) however KFCA respond regarding for the
plans to upgrade the fire alarm and firefighting system next year by project department)
❖ To Clarify the MSK Contractor in progress Upgrading of electrical Work into 380 V power that Maintenance team cannot
evaluate & perform PM task on Electrical panel on the following area at Zone 5 (SA14, SA05, SA6B, Sa06, Sa07, Sa05A &
SA04)
❖ To highlight the difficulty of communicating with the IT Department in addressing and resolving some IT tasks that are
frequently received by the call center.
❖ Awaiting to comply with client requirement for telephone feature such as recording, call waiting option and other related
features on call center task.
❖ At Sa-08 building GF electrical room remains closed on Friday and Saturday. The room have LV panel & fire alarm panel, so in
case of any power outage or breaker tripping or fire alarm activation, we face trouble in entering the room as the room key is
with customs official and they do not let other people to hold key or enter room. This was intimated to the customs official, and
no action has been taken. Failures did happen before in SA-08 building on Saturdays, and we had encountered troubles even
before.
❖ Lack of fire alarm drawings for the buildings which becomes a barrier for the fire alarm subcontractor to do the rectification
work quickly. Apparently if drawings are not found out, almost all panels will require total reprogramming & certain panels will
need complete replacement and programming, commissioning. The voltage change project happening in cargo area buildings
caused some of light fixtures to get defective.
❖ Complaint arises from Immigration new car parking near SA-06 civil defense. This barrier and parking area streetlights are not
yet handed over to maintenance nor have the operating key for the lighting panel and exit barrier. Officials complained about
the exit barrier but couldn't check as not handed over from KFCA and did not have the operating key. Key need to be handed
over to maintenance for regular maintenance.
❖ At SA-02 departure side ladies’ office & SA-02 FF captain office lights got damaged due to water leakage from AC unit
(clogged pipe). Rectified the leakage issue and replaced the busted lights.
❖ Power interruption happened at SA-04A due to voltage change project by MSK contractor. This was sorted out later with
proper coordination with MSK contractor.
❖ Power interruption happened at SA-12 building for cameras & outlets due to voltage change project by MSK contractor. This
was sorted out later with proper coordination with MSK contractor.
❖ No coordination from the maintenance for the new Package A/C installation by KFCA Subcontractor.
❖ Condition of Pier 31 of Bridge 4, due to the cracks resulting from the impact of the accident that occurred previously, ACTS has
conducted an inspection of the bridge to assess the extent of the existing damage and propose a suitable corrective action.

The visual inspection’s findings were as follows:

1-Bottom Side of Pier 31: Inspection was done to the bottom side of Pier 31, where the collision of the sailing boat
occurred. The inspection showed only repaired patches of the impact point and the corresponding scratches afterwards,
with no signs of any recent consequent cracking.

2-Top Side of Pier 31: The inspection done to the top side of Pier 31 showed clear signs of post-collision cracking just
below the pier cap, with cracks visible in a few of the repaired areas. This indicates a high potential of further expansion of
the existing cracks, and possibility of new cracks formation due to any minor structural instability that could have occurred
due to the collision. (Refer to acts inspection observation page)

❖ Immigration Server Room Power failure: as observed server room was not fit for purpose that needs some modification as per
standards requirement.
❖ IT rooms don’t have access (attached list)

Report Ref : KFCA-SAFOM-M228-MMR-16-23 Page 12


King Fahd Causeway FM Services Contract (M228)

M228 Hard Service Progress Report


3. Preventive Maintenance Work Order
PREVENTIVE MAINTENANCE -DEPARTMENT / SECTION
DEPARTMENT / SECTION ISSUED THIS MONTH
GRAND
CLOSE OPEN
TOTAL
M228 1896 71 1967
PERCENTAGE 96.39% 3.61% 100%
TOTAL NUMBER OF PREVENTIVE MAINTENANCE 1992
OPEN 71
CANCELLED 25
CLOSE 1896

PREVENTIVE MAINTENANCE -DEPARTMENT / SECTION

DEPARTMENT / ISSUED THIS MONTH


SECTION ISSUED CANCEL ACTIVE CLOSED OPEN %
CIVIL 347 1 346 341 5 98.6%
ELEC 657 0 657 629 28 95.7%
MECH 694 24 670 637 33 95.1%
HSE 100 0 100 97 3 97.0%
BRIDGE INSP. 194 0 194 192 2 99.0%

Issues being Noted During PPM Undertaking:


❖ Most of building have no safe Access for roof tops to perform the required AC outdoor unit PPM.

Report Ref : KFCA-SAFOM-M228-MMR-16-23 Page 13


King Fahd Causeway FM Services Contract (M228)

❖ Indoor PPM activities are unable to be performed during the evening and nighttime since almost all offices and
indoor premises close after 2pm. Due to this it is unable to pass the PPM activities for the other shifts and
experiencing flooding during morning shift.
❖ Additional work that hinders our regular PPM activities
❖ In accessible of the building to perform PM task due to restriction / no Access

4. M228- Reactive Maintenance Progress (RM)


REACTIVE MAINTENANCE / CORRECTIVE MAINTENANCE -DEPARTMENT / SECTION

DEPARTMENT / SECTION ISSUED THIS MONTH

CLOSE OPEN GRAND TOTAL

M228 782 148 930

PERCENTAGE 84.09% 15.91% 100%

TOTAL ISSUED 942

CANCELLED 12

TOTAL NUMBER OF REACTIVE MAINTENANCE / CORRECTIVE MAINTENANCE ACTIVE 930

OPEN 148

CLOSE 782

REACTIVE MAINTENANCE / CORRECTIVE MAINTENANCE -DEPARTMENT / SECTION


ISSUED THIS MONTH

TOTAL ISSUED CANCELLED CLOSED INPROG


COMBINE CM /RM
PERCENTAGE PER
TOTAL CANCELLED CANCELLED TOTAL ACTIVE WORK CLOSED CLOSED TOTAL DEPARTMENT
DEPARTMENT / SECTION ISSUED RM ISSUED CM OPEN RM OPEN CM TOTAL OPEN
ISSUED RM CM ORDER RM CM CLOSED

CIVIL 248 17 265 2 0 263 214 9 223 32 8 40 84.8%


ELEC 205 31 236 2 0 234 187 16 203 16 15 31 86.8%
MECH 339 29 368 2 0 366 291 20 311 46 9 55 85.0%
HSE 45 0 45 0 0 45 26 0 26 19 0 19 57.8%
BRIDGE INSPECTION 25 3 28 6 0 22 19 0 19 0 3 3 86.4%
Grand Total 862 80 942 12 0 930 737 45 782 113 35 148 85%

Report Ref : KFCA-SAFOM-M228-MMR-16-23 Page 14


King Fahd Causeway FM Services Contract (M228)

Issues Being Noted During RM / CM Undertaking:

❖ Most of the issues being undertaken in the CM are primarily with the PM Deficiency that has been identified during
the undertaking of the task that cannot be pursued due to the following issue.

• Material Requirement that is currently not available in the market.


• Sub-Contractor Requirement to perform the essential and major issue.

❖ End user refusal to paint the Cabin/ offices at Immigration and Custom Area (Zone 4)

❖ Some restricted areas and No access

5. Service Request /Call Center Status Report


SERVICE REQUEST /CALL CENTER-DEPARTMENT / SECTION

DEPARTMENT / ISSUED THIS MONTH


GRAND
CLOSE OPEN
TOTAL
M228 -SA 1448 115 1563
PERCENTAGE 93% 7% 100%

Total Number of Service Request 1563


OPEN 115
CLOSE 1429 M228 SERVICE REQUEST / CALL CENTER
CANCELLED 19 700

SERVICE REQUEST /CALL CENTER-DEPARTMENT / SECTION


600
DEPARTMENT / ISSUED THIS MONTH
SECTION
CANCELLED CLOSED INPROG Grand Total
BI-CIV 6 17 0 23 500

BI-MECH 0 2 0 2
CIVIL 4 216 30 250
FAS 0 0 0 0 400
GEN 0 1 1 2 CANCELLED
GEN-MECH 0 0 0 0 CLOSED
GNR-MECH 0 0 0 0 300
INPROG
HSE 0 26 19 45
HVA 0 123 22 145
HYD 3 165 26 194 200
K-L-E 1 0 0 1
LC 0 2 0 2
LV 2 109 12 123 100
MV 0 1 0 1
S-A-F 0 1 0 1
TEL 0 0 0 0 0
VEH 0 0 2 2
VER 2 74 3 79
W-C-C 1 692 0 693
Grand Total 19 1429 115 1563
Issues being Noted During SR Undertaking:

Report Ref : KFCA-SAFOM-M228-MMR-16-23 Page 15


King Fahd Causeway FM Services Contract (M228)

5.1 YEAR 2022 RM/CM BACKLOG

Report Ref : KFCA-SAFOM-M228-MMR-16-23 Page 16


King Fahd Causeway FM Services Contract (M228)

6. Quality Audit Report:


The quality system and quality management plan shall be in accordance with ISO 9001 and include maintaining the
accreditation and related systems throughout the contract term.

a. Incident Report

Saudi Side Bahrain Side TOTAL

Issued This Month 3 0 3


Previous Issued 56 1 57
Total issued to date 59 1 60

KFCA_SAF_SA_IR-57 Incident Report dated 24April 2023 at SA-02-Stormwater Manhole damaged by contractor.
KFCA_SAF_SA_IR-58 Incident Report dated 24April 2023 at SA-02_Sewage pump not working.
KFCA_SAF_SA_IR-59 Incident Report dated 29April 2023 at SICD Saudi Immigration Departure Cabin for broken
underground potable line towards South VIP Building

b. Technical Report

Saudi Side Bahrain Side TOTAL

Issued This Month 5 1 6

Previous Issued 44 61 105

Total issued to date 49 62 111

KFCA_SAFARI_SA_TR #045 Issued 05April, 2023 for Operation and Condition of Irrigation Pumps at SA24 RO Plant
KFCA_SAFARI_SA_TR #046 Issued 20April, 2023 for Sewage pump not working in auto mode in front of SA05 Intelligence.
KFCA_SAF_SA_TR-047 Issued 29April, 2023 for FADED FLOOR TILES at Custom Arrival & Departure Cabins
KFCA_SAF_SA_TR-048 Issued 30April, 2023 for Broken Kitchen Counter at SA 17 North VIP Building
KFCA_SAF_SA_TR-049 Issued 30April, 2023 for Damaged Wallpaper at SA17 North VIP Building
KFCA_SAFARI_BA_TR - 062 Technical Report Issued 01April, 2023 For Damaged Umbrella Tent Fabric at BICA Bahrain
Immigration Cabins Arrival.

c. Observation Report

Client Managing Party TOTAL

Issued This Month 26 26

Previous Issued 2390 2390

Total issued to date 2416 2416

Report Ref : KFCA-SAFOM-M228-MMR-16-23 Page 17


King Fahd Causeway FM Services Contract (M228)

d. QC Inspection Report

Total No’s of Inspected / AUDIT Inspection Rejection


Total Items for inspection
OA Percentage
Consideration SAF OA OA
SAF
BRIDGE INSP. CIVIL ELEC MECH SAFARI BRIDGE INSP. CIVIL ELEC MECH TOTAL SA BA TOTAL
TOTAL
PERCENTAGE REJECTION
MONTH OF APRIL SA BA SA BA SA BA SA BA SA BA SA BA SA BA SA BA SA BA CIVIL ELEC MECH CIVIL ELEC MECH

PM 1896 43 60 38 13 82 37 97 28 398 14.86% 11 7 10 45 24 0 74 87 258 0 0 1 0 4 11 0 3 19 9.63%

RM 782 11 15 41 47 20 43 64 53 294 10.98% 1 3 24 24 3 0 29 26 110 0 0 0 0 0 0 0 0 0 4.11%

TOTAL 2678 54 75 79 60 102 80 161 81 692 25.84% 12 10 34 69 27 0 103 113 368 0 0 1 0 4 11 0 3 19 13.74%
`
e. Joint Audit Report

7. Asset Failures:
❖ SA01 VRV system # 4 not working due to a power supply failure.

Report Ref : KFCA-SAFOM-M228-MMR-16-23 Page 18


King Fahd Causeway FM Services Contract (M228)

7.1 Management Challenges & various related issues that significantly affect the target project
deliverables as follows:
❖ The unavailability of the Maintenance & Operation’s Manual also affects the target plans and schedule prior to
maintaining the system with high standards and valuables.
❖ The unavailability of an updated As-built drawing shall be a factor of a possible failure to achieve the desired operation
and services in an ample time due to limited information currently available on site.

7.2 Training program

Training program status

SAUDI BAHRAIN TOTAL


Issued This Month 1 1 2
Previous Issued 3 3 6

Total issued to date 4 4 8


DESCRIPTION OF TRAINING

1. Saudi Side / Bahrain Side


❖ Generator Technician Skills Development were conducted through the below mention topics :
ATS Training
Generator Basic Training

Report Ref : KFCA-SAFOM-M228-MMR-16-23 Page 19


King Fahd Causeway FM Services Contract (M228)

7.3 LEGAL SCREENING PROGRAM

7.3.1 ELECTRICAL DEPARTMENT

7.3.2 MECHANICAL DEPARTMENT

Report Ref : KFCA-SAFOM-M228-MMR-16-23 Page 20


King Fahd Causeway FM Services Contract (M228)

Legal Screen Documents compliance:

Report Ref : KFCA-SAFOM-M228-MMR-16-23 Page 21


King Fahd Causeway FM Services Contract (M228)

Report Ref : KFCA-SAFOM-M228-MMR-16-23 Page 22


King Fahd Causeway FM Services Contract (M228)

Report Ref : KFCA-SAFOM-M228-MMR-16-23 Page 23


King Fahd Causeway FM Services Contract (M228)

Report Ref : KFCA-SAFOM-M228-MMR-16-23 Page 24


King Fahd Causeway FM Services Contract (M228)

Report Ref : KFCA-SAFOM-M228-MMR-16-23 Page 25


King Fahd Causeway FM Services Contract (M228)

Note : Item # 1 & item # 3 Under KFCA Responsibility and still no action

Report Ref : KFCA-SAFOM-M228-MMR-16-23 Page 26


King Fahd Causeway FM Services Contract (M228)

8. Safety & Health Environment Report


Comprehensive health and safety systems shall be in accordance with OHSAS 18001:28 requirements in relation to
project site standard while accreditation and training on other related systems shall be maintained throughout the term of the
contract.
The health and safety policy for service providers shall be performed with respect to the corresponding scope of work
and site base requirement. Standard safety Guideline is being implemented at site. Location/ Safety signboards, signage
and bollards are installed. Safety traffic cone and barricade with safety tape was always found in site whenever is required
while work permit system is the primary core of this aspect and shall be Imposed a no permit no work policy as a basic
requirement to maintain the standard safety feature and environment in the island. Safety Statistics of the project is as
below:
a. Manpower - Safety Man-hour

Total Cumulative
` M228-SA M228-BA
Manhour
Manhour this month 31,824 19,552 51,376
Previous manhour to date 84,104 58,456 142,560
Total Manhour Year 2023 115,928 78,008 193,936
Total Manhour YEAR 2022 339,457 203,015 542,472

b. Safety Statistics

ISSUED THIS MONTH PREVIOUS MONTH YEAR TO DATE 2023 CUMULATIV E


DESCRIPTION
M228-SA M228-BA M228-SA M228-BA M228-SA M228-BA STATUS 2022
OA SAFETY OBSERVATION
REPORT
23 22 2 17 25 39 256
HSE RELATED TRAINING /
TOPICS
1 0 4 0 5 0 24
TOOLBOX TRAINING 3 0 11 0 14 0 0
FIRST AID CASES 0 0 2 0 2 0 4
SAFETY INCIDENT 0 0 7 0 7 0 0
SAFETY JOINT INSPECTION 0 0 10 9 10 9 0
SAFARI OBSERVATION 0 0 32 15 32 15 224

c. Toolbox Talk Topics:


1.Manual Handling
2.Eid Holidays
3.Tips for Focusing on work after holidays

Report Ref : KFCA-SAFOM-M228-MMR-16-23 Page 27


King Fahd Causeway FM Services Contract (M228)

d. Accident Report Status

Saudi Side Bahrain Side TOTAL

Issued this Month 9 Issued this Month 8 17

Previous Issued to date 74 Previous Issued to date 66 140

Total issued to date 83 Total issued to date 74 157

e. Accident Report Chart

f. HSE PPE Audit:

Report Ref : KFCA-SAFOM-M228-MMR-16-23 Page 28


King Fahd Causeway FM Services Contract (M228)

9. Utilities and Consumption


a. Monthly Water Consumption

Report Ref : KFCA-SAFOM-M228-MMR-16-23 Page 29


King Fahd Causeway FM Services Contract (M228)

Report Ref : KFCA-SAFOM-M228-MMR-16-23 Page 30


King Fahd Causeway FM Services Contract (M228)

b. Monthly Electricity Consumption

Report Ref : KFCA-SAFOM-M228-MMR-16-23 Page 31


King Fahd Causeway FM Services Contract (M228)

c. Monthly Diesel Consumption

Report Ref : KFCA-SAFOM-M228-MMR-16-23 Page 32


King Fahd Causeway FM Services Contract (M228)

10. MANPOWER SCHEDULE


Vacancies
Project Manning as per Approved Actual on Extra
S No Division Project Dept Position Gender
Code RFA Manning Site Manpower
Saudi side Bahrain Side

1 FM M228 King Fahad Causeway - Both Site Site Management Project Manager M 1 1 1 0 0
2 FM M228 King Fahad Causeway - Both Site Site Management General Supervisor M 3 3 3 0 0
3 FM M228 King Fahad Causeway - Both Site Site Management Head of Department M 10 10 10 0 0
Quality Assurance & Quality Control
4 FM M228 King Fahad Causeway - Both Site Site Management M 1 1 1 0 0 1
Engineer
5 FM M228 King Fahad Causeway - Both Site Site Management Material Engineer M 2 2 2 0 0
6 FM M228 King Fahad Causeway - Both Site Site Management Storekeeper M 3 3 3 0 0
7 FM M228 King Fahad Causeway - Both Site Site Management Administrative Staff M&F 5 5 4 0 1
8 FM M228 King Fahad Causeway - Both Site Site Management Data Entry M&F 4 4 4 0 0
9 FM M228 King Fahad Causeway - Both Site Site Management Telephone Operator M&F 4 4 4 0 0
10 FM M228 King Fahad Causeway - Both Site Site Management Boat Driver M 5 5 5 0 0
11 FM M228 King Fahad Causeway - Both Site Site Management Heavy Equipment Operator M 8 8 8 0 0
12 FM M228 King Fahad Causeway - Both Site Site Management Light Equipment Operator M 7 7 7 0 0
13 FM M228 King Fahad Causeway - Both Site Architectural Painting Technician M 11 11 11 0 0
14 FM M228 King Fahad Causeway - Both Site Architectural Carpentry Technician M 5 5 5 0 0
Bridge Comprehensive
15 Civil Technician M 8 8 8 0 0
FM M228 King Fahad Causeway - Both Site Inspection
Bridge Comprehensive
16 Painting Technician M 10 10 10 0 0
FM M228 King Fahad Causeway - Both Site Inspection
17 FM M228 King Fahad Causeway - Both Site Civil Construction & Building Technician M 4 4 4 0 0
18 FM M228 King Fahad Causeway - Both Site Civil Civil Work Technician M 10 10 10 0 0
19 FM M228 King Fahad Causeway - Both Site Civil Carpentry Technician M 9 9 9 0 0
20 FM M228 King Fahad Causeway - Both Site Civil Blacksmith Technician M 1 1 1 0 0
21 FM M228 King Fahad Causeway - Both Site Civil Carpentry Technician M 1 1 1 0 0
22 FM M228 King Fahad Causeway - Both Site Civil Welding Technician M 4 4 4 0 0
23 FM M228 King Fahad Causeway - Both Site Civil Labor M 5 5 5 0 0
24 FM M228 King Fahad Causeway - Both Site Electrical Systems Auto Electrician M 2 2 2 0 0
25 FM M228 King Fahad Causeway - Both Site Electrical High & Mediuum Voltage Technician M 4 4 4 0 0
26 FM M228 King Fahad Causeway - Both Site Electrical Low Voltage Technician M 22 22 22 0 0
27 FM M228 King Fahad Causeway - Both Site Mechanical Plumbing Technician M 14 14 14 0 0
28 FM M228 King Fahad Causeway - Both Site Mechanical HVAC Technician M 19 19 19 0 0
29 FM M228 King Fahad Causeway - Both Site Mechanical Auto Mechanic M 4 4 4 0 0
30 FM M228 King Fahad Causeway - Both Site Mechanical Hydraulic Technician M 3 3 3 0 0
31 FM M228 King Fahad Causeway - Both Site Mechanical Floor Scale Technician M 2 2 2 0 0
32 FM M228 King Fahad Causeway - Both Site Mechanical Pump Technician M 4 4 4 0 0
33 FM M228 King Fahad Causeway - Both Site Mechanical Generator Technician M 4 4 4 0 0
34 FM M228 King Fahad Causeway - Both Site Mechanical WTP Operator & Technician M 4 4 4 0 0
35 FM M228 King Fahad Causeway - Both Site Mechanical STP Operator & Technician M 4 4 4 0 0
36 FM M228 King Fahad Causeway - Both Site Change order number 1 safety Labor M 3 3 3 0 0
37 FM M228 King Fahad Causeway - Both Site Change order number 2 Engineer M 2 2 0 1 1
38 FM M228 King Fahad Causeway - Both Site Change order number 2 Sheriff Central M 1 1 1 0 0
39 FM M228 King Fahad Causeway - Both Site Change order number 2 carpentry technician M 4 4 4 0 0
40 FM M228 King Fahad Causeway - Both Site Change order number 2 Low Voltage Technican M 2 2 1 0 1
41 FM M228 King Fahad Causeway - Both Site Change order number 2 Construction and building technician M 4 4 3 1 0
42 FM M228 King Fahad Causeway - Both Site Change order number 2 Plumbing Technician M 4 4 4 0 0
43 FM M228 King Fahad Causeway - Both Site Change order number 2 Painting Technician M 2 2 2 0 0
44 FM M228 King Fahad Causeway - Both Site Change order number 2 HVAC Technician M 2 2 2 0 0
45 FM M228 King Fahad Causeway - Both Site Change order number 2 Labor M 6 6 2 0 1
46 FM M228 King Fahad Causeway - Both Site Support Staff - HR HR Supervisor M 0 1 1 0 0
47 FM M228 King Fahad Causeway - Both Site Support Staff - HR Payroll & Timekeeper M 0 1 1 0 0
48 FM M228 King Fahad Causeway - Both Site Support Staff - HR Camp Boss M 0 1 0 1 0
49 FM M228 King Fahad Causeway - Both Site Support Staff - HR Admin Assistant F 0 1 1 0 0
50 FM M228 King Fahad Causeway - Both Site Support Staff - HR Security Guard M 0 1 0 1 0
51 FM M228 King Fahad Causeway - Both Site Support Staff - Supply Chain Warehouse Supervisor M 0 1 1 0 0
52 FM M228 King Fahad Causeway - Both Site Support Staff - Supply Chain Site Purchaser M 0 1 1 0 0 2
53 FM M228 King Fahad Causeway - Both Site Support Staff - Supply Chain Warehouse Labor M 0 2 2 0 0
54 FM M228 King Fahad Causeway - Both Site Support Staff - Operations Call Centre - Helpdesk M&F 0 4 2 2 0
55 FM M228 King Fahad Causeway - Both Site Support Staff - Tranportation Transportation Supervisor M 0 1 1 0 0
56 FM M228 King Fahad Causeway - Both Site Support Staff - Tranportation Driver Heavy Vehicle M 0 4 4 0 0
57 FM M228 King Fahad Causeway - Both Site Support Staff - Tranportation Driver Light Vehicle M 0 2 2 0 0
237 257 244 6 4 3
Grand Total

Report Ref : KFCA-SAFOM-M228-MMR-16-23 Page 33


King Fahd Causeway FM Services Contract (M228)

Project Emp
S No Division Project Dept Position Name ID/Iqama Nationality
Code Code

1 FM M228 King Fahad Causeway - Both Site Site Management Project Manager 37582 TREVOR WIGHTON 538582608 BRITISH
2 FM M228 King Fahad Causeway - Both Site Site Management General Supervisor (Maintenance-Saudi) 30583 Omer Mohammed Ahmed Yousof 2380875803 Sudanese
3 FM M228 King Fahad Causeway - Both Site Site Management General Supervisor (Maintenance-Bahrain) 32791 HOSHAM OSMAN 820399027 Sudan
4 FM M228 King Fahad Causeway - Both Site Site Management Head of the Department (Mechanical) 37775 SUBRAMANA RAJA BALASUBRAMANIAN 2421007309 Indian
5 FM M228 King Fahad Causeway - Both Site Site Management Head of the Department (Electrical) 32382 Midhun Mohan Edavalath 2431694047 Indian
6 FM M228 King Fahad Causeway - Both Site Site Management General Supervisor (Inspection-Saudi & Bahrain) 32659 HORACIO DAYAG 560418132 Filipino
7 FM M228 King Fahad Causeway - Both Site Site Management Head of the Department (Civil) 35639 Moayad Khald Mohamed Idris 2421247947 Sudanese
8 FM M228 King Fahad Causeway - Both Site Site Management Head of the Department (Inspection) 32536 WILFREDO BALAOING PIMENTEL 660736179 Filipino
9 FM M228 King Fahad Causeway - Both Site Site Management Head of the Department (Electrical) 32158 Mohammad Aariz Shakeel Jafferi 2420960607 Indian
10 FM M228 King Fahad Causeway - Both Site Site Management Head of the Department (Civil) 32623 YOUSEF EL SAYEED 890633509 Egyptian
11 FM M228 King Fahad Causeway - Both Site Site Management Head of the Department (Inspection) 36456 Osman Abd Elrahim Ahmed Abu Sinaina 2252695503 Sudanese
12 FM M228 King Fahad Causeway - Both Site Site Management Head of the Department (Electrical) 32527 SAJID ABDULGANI VOHRA 751058629 India
13 FM M228 King Fahad Causeway - Both Site Site Management Quality Assurance & Quality Control Engineer 32128 Syed Furquan Ali 2504490802 Indian
14 FM M228 King Fahad Causeway - Both Site Site Management Head of the Department (Electrical) 32631 ALI ABDULLAH JASIM AL HAIKI 900807067 Bahrain
15 FM M228 King Fahad Causeway - Both Site Site Management Materials Engineer 32292 Khalid Ibrahim Ali Alqahtani 1097156465 Saudi
16 FM M228 King Fahad Causeway - Both Site Site Management Store Keeper 32159 Mark Anthony Jacinto Dia 2334364961 Filipino
17 FM M228 King Fahad Causeway - Both Site Site Management Store Keeper 31267 Noel Gapas Maghuyop 2290935226 Filipino
18 FM M228 King Fahad Causeway - Both Site Site Management Administrative Employee 37780 Saif Abdullah Al Rashaedi 1110842315 Saudi
19 FM M228 King Fahad Causeway - Both Site Site Management Administrative Employee 36004 Hanan Meshal F Alharthi 1090664200 Saudi
20 FM M228 King Fahad Causeway - Both Site Site Management Administrative Employee 32412 Majid Mohammed Alshaheen 1075597813 Saudi
21 FM M228 King Fahad Causeway - Both Site Site Management Head of the Department (Mechanical) 37773 AZZAM ABDULRAHMAN AHMED ALMUDHI 1077130860 Saudi
22 FM M228 King Fahad Causeway - Both Site Site Management Administrative Employee 32411 Abdullah Ahmed Al Eid 1041740984 Saudi
23 FM M228 King Fahad Causeway - Both Site Site Management Data Entry 37088 Abdel Aziz Abdel Rahman Bin Hilal 1110346697 Saudi
24 FM M228 King Fahad Causeway - Both Site Site Management Materials Engineer 32624 MOHAMMED AL SAYED 900149671 Egyptian
25 FM M228 King Fahad Causeway - Both Site Site Management Data Entry 31918 Maha Fuad Masoud Binssad 1061301865 Saudi
26 FM M228 King Fahad Causeway - Both Site Site Management Telephone Operator 32196 Mohammed Saad Ibrahim Al Farhan 1023234261 Saudi
27 FM M228 King Fahad Causeway - Both Site Site Management Telephone Operator 32053 Amani Fahad N Al Naimi 1050330610 Saudi
28 FM M228 King Fahad Causeway - Both Site Site Management Telephone Operator 31919 Amjad Salman Saad Yaanallah 1086016860 Saudi
29 FM M228 King Fahad Causeway - Both Site Site Management StoreKeeper 32620 AMMAR MOHAMED FARDAN 951204750 Bahrain
30 FM M228 King Fahad Causeway - Both Site Site Management Telephone Operator 32286 Al Anud Abdulaziz Althawadi 1018567105 Saudi
31 FM M228 King Fahad Causeway - Both Site Site Management boat driver 32463 Abdulmohsen Abdurahman Almohsen 1035932522 Saudi
32 FM M228 King Fahad Causeway - Both Site Site Management boat driver 32290 Saad Yousef Ali Alzwady 1028764536 Saudi
33 FM M228 King Fahad Causeway - Both Site Site Management heavy equipment operator 32395 Ziyad Huda Bather Alrashidi 1010150942 Saudi
34 FM M228 King Fahad Causeway - Both Site Site Management heavy equipment operator 32318 Mohammad Tajuddin Khan 2508340060 Indian
35 FM M228 King Fahad Causeway - Both Site Site Management Administrative Employee Vacant Vacant
36 FM M228 King Fahad Causeway - Both Site Site Management heavy equipment operator 32215 Sakir Sabbirbhai Kureshi 2511250561 Indian
37 FM M228 King Fahad Causeway - Both Site Site Management Data Entry 32634 ELYAS SHAKER MOOSA MUBARAK ALMASS 940401444 Bahrain
38 FM M228 King Fahad Causeway - Both Site Site Management heavy equipment operator Rental Hasnain Raza Akhter Ghulam 2526832742 Pakistani
39 FM M228 King Fahad Causeway - Both Site Site Management Data Entry 32675 YOUSEF SALEH MOQBIL ALI 760709149 Bahrain
40 FM M228 King Fahad Causeway - Both Site Site Management Light equipment operator 32165 Mohammad Shahinur 2423091632 Bangladeshi
41 FM M228 King Fahad Causeway - Both Site Site Management Light equipment operator 32601 Shahidhusen Sadikhusen Markarani 2511249951 Indian
42 FM M228 King Fahad Causeway - Both Site Site Management Light equipment operator Rental Mohammed Waseem Zaman 2526834177 Pakistan
43 FM M228 King Fahad Causeway - Both Site Site Management Light equipment operator 32302 Nasir Mushtak Ahmad 2511331718 Indian
44 FM M228 King Fahad Causeway - Both Site Electrical Systems Vehicles (Auto) electrician 32369 Mohd Ali 2512545704 Indian
45 FM M228 King Fahad Causeway - Both Site Electrical Systems Medium and high Voltage Technician 32160 Jorge Duya Christobal 2373094289 Filipino
46 FM M228 King Fahad Causeway - Both Site Electrical Systems Medium and high Voltage Technician 32161 Nasir Khan Habib Khan 2412658284 Pakistan
47 FM M228 King Fahad Causeway - Both Site Electrical Systems Low Voltage Technican 32298 Hamad Abdulrhman A Aldossary 1089780694 Saudi
48 FM M228 King Fahad Causeway - Both Site Electrical Systems Low Voltage Technican 32297 Ali Abdurahman A Aldossary 1104400518 Saudi
49 FM M228 King Fahad Causeway - Both Site Site Management Boat Driver 32668 ABDUL RAHMAN AHMED ALI 760308306 Bahrain
50 FM M228 King Fahad Causeway - Both Site Electrical Systems Low Voltage Technican 32336 Md Sajid Sahabaj 2402420158 Indian
51 FM M228 King Fahad Causeway - Both Site Site Management Boat Driver 32703 HASSAN DUAIJ 961006269 Bahrain
Report Ref : KFCA-SAFOM-M228-MMR-16-23 Page 34
King Fahd Causeway FM Services Contract (M228)

52 FM M228 King Fahad Causeway - Both Site Electrical Systems Low Voltage Technican 31992 Romeo Tuizo Castro 2376713836 Filipino
53 FM M228 King Fahad Causeway - Both Site Site Management Boat Driver 32684 MOHAMED FOUAD 940805197 Bahrain
54 FM M228 King Fahad Causeway - Both Site Electrical Systems Low Voltage Technican 32061 Mohammad Shabbir Alam 2469282699 Indian
55 FM M228 King Fahad Causeway - Both Site Site Management Heavy Equipment Operator 32883 ABDUL AMEER KHALIL EBRAHIM 660063980 Bahrain
56 FM M228 King Fahad Causeway - Both Site Electrical Systems Low Voltage Technican 32906 IMRAN KHAN KAUM KHAN 2512826302 Indian
57 FM M228 King Fahad Causeway - Both Site Site Management Heavy Equipment Operator 32663 ADEL YOUSUFJABER 780506693 Bahrain
58 FM M228 King Fahad Causeway - Both Site Electrical Systems Low Voltage Technican 32404 Md Nasim Afzal 2451211193 Indian
59 FM M228 King Fahad Causeway - Both Site Site Management Heavy Equipment Operator 37171 SANAULLAH KHAN ASHRAF 2363704715 Pakistan
60 FM M228 King Fahad Causeway - Both Site Electrical Systems Low Voltage Technican 31991 Mohammad Sazzat Hossain Shah M Shah 2339881944 Bangladeshi
61 FM M228 King Fahad Causeway - Both Site Site Management Heavy Equipment Operator 32667 ALI JAMAL RABEEA 861102460 Bahrain
62 FM M228 King Fahad Causeway - Both Site Electrical Systems Low Voltage Technican 32386 Jazy Perez Lipardo 2372875613 Filipino
63 FM M228 King Fahad Causeway - Both Site Electrical Systems Low Voltage Technican 32309 Mohammad Nijam Ali 2467638686 Indian
64 FM M228 King Fahad Causeway - Both Site Electrical Systems Low Voltage Technican 26146 Mohammad Parvez Mohammad Yaseen 2473800874 Indian
65 FM M228 King Fahad Causeway - Both Site Mechanical Systems Plumbing Technician 32367 Mohd Shabaz Mohd Shaqeel 2512543691 Indian
66 FM M228 King Fahad Causeway - Both Site Mechanical Systems Plumbing Technician 29513 Ijhar Alam 2259619704 Indian
67 FM M228 King Fahad Causeway - Both Site Site Management Light Equipment Operator 32621 AHMED MAHDI AHMED 830602143 Bahrain
68 FM M228 King Fahad Causeway - Both Site Mechanical Systems Plumbing Technician 32209 Mohammad Shoaib Mohammad Jakir 2511258465 Indian
69 FM M228 King Fahad Causeway - Both Site Site Management Light Equipment Operator 36875 SHAJEEL AHMAD 831476770 Pakistan
70 FM M228 King Fahad Causeway - Both Site Mechanical Systems Plumbing Technician 31994 Anis Ahmad Habiburrehman 2511258820 Indian
71 FM M228 King Fahad Causeway - Both Site Site Management Light Equipment Operator 37103 ATIF SIDDIQUI 880574526 India
72 FM M228 King Fahad Causeway - Both Site Mechanical Systems Plumbing Technician 32321 Mohammed Irshad Mohammed Jamirudin 2511258606 Indian
73 FM M228 King Fahad Causeway - Both Site Mechanical Systems Plumbing Technician 26307 Noor Alam Ansari 2474853906 Indian
74 FM M228 King Fahad Causeway - Both Site Mechanical Systems Plumbing Technician 26107 Muhammed Nadeem Naim Ahmed 2474041155 Indian
75 FM M228 King Fahad Causeway - Both Site Mechanical Systems HVAC Technician 32291 Mohammad Wasim Akram 2508340094 Indian
76 FM M228 King Fahad Causeway - Both Site Mechanical Systems HVAC Technician 32172 Jasim Khan Jamil 2508339815 Indian
77 FM M228 King Fahad Causeway - Both Site Electrical Systems Vehicles (Auto) electrician 32525 SHAH NAWAZ 791332306 India
78 FM M228 King Fahad Causeway - Both Site Mechanical Systems HVAC Technician 32049 Zunaid Akhtar Azimullah Ansari 2512545043 Indian
79 FM M228 King Fahad Causeway - Both Site Mechanical Systems HVAC Technician 32377 Mazhar Khan Akbar 2508339856 Indian
80 FM M228 King Fahad Causeway - Both Site Electrical Systems Medium and High Voltage Technician 32517 GAPUL SAILABBI 691127263 Filipino
81 FM M228 King Fahad Causeway - Both Site Mechanical Systems HVAC Technician 32347 Mohd Saleem Ansari 2511332393 Indian
82 FM M228 King Fahad Causeway - Both Site Electrical Systems Medium and High Voltage Technician 37160 AMARJEET KUMAR 910353433 India
83 FM M228 King Fahad Causeway - Both Site Mechanical Systems HVAC Technician 32649 Md Sajid Ansari 2511335040 Indian
84 FM M228 King Fahad Causeway - Both Site Mechanical Systems HVAC Technician 32204 Mohammad Wahid Zubbair 2511252005 Indian
85 FM M228 King Fahad Causeway - Both Site Mechanical Systems HVAC Technician 32300 Mohammad Suhail Saleem 2370788982 Indian
86 FM M228 King Fahad Causeway - Both Site Mechanical Systems HVAC Technician 32157 Jamshed Nehal 2455154035 Indian
87 FM M228 King Fahad Causeway - Both Site Mechanical Systems HVAC Technician 32213 Irfan Alam Md Azmuddin 2512544152 Indian
88 FM M228 King Fahad Causeway - Both Site Mechanical Systems Vehcile (Auto) mechanic technician 32205 Mohammad Nadeem Samshad Ahmad 2512541513 Indian
89 FM M228 King Fahad Causeway - Both Site Mechanical Systems Vehcile (Auto) mechanic technician 32642 Mohammad Mahtab 2512545845 Indian
90 FM M228 King Fahad Causeway - Both Site Mechanical Systems Vehcile (Auto) mechanic technician 32974 Karim Ullah Saeed Ullah 2445674027 Indian
91 FM M228 King Fahad Causeway - Both Site Mechanical Systems Vehcile (Auto) mechanic technician 32045 Shiek Ashraf 2374541916 India
92 FM M228 King Fahad Causeway - Both Site Mechanical Systems hydraulic technician 32414 Wahid Khan Nazir Khan 2512543956 Indian
93 FM M228 King Fahad Causeway - Both Site Mechanical Systems hydraulic technician 32041 Mohamed Halith Hussain Raja 2374879241 Indian
94 FM M228 King Fahad Causeway - Both Site Mechanical Systems hydraulic technician 32376 Tahir Ali Sher Ali Shaikh 2512545795 Indian
95 FM M228 King Fahad Causeway - Both Site Mechanical Systems Floor scale technician 34217 Epitacio Jr Bermejo Balasabas 2401604737 Filipino
96 FM M228 King Fahad Causeway - Both Site Mechanical Systems Floor scale technician 36005 Khalil Ibrahim J Almizraq 1019735578 Saudi
97 FM M228 King Fahad Causeway - Both Site Electrical Systems Low Voltage Technican 34455 EDISON NGWA AMABO 900585250 Cameroonian
98 FM M228 King Fahad Causeway - Both Site Mechanical Systems Pump Technician 32364 Nithese Kumar Vijay Yadav 2512544764 India
99 FM M228 King Fahad Causeway - Both Site Electrical Systems Low Voltage Technican 32542 EDWARDSON OLINARES 940142163 Filipino
100 FM M228 King Fahad Causeway - Both Site Mechanical Systems Pump Technician 12731 Augusto Gastilo Laynesa 2288566587 Filipino
101 FM M228 King Fahad Causeway - Both Site Electrical Systems Low Voltage Technican 32687 DANILO ESIDENIO 820658065 Filipino
102 FM M228 King Fahad Causeway - Both Site Mechanical Systems Pump Technician 32203 Pintoo Lal Kumar 2511251445 Indian

Report Ref : KFCA-SAFOM-M228-MMR-16-23 Page 35


King Fahd Causeway FM Services Contract (M228)

103 FM M228 King Fahad Causeway - Both Site Electrical Systems Low Voltage Technican 32538 JORGE ABIAN 590180878 Filipino
104 FM M228 King Fahad Causeway - Both Site Mechanical Systems Pump Technician 32387 Ruplal Kumar Bhikhari Singh 2511250850 Indian
105 FM M228 King Fahad Causeway - Both Site Electrical Systems Low Voltage Technican 32800 MD AMANULLAH 910638233 India
106 FM M228 King Fahad Causeway - Both Site Mechanical Systems Generator Technician 32229 Asgar Ali Daud Ali 2512543923 Indian
107 FM M228 King Fahad Causeway - Both Site Electrical Systems Low Voltage Technican 32627 MD FAIZULLAH 920836976 India
108 FM M228 King Fahad Causeway - Both Site Mechanical Systems Generator Technician 21342 Shabbir Ismail Mujavar 2272099983 Indian
109 FM M228 King Fahad Causeway - Both Site Electrical Systems Low Voltage Technican 32629 SARFUDDIN ANSARI 771152469 India
110 FM M228 King Fahad Causeway - Both Site Mechanical Systems WTP Operator & Technician (Chemist) 32784 Saad Khalaf M Alhajri 1041773944 Saudi
111 FM M228 King Fahad Causeway - Both Site Electrical Systems Low Voltage Technican 32529 MOHAMMAD JAMALUDDIN 871259982 India
112 FM M228 King Fahad Causeway - Both Site Mechanical Systems WTP Operator & Technician 32051 Fahim Urrahim Aziz Ur Rahman 2375784879 Pakistani
113 FM M228 King Fahad Causeway - Both Site Electrical Systems Low Voltage Technican 32664 EMRAN ABUL HOSSAIN 871257483 Bangladesh
114 FM M228 King Fahad Causeway - Both Site Mechanical Systems WTP Operator & Technician 32340 Abdul Rahman 2511337780 Indian
115 FM M228 King Fahad Causeway - Both Site Electrical Systems Low Voltage Technican 32628 DOMINGO PURAY JR. 780370082 Filipino
116 FM M228 King Fahad Causeway - Both Site Mechanical Systems WTP Operator & Technician 32638 Aishwarya Basishat 2512545993 Indian
117 FM M228 King Fahad Causeway - Both Site Electrical Systems Low Voltage Technican 32682 ABDULLA JASIM ALI ALROWAIEI ALDOSERI 860611248 Bahrain
118 FM M228 King Fahad Causeway - Both Site Mechanical Systems STP Operator & Technician 32641 Mohammad Gulfam Ansari 2511335842 Indian
119 FM M228 King Fahad Causeway - Both Site Mechanical Systems STP Operator & Technician 32207 Mohammad Sarfuzzama 2512544731 Indian
120 FM M228 King Fahad Causeway - Both Site Mechanical Systems STP Operator & Technician 36814 Tahir Mahmood Kala Khan 2362882967 Pakistani
121 FM M228 King Fahad Causeway - Both Site Mechanical Systems STP Operator & Technician New MOHAMMD SHAGIR ANSARI U7822948 Indian
122 FM M228 King Fahad Causeway - Both Site Civilian Elements Construction and building technician 19525 Samsad Aalam 2440275879 Indian
123 FM M228 King Fahad Causeway - Both Site Civilian Elements Construction and building technician 26094 Mohammad Aasif Mohammad Yasin 2473800379 Indian
124 FM M228 King Fahad Causeway - Both Site Civilian Elements Civil works technician 32211 Mohammad Nazim Islam Nabi 2512545357 Indian
125 FM M228 King Fahad Causeway - Both Site Civilian Elements Civil works technician 32401 Bilawal Hassan Noor Muhammad 2454816691 Pakistani
126 FM M228 King Fahad Causeway - Both Site Mechanical Systems Plumbing Technician 32615 REYNALDO DAVID PADILLA 670644013 Filipino
127 FM M228 King Fahad Causeway - Both Site Civilian Elements Civil works technician 32650 Tasleem Anvar Hussain 2512545472 Indian
128 FM M228 King Fahad Causeway - Both Site Mechanical Systems Plumbing Technician 32528 EUGENE ELECARTE 760362564 Filipino
129 FM M228 King Fahad Causeway - Both Site Civilian Elements Civil works technician 32201 Mohammad Tanvir Rahis Ahmad 2512545126 Indian
130 FM M228 King Fahad Causeway - Both Site Mechanical Systems Plumbing Technician 32539 SITARAM YADAV 870866540 India
131 FM M228 King Fahad Causeway - Both Site Civilian Elements Civil works technician 32310 Shameem Akhtar 2512544616 Indian
132 FM M228 King Fahad Causeway - Both Site Mechanical Systems Plumbing Technician 32658 SAIYAD ALI 831267690 India
133 FM M228 King Fahad Causeway - Both Site Civilian Elements carpentry technician 32227 Azmat Ali Mohd Basharat 2512544970 Indian
134 FM M228 King Fahad Causeway - Both Site Mechanical Systems Plumbing Technician 32541 MICHAEL JOHN FLORDELIZE 770301983 Filipino
135 FM M228 King Fahad Causeway - Both Site Civilian Elements carpentry technician 32339 Lorenzo Boragay Bonavente 2372875621 Filipino
136 FM M228 King Fahad Causeway - Both Site Mechanical Systems Plumbing Technician 32533 MOHAMMAD SADDAM 910254613 India
137 FM M228 King Fahad Causeway - Both Site Civilian Elements carpentry technician 32312 Waseem Ali Mubarik Husain 2512542586 Indian
138 FM M228 King Fahad Causeway - Both Site Mechanical Systems Plumbing Technician 32458 MD ZUALE RANA 790347563 Bangladesh
139 FM M228 King Fahad Causeway - Both Site Civilian Elements carpentry technician 32345 Adnan Mohammad Said 2512542180 Indian
140 FM M228 King Fahad Causeway - Both Site Civilian Elements carpentry technician 32362 Mohammad Mukim Intijar Husain 2512542487 Indian
141 FM M228 King Fahad Causeway - Both Site Civilian Elements Blacksmith technician 32311 Mohd Salman Mustakeem Ahmad 2511333177 Indian
142 FM M228 King Fahad Causeway - Both Site Civilian Elements carpentry technician 23798 Mohammad Asif Riyasat Husain 2456829163 Indian
143 FM M228 King Fahad Causeway - Both Site Civilian Elements Welding technician 32047 Nand Lal Sah 2374484711 Indian
144 FM M228 King Fahad Causeway - Both Site Civilian Elements Welding technician 32155 Javed Ahmad Ekram Ali 2376988008 Indian
145 FM M228 King Fahad Causeway - Both Site Civilian Elements Labor NEW Nasarudin Ansari R8981410 India
146 FM M228 King Fahad Causeway - Both Site Civilian Elements Labor NEW Mohammad Aslam Khan U2173772 India
147 FM M228 King Fahad Causeway - Both Site Civilian Elements Labor NEW Shamsad Ansari N1132306 India
148 FM M228 King Fahad Causeway - Both Site Architectural Elements Painting Technician 32322 Mohammad Abubakar Abdul Kadir 2512542719 India
149 FM M228 King Fahad Causeway - Both Site Architectural Elements Painting Technician 32328 Mohammad Irshad Mohammad Zahur 2512541802 India
150 FM M228 King Fahad Causeway - Both Site Mechanical Systems HVAC Technician 35013 MUDASSAR HUSSAIN 880893931 Pakistan
151 FM M228 King Fahad Causeway - Both Site Architectural Elements Painting Technician 32355 Shameem Ahmad Zameer Ahmad 2512541786 India
152 FM M228 King Fahad Causeway - Both Site Mechanical Systems HVAC Technician 36427 ALDRIN AILES QUEMADA 920196179 Filipino
153 FM M228 King Fahad Causeway - Both Site Architectural Elements Painting Technician 32639 Samsad Ali Anwarul Hoda 2511258895 India
154 FM M228 King Fahad Causeway - Both Site Mechanical Systems HVAC Technician 32526 ADRIAN PASCUAL 780615433 Filipino
Report Ref : KFCA-SAFOM-M228-MMR-16-23 Page 36
King Fahd Causeway FM Services Contract (M228)

155 FM M228 King Fahad Causeway - Both Site Architectural Elements Painting Technician 12531 Muhammad Asim Butt Nazir 2400678690 Pakistani
156 FM M228 King Fahad Causeway - Both Site Mechanical Systems HVAC Technician 32540 BRIGIDO PACUL 730230856 Filipino
157 FM M228 King Fahad Causeway - Both Site Architectural Elements Painting Technician 26137 Achchhelal Banarasi 2473796445 India
158 FM M228 King Fahad Causeway - Both Site Mechanical Systems HVAC Technician 35209 RANJIT BARIO 760850208 India
159 FM M228 King Fahad Causeway - Both Site Architectural Elements carpentry technician 22877 Art Rioja Tajo 2455524062 Filipino
160 FM M228 King Fahad Causeway - Both Site Mechanical Systems HVAC Technician 32537 AFZAL ALI ANSARI 761236058 India
161 FM M228 King Fahad Causeway - Both Site Architectural Elements carpentry technician 11434 Ram Pher Avadh 2389101870 India
162 FM M228 King Fahad Causeway - Both Site Mechanical Systems HVAC Technician 32617 KAISAR ISMAYEL 830576169 India
163 FM M228 King Fahad Causeway - Both Site Architectural Elements carpentry technician 18237 Sambath Kumar Perumal Kumar 2439269594 India
164 FM M228 King Fahad Causeway - Both Site Mechanical Systems HVAC Technician 32612 HASMAT ANSARI 960731660 India
165 FM M228 King Fahad Causeway - Both Site Bridge comprehensive inspection work Civil technician 32325 Amjad Baig Haseen 2512544897 Indian
166 FM M228 King Fahad Causeway - Both Site Mechanical Systems HVAC Technician 32676 MUHAMMAD IRSHAD 830386351 India
167 FM M228 King Fahad Causeway - Both Site Bridge comprehensive inspection work Civil technician 31995 Dilshad Mohammad Isarael 2512545241 Indian
168 FM M228 King Fahad Causeway - Both Site Bridge comprehensive inspection work Civil technician 32156 Randy Dumot Redulfin 2433180003 Filipino
169 FM M228 King Fahad Causeway - Both Site Bridge comprehensive inspection work Civil technician (Foreman) 32060 Almuiz Alawangsa Bakil 2277506743 Filipino
170 FM M228 King Fahad Causeway - Both Site Bridge comprehensive inspection work Painting Technician 32323 Mohammad Najim Mohammad Khalik 2512542065 Indian
171 FM M228 King Fahad Causeway - Both Site Bridge comprehensive inspection work Painting Technician 32358 Nazim Ali Khaleel Ahamad 2512542115 Indian
172 FM M228 King Fahad Causeway - Both Site Bridge comprehensive inspection work Painting Technician 26085 Sarilk Khan 2472332028 India
173 FM M228 King Fahad Causeway - Both Site Bridge comprehensive inspection work Painting Technician 32324 Irshad Nazir 2512542263 Indian
174 FM M228 King Fahad Causeway - Both Site Bridge comprehensive inspection work Painting Technician 32293 Zafrul Islam Mohammad Islam 2512542669 Indian
175 FM M228 King Fahad Causeway - Both Site Support Staff - Maintenance Call Center 32043 Nasser Mohammed N Al Hajri 1075336659 Saudi
176 FM M228 King Fahad Causeway - Both Site Support Staff - Maintenance Call Center Vacant
177 FM M228 King Fahad Causeway - Both Site Support Staff - Maintenance Call Center 32410 Haitham Abdullah Al Suwayegh 1001479938 Saudi
178 FM M228 King Fahad Causeway - Both Site Support Staff - Maintenance Call Center Vacant
179 FM M228 King Fahad Causeway - Both Site Support Staff - HR HR Supervisor 31504 Sattam Naame Farhan Alharbi 1003431515 Saudi
180 FM M228 King Fahad Causeway - Both Site Support Staff - HR Payroll & Timekeeper 35678 Ibrahim Ayad Rasheed Almutairi 1099860601 Saudi
181 FM M228 King Fahad Causeway - Both Site Mechanical Systems Generator Technician 32688 GERRY CANADA JR 851067220 Filipino
182 FM M228 King Fahad Causeway - Both Site Support Staff - HR Camp boss Vacant
183 FM M228 King Fahad Causeway - Both Site Mechanical Systems Generator Technician 34453 FASANMI T OLDIMEJI 910669880 Nigerian
184 FM M228 King Fahad Causeway - Both Site Support Staff - HR Admin Assistant 32178 JACKSON A. ESCOBAR 2514843495 Filipino
185 FM M228 King Fahad Causeway - Both Site Support Staff - HR Security Guard Vacant
186 FM M228 King Fahad Causeway - Both Site Support Staff - Logistic Warehouse Supervisor 37087 Abdullah Mohammed Alhamdan 1106480559 Saudi
187 FM M228 King Fahad Causeway - Both Site Support Staff - Logistic Purchaser 31704 Mohd Eltahir Mohd Abdu 2049363621 Sudanese
188 FM M228 King Fahad Causeway - Both Site Support Staff - Logistic warehouse Labor 32166 Walid Batuan Apinoa 2399277785 Filipino
189 FM M228 King Fahad Causeway - Both Site Support Staff - Logistic warehouse Labor 26440 SERAFIN TABORADA 2475038242 Filipino
190 FM M228 King Fahad Causeway - Both Site Support Staff - Tranportation Transportation Supervisor 32398 Salah Mustafa Ahmed Mohammed 2208646220 Egyptian
191 FM M228 King Fahad Causeway - Both Site Support Staff - Tranportation Bus Heavy Driver 29621 Fathi Abdulhafith Sati Hamad 2158772208 Sudanese
192 FM M228 King Fahad Causeway - Both Site Support Staff - Tranportation Bus Heavy Driver 34420 Muhammad Bilal Muhammad Abid 2508645682 Pakistani
193 FM M228 King Fahad Causeway - Both Site Support Staff - Tranportation Bus Heavy Driver 34412 Khan Daraz Mir Daraz Khan 2336122904 Pakistani
194 FM M228 King Fahad Causeway - Both Site Support Staff - Tranportation Bus Heavy Driver 16193 Rahmatulla Khan Hakamuddin 2425082936 Indian
195 FM M228 King Fahad Causeway - Both Site Civilian Elements Construction and Building Technician 32801 MOHAMED ABDULHAMED YOUSF ALSAEI 860605418 Bahrain
196 FM M228 King Fahad Causeway - Both Site Support Staff - Tranportation Light Driver 36813 Nori Mohamed Osman Abdelsamat 2333557656 Sudanese
197 FM M228 King Fahad Causeway - Both Site Civilian Elements Construction and Building Technician 32534 RYAN CARINO 840938950 Filipino
198 FM M228 King Fahad Causeway - Both Site Support Staff - Tranportation Light Driver 29507 Millat Aminur Islam 2215686136 Bangladeshi
199 FM M228 King Fahad Causeway - Both Site Change order number 1 Safety Labor 32907 Jhulan Prasad Jagdish Prasad 2512548229 Indian
200 FM M228 King Fahad Causeway - Both Site Change order number 1 Safety Labor 31266 Muhammad Ishaq Ghulam Muhammad 2366238364 Pakistani
201 FM M228 King Fahad Causeway - Both Site Civilian Elements Civil Works Technician 36424 VIGNESWARAN THIRUNAVUKKARASU 870722980 India
202 FM M228 King Fahad Causeway - Both Site Change order number 1 Safety Labor Rental Mohammad Ahmed Raza 2518831991 Bangladeshi
203 FM M228 King Fahad Causeway - Both Site Civilian Elements Civil Works Technician 32669 MD KAYAMUDDIN 861358368 India
204 FM M228 King Fahad Causeway - Both Site Change order number 2 Engineer Vacant
205 FM M228 King Fahad Causeway - Both Site Civilian Elements Civil Works Technician 32524 JAVED SAH 821364430 India
206 FM M228 King Fahad Causeway - Both Site Change order number 2 Sheriff Central 37774 MARYAM SAAD ALHAMDAN 1075610715 saudi
Report Ref : KFCA-SAFOM-M228-MMR-16-23 Page 37
King Fahd Causeway FM Services Contract (M228)

207 FM M228 King Fahad Causeway - Both Site Civilian Elements Civil Works Technician 32618 NAIM SHAH 891325751 India
208 FM M228 King Fahad Causeway - Both Site Change order number 2 carpentry technician NEW Arif Khan L3975651 Indian
209 FM M228 King Fahad Causeway - Both Site Civilian Elements Civil Works Technician 32673 RAMESH GUPTA 781254680 India
210 FM M228 King Fahad Causeway - Both Site Change order number 2 carpentry technician NEW Akhtar Ali S9759324 Indian
211 FM M228 King Fahad Causeway - Both Site Change order number 2 Low Voltage Technican NEW Mohammad Shamim N6364985 Indian
212 FM M228 King Fahad Causeway - Both Site Change order number 2 Construction and building technician Vacant
213 FM M228 King Fahad Causeway - Both Site Change order number 2 Construction and building technician NEW Abdul Nazeer Abdul Rasheed V3776851 Indian
214 FM M228 King Fahad Causeway - Both Site Change order number 2 Plumbing Technician NEW Amanullah Siddique V3123223 Indian
215 FM M228 King Fahad Causeway - Both Site Change order number 2 Plumbing Technician NEW Manzar Ali Ali Akbar R3663137 Indian
216 FM M228 King Fahad Causeway - Both Site Civilian Elements Carpentry Technician 32670 MOHAMMAD SALIM 751416959 India
217 FM M228 King Fahad Causeway - Both Site Change order number 2 Painting Technician NEW Rashid Mohammed U0947699 Indian
218 FM M228 King Fahad Causeway - Both Site Civilian Elements Carpentry Technician 32689 BADELAL TABBU BISHVAKARMA 720749964 India
219 FM M228 King Fahad Causeway - Both Site Change order number 2 HVAC Technician NEW Rayeeny Sadrelam Abdul U8532166 Indian
220 FM M228 King Fahad Causeway - Both Site Civilian Elements Carpentry Technician 32531 RAJENDRA YADAV 831485710 India
221 FM M228 King Fahad Causeway - Both Site Change order number 2 Labor Vacant Ansari Wasim 2527072884 Nepal
222 FM M228 King Fahad Causeway - Both Site Civilian Elements Carpentry Technician 32633 BABLU KUMAR 950133094 India
223 FM M228 King Fahad Causeway - Both Site Change order number 2 Labor Vacant Mustakim Nau 2517298754 Nepal
224 FM M228 King Fahad Causeway - Both Site Change order number 2 Labor Vacant Mohammad Mojassam Najar 2517298150 Nepal
225 FM M228 King Fahad Causeway - Both Site Civilian Elements Welding Technician 32543 RAZZAK ABDUL 790157160 Bangladesh
226 FM M228 King Fahad Causeway - Both Site Civilian Elements Welding Technician 34454 MADASSIR HUSSAIN 960163174 Pakistan
227 FM M228 King Fahad Causeway - Both Site Civilian Elements Labor 32655 MUTHANNA KOTHUR 850269296 India
228 FM M228 King Fahad Causeway - Both Site Civilian Elements Labor 37343 NAUSHAD KHAN 890465584 India
229 FM M228 King Fahad Causeway - Both Site Architectural Elements Painting Technician 32532 AKBAR ANSARI 860859827 India
230 FM M228 King Fahad Causeway - Both Site Architectural Elements Painting Technician 32523 SUGRIV KUMAR 790236168 India
231 FM M228 King Fahad Causeway - Both Site Architectural Elements Painting Technician 32614 SYED AMIRUL HASAN 831452986 India
232 FM M228 King Fahad Causeway - Both Site Architectural Elements Painting Technician 32686 PEDRO COLMO 700945199 Filipino
233 FM M228 King Fahad Causeway - Both Site Architectural Elements Painting Technician 32530 MOHAMMAD NEZAMUDDIN 890755922 India
234 FM M228 King Fahad Causeway - Both Site Architectural Elements Carpentry Technician 32626 BILLAL HOSAIN 751335517 Bangladesh
235 FM M228 King Fahad Causeway - Both Site Architectural Elements Carpentry Technician 33154 EDGARDO PRESTO 651124603 Filipino
236 FM M228 King Fahad Causeway - Both Site Bridge comprehensive inspection work Civil Technician 32654 ANDRES ACOBA 810585740 Filipino
237 FM M228 King Fahad Causeway - Both Site Bridge comprehensive inspection work Civil Technician 32630 HECTOR STEPHEN DEMI 720746086 Filipino
238 FM M228 King Fahad Causeway - Both Site Bridge comprehensive inspection work Civil Technician 32616 LANI RAMOS 690428456 Filipino
239 FM M228 King Fahad Causeway - Both Site Bridge comprehensive inspection work Civil Technician 32685 ABDUL KARIM ABDUL KADOUS 810263904 Bangladesh
240 FM M228 King Fahad Causeway - Both Site Bridge comprehensive inspection work Painting Technician 32672 DASHRATH SAH 821328352 India
241 FM M228 King Fahad Causeway - Both Site Bridge comprehensive inspection work Painting Technician 32794 BASU LAVUDYA 800278682 India
242 FM M228 King Fahad Causeway - Both Site Bridge comprehensive inspection work Painting Technician 32697 HAROLD GALLE 850640911 Filipino
243 FM M228 King Fahad Causeway - Both Site Bridge comprehensive inspection work Painting Technician 32660 MOHAMMAD ALAMGIR 820294535 India
244 FM M228 King Fahad Causeway - Both Site Bridge comprehensive inspection work Painting Technician 32657 ATEEQUE AHMAD 780864263 India
245 FM M228 King Fahad Causeway - Both Site Change Order Number 2 Engineer Vacant Vacant
246 FM M228 King Fahad Causeway - Both Site Change Order Number 2 Carpentry Technician 37776 Kalamuddin Ahmed P3984691 Indian
247 FM M228 King Fahad Causeway - Both Site Change Order Number 2 Carpentry Technician 37779 Muhammad Zubair Khan LR115953 Pakistan
248 FM M228 King Fahad Causeway - Both Site Change Order Number 2 Low Voltage Technican Vacant Vacant
249 FM M228 King Fahad Causeway - Both Site Change Order Number 2 Construction and Building Technician N/A Mohammad Anjar T9263849 Indian
250 FM M228 King Fahad Causeway - Both Site Change Order Number 2 Construction and Building Technician N/A Mohammed Rafik N2254471 Indian
251 FM M228 King Fahad Causeway - Both Site Change Order Number 2 Plumbing Technician N/A Rajesh Kumar R9180429 Indian
252 FM M228 King Fahad Causeway - Both Site Change Order Number 2 Plumbing Technician N/A MOHAMMAD SOHEL RANA EK0877634 Bangladesh
253 FM M228 King Fahad Causeway - Both Site Change Order Number 2 Painting Technician N/A Mudassar Zaman DF5203442 Pakistan
254 FM M228 King Fahad Causeway - Both Site Change Order Number 2 HVAC Technician N/A MUHAMMAD JAMIL AHMAD JY1167453 Pakistan
255 FM M228 King Fahad Causeway - Both Site Change Order Number 2 Labor N/A Sarwan Singh N0559566 Indian
256 FM M228 King Fahad Causeway - Both Site Change Order Number 2 Labor N/A Birendra Pal U3744038 Indian
257 FM M228 King Fahad Causeway - Both Site Change Order Number 2 Labor Vacant Vacant
Report Ref : KFCA-SAFOM-M228-MMR-16-23 Page 38
King Fahd Causeway FM Services Contract (M228)

10.1 Status of Subcontractor:


Any subcontractor used by the contractor, or any technical support agreements shall be approved by the
Employer, and the contractor shall carry out the management and supervision of the activities to ensure quality
and safety, including detailed execution methodology, check any risk evaluation and issue the clearance as
required.
Services provided by subcontractors are subject to Performance Measurement, which the contractor
shall be responsible for achieving the Key Performance Indicators.

List of Subcontractor to carry out services throughout the entire contract.

SN Asset Description Sub-Contractor CONTACT PERSON LOCATION Remarks

1 Elevator SCHINDLER Engr .Nathahar shah Saudi Side

2 Elevator OTIS Sheraz Aslam Bahrain Side

3 Elevator KONI Almeer Duaij Bahrain Side

Fire Direct Co.


4 Fire Alarm System Ruwan Priyanka Both side
Ltd.

4 Water Treatment Test LAVIE KINGDOM Lujain Mohammad Both side

5 Specialist Bridge Inspection ACTS Khaled El Boukhari Both side


Team

AJM Kooheji
6 MARINE BOAT Both Side
Group

7 Elevator OTIS Ronald Dam Saudi Side

Report Ref : KFCA-SAFOM-M228-MMR-16-23 Page 39


King Fahd Causeway FM Services Contract (M228)

11. Spare Parts & Consumables


11.1 M228_KFCA - Operations, Maintenance and Integral Inspection

On
SN Description RFP QTY Remarks
Site

Two cabins conditioned Toyota car, equipped with traffic


1 12 12
safety signs- with installation of warning lights

Water Tanker 8,000ltr , KARCHER w/pump with diesel


2 engine drive (Kubota Brant) of (350-400 bar) capacity, with 2 2
installation of warning lights
426F2 Backhoe Loader subtitute Backhoe Loader 1.5m³
3 2 2
with Concrete Breaker, J.C.B. 3CX Brand
4 Portable Sludge Pump 30m³/hr (Kubota Brand) 4 4
Portable Water Pump 30m³/Hr Self-priming Pump (Robin
5 2 2
Brand)
High pressure Washing KARCHER Machine, not less than On reviewed for
6 6 0
Substitutes
300 bar
7 Forklift (5ton) Caterpillar, with warning lights 2 2
Mobile Welding Machine 450AMP with diesel Engine Drive
8 2 2
Lincoin Brand
Portable Welding Machine 400amp, 220/380v, with
9 complete Cable and Accessories. Italy Brand [PO 2 2
WELD450)
Asphalt Cutter machine Disc 50cm Diameter Robin Engine
10 2 2
Brand
Concrete Drilling Machine (core drill) up to 150mm Dia.
11 2 2
Hilti 220v 60H
Hilti Hammer Drill, 220v 60HZ with complete bit Set of up
12 6 6
to 25mm
13 Hammer Drill with drill Bit set, Makita brand 220v 60H2 6 6

Drill with steel bit sets 1/8-3/4 inch, Makita 220v 60H2
14 6 6
Dewalt

15 Battery Drill with complete steel drill bits, Makita 3 3

Makita Bench Grinding Machine with 8” dia. X2Disc, 220v


16 2 2
60Hz

Report Ref : KFCA-SAFOM-M228-MMR-16-23 Page 40


King Fahd Causeway FM Services Contract (M228)

SN Description RFP QTY On Site Remarks

17 Portable Angel Grinder Machine 8 inch- Makita 220v/60Hz 4 4

18 Portable Angel Grinder Machine 4 inchm - Makita 220v/60Hz 4 4

Borang Asphalt Roller with (2) drums (walk behind)


19 1 1
model:BW65H
Oxi/Accy Welding/Cutting Torch Kit Set Big Saudi standard
20 2 2
fittings with trolley (Victor Brand)
Portable Oxi/Accy Welding/Cutting Torch kit set small Saudi
21 2 2
standard fittings (Victor Brand)
Portable tig welding machine with complete accessories
22 1 1
(Telwin)

23 Makita Type Bench 220v/60Hz portable circular saw 2 2

24 Makita Jack Saw with complete Blade Sets 220v/60Hz 2 2

25 Makita Abrasing Cut-off Saw 14 inch 220v/60Hz 2 2

26 Suction feed spray gun for painting (Italy Brand) 2 2

27 Portable painting electric mixer for paint 220v/60Hz 1 1

28 Aluminum Scaffolding set with wheel 12mtr H & 12mtr W 4 4

29 Crocodile Hydraulic Jack 5tons Italy or USA made 2 2

30 Fluke Digital Clamp Meter Tester 18KV/600Amp (mod 3810) 2 2

31 Fluke Digital Clamp Meter Tester 300 Amp (Mod 324) 10 10

32 Fluke Digital Multimeter 1000v 4 4

It was returned not


33 Iron oxidized with concrete meter 1 0 considered - bought Vernier
depth Gauge
Has delivered in Bridge
Inspection - Crack Check
34 Concrete cracks monitor 1 0 Telescope RFP#08 - Utilized
by Bridge Inspections.
Report Ref : KFCA-SAFOM-M228-MMR-16-23 Page 41
King Fahd Causeway FM Services Contract (M228)

SN Description RFP QTY On Site Remarks

Has delivered same


35 iron depth Gauge Detector 1 0 description utilized by Bridge
Inspection Team RFP#10

36 (2000 Ohms) MEGGER Fluke Brand (Mod. 1587) 1 1

Sandblasting Machine 150kg, with accessories, Atlas Comp


37 1 1
(with air compressor)
Portable Air Compressor with Pneumatic Jack Hammer Sets
38 1 1
ATALS COPCO Brand 48
Truck equipped with 12m³ tank for suctioning sludge and
39 2 2
opening clogged drains with warning lights

40 Toyota Dump truck 5m³ with warning lights 1 1

41 Bobcat with warning lights 1 1

42 Flat plate compressor (Robin) 15x20inch 1 1

43 Digital satellite finder Meter. TV Signal (sat link) 1 2

44 Loose connection detector instrument 2 2

45 Electric Cable Fault Detector 1 1

Diesel Working Height 20mrt GENIE Man Lift BOOM Snake


46 2 1 BALANCE
Smart, with warning lights

47 Chain Block 3ton (Rigid) 2 2

48 Engine Hoist (Enerpac) 2ton capacity 2 2

49 Hydraulic Crimping Machine (rigid) 10mm-360mm 2 2

Universal Hydraulic Flaring Tools Set (Mastertool) 3/16 to 1 &


50 2 2
4.75mm to 25mm

51 Hydraulic Knock- out punch (Rigid) 0.5-5inch 2 2

52 Measuring Wheel Duraweel 0-1000m 1 1

Report Ref : KFCA-SAFOM-M228-MMR-16-23 Page 42


King Fahd Causeway FM Services Contract (M228)

SN Description RFP QTY On Site Remarks

53 Phase Sequence Meter (Fluke) 1 1

54 Puller Set (SNAPON) 1 1


Has delivered 2-Water Leak
Detector RFP of Landscaping
55 Water Leak Detector Sewrin Aquatest T10 1 0 different type which ulitized
by Maintenance.

56 Genie Slab Scissor Lift Mod. GS-3232 2 1 Balance

139 128

11.2 M228_KFCA BRIDGE INSPECTION EQUIPMENT

RFP
SN Description Approved On Site Remarks
QTY
Two cabins conditioned Toyota car, equipped with Bar
1 Lights and Safety equipment will provide inside the 2 2
vehicle.
Water Tanker 12,000 Litre capacity equipped with High
2 pressure pump (350-440) Bar. With Bar Lights and Safety 2 2
equipment will provide inside the vehicle.
High Pressure Washer (250-300BAr) Self operated ,20
3 2 2
meters hose
Makita electric Concrete crushing machine (Jack
4 1 1
Hammer). Note: 1 set each side (Large) and (Small)
Silent Diesel Generator 35KVA/220V/3HP. Note: Should
5 2 2
equipped in old voltage. Note: 1 set each side.
Makita Electric Dye Mixing Machine. Note: Has
6 (1pc in Bridge) (1pc in Integral) and additional 4pcs 6 6
equipments.
Unpaking, Linking and Cutting kits for Technician Civil
7 1 0 Still Sourcing
Department
8 Hilti Portable Crack Meter 1 1
9 Hilti concrete iron Oximeter 1 1
10 Hilti Iron Depth Gauge 1 1
11 Laser Measurement Device 2 2
12 Airless Painting Machine with all the Accessories 2 2

TOTAL 23 22
Report Ref : KFCA-SAFOM-M228-MMR-16-23 Page 43
King Fahd Causeway FM Services Contract (M228)

12. Procurement Status Report


All Material shall be provided by the client at their own expense. Prior to execute the scope of work, all necessary material
requirements were stored /located in an easily accessible Central warehouse through an extensive usage and daily
frequently used. The contractor shall ensure that there is enough stock for all the items in order not to hamper the execution
of works.

Procurement of spare parts (as per Employer’s procurement regulations) is the responsibility of the contractor with cost
recovery throughout the agreement term.

The below listed item shows the Material Requirement /Procurement Status for an out-of-stock item.

a. Material Request Status

Awaiting Material under procurement

Issued this Month Saudi Bahrain Total

Civil 10 15 25

Electrical 1 19 20
Mechanical
(HVAC / Plumbing 9 25 34
/TRANSP)
Low Current / VER 0 1 1

HSE 0 2 2

BRIDGE INSPECTION 1 1 2
Total this month 21 63 84

b. RM Details under Awaiting Materials:


Work Order Description COUNTRY Location Section Department Work Status MR Ref.NO
SN
Type
WO19240081 FM,Mechanical System - SAUDI SIDE M228-SA-ZN2-SA15 HVA MECH RM WMATL SA-MECH-58
‫نظام ميكانيكي‬,HVAC System -
1 ‫نظام التكيف‬,A/C Package Units -
‫وحدة التبريد‬,Not Working/No Power -
‫ ال توجد طاقة‬/ ‫ال تعمل‬
WO19393086 FM,Mechanical System - SAUDI SIDE M228-SA-ZN2-SA15 HVA MECH RM WMATL SA-MECH-
‫نظام ميكانيكي‬,HVAC System - 061
2
‫نظام التكيف‬,Split Type A/C Unit -
‫وحدة تكيف اسبليت‬,Too Hot - ‫حار جدا‬
WO19393194 FM,Mechanical System - SAUDI SIDE M228-SA-ZN4-SA09 HVA MECH RM WMATL
‫نظام ميكانيكي‬,HVAC System -
3 ‫نظام التكيف‬,Split Type A/C Unit -
‫وحدة تكيف اسبليت‬,Not Working/No Power -
‫ ال توجد طاقة‬/ ‫ال تعمل‬
WO19261064 FM,Civil Services,Lock and Key - SAUDI SIDE M228-SA-ZN5-SA05 CIVIL CIV RM WMATL SA-CIVIL-56
4 ‫قفل ومفتاح‬,Installation Of New Lock Set -
‫تركيب اقفال جديدة‬
WO19323429 FM,Mechanical System - SAUDI SIDE M228-SA-ZN4-SA03 HVA MECH RM WMATL SA-MECH-56
‫نظام ميكانيكي‬,HVAC System -
5
‫نظام التكيف‬,A/C Package Units -
‫وحدة التبريد‬,Too Hot - ‫حار جدا‬

Report Ref : KFCA-SAFOM-M228-MMR-16-23 Page 44


King Fahd Causeway FM Services Contract (M228)

Work Order Description COUNTRY Location Section Department Work Status MR Ref.NO
SN
Type
WO19351528 FM,Civil Services,Painting - SAUDI SIDE M228-SA-ZN3-SA24 CIVIL CIV RM WMATL
6 ‫الدهان‬,PEELED OFF PAINT-
NEEDS REPAINTING - ‫صيانة دهان مقشر‬
WO19000212 FM,Mechanical System - SAUDI SIDE M228-SA-ZN5-SA4A HVA MECH RM WMATL
‫نظام ميكانيكي‬,HVAC System -
7
‫نظام التكيف‬,Split Type A/C Unit -
‫وحدة تكيف اسبليت‬
WO19013285 FM,Civil Services,Lock and Key - SAUDI SIDE M228-SA-ZN1 CIVIL CIV RM WMATL
8 ‫قفل ومفتاح‬,Installation Of New Lock Set -
‫تركيب اقفال جديدة‬
WO19013734 FM,Mechanical System - SAUDI SIDE M228-SA-ZN5-SA4B HYD MECH RM WMATL
‫نظام ميكانيكي‬,Hydraulics Mechanical (Plumb
9
ing, Pumps & Water Treatment),Plumbing
System - ‫نظام السباكة‬
WO19013737 FM,Mechanical System - SAUDI SIDE M228-SA-ZN3-SCIA HVA MECH RM WMATL SA-MECH-57
‫نظام ميكانيكي‬,HVAC System -
10
‫نظام التكيف‬,FAN - ‫المروحة‬,Fan Not Working

WO19058068 FM,Civil Services,Masonry- SAUDI SIDE M228-SA-ZN4-SA20 CIVIL CIV RM WMATL BH-CIV-252
‫أعمال المبانى‬,Constructing & Repairing Bloc
11 k Wall & Concrete Floor-
‫بناء وإصالح حوائط البلوك واألرضيات الخرسان‬
‫ية‬
WO19100272 FM,Mechanical System - SAUDI SIDE M228-SA-ZN1-LND2 HYD MECH RM WMATL
‫نظام ميكانيكي‬,Hydraulics Mechanical (Plumb
12 ing, Pumps & Water Treatment),PUMP -
‫المضخات‬,PUMP NOT OPERATIONAL -
‫المضخة ال تعمل‬
WO19166141 FM,Civil Services,Lock and Key - SAUDI SIDE M228-SA-ZN5-SA07 CIVIL CIV RM WMATL SA-CIVIL-55
13 ‫قفل ومفتاح‬,Installation Of New Lock Set -
‫تركيب اقفال جديدة‬
WO19194378 FM,Mechanical System - SAUDI SIDE M228-SA-ZN5-S101-00-0006 HYD MECH RM WMATL
‫نظام ميكانيكي‬,Hydraulics Mechanical (Plumb
14 ing, Pumps & Water Treatment),Plumbing
System - ‫نظام السباكة‬,Wc Damage -
‫تلف الحمام‬
WO19208131 FM,Civil Services,Carpentry- SAUDI SIDE M228-SA-ZN2-SA01 CIVIL CIV RM WMATL
‫أعمال النجارة‬,DOORS -
15
‫أعمال االبواب‬,Back door is broken -
need repair
16 WO19166143 FM,Civil Services,Civil Works SAUDI SIDE M228-SA-ZN5-S24A CIVIL CIV RM WMATL
17 WO19166139 FM,Civil Services,Civil Works SAUDI SIDE M228-SA-ZN5-SA4A CIVIL CIV RM WMATL SA-CIVIL-57
WO19393072 FM,Civil Services,Carpentry- SAUDI SIDE M228-SA-ZN1-SATG CIVIL CIV RM WMATL SA-CIVIL-54
18 ‫أعمال النجارة‬,Carpentry Repair & Installation

WO19337603 BRIDGE INSPECTION EQUIPMENT MAIN SAUDI SIDE M228-SA-ZN5-SA13 BI- BIE CM WMATL BH-INSP-025
19 TENANCE OLD MOOG # 3 PN 9575 MOD MECH
EL : MbI 150-1,7/S SR # 01-0355-05
WO19351534 Inspection of External Building Civil Structur SAUDI SIDE M228-SA-ZN5-SA14 CIVIL CIV CM WMATL
20 e-ZN5-Bldg.# SA14-
Causeway Bridge Center
WO19166044 Preventive Maintenance of Electrical Low V SAUDI SIDE M228-SA-ZN5-SA13 LV ELEC CM WMATL
21 oltage Panel-ZN5-Bldg.# SA13-
Maintenance Workshop

Report Ref : KFCA-SAFOM-M228-MMR-16-23 Page 45


King Fahd Causeway FM Services Contract (M228)

BAHRAIN SIDE
SN
Work Order Description Country Location Section Department Work Type Status MR Ref.NO

WO19046672 FM,Electrical System - ‫نظام الكهرباء‬,Electrical Low Voltage System - Bahrain Side M228-BA-ZN3-BA19 LV ELEC RM WMATL BH-ELEC-287
1 ‫كهرباء الجهد المنخفض‬,Low Voltage Control System-
‫نظام التحكم في الجهد المنخفض‬,Control Panel - ‫لوحة تحكم‬
WO19019925 FM,Mechanical System - Bahrain Side M228-BA-ZN3-BA4B HYD MECH RM WMATL BH-MECH-499
2 ‫نظام ميكانيكي‬,Hydraulics Mechanical (Plumbing, Pumps & Water Treatm
ent),Plumbing System - ‫نظام السباكة‬,Water Leaking From Ceiling -
WO19019940 ‫تسرب المياه من السقف‬
FM,Mechanical System - Bahrain Side M228-BA-ZN2-B98A HYD MECH RM WMATL BH-MECH-293
3 ‫نظام ميكانيكي‬,Hydraulics Mechanical (Plumbing, Pumps & Water Treatm
ent),Plumbing System - ‫نظام السباكة‬,Toilet Flush Defective -
WO19072199 ‫ عيب المرحاض‬System -
FM,Mechanical Bahrain Side M228-BA-ZN2-B98A HYD MECH RM WMATL BH-MECH-293
4 ‫نظام ميكانيكي‬,Hydraulics Mechanical (Plumbing, Pumps & Water Treatm
ent),Plumbing System - ‫نظام السباكة‬
WO19100248 FM,Mechanical System - Bahrain Side M228-BA-ZN3-BA02 HYD MECH RM WMATL BH-MECH-506
5 ‫نظام ميكانيكي‬,Hydraulics Mechanical (Plumbing, Pumps & Water Treatm
ent),Plumbing System - ‫نظام السباكة‬
WO19108139 FM,Mechanical System - Bahrain Side M228-BA-ZN3-BA15 HYD MECH RM WMATL BH-MECH-503
6 ‫نظام ميكانيكي‬,Hydraulics Mechanical (Plumbing, Pumps & Water Treatm
ent),Plumbing System - ‫نظام السباكة‬,Hand Spray Damage - ‫كسر الشطاف‬
WO19208114 FM,Mechanical System - Bahrain Side M228-BA-ZN3-BA15 HYD MECH RM WMATL BH-MECH-513
7 ‫نظام ميكانيكي‬,Hydraulics Mechanical (Plumbing, Pumps & Water Treatm
ent),Plumbing System - ‫نظام السباكة‬,Hand spray need to replace
WO19261055 FM,Mechanical System - ‫نظام ميكانيكي‬,HVAC System - Bahrain Side M228-BA-ZN3-BA04 HVA MECH RM WMATL BH-MECH-524
8 ‫نظام التكيف‬,Air Handling Unit - ‫وحدة مناولة الهواء‬

WO19330400 FM,Electrical System - ‫نظام الكهرباء‬,Electrical Low Voltage System - Bahrain Side M228-BA-ZN4-BA10 LV ELEC RM WMATL BH-ELEC-304
9 ‫كهرباء الجهد المنخفض‬,Low Voltage Control System-
‫نظام التحكم في الجهد المنخفض‬,FEEDER PILLAR -
WO19340932 FM,Mechanical System -TERMINATION
‫الموزع الكهربائي‬,CABLE - ‫الكابل‬
‫نظام ميكانيكي‬,HVAC ‫توصيالت‬
System - Bahrain Side M228-BA-ZN3-BA02 HVA MECH RM WMATL BH-MECH-519
10 ‫نظام التكيف‬,A/C Package Units - ‫وحدة التبريد‬

WO19301872 FM,Mechanical System - ‫نظام ميكانيكي‬,HVAC System - ‫نظام التكيف‬,FAN - Bahrain Side M228-BA-ZN4-BA10 HVA MECH RM WMATL BH-MECH-520
11 ‫المروحة‬

WO19108255 FM,Civil Services,Carpentry- ‫أعمال النجارة‬,WINDOWS - Bahrain Side M228-BA-ZN3-BA4B CIVIL CIV RM WMATL BH-CIV-259
12 ‫النوافذ‬,DEFECTED WINDOW HARDWARE- NEEDS REPAIR -
‫إصالح اكسسوارات النافذة‬
WO19152501 FM,Mechanical System - Bahrain Side M228-BA-ZN3-BA15 HYD MECH RM WMATL BH-MECH-510
13 ‫نظام ميكانيكي‬,Hydraulics Mechanical (Plumbing, Pumps & Water Treatm
ent),PLUMBING FIXTURES -
WO19166094 SENSOR
‫أدوات الصحية‬,WCSystem
FM,Mechanical NOT WORKING
- ‫ميكانيكي‬ ‫نظام‬,HVAC -System
‫ ال يعمل‬-‫الحساسا‬ Bahrain Side M228-BA-ZN4-B25A HVA MECH RM WMATL BH-MECH-518
14 ‫نظام التكيف‬,Window AC Unit - ‫مكيف شباك‬

WO19058059 FM,Electrical System - ‫نظام الكهرباء‬,Electrical Low Voltage System - Bahrain Side M228-BA-ZN2-BA6B LV ELEC RM WMATL BH-ELEC-285
15 ‫كهرباء الجهد المنخفض‬,External Lightings - ‫االنارة الخارجية‬

WO19058064 FM,Civil Services,Masonry- Bahrain Side M228-BA-ZN4-SVIP CIVIL CIV RM WMATL BH-CIV-240
16 ‫أعمال المبانى‬,Repair Curbstones & Concrete Barrier -
‫اصالح احجار الرصيف والحواجز الخرسانية‬
WO19031670 FM,Health,Safety & Environment,General Service related to Safety - Bahrain Side M228-BA-ZN2-BA01 H-S-E HSE RM WMATL PR-HSE-
17 ‫أعمال عامة تتعلق بالسالمة‬ TOOLS

WO19013727 FM,Civil Services,Civil Works Bahrain Side M228-BA-ZN3-BCDP CIVIL CIV RM WMATL BH-CIV-250
18

WO19100254 FM,Electrical System - Bahrain Side M228-BA-ZN2-BA18-00- VER ELEC RM WMATL BH-CIV-258
19 ‫نظام الكهرباء‬,Lifts Machinery, Escalator & Security Access,Security Acc BASC
ess - ‫منطقة االمن‬,Road Barrier - ‫بوابة حاجز الطريق‬,Defective boom/arm -
WO19100260 ‫ الذراع متضرر‬System - ‫نظام ميكانيكي‬,HVAC System -
FM,Mechanical Bahrain Side M228-BA-ZN3-BAPC HVA MECH RM WMATL BH-MECH-508
20 ‫نظام التكيف‬,Chiller Unit - ‫وحدة المبردات‬,REFRIGERANT LEAKAGE -
‫تسريب من مواسير المبرد‬
WO19058039 FM,Mechanical System - Bahrain Side M228-BA-ZN3-BA08 HYD MECH RM WMATL BH-MECH-503
21 ‫نظام ميكانيكي‬,Hydraulics Mechanical (Plumbing, Pumps & Water Treatm
ent),Plumbing System - ‫نظام السباكة‬,Hand Spray Damage - ‫كسر الشطاف‬
WO19100244 FM,Health,Safety & Environment,General Service related to Safety - Bahrain Side M228-BA-ZN2-BA06 H-S-E HSE RM WMATL PR-000161360
22 ‫أعمال عامة تتعلق بالسالمة‬

Report Ref : KFCA-SAFOM-M228-MMR-16-23 Page 46


King Fahd Causeway FM Services Contract (M228)

Work Order Description Country Location Section Department Work Type Status MR Ref.NO
SN

WO19261026 FM,Electrical System - ‫نظام الكهرباء‬,Electrical Low Voltage System - Bahrain Side M228-BA-ZN4-BA25 LV ELEC RM WMATL BH-ELEC-301
23 ‫كهرباء الجهد المنخفض‬,Low Voltage Control System-
‫نظام التحكم في الجهد المنخفض‬,Distribution Panel - ‫لوحة توزيع الكهرباء‬
WO19166097 FM,Civil Services,Painting - Bahrain Side M228-BA-ZN3-BA15 CIVIL CIV RM WMATL BH-CIV-262
24 ‫الدهان‬,Painting Of Doors & Door Frames, Texture Wall, All Kind Of Ext
erior Wall - ‫دهان االبواب وجميع انواع الجدران الخارجية‬
WO19166144 FM,Civil Services,Carpentry- ‫أعمال النجارة‬,DOORS - ‫أعمال االبواب‬ Bahrain Side M228-BA-ZN2-BA07 CIVIL CIV RM WMATL BH-CIV-264
25

WO19341765 FM,Civil Services,Carpentry- ‫أعمال النجارة‬,DOORS - ‫أعمال االبواب‬ Bahrain Side M228-BA-ZN2-BA18 CIVIL CIV RM WMATL BH-CIV-269
26

WO19351484 FM,Electrical System - ‫نظام الكهرباء‬,Electrical Low Voltage System - Bahrain Side M228-BA-ZN3-BA15-01- LV ELEC RM WMATL BH-ELEC-313
27 ‫كهرباء الجهد المنخفض‬,Low Voltage Control System- 1002
‫نظام التحكم في الجهد المنخفض‬
WO19390724 FM,Mechanical System - ‫نظام ميكانيكي‬,HVAC System - Bahrain Side M228-BA-ZN2-BA07 HVA MECH RM WMATL BH-MECH-527
28 ‫نظام التكيف‬,Split Type A/C Unit - ‫وحدة تكيف اسبليت‬

WO19390727 FM,Mechanical System - Bahrain Side M228-BA-ZN2-BA24 HYD MECH RM WMATL BH-MECH-525
29 ‫نظام ميكانيكي‬,Hydraulics Mechanical (Plumbing, Pumps & Water Treatm
ent),Water Pump - ‫مضخة مياه‬
WO19390736 FM,Electrical System - ‫نظام الكهرباء‬,Electrical Low Voltage System - Bahrain Side M228-BA-ZN3-BA02 LV ELEC RM WMATL BH-ELEC-315
30 ‫كهرباء الجهد المنخفض‬,Internal Lightings & Small Power,LIGHTING -
‫اإلنارة‬,NOT OPERATIONAL - ‫ال تعمل‬
WO19340928 FM,Electrical System - ‫نظام الكهرباء‬,Electrical Low Voltage System - Bahrain Side M228-BA-ZN2-BA7C LV ELEC RM WMATL BH-ELEC-314
31 ‫كهرباء الجهد المنخفض‬,Internal Lightings & Small Power,LIGHTING -
‫اإلنارة‬,BUSTED - ‫ال تعمل‬
WO19194351 FM,Civil Services,Civil Works Bahrain Side M228-BA-ZN4-BACP CIVIL CIV RM WMATL BH-CIV-261
32

WO19240021 FM,Civil Services,Civil Works Bahrain Side M228-BA-ZN2-VIPC CIVIL CIV RM WMATL BH-CIV-265
33

WO19250342 FM,Mechanical System - Bahrain Side M228-BA-ZN4-BA25 HYD MECH RM WMATL BH-MECH-514
34 ‫نظام ميكانيكي‬,Hydraulics Mechanical (Plumbing, Pumps & Water Treatm
ent),RAIN WATER, SANITARY DRAINAGE AND VENT SYSTEMS -
WO19261024 ‫والمجاري و تهويتها‬
FM,Electrical ‫االمطار‬
System ‫نظامصرف‬,Electrical
- ‫الكهرباء‬ ‫أنظمة‬ Low Voltage System - Bahrain Side M228-BA-ZN1 LV ELEC RM WMATL BH-ELEC-300
35 ‫كهرباء الجهد المنخفض‬,Internal Lightings & Small Power,LIGHTING -
‫اإلنارة‬,LAMP - )‫المصابيح (اللمبات‬
WO19208120 FM,Civil Services,Civil Works Bahrain Side M228-BA-ZN1 CIVIL CIV RM WMATL BH-CIV-263
36

WO19340912 Weekly Inspection of Emergency Generator(HIMOINSA- Bahrain Side M228-BA-ZN2-BA98 GEN ELEC CM WMATL BH-ELEC-317
37 1000KVA@ 220/380V)-ZN2-Bldg.# BA98-Service Bldg.

WO19100246 FM,Civil Services,Civil Works Bahrain Side M228-BA-ZN2-BA07 CIVIL CIV RM WMATL BH-CIV-253
38

WO19119698 FM,Civil Services,Civil Works Bahrain Side M228-BA-ZN2-BA06 CIVIL CIV RM WMATL BH-CIV-258
39

WO19058065 FM,Civil Services,Masonry- Bahrain Side M228-BA-ZN3-BRD1 CIVIL CIV RM WMATL BH-CIV-250
40 ‫أعمال المبانى‬,Repair Curbstones & Concrete Barrier -
‫اصالح احجار الرصيف والحواجز الخرسانية‬
WO19046690 Preventive Maintenance of External Lightings-ZN2-Bldg.# BA6B- Bahrain Side M228-BA-ZN2-BA6B LV ELEC CM WMATL BH-ELEC-285
41 Clinic Bldg.

WO19166095 Inspection of External Civil Structure-ZN3-Bldg.# BA03- Bahrain Side M228-BA-ZN3-BA03 CIVIL CIV CM WMATL BH-CIV006
42 Custom Department Bldg.

WO19337661 Preventive Maintenance of Package Air Handling Unit-ZN3- Bahrain Side M228-BA-ZN3-BA15 HVA MECH CM WMATL BH-MECH-526
43 Bldg.# BA15-Mosque

WO19340913 Weekly Inspection of Emergency Generator(HIMOINSA- Bahrain Side M228-BA-ZN2-BA24 GEN ELEC CM WMATL BH-ELEC-311
44 1000KVA@ 220/380V)-ZN2-Bldg.# BA24-
Maintenance Workshop & Desalination Plant

Report Ref : KFCA-SAFOM-M228-MMR-16-23 Page 47


King Fahd Causeway FM Services Contract (M228)

Work Order Description Country Location Section Department Work Type Status MR Ref.NO
SN

WO19240068 Weekly Inspection of Emergency Generator(CUMMINS- Bahrain Side M228-BA-ZN4-BA20 GEN ELEC CM WMATL BH-ELEC-294
45 500KVA@ 220/380V)-ZN4-Bldg.# BA20-Service Bldg.

WO19261060 Preventive Maintenance of Split A/C unit-ZN3-Bldg.# BA8A- Bahrain Side M228-BA-ZN3-BA8A HVA MECH CM WMATL BH-MECH-523
46 Passenger Quarantine Facility & CID Office

WO19261038 Preventive Maintenance of Toilet Sanitary Fixtures-ZN4-Bldg.# SVIP- Bahrain Side M228-BA-ZN4-SVIP-00- HYD MECH CM WMATL BH-MECH-522
47 South VIP Royal Bldg. 0007

WO19144469 Preventive Maintenance of Split A/C unit-ZN2-Bldg.# BA21- Bahrain Side M228-BA-ZN2-BA21 HVA MECH CM WMATL BH-MECH-515
48 Service Bldg.

WO19340911 Weekly Inspection of Emergency Generator(HIMOINSA- Bahrain Side M228-BA-ZN4-BA20 GEN ELEC CM WMATL BH-ELEC-312
49 1000KVA@ 220/380V)-ZN4-Bldg.# BA20-Service Bldg.

WO19240040 Inspection of Internal Building Civil Structure Fabric & Furniture-ZN3- Bahrain Side M228-BA-ZN3-BA05 CIVIL CIV CM WMATL BH-CIV-268
50 Bldg.# BA05-National Security Bldg.

WO19240059 Inspection of Internal Building Civil Structure Fabric & Furniture-ZN3- Bahrain Side M228-BA-ZN3-BAIC CIVIL CIV CM WMATL BH-CIV-267
51 BAIC-Inssurance Arrival Cabin

WO19046698 Preventive Maintenance of Toilet Sanitary Fixtures-ZN2-Bldg.# BA07- Bahrain Side M228-BA-ZN2-BA07-00- HYD MECH CM WMATL BH-MECH-505
52 Police Public Security Bldg.Ground Flr. 0025

WO19046701 Preventive Maintenance of Water Heater-ZN1-Bldg.# BTG3- Bahrain Side M228-BA-ZN1-BTG3 HYD MECH CM WMATL BH-MECH-504
53 Causeway Toll Both Office & Truck Cabin

WO19072244 Preventive Maintenance of External Lightings-ZN1-BAUP- Bahrain Side M228-BA-ZN1-BAUP LV ELEC CM WMATL BH-ELEC-296
54 Um Al Naasan Underpass

WO19100197 Preventive Maintenance of External Lightings-ZN2-BRD5- Bahrain Side M228-BA-ZN2-BRD5 LV ELEC CM WMATL BH-ELEC-295
55 TRUCK CUSTOM CARGO DEPARTURE ROAD

WO19100198 Preventive Maintenance of External Lightings-ZN2-BRD3- Bahrain Side M228-BA-ZN2-BRD3 LV ELEC CM WMATL BH-ELEC-297
56 NORTH VIP BAHRAIN & SAUDI CROSSING ROAD

WO19100199 Preventive Maintenance of External Lightings-ZN2-BRD1- Bahrain Side M228-BA-ZN2-BRD1 LV ELEC CM WMATL BH-ELEC-298
57 TRUCK ENTRY & NORTH VIP ROAP

WO19144411 Preventive Maintenance of Exhaust Fan-ZN4-Bldg.# BA25- Bahrain Side M228-BA-ZN4-BA25 HVA MECH CM WMATL BH-MECH-512
58 Cleaning Office

WO19261056 Preventive Maintenance of Exhaust Fan-ZN4-Bldg.# B25B- Bahrain Side M228-BA-ZN4-B25B HVA MECH CM WMATL BH-MECH-521
59 Custom Clearance Agent Bldg.

WO19301804 Preventive Maintenance of Internal Lightings-ZN3-Bldg.# BA4B- Bahrain Side M228-BA-ZN3-BA4B-00 LV ELEC CM WMATL BH-ELEC-302
60 Police K9 Dog Bldg.Ground Flr.

WO19301805 Preventive Maintenance of Internal Lightings-ZN2-Bldg.# BA06- Bahrain Side M228-BA-ZN2-BA06-00 LV ELEC CM WMATL BH-ELEC-303
61 Civil Defense Department Bldg.Ground Flr.

WO19261043 Preventive Maintenance of Air Duct System-ZN3-Bldg.# BA04- Bahrain Side M228-BA-ZN3-BA04 HVA MECH CM WMATL BH-MECH-524
62 Insurance & Commercial Bldg.

WO19340902 Inspection of Slope Protection (Sea) - Bahrain Side M228-BA-ZN1-CB5N BI-CIV BIC CM WMATL BH-INSP-024
63 Pile / Pier AT B4&B5 S&N (Pile 02-67)(Pile 02-19)

Report Ref : KFCA-SAFOM-M228-MMR-16-23 Page 48


King Fahd Causeway FM Services Contract (M228)

c. SAFARI REIMBURSABLE DELIVERY NOTE MONTH OF APRIL 2023


SAUDI SIDE
SAFARI REIMBURSABLE DELIVERY NOTE MONTH OF APRIL 2023
DEL SERIAL# WO# SR# MR# PR# INVOICE # SUPPLIER NAME PROJET CODE DEPARTMENT LINE ITEM DATE OF ARRIVAL ISSUANCE TRANSACTION SERIAL# OLIVE ARABIA STATUS
000093 SA-SIDE 001244 000976 HSD_SI_00208123 REZA HYGINE M226 SA-CUSTODIAL 1 1-Apr-23 CHECKED & SIGNED
000094 17455406 001236 000969 5158 AL MANZOUR AL SHAMI TRADING EST M228 SA-CIVIL 1 4-Apr-23 00614 CHECKED & SIGNED
000095 17465883 001253 000986 5157 AL MANZOUR AL SHAMI TRADING EST M228 SA-CIVIL 1 4-Apr-23 00615 CHECKED & SIGNED
000096 17472296 001258 000991 25910 AL NAJIM AL WAHEED TRADING EST M228 SA-ELECT 1 4-Apr-23 00616 CHECKED & SIGNED
000097 17094092 001155 000904 SO141018 ALHAKBANI GROUP TRADING COMPANY M228 SA-ELECT 1 4-Apr-23 00619 CHECKED & SIGNED
000098 16784337 1086 825 SO141019 ALHAKBANI GROUP TRADING COMPANY M228 SA-ELECT 1 4-Apr-23 00618 CHECKED & SIGNED
000099 17472350 001261 00994 SO141017 ALHAKBANI GROUP TRADING COMPANY M228 SA-ELECT 1 4-Apr-23 00617 CHECKED & SIGNED
000100 19019948 MECH-45 2301261 PIPE WORLD TRADING COMPANY M228 SA-PLUM 5 4-Apr-23 00605 CHECKED & SIGNED
000101 16427691 000986 000749 A24-2143 UNIVERSAL BEARINGS CO. M228 SA-PLUM 2 4-Apr-23
000102 18627761 INSP-8 INSP-8 8110016679 GENERAL CONTRACTING COMPANY M228 SA-INSP 3 5-Apr-23 00613
000103 STOCK ORDER 001145 000895 882 QUALITY WORKS EST M228 SA-CIVIL 2 6-Apr-23 CHECKED & SIGNED
000104 16579272 000988 000838 25202 NAYIL ANWARNASSERAL-ESA TRADING.EST M228 SA-MECH 1 6-Apr-23 00622 CHECKED & SIGNED
000105 16794804 001089 000828 0002-1537 WALEED NOOR TRADING COMPANY M228 SA-ELECT 3 6-Apr-23 00621 CHECKED & SIGNED
000106 STOCK ORDER CIVIL-31 001175 INV602320601409-D1 ABDULAZIZ & SAAD AL MOAJIL TRADE & INVESTMENT M228 SA-CIVIL 8 10-Apr-23 CHECKED & SIGNED
000107 STOCK ORDER M2226-3 001144 0003-WHO3-883 AL BARIQ M226 SA-CUSTODIAL 2 12-Apr-23 CHECKED & SIGNED
000108 18655029 ELEC-33 ELEC-33 200231205944/ 2301000952 ZAHID TRACTOR / ENERGY BOX TRADING M228 SA-INSP 4 12-Apr-23 00640 CHECKED & SIGNED
000109 CM-WO18568222 BA-ELEC-257 100062988 SAUDI DIESEL EQUIPMENT M228 BA-ELEC-257 3 12-Apr-23 BA-ELEC-257 CHECKED & SIGNED
000110 14759200 000334 000315 431023001472 ABDULLAH HASHIM COMPANY LTD M228 SA-ELECT 1 17-Apr-23 00657 CHECKED & SIGNED
000111 STOCK ORDER MECH-29 001199 DEL#SCL230277 METito M228 SA-MECH 4 17-Apr-23 00655/ 00671 CHECKED & SIGNED
000112 19100218 INSP9 INSP9 DAM_SCS087850 FORSOC M228 SA-INSP 1 17-Apr-23 CHECKED & SIGNED
000113 19119723 MECH-51 MECH-51 DMMINV-202-0856 DMM-INV-2023-0855 IBRAHIM A AZIZ AL MOEJEL EST FOR TRADING M228 SA-MECH 4 18-Apr-23 CHECKED & SIGNED
000114 18187467 MECH-29 MECH-29 NOTE NO .373 IBRAHIM A AZIZ AL MOEJEL EST FOR TRADING M228 SA-MECH 1 18-Apr-23 CHECKED & SIGNED
000115 16395527 BH-MECH265 BH-MECH265 DELIVERY NOT#6894 SAFANA UNITED TRD CO. PROJRCT BR M228 SA-MECH 1 18-Apr-23 CHECKED & SIGNED
000116 STOCK ORDER 001244 000976 DEL# DN-K2023/3021 REZA HYGINE M226 SA-CUSTODIAL 4 18-Apr-23 CHECKED & SIGNED
000117 STOCK ORDER SM001169 DEL#361 IBRAHIM A AZIZ AL MOEJEL EST FOR TRADING M228 SA-PLUM 7 25-Apr-23 CHECKED & SIGNED
000118 18261176 000934 00703 DNC-6526450 ADAR ELECTRICAL MATERIALS CO LTD. M228 SA-ELECT 2 26-Apr-23 00677 CHECKED & SIGNED
000119 17472297 1260 993 23030000073 SAFANA UNITED COMPANY M228 SA-PLUM 1 26-Apr-23 00684 CHECKED & SIGNED
000120 19340933 CIVIL-54 CIVIL-54 CS231106/4757 BEST DEAL TRADING EST M228 SA-PLUM 2 26-Apr-23 AHMED ISSUED ON SITE
000121 193404934 ELEC-35 ELEC-35 T175000421602/1605/SI43246 NESTO/AYUB TRADING COMPANY/POWER CNTRL M228 SA-ELECT 9 26-Apr-23 AHMED ISSUED ON SITE
000122 MECH-42 MECH-42 001221 1396 SHROOQ AL BILAD TRADING CO M228 SA-PLUM 2 27-Apr-23 00686 CHECKED & SIGNED

BAHRAIN SIDE
SAFARI REIMBURSABLE DELIVERY NOTE MONTH OF APRIL 2023
S/N DEL SERIAL# INVOICE WO# SR# MR# PR# PROJET CODE DEPARTMENT LINE ITEM DATE OF ARRIVAL ISSUANCE TRANSACTION SERIAL# OLIVE ARABIA STATUS
1 000045 CS3/23-05123 WO18951281 BH-MECH-494 BH-MECH-494 M228 MECH 1 4/3/2023 104 INFORMED TO OLIVE
2 000046 ICS-INV-14376-2023 WO19019946 BH-MECH-500 BH-MECH-500 M228 MECH 1 4/11/2023 109 INFORMED TO OLIVE
3 000047 CH-51044/23 STP-CHEMICAL stock BH-STORE-010(B) BH-STORE-010(B) M228 Store Stock 2 4/11/2023 INFORMED TO OLIVE
4 000048 21887 WO19058071 BH-CIV-254 BH-CIV-254 M228 CIV 1 4/18/2023 121 INFORMED TO OLIVE
5 000049 ISR-23-03177 WO16795033 BH-ELEC-153 BH-ELEC-153 M228 ELEC 1 4/13/2023 INFORMED TO OLIVE
6 000050 SINV76036915 Custodial stock BH-STORE-011B BH-STORE-011B M227 Store Stock 4 4/20/2023 INFORMED TO OLIVE
7 000051 RHB-SI00008393 Custodial stock BH-STORE-011A BH-STORE-011A M227 Store Stock 5 4/20/2023 INFORMED TO OLIVE
8 000052 RHB-SI00008426 Custodial stock BH-STORE-011A BH-STORE-011A M227 Store Stock 1 4/22/2023 INFORMED TO OLIVE
9 000053 CM-095968 WO19166097 BH-CIV-262 BH-CIV-262 M228 CIV 1 4/29/2023 126 INFORMED TO OLIVE
10 000054 PDC-22-1601060 WO#15102436 BH-195 BH-195 M228 ELEC 1 4/20/2023 122 INFORMED TO OLIVE
WO17472196 BH-CIV-104 BH-CIV-104
WO17323369 BH-CIV-177 BH-CIV-177
11 000055 CM-093626 WO17334735 BH-CIV-178 BH-CIV-178 M228 CIV 1 4/27/2023 INFORMED TO OLIVE
WO17334737 BH-CIV-186 BH-CIV-186
WO16579326
CM-093627 WO16691354 BH-CIV-183 BH-CIV-183 M228 CIV 1 4/27/2023 INFORMED TO OLIVE
WO16784116 BH-CIV-129 BH-CIV-129
WO16786344 BH-CIV-134 BH-CIV-134
WO16794793 BH-CIV-138 BH-CIV-138
WO16953425 BH-CIV-151 BH-CIV-151
WO16953525 BH-CIV-152 BH-CIV-152
WO17042833 BH-CIV-156 BH-CIV-156
WO17042838 BH-CIV-168 BH-CIV-168
13 000056 WO17042863 BH-CIV-176 BH-CIV-176 BH-
WO17250644 BH-CIV-183 CIV-183
WO17303291
WO17278010
WO17278040
WO17278014
WO17278037
WO17278039

WO17492845 INFORMED TO OLIVE


14 000057 1600239674 WO17492865 BH-MECH-359A BH-MECH-359A M228 MECH 1 4/30/2023 127

15 000058

Report Ref : KFCA-SAFOM-M228-MMR-16-23 Page 49


King Fahd Causeway FM Services Contract (M228)

d. APRIL 2023 WAREHOUSE ISSUANCE DETAILS – SAUDI SIDE


APRIL 2023 ISSUANCE DETAILS
S/N SERIAL# WO# SR DEPARTMENT LINE ITEM REPORT ORDER DATE DATE ISSUED MR# PR# STATUS REMARKS
1 00591 18954430 SA-CIVL 1 28-Mar-23 01-Apr-23 STORE ISSUE
2 00592 19000160 SA-CIVL 1 01-Apr-23 01-Apr-23 STORE ISSUE
3 00593 19000164 SA-ELEC 2 01-Apr-23 01-Apr-23 STORE ISSUE
4 00594 19000165 SA-CIVL 1 01-Apr-23 01-Apr-23 STORE ISSUE
5 00595 19000167 SA-HVAC 7 01-Apr-23 01-Apr-23 STORE ISSUE
6 00596 19013742 SA-PLUM 3 01-Apr-23 02-Apr-23 STORE ISSUE
7 00597 19019821 SA-PLUM 7 01-Apr-23 02-Apr-23 STORE ISSUE
8 00598 19031654 SA-CIVL 1 03-Apr-23 03-Apr-23 STORE ISSUE
9 00599 18973840 SA-ELEC 4 03-Apr-23 03-Apr-23 STORE ISSUE
10 00600 19019942 SA-CIVL 3 03-Apr-23 03-Apr-23 STORE ISSUE
11 00601 19031845 SA-HVAC 2 03-Apr-23 03-Apr-23 STORE ISSUE
12 00602 19031846 SA-MECH 1 03-Apr-23 03-Apr-23 STORE ISSUE
13 00603 17472297 SA-MECH 1 26-Mar-23 26-Mar-23 001260 00933 DELIVER ISSUED
14 00604 19046692 SA-HVAC 1 04-Apr-23 04-Apr-23 STORE ISSUE
15 00605 19019948 SA-PLUM 6 04-Apr-23 05-Apr-23 MECH-45 DELIVER ISSUED
16 00606 18669343 SA-MECH 1 05-Apr-23 05-Apr-23 STORE ISSUE
17 00607 19046705 SA-ELEC 2 05-Apr-23 05-Apr-23 STORE ISSUE
18 00608 19046699 SA-ELEC 8 05-Apr-23 05-Apr-23 STORE ISSUE
19 00609 19046703 SA-ELEC 1 05-Apr-23 05-Apr-23 STORE ISSUE
20 00610 19046671 SA-CIVL 1 05-Apr-23 05-Apr-23 STORE ISSUE
21 00611 19058040 SA-CIVL 2 05-Apr-23 05-Apr-23 STORE ISSUE
22 00612 1909950 SA-CIVL 1 05-Apr-23 05-Apr-23 STORE ISSUE
23 00613 18627761 INSP-8 3 05-Apr-23 06-Apr-23 INSP-8 INSP-8 DELIVER ISSUED
24 00614 17455406 SA-CIVL 1 05-Apr-23 06-Apr-23 001236 000969 DELIVER ISSUED
25 00615 17465883 SA-CIVL 1 05-Apr-23 06-Apr-23 001253 000986 DELIVER ISSUED
26 00616 17472296 SA-ELEC 1 05-Apr-23 06-Apr-23 000991 001258 DELIVER ISSUED
27 00617 17472350 SA-MECH 1 05-Apr-23 06-Apr-23 00994 001261 DELIVER ISSUED
28 00618 16784337 SA-MECH 1 05-Apr-23 06-Apr-23 001086 00825 DELIVER ISSUED
29 00619 17094092 SA-MECH 1 05-Apr-23 06-Apr-23 001155 000904 DELIVER ISSUED
30 00620 19072245 SA-PLUM 6 05-Apr-23 06-Apr-23 STORE ISSUE
31 00621 16794804 SA-MECH 3 06-Apr-23 06-Apr-23 001089 000828 DELIVER ISSUED
32 00622 16579272 SA-ELEC 1 06-Apr-23 06-Apr-23 000998 000838 DELIVER ISSUED
33 00623 19108248 SA-CIVL 1 09-Apr-23 09-Apr-23 STORE ISSUE
34 00624 19100263 SA-MECH 5 08-Apr-23 10-Apr-23 STORE ISSUE
35 00625 19119715 SA-PLUM 4 10-Apr-23 10-Apr-23 STORE ISSUE
36 00626 19109977 SA-CIVL 1 10-Apr-23 10-Apr-23 STORE ISSUE
37 00627 18836294 SA-CIVL 1 18-Mar-23 11-Apr-23 STORE ISSUE
38 00628 19000159 SA-CIVL 1 01-Apr-23 11-Apr-23 STORE ISSUE
39 00629 17999684 SA-CIVL 1 25-Jan-23 11-Apr-23 STORE ISSUE
40 00630 17748004 SA-CIVL 1 10-Jan-23 11-Apr-23 STORE ISSUE
41 00631 18853799 SA-CIVL 1 20-Mar-23 11-Apr-23 STORE ISSUE
42 00632 19058042 SA-CIVL 1 05-Apr-23 11-Apr-23 STORE ISSUE CANCELLED
43 00633 19100218 SA-INSP 1 08-Apr-23 11-Apr-23 STORE ISSUE
44 00634 19144262 SA-INSP 1 08-Apr-23 11-Apr-23 STORE ISSUE
45 00635 19058042 SA-CIVL 1 05-Apr-23 11-Apr-23 STORE ISSUE
46 00636 19144449 SA-CIVL 1 11-Apr-23 11-Apr-23 STORE ISSUE
47 00637 19144446 SA-CIVL 2 11-Apr-23 11-Apr-23 STORE ISSUE
48 00638 19144424 SA-CIVL 1 11-Apr-23 11-Apr-23 STORE ISSUE
49 00639 19144428 SA-ELEC 3 11-Apr-23 11-Apr-23 STORE ISSUE
50 00640 18655029 SA-INSP 4 06-Mar-23 12-Apr-23 ELEC-33 ELEC-33 DELIVER ISSUED
51 00641 17272907 SA-CIVL 1 13-Apr-23 13-Apr-23 STORE ISSUE
52 00642 19144414 SA-MECH 3 11-Apr-23 15-Apr-23 STORE ISSUE
53 00643 19194352 SA-MECH 1 15-Apr-23 15-Apr-23 STORE ISSUE
54 00644 1864439 SA-PLUM 4 15-Apr-23 15-Apr-23 STORE ISSUE
55 00645 19194384 SA-CIVL 1 15-Apr-23 15-Apr-23 STORE ISSUE
56 00646 19208039 SA-CIVL 1 16-Apr-23 16-Apr-23 STORE ISSUE
57 00647 19166135 SA-CIVL 1 16-Apr-23 16-Apr-23 STORE ISSUE
58 00648 19166090 SA-MECH 2 13-Apr-23 16-Apr-23 STORE ISSUE
59 00649 19166146 SA-MECH 2 16-Apr-23 16-Apr-23 STORE ISSUE
60 00650 17334874 SA-CIVL 1 16-Apr-23 16-Apr-23 STORE ISSUE
61 00651 19194378 SA-PLUM 2 16-Apr-23 17-Apr-23 STORE ISSUE
62 00652 19240056 SA-CIVL 1 17-Apr-23 17-Apr-23 STORE ISSUE
63 00653 19240055 SA-CIVL 1 17-Apr-23 17-Apr-23 STORE ISSUE
64 00654 18240023 SA-PLUM 1 17-Apr-23 17-Apr-23 STORE ISSUE
65 00655 STOCK ORDER SA-RO 2 17-Apr-23 18-Apr-23 MECH-29 001199 DELIVER ISSUED
66 00656 19119723 SA-MECH 4 18-Apr-23 18-Apr-23 MECH-51 MECH-51 DELIVER ISSUED
67 00657 14759200 SA-ELECT 1 18-Apr-23 18-Apr-23 000334 000315 DELIVER ISSUED
68 00658 19100218 SA-INSP 1 18-Apr-23 18-Apr-23 INSP-9 INSP-9 DELIVER ISSUED
69 00659 19261065 SA-CIVL 1 19-Apr-23 19-Apr-23 STORE ISSUE
70 00660 19261006 SA-CIVL 2 19-Apr-23 19-Apr-23 STORE ISSUE
71 00661 19144442 SA-PLUM 1 11-Apr-23 20-Apr-23 STORE ISSUE
72 00662 19261075 SA-PLUM 5 19-Apr-23 20-Apr-23 STORE ISSUE
73 00663 19337633 SA-CIVL 1 20-Apr-23 20-Apr-23 STORE ISSUE
74 00664 19240053 SA-ELEC 2 17-Apr-23 23-Apr-23 STORE ISSUE
75 00665 19274594 SA-ELEC 3 20-Apr-23 23-Apr-23 STORE ISSUE
76 00666 19240054 SA-ELEC 4 20-Apr-23 23-Apr-23 STORE ISSUE
77 00667 19322485 SA-CIVL 1 23-Apr-23 23-Apr-23 STORE ISSUE
78 00668 19322490 SA-CIVL 1 23-Apr-23 23-Apr-23 STORE ISSUE
79 00669 19322493 SA-CIVL 1 23-Apr-23 23-Apr-23 STORE ISSUE
80 00670 19301850 SA-MECH 1 22-Apr-23 24-Apr-23 STORE ISSUE
81 00671 STOCK ORDER SA-MECH STP 3 24-Apr-23 24-Apr-23 MECH-29 001199 DELIVER ISSUED
82 00672 19325919 SA-CIVL 1 24-Apr-23 24-Apr-23 STORE ISSUE
83 00673 19325921 SA-MECH 3 24-Apr-23 24-Apr-23 STORE ISSUE
84 00674 19325922 SA-CIVL 1 24-Apr-23 24-Apr-23 STORE ISSUE
85 00675 19337574 SA-CIVL 1 25-Apr-23 25-Apr-23 STORE ISSUE
86 00676 19337630 SA-MECH 1 25-Apr-23 25-Apr-23 STORE ISSUE
87 00677 18261176 SA-ELEC 1 26-Apr-23 26-Apr-23 000934 00703 DELIVER ISSUED
88 00678 19338332 SA-CIVIL 2 25-Apr-23 26-Apr-23 STORE ISSUE
89 00679 19340906 SA-PLUM 5 26-Apr-23 26-Apr-23 STORE ISSUE
90 00680 19340906 SA-PLUM 4 26-Apr-23 26-Apr-23 STORE ISSUE
91 00681 19330392 SA-MECH 2 26-Apr-23 26-Apr-23 STORE ISSUE
92 00682 19340927 SA-MECH 1 26-Apr-23 26-Apr-23 STORE ISSUE
93 00683 19325921 SA-MECH 4 26-Apr-23 26-Apr-23 STORE ISSUE
94 00684 17472297 SA-PLUM 1 26-Apr-23 26-Apr-23 001260 00993 DELIVER ISSUED
95 00685 19338331 SA-MECH 1 26-Apr-23 27-Apr-23 STORE ISSUE
96 00686 MECH-42 SA-MECH 2 26-Apr-23 26-Apr-23 MECH-42 001221 DELIVER ISSUED
97 00687 19390730 SA-MECH 1 29-Apr-23 29-Apr-23 STORE ISSUE
98 00688 19341565 SA-CIVIL 1 29-Apr-23 29-Apr-23 STORE ISSUE
99 00689 19340930 SA-INSP 2 29-Apr-23 29-Apr-23 STORE ISSUE
100 00690 19390815 SA-MECH 1 29-Apr-23 29-Apr-23 STORE ISSUE
101 00691 19393065 SA-CIVIL 2 30-Apr-23 30-Apr-23 STORE ISSUE
102 00692 19393214 SA-MECH 1 30-Apr-23 30-Apr-23 STORE ISSUE

Report Ref : KFCA-SAFOM-M228-MMR-16-23 Page 50


King Fahd Causeway FM Services Contract (M228)

BAHRAIN SIDE
APRIL 2023 ISSUANCE DETAILS
S/N SERIAL# WO# DEPARTMENT LINE ITEM REPORT ORDER DATE DATE ISSUED MR# PR# REMARKS
1 000102 WO18625488 ELEC 1 4/3/2023 4/3/2023 ELEC-286 BA STORE
2 000103 WO18951281 MECH 1 4/4/2023 4/4/2023 MECH-494 BA STORE
000104 WO18951281 MECH 1 4/3/2023 4/3/2023 BH-MECH-494 Purched/ Delivered
3 000105 WO18669371 CIV 1 4/6/2023 4/6/2023 CIV-233 BA STORE
4 000106 WO18930582 MECH 1 4/6/2023 4/6/2023 MECH-487 BA STORE
5 000107 SR1295058 MECH 1 4/6/2023 4/6/2023 MECH-501 BA STORE
WO19046700
WO19046697
6 000108 WO19046702 MECH 1 4/8/2023 4/8/2023 MECH-502 BA STORE
000109 WO19019946 MECH 1 4/11/2023 4/11/2023 BH-MECH-500 Purched/ Delivered
7 000110 WO18242628 MECH 1 4/12/2023 4/12/2023 MECH-413 BA STORE
8 000111 WO18776989 MECH 1 4/12/2023 4/12/2023 MECH-495 BA STORE
9 000112 WO18776972 MECH 3 4/12/2023 4/12/2023 MECH-496 BA STORE
000113 WO16795033 ELEC 1 4/13/2023 4/13/2023 BH-ELEC-153 Purched/ Delivered
10 000114 WO19058081 ELEC 1 4/5/2023 4/25/2023 ELEC-288 BA STORE
11 000115 WO18873234 ELEC 1 4/9/2023 4/25/2023 ELEC-289 BA STORE
12 000116 WO19144268 MECH 1 4/16/2023 4/17/2023 MECH-508 BA STORE
13 000117 WO19144263 MECH 1 4/16/2023 4/17/2023 MECH-509 BA STORE
14 000118 WO19240021 CIV 1 4/17/2023 4/17/2023 CIV-266 BA STORE
15 000119 SR1296747 MECH 1 4/18/2023 4/18/2023 MECH-514 BA STORE
16 000120 WO19152502 MECH 4 4/18/2023 4/18/2023 MECH-511 BA STORE
17 000121 WO19058071 CIV 1 4/18/2023 4/18/2023 CIV-254 Purched/ Delivered
18 000122 WO15102436 MECH 1 4/25/2023 4/25/2023 BH-195 Purched/ Delivered
19 000123 WO19330400 ELEC 1 4/25/2023 4/25/2023 ELEC-304 BA STORE
20 000124 WO19166094 MECH 4 4/26/2023 4/26/2023 MECH-518 BA STORE
21 000125 SR1298022 ELEC 1 4/27/2023 4/27/2023 ELEC-313 BA STORE
22 000126 WO19166097 CIV 1 4/30/2023 4/30/2023 CIV-262 BA STORE
23 000127 1600239674 MECH 1 4/30/2023 4/30/2023 MECH-359A Purched/ Delivered
24 000128

MONTHLY REPORT FOR ISSUED MATERIALS


29 APRIL 2023

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30

RECEIVED
Line # Material Description PREVIOUS
STOCK IN Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun
APRIL 2023 TOTAL MONTH CURRENT
ISSUED BALANCE BALANCE MR #

COMPRESSOR,RECIPROCATING,1PH,208- MECH-487 MECH-496


4
230V,60HZ,4LEGS,W/RUBBER GROMMETS,110LRA,M.N:
1 2 1 4 0 MECH-495 & MECH-511
AWZ5538EXN,TECUMSEH ~ ( For Split AC 3ton's Al Zamil Model#
130206010102001 KRC36CDSHJCW) 4

15 40 300 260 MECH-518


TAPE,PIPE WRAPPING,PVC,SINGLE SIDE RUBBER ADHESIVE,2"
150511030400002 W,THICK. 0.2MM,WATERPROOF,BLACK COLOR,WONDER,TAIWAN ~ 40

18 3 3 0 MECH-518
REFRIGERATION PANCAKE TUBE COPPER 1/4"DIA. X 50'L /ROLL X
120601020000002 0.030" WALL THICK. M.N: D 04050 MUELLER 3

20 3 3 0 MECH-518
REFRIGERATION PANCAKE TUBE,COPPER ,1/2" DIA X 0.032” WALL
120601020000005 THICK X 50FT (15M) L/ROLL,MUELLER,USA ~ 3

42 1 7 6 MECH-496
ROD BRAZING,STAY-SILV5,SILVER BRAZING ALLOY,0.05" X 1/8" X
150208010000002 19.7",28PC S/PACKAGE, P.N: 41035 OR 5620F1, HARRIS ~ 1

43 6 50 44 MECH-496

150512020200001 WELDING ROD,BRONZE-COPPER ALLOY,1/8"DIA. X 1MTR L 6

MECH-502 & MECH-508 &


44 5 2 7 20 6 MECH-511
VALVE,ANGLE,BRASS,CHROME FINISH,1/2" X 1/2",NEUTRAL
120209050100001 HANDLE,M.N: P-IX 762/IA,P.N: 22 940 000,GROHE GERMANY ~ 14

45 1 4 3 MECH-494
VALVE,BALL,TAP TYPE MALE THREADED,CHROME,
120505010300002 1/2",BUGATTI,ITALY 1

62 1 1 5 3 MECH-501 MECH-413
WATER HEATER,ELECTRICAL,VERTICAL,WHITE,220-
140105010000008 240V,1500W,80LTR,SKU#: 140111010105011, SAUDI CERAMICS 2

63 1 6 12 5 MECH-509 & MECH-511

150103030000001 LAVATORY-MOUNTED SOAP DISPENSER,MODEL: B-822,BOBRICK ~ 7

SILICON SEALANT, ACETIC, 280ML/TUBE, BLACK, GENERAL PURPOSE,


123 150505000000002
EXPIRY DATE MINIMUM 6MONTH, SL212, PATTEX, GERMANY
10 53 43 CIV-266

10

129 110101050000001 WD-40 OIL PENETRATING,330ML/CAN 5 3 3 15 4 CIV-233(5) ELEC(289&288)

11

133 MULTI OUTLET EXTENSION CORD,13A SAFETY FUSE BUTTON,MAX. 1 70 69 ELEC-313


3250W,4 SOCKETS,5M CORD LENGTH,PREMIUM-LINE FB,PRLS 04 GB
140201040000004 V2,BRENNENSTUHL,GERMANY 1

135 CABLE,CU/PVC/PVC 2 13 11 MECH-518


FLEXIBLE,3CORE,2.5MM2,100YARDS/92MTR/ROLL,ROYAL,RIYADH
140202030100002 CABLES,KSA ~ 2

SPLICING CABLE KIT,LOW VOLTAGE,CABLE CONDUCTOR,CABLE OD


137
14MM-32MM, SIZE 16MM2-25MM2 ,VOLTAGE RATING 1.1KV,WITH
2 2 0 ELEC-286

POLYURETHANE RESIN,SCOTCHCAST,(EXPIRY DTATE NOT LESS THAN


140203080100002 24 MONTHS),90A-02,3M CORPORATION ~ 2

139 SPLICING CABLE KIT,LOW VOLTAGE CABLE,CABLE OD:45-70MM 2 2 0 ELEC-286


MAX,SIZE: 120MM2-150MM2,WITH POLYURETHANE,(EXPIRY DATE
140203080100003 NOT LESS THAN 24 MONTHS),90A-06, 3M CORPOTARION ~ 2

179 CABLE TIE,PVC,200MM L X 2.5MM W,100PCS/PKT,FS 200 A-C,3M 3 98 95 ELEC-304


140201020000002 SCOTCHFLEX,THAILAND ~ 3

187 12 170 158 MECH-511

140702030201006 BATTERY ALKALINE 1.5V AAA ROUND SHAPE DURACELL 12


258 42 42
150514000000001 CEMENT, RESISTANT, GRAY, 50KG, KSA 42 42DEL 0
259 15 15
150508050200001 POLYTHENE SHEET,500 MICRON,15MTR L X 3MTR W/ROLL ~ 0

263 35 15 MECH-514
110802010000003 SODIUM HYPOCHLORITE- DRUM 20LTR 35 20 20

268 20 20
110802010000025 ANTI FOAM (FOAMTROL AF 1440 E ) 17KG 20 20DEL 0

269 2 2
110802010000026 DAP / GRANULAR 50 KG-18-46-0 2 20DEL 0

270 LACQUER THINNER, 3.6 LITERS/GAL , NATIONAL PROTECTIVE 24 22 CIV-262


110700000000007 COATINGS, NATIONAL PAINTS 22 22DEL 2DEL 2 2

Report Ref : KFCA-SAFOM-M228-MMR-16-23 Page 51


King Fahd Causeway FM Services Contract (M228)

13. APPENDICES: (ADDITIONAL WORK OUTSIDE SCOPE OF CONTRACT)


❖ UNDERTAKING OF ADDITIONAL WORK AT SAUDI SIDE & BAHRAIN SIDE
Re-installation of Two (2) units split A/C that dismantled by SRACO company @ M228-SA-ZN4-SICD
1
Immigration Cabin Departure-WO19000167

MANPOWER REQUIREMENT Quantity Hours TOTAL UNIT COST TOTAL AMOUNT

SUPERVISOR 1 6 6 112.5 675

HVAC TECHNICIAN 3 6 18 23.75 427.5

SUBTOTAL
1,102.50
Expansion of the entrance to the parking spaces of the private track entrance at M228-SA-ZN3 PARKING VIP
2
ZONE 3 - WO19100226

MANPOWER REQUIREMENT Quantity Hours TOTAL UNIT COST TOTAL AMOUNT

SUPERVISOR 1 4 4 112.5 450

CIVIL TECHNICIAN 6 4 24 23.75 570

PAINTING TECHNICIAN 2 4 8 23.75 190

SUBTOTAL
1,210.00
Provide Power Supply to the Screen TV at Main Toll Gate at M228-SA-ZN1-SAG2 GATE NO.2 BRANCH TOLL
3
GATE- WO19144428

MANPOWER REQUIREMENT Quantity Hours TOTAL UNIT COST TOTAL AMOUNT

SUPERVISOR 1 0.75 0.75 112.5 84.375

ELECTRICAL TECHNICIAN 2 0.75 1.5 23.75 35.625

SUBTOTAL
120.00

Report Ref : KFCA-SAFOM-M228-MMR-16-23 Page 52


King Fahd Causeway FM Services Contract (M228)

4 Installation of 2 units cladding at M228-BA-ZN2-BA7C Gate Coast Guard New Building - WO18337415

MANPOWER REQUIREMENT Quantity Hours TOTAL UNIT COST TOTAL AMOUNT

SUPERVISOR 1 2 2 112.5 225

CARPENTRY TECHNICIAN 2 2 4 23.75 95

SUBTOTAL
320.00
Installation of Security Fence from shipping gate to cabin Arrival # 2 at M228-SA-ZN3 CUSTOM & VIP AREA-ZONE SA3-
5
WO19261000

MANPOWER REQUIREMENT Quantity Hours TOTAL UNIT COST TOTAL AMOUNT

SUPERVISOR 1 3 3 112.5 337.5

CIVIL TECHNICIAN 6 7 42 23.75 997.5

WELDING TECHNICIAN 3 7 21 22.5 472.5

Heavy Equipment Operator 1 3 3 31.25 93.75

SUBTOTAL
1,901.25

6 Leaking in the wall from the toilet at M228-SA-ZN3-S124 CUSTOM SECURITY BUILDING NEW-124 - WO19323422

MANPOWER REQUIREMENT Quantity Hours TOTAL UNIT COST TOTAL AMOUNT

SUPERVISOR 1 1 1 112.5 112.5

Plumber Technician 1 1 1 23.75 23.75

SUBTOTAL 136.25
7 AC Issue at M228-SA-ZN4-SA03 CUSTOM DEPARTMENT- WO19323401

MANPOWER REQUIREMENT Quantity Hours TOTAL UNIT COST TOTAL AMOUNT

SUPERVISOR 1 1.5 1.5 112.5 168.75


HVAC Technician 2 1.5 3 23.75 71.25

SUBTOTAL
240.00

Report Ref : KFCA-SAFOM-M228-MMR-16-23 Page 53


King Fahd Causeway FM Services Contract (M228)

8 Paint floor lines at the cabins at M228-SA-ZN4-SICD New immigration Departure Cabin - WO19325922

MANPOWER REQUIREMENT Quantity Hours TOTAL UNIT COST TOTAL AMOUNT

SUPERVISOR 1 1.5 1.5 112.5 168.75

Painting Technician 2 1.5 3 23.75 71.25

SUBTOTAL
240.00

9 Fabrication of parking signpost (2 ea.) at M228-SA-ZN2-SA01 KFCA Administration Building Parking - WO19341702

MANPOWER REQUIREMENT Quantity Hours TOTAL UNIT COST TOTAL AMOUNT

SUPERVISOR 1 2 2 112.5 225

WELDER 2 2 4 22.5 90

SUBTOTAL
315.00

10 Installation Split Type A/C Unit @ M228-SA-ZN4-SA9B CLEARANCE AGENTS BUILDING- WO15401990

MANPOWER REQUIREMENT Quantity Hours TOTAL UNIT COST TOTAL AMOUNT

SUPERVISOR 1 6 6 112.5 675

HVAC Technician 2 6 12 23.75 285

SUBTOTAL
960.00

OUT OF SCOPE WORK TOTAL LABOR COST


6,545.00

Report Ref : KFCA-SAFOM-M228-MMR-16-23 Page 54


King Fahd Causeway FM Services Contract (M228)

Operation & Maintenance Inspection Report

Appendix 1
INSPECTION REPORT

Report Ref : KFCA-SAFOM-M228-MMR-16-23 Page 55


King Fahd Causeway FM Services Contract (M228)

Ref:

Date: May 1, 2023

To : Eng’r. Fahad Adel Yusef


KING FAHAD CAUSEWAY AUTHORITY

INSPECTION MONTHLY REPORT


King Fahd Causeway
APRIL 2023

Please find attached Monthly Inspection Report of King Fahd Causeway for APRIL 2023

Thank you.

Eng’r. Horacio Dayag Jr.

SAFARI INSPECTION DEPARTMENT

cc: Trevor Wighton


SAFARI PROJECT MANAGER

Report Ref : KFCA-SAFOM-M228-MMR-16-23 Page 56


King Fahd Causeway FM Services Contract (M228)

a. Bridge Inspection Technical Information:

Bridges and its components

Bridge Bridge Bridge Bridge


Bridge No.3
No. Description No.1 No. 2 No.4. No.5
KSA
KSA KSA Bahrain Bahrain
1 Total length 934m 2034m 5194m 3334m 934m
2 Total columns 36 80 200 132 36
3 Circular trusses (columns) diameter 3.5
0 0 24 0 0
meter
4 Trusses (columns) rectangular shaped dia.
3.5x4.5meter
5 Navigation main hatch trusses (rectangular
0 0 8 0 0
shape)
6 The height of navigation hatches above
15.5m 5m 32.5 (28)m 15.5m 15.5m
sea surface
7 Trusses (columns) bridges beginnings 2-4 2-4 2-4 2-4 2-4
8 The bonding bases between the
0 0 20 0 0
submerged struts
9 The under bases submerged trusses
0 0 80 0 0
(columns)
10 Submerged truss-bearing bases 0 0 0 0 18
11 Girders (bridges) 38 82 196 134 38
12 Based Girders 18 40 96 66 18
13 Suspended girders (beam) 20 42 100 68 20
14 Total expansion joints:
a. Distance control spring 252 540 1332 828 252
b. Pressure spring 144 288 684 432 144
c. Moving spring 144 288 684 432 144
15 Vibration absorption spring:
d. Connections between beams 14 136 316 224 64
e. Struts heads 72 160 264 264 72
f. Marine main hatch truss heads 0 0 8 0 0
16 Ball bearing at expansion joints 16 32 76 48 16

Embankments:

No. Description Length Side (Saudi or Bahraini)


1 Embankment No. 1 668 meters Saudi
2 Embankment No. 2 891 meters Saudi
3 Embankment No. 3 921 meters Saudi
4 Embankment No. 4 (Border Island) 2387 meters Two sides
5 Embankment No. 5 3636 meters Bahraini
6 Um Al Nasaan Island Embankment 1500 meters Bahraini
7 Embankment No. 6 666 meters Bahraini
8 Embankment No. 7 1901 meter Bahraini

Report Ref : KFCA-SAFOM-M228-MMR-16-23 Page 57


King Fahd Causeway FM Services Contract (M228)

SAUDI SIDE

Ln Activities Location Status

RWA 008 Inspection of concrete superstructure, edge beam, expansion


1 joints, pavement bitumen, steel drainage & guardrail all above Flyover SA SA FO-1 Completed
FO-1 N&S.
2 RWE003 Inspection of slope protection @ EMB 02 south side EMB 2S Completed
PM WO18575764.
3 SA-13 Completed
Inspection Maintenance bridge Equipment Moog#3 PN9575.
PM WO17993248. Completed
4 SA-13
Inspection Maintenance Bridge Equipment Moog#5 PN103695.
RWB 002 Inspection Piers, Decks and Elastomeric above pier @ Aziziya Completed
5 AZ FO
Fiy over

6 RWE003 Inspection of Bitumen / Guardrail N&S @ EMB 04 EMB 4 N&S Completed

PM WO18617529.
7 SA-13 Completed
Inspection Maintenance bridge Equipment Moog#3 PN9575.

PM WO179932650. Completed
8 SA-13
Inspection Maintenance Bridge Equipment Moog#5 PN103695.

PM: WO18195396. RI010 Inspection of Girder Outside/Edge Completed


9 B3S OG66to G101
beam/Cont./bearings /expansion joints at B3S (G66 to G101)

RWA 007 Inspection of Expansion Joint M1 & M2, Pavement, Bitumen,


10 AZ FO Completed
Steel, drainpipes, and Guardrail N&S Q1-Q4

PM WO18626060.
11 SA-13
Inspection Maintenance bridge Equipment Moog#3 PN9575. Completed

PM WO17993293.
12 SA-13 Completed
Inspection Maintenance Bridge Equipment Moog#5 PN103695.
RWA 008 Inspection of Concrete superstructure, Edge beam, Expansion
13 joint M1 to M6, Pavement bitumen, steel, drain pipes, guardrail @ FO-1 SA FO -1 Completed
N&S.
PM WO18636398.
14 SA-13
Inspection Maintenance bridge Equipment Moog#3 PN9575. Completed

PM WO17993310.
15 SA-13 Completed
Inspection Maintenance Bridge Equipment Moog#5 PN103695.
RWB001 Inspection of concrete at abutments, Spherical bearings, steel
16 gangways near abutments, expansion joints at abutments & Security B1, B2&B3 N&S Completed
enclosures @ B1, B2,B3 N&S.
PM WO18652847.
17 SA-13 Completed
Inspection Maintenance bridge Equipment Moog#3 PN9575.

PM WO18652875.
18 SA-13 Completed
Inspection Maintenance Bridge Equipment Moog#5 PN103695.

Report Ref : KFCA-SAFOM-M228-MMR-16-23 Page 58


King Fahd Causeway FM Services Contract (M228)

Ln Activities
Location Status

RM WO 19072205 RWB003 Repair of concrete surface crack CONS-CR


19 SA FO-1 Deck 06 NS Completed
SA FLY OVER SA FO-1

20 RWB001 Visual Inspection of steel gangways on bridge 1, 2 &3 B1, B2 & B3 Completed

PM WO18667730.
21 SA-13
Inspection Maintenance bridge Equipment Moog#3 PN9575. Completed
PM WO19072205.
22 SA-13 Completed
Inspection Maintenance Bridge Equipment Moog#5 PN103695.
RM WO 19100218 Repair of concrete surface crack CONS-CR RWA07 @ AZ FO S EDS Q1
23 Completed
Aziziya fly over.
PM WO18685933. Inspection Maintenance bridge Equipment Moog#3
24 PN9575. SA-13
Completed
PM WO18652909. Inspection Maintenance
25 Bridge Equipment Moog#5 PN103695. SA-13 Completed

PM WO18707566.
26 SA-13
Completed
Inspection Maintenance bridge Equipment Moog#3 PN9575.
PM WO18652926.
27 SA-13 Completed
Inspection Maintenance Bridge Equipment Moog#5 PN103695.
28 RWA 5 & RWA 06 Repair of defects on Guardrail @ B1, B2&B3 N&S B1, B2&B3 N&S Completed

PM WO18719349.
29 SA-13
Completed
Inspection Maintenance bridge Equipment Moog#3 PN9575.
PM WO18652947.
30 SA-13 Completed
Inspection Maintenance Bridge Equipment Moog#5 PN103695.
PM WO18728827.
31 SA-13
Completed
Inspection Maintenance bridge Equipment Moog#3 PN9575.
PM WO18652964.
32 SA-13 Completed
Inspection Maintenance Bridge Equipment Moog#5 PN103695.
PM WO18737971.
33 SA-13
Completed
Inspection Maintenance bridge Equipment Moog#3 PN9575.
PM WO18652981. Inspection Maintenance Bridge
34 Equipment Moog#5 PN103695. SA-13 Completed

WO 18655029 CM Bridge inspection equipment maintenance Boat #3


35 SA-13 Completed
portable generator oil filter, fuel filter an air filter, 80 AH battery.
PM WO18748222.
36 SA-13
Completed
Inspection Maintenance bridge Equipment Moog#3 PN9575.

Report Ref : KFCA-SAFOM-M228-MMR-16-23 Page 59


King Fahd Causeway FM Services Contract (M228)

Activities
Ln Location Status

PM WO18652998.
37 SA-13 Completed
Inspection Maintenance Bridge Equipment Moog#5 PN103695.
RWA 4 Cleaning with high pressure and Inspection of expansion joint @
38 B1, B2&B3 N&S Completed
B1, B2&B3 N&S.
PM WO18769849.
39 SA-13
Completed
Inspection Maintenance bridge Equipment Moog#3 PN9575.
PM WO18653015.
40 SA-13 Completed
Inspection Maintenance Bridge Equipment Moog#5 PN103695.
B3N&S P101-P45 Completed P101 to
41 RB1 Inspection of Pile/Pier-Foundation Grid @ B3 N&S and MS-Grid # 45
MS-Grid # 45 P45
PM WO18796012.
42 SA-13
Completed
Inspection Maintenance bridge Equipment Moog#3 PN9575.
PM WO18653032.
43 SA-13 Completed
Inspection Maintenance Bridge Equipment Moog#5 PN103695.
PM: WO18195396. RI010 Inspection of Girder Outside/Edge beam/Cont.
44 B3S OG66 to G101 Completed
/bearings /expansion joints at B3S (G66 to G101)
PM WO18832866.
45 SA-13
Completed
Inspection Maintenance bridge Equipment Moog#3 PN9575.
PM WO18653053.
46 SA-13 Completed
Inspection Maintenance Bridge Equipment Moog#5 PN103695.
PM WO18841254.
47 SA-13
Completed
Inspection Maintenance bridge Equipment Moog#3 PN9575.
PM WO18653070.
48 SA-13 Completed
Inspection Maintenance Bridge Equipment Moog#5 PN103695.
RM WO 19261040 Rust removal and touch-up paint of rusted steel
49 SA-13 On-going
enclosure Boat #1 generator

WO19261039 Replacement of damaged lateral friction roller guide main


50 SA-13 Completed
platform for Moog#5.
PM WO18848776.
51 SA-13
Completed
Inspection Maintenance bridge Equipment Moog#3 PN9575.
PM WO18653087.
52 SA-13 Completed
Inspection Maintenance Bridge Equipment Moog#5 PN103695.
PM WO18863609.
53 SA-13
Completed
Inspection Maintenance bridge Equipment Moog#3 PN9575.

Report Ref : KFCA-SAFOM-M228-MMR-16-23 Page 60


King Fahd Causeway FM Services Contract (M228)

Activities
Ln Location Status

PM WO18653104.
54 SA-13 Completed
Inspection Maintenance Bridge Equipment Moog#5 PN103695.

RM WO19325916 RWB1Cleaning, Rust removal and touch up paint on


55 B3 GW-18 Completed
GANGWAY#18 at B3 N/S

RM WO 19100218 Repair of concrete surface crack CONS-CR RWA07 @ AZ FO S EDS Q1


56 Completed
Aziziya fly over.

PM WO18922698.
57 SA-13
Completed
Inspection Maintenance bridge Equipment Moog#3 PN9575.
PM WO18653159.
58 SA-13 Completed
Inspection Maintenance Bridge Equipment Moog#5 PN103695.

WO19337637 RWB002 Repair of concrete surface crack CONS-CR @


59 AZ FO P04 S Completed
Aziziya flyover.

PM WO18929119.
60 SA-13
Completed
Inspection Maintenance bridge Equipment Moog#3 PN9575.

PM WO18653176.
61 SA-13 Completed
Inspection Maintenance Bridge Equipment Moog#5 PN103695.

RM WO19340930 RWB1Cleaning, Rust removal and touch up paint on


62 B3 GW-17 Completed
GANGWAY#17 at B3 N/S

PM WO18933745.
63 SA-13
Completed
Inspection Maintenance bridge Equipment Moog#3 PN9575.
PM WO18653193.
64 SA-13 Completed
Inspection Maintenance Bridge Equipment Moog#5 PN103695.

RM WO19340930 RWB1Cleaning, Rust removal and touch up paint on


65 B3 GW-17 Ongoing
GANGWAY#17 at B3 N/S

WO19351481 RWB002 Repair of concrete surface crack CONS-CR @


66 AZ FO P05 N On-going
Aziziya flyover.

RM WO19340930 RWB1Cleaning, Rust removal and touch up paint on


67 B3 GW-17 Completed
GANGWAY#17 at B3 N/S

Report Ref : KFCA-SAFOM-M228-MMR-16-23 Page 61


King Fahd Causeway FM Services Contract (M228)

PM WO18967967.
68 SA-13
Completed
Inspection Maintenance bridge Equipment Moog#3 PN9575.
PM WO18653227.
69 SA-13 Completed
Inspection Maintenance Bridge Equipment Moog#5 PN103695.
PM WO18984177.
70 SA-13
Completed
Inspection Maintenance bridge Equipment Moog#3 PN9575.
PM WO18653244.
71 SA-13 Completed
Inspection Maintenance Bridge Equipment Moog#5 PN103695 .

On April 30 , 2023 site activities suspended @ 9:00 AM due to car traffic accident caused death of two of team members,
and the third fell into water( still missing).
Submitted By:

OSMAN AHMED ABUSINAINA


Section head SA, Inspection department

Report Ref : KFCA-SAFOM-M228-MMR-16-23 Page 62


King Fahd Causeway FM Services Contract (M228)

BAHRAIN SIDE
Monthly Report
PERIOD: APRIL 1-30, 2023

INSPECTION & REPAIR WORKS


In Loc WO/RM/PM Activities Status
Repair works outside girder as per inspection results deficiency, (under RI
011-RI 015, B4&B5, N&S);
*(Painting of PH12 up to Pier Connection & PH24) & (Cleaning of Pier
Connection &
PH25 up to PH28)-
COMPLETED
*(Painting the marking level of PH12 up to PH24)-COMPLETED
*(Repair of CONS-CS, Girder-outside, G12, G14, G16, G18, G20, G26)-
WO18211615 COMPLETED
1 B4S & *(Repair of Bearing elastomeric -Crack at HJ19-20N)-COMPLETED Completed
WO18104972 *(Repair of CONS-CH, Girder-outside, G13Q1, G14Q4)-COMPLETED
*(Cleaning of Expansion joint, EJ3, EJ4, EJ5)-COMPLETED
*(Cleaning & touch up painting of gangway, GW3, GW4, GW5)-COMPLETED

NOTE: B4S WO18211615 & WO18104972-SKIPPED THE PAINTING


WORKS OF
PIER HEAD & PIER CONNECTION, from (PH25S onwards) DUE TO
UNAVAILABILITY OF EPOXY PAINT; (JOTUN M (A&B) 20LTR/DR,
COL. YELLOW & JOTUN THINNER # 17)
Repair & painting of guardrail with defects as per inspection results
deficiency, (under RWA 012, Guardrail-outside & median);
2 B5N WO19019922 Completed
*(Repainting of guardrail with defects/scratched due to accident & curb stone
approached B5N).
-COMPLETED
Repair & painting of guardrail with defects as per inspection results
deficiency, (under RWA 012, Guardrail-outside & median);
3 B5S WO19019915 Completed
*(Repainting of guardrail with defects/scratched due to accident & curb stone
approached B5S).
-COMPLETED
4 BATG-S WO18636353 Inspection of pavement (Bitumen) under WO18027746 Completed
5 BATG-N WO18636368 Inspection of pavement (Bitumen) under WO18027761 Completed
6 E5 WO18636383 Inspection of pavement (Bitumen) under WO18441886, WO18027686 Completed
Inspection of Guardrails/Crash Barrier at Embankment, E6 S&N under
7 E6 WO18652802 Completed
WO18027791
Inspection of Guardrails/Crash Barrier at Embankment, E7 S&N under
8 E7 WO18652817 Completed
WO18027806
Inspection of Guardrails/Crash Barrier at Embankment, UN, N under
9 UN WO18652832 Completed
WO18027821
10 B4S WO18573773 Preventive Maintenance of Navigation Lights Completed
11 B4S WO18573761 Preventive Maintenance of Navigation Lights Completed
Painting of guardrail-scratched cause by accident as per inspection results
deficiency, (under RWE 005, Guardrail/Crash Barrier-outside & median);
12 UN-Emb WO19100270 Completed
*(Painting of guardrail-scratched cause by accident & curb stone approached
over pass-UN-S)
Report Ref : KFCA-SAFOM-M228-MMR-16-23 Page 63
King Fahd Causeway FM Services Contract (M228)

In Loc WO/RM/PM Activities Status


Painting of guardrail-scratched cause by accident as per inspection results
deficiency, (under RWE 005, Guardrail/Crash Barrier-outside & median);
13 UN-Emb WO19100271 Completed
*(Painting of guardrail-scratched cause by accident & curb stone approached
over pass-UN-N)
14 BATG-S WO18728797 Inspection of guardrails/crash barrier at BATG-S, under WO18027836 Completed
15 BATG-N WO18728782 Inspection of guardrails/crash barrier at BATG-N, under WO18027851 Completed
Inspection of guardrail/crash barrier at embankment, E5, under WO18027866
16 E5 WO18728812 Completed
& WO18027776
17 E6 WO18737941 Inspection of slope protection at E6, under WO18027881 Completed
18 E7 WO18737956 Inspection of slope protection at E7, under WO18027896 Completed
Inspection Equipment Maintenance Portable Generator for Boat #1
19 BA16 WO18719422 Completed
*(Painting of generator cover)-COMPLETED
Painting of guardrail-scratched under RWE 005, Guardrail/Crash Barrier-
outside & median);
20 E5-S WO19194370 Completed
*(Painting of guardrail-scratched cause by accident at Embankment, E5-S)-
COMPLETED
Painting of guardrail-scratched under RWE 005, Guardrail/Crash Barrier-
outside & median);
21 E5-N WO19194371 Completed
*(Painting of guardrail-scratched cause by accident at Embankment, E5-N)-
COMPLETED
Inspection of slope protection at UN, Embankment, RWE 006,
22 UN WO18841209 Completed
under WO18027911
Inspection of slope protection at BATG-S, RWE 006
23 BATG-S WO18841224 Completed
under WO18027926
Inspection of slope protection at BATG-S, RWE 006
24 BATG-N WO1884139 Completed
under WO18027941
B4&B5,S& PM for Expansion joint, Cleaning with air compressor, (EJ1-EJ12), N&S,
25 WO19261035 Completed
N (EJ1-EJ4), N&S
26 B4N WO17690570 Inspection of Pile/Pier, P2-67, RB 004-COMPLETED 15-3-2023 Completed
27 B4S WO17690582 Inspection of Pile/Pier, P2-67, RB 004-COMPLETED 15-3-2023 Completed
28 B5S&N WO19301924 PM for Expansion joint, Cleaning with air compressor, EJ1-EJ4. Completed
29 B5S&N WO19301925 PM for greasing of guardrail moving joint, (guardrail joint-outside & median) Completed
PM for greasing of guardrail moving joint; (guardrail joint-outside & median),
30 B4N WO19325868 Completed
B4N.
PM for greasing of guardrail moving joint; (guardrail joint-outside & median),
30 B4S WO19325871 Completed
B4S.
32 B4S WO19118341 Repair of girder-inside with deficiency-(CONS-CR>=0.20mm). Completed
33 B5S WO17690606 Inspection of Pile/Pier, P2-19, RB 004-COMPLETED 15-3-2023 Completed
34 B4S WO19118341 Repair of girder-inside with deficiency-(CONS-CR>=0.20mm).
35 BA16 WO18873254 Installation of (RH-outboard engine mercury 150hp)-AlKooheji
36 B4N WO19085081 Repair of girder-inside with deficiency-(CONS-CR>=0.20mm).
37 BA16 WO18968066 Inspection Equipment Maintenance Boat #1, Mercury150hp
38 KOOHEJI WO18968079 Inspection Equipment Maintenance Boat #2, Suzuki 300hp

Report Ref : KFCA-SAFOM-M228-MMR-16-23 Page 64


King Fahd Causeway FM Services Contract (M228)

In Loc WO/RM/PM Activities Status


39 B4N WO19118360 Repair of girder-inside with deficiency-(CONS-CR>=0.20mm). B4N
Inspection Equipment Maintenance MOOG #2, PN1012-
40 BA24 WO18575792 Completed
(Note: Stop to use report order-British Lloyd-WO18873232)
Inspection Equipment Maintenance MOOG #4, PN103694.
41 BA24 WO18575820 Completed
NOTE; No operation of moog today due to strong wind 26kts
Garage- Inspection Equipment Maintenance Boat #2, Suzuki 300hp.
42 WO18575876 Completed
Kooheji NOTE; *(Under repair & maintenance, date 25-1-2023).
Inspection Equipment Maintenance BOAT #1, Mercury150hp
43 BA16 WO18575863 Completed
NOTE; *(With scaffolding installed).
Inspection Equipment Maintenance MOOG #2, PN1012-
44 BA24 WO18667758 Completed
(Note: Stop to use report order-British Lloyd-WO18873232)
Inspection Equipment Maintenance MOOG #4, PN103694.
45 BA24 WO18667786 Completed
NOTE; No operation of moog today due to strong wind 21kts
Inspection Equipment Maintenance MOOG #2, PN1012-
46 BA24 WO18653506 Completed
(Note: Stop to use report order-British Lloyd-WO18873232)
47 B4S WO18653534 Inspection Equipment Maintenance MOOG #4, PN103694. Completed
Inspection Equipment Maintenance MOOG #2, PN1012-
48 BA24 WO18636426 Completed
(Note: Stop to use report order-British Lloyd-WO18873232)
B4S WO18636454 Inspection Equipment Maintenance MOOG #4, PN103694. Completed
49
Inspection Equipment Maintenance MOOG #2, PN1012-
50 BA24 WO18626101 Completed
(Note: Stop to use report order-British Lloyd-WO18873232)
51 B4S WO18626129 Inspection Equipment Maintenance MOOG #4, PN103694. Completed
Inspection Equipment Maintenance MOOG #2, PN1012-
52 BA24 WO18617558 Completed
(Note: Stop to use report order-British Lloyd-WO18873232)
53 B4S WO18617587 Inspection Equipment Maintenance MOOG #4, PN103694. Completed
Inspection Equipment Maintenance MOOG #2, PN1012-
54 BA24 WO18685961 Completed
(Note: Stop to use report order-British Lloyd-WO18873232)
55 B4S WO18685989 Inspection Equipment Maintenance MOOG #4, PN103694. Completed
Inspection Equipment Maintenance MOOG #2, PN1012-
56 BA24 WO18707594 Completed
(Note: Stop to use report order-British Lloyd-WO18873232)
57 B4S WO18707622 Inspection Equipment Maintenance MOOG #4, PN103694. Completed
Inspection Equipment Maintenance MOOG #2, PN1012-
58 BA24 WO18719377 Completed
(Note: Stop to use report order-British Lloyd-WO18873232)
59 B4S WO18719405 Inspection Equipment Maintenance MOOG #4, PN103694. Completed
Inspection Equipment Maintenance MOOG #2, PN1012-
60 BA24 WO18728855 Completed
(Note: Stop to use report order-British Lloyd-WO18873232)
61 B4S WO18728883 Inspection Equipment Maintenance MOOG #4, PN103694. Completed
Inspection Equipment Maintenance MOOG #2, PN1012-
62 BA24 WO18737999 Completed
(Note: Stop to use report order-British Lloyd-WO18873232)
63 B4S WO18738027 Inspection Equipment Maintenance MOOG #4, PN103694. Completed
Inspection Equipment Maintenance MOOG #2, PN1012-
64 BA24 WO18748250 Completed
(Note: Stop to use report order-British Lloyd-WO18873232)
65 B4S WO18748278 Inspection Equipment Maintenance MOOG #4, PN103694. Completed
Inspection Equipment Maintenance Speed Boat #2 Suzuki 300hp-(Note: under
66 GARAGE WO18769961 Completed
repair-WO18442868)-ALDHAEN
67 BA16 WO18719422 Inspection Equipment Maintenance Portable Generator for Boat #1
Inspection Equipment Maintenance MOOG #2, PN1012-
68 BA24 WO18769877 Completed
(Note: Stop to use report order-British Lloyd-WO18873232)
69 B4S WO18769905 Inspection Equipment Maintenance MOOG #4, PN103694. Completed
Inspection Equipment Maintenance MOOG #2, PN1012-
70 BA24 WO18796040 Completed
(Note: Stop to use report order-British Lloyd-WO18873232)
Report Ref : KFCA-SAFOM-M228-MMR-16-23 Page 65
King Fahd Causeway FM Services Contract (M228)

71 B4S WO18796068 Inspection Equipment Maintenance MOOG #4, PN103694. Completed

Inspection Equipment Maintenance MOOG #2, PN1012-


72 BA24 WO18832894 Completed
(Note: Stop to use report order-British Lloyd-WO18873232)
73 B4S WO18832922 Inspection Equipment Maintenance MOOG #4, PN103694. Completed
Inspection Equipment Maintenance MOOG #2, PN1012-
74 BA24 WO18841282 Completed
(Note: Stop to use report order-British Lloyd-WO18873232)
75 B4S WO18841310 Inspection Equipment Maintenance MOOG #4, PN103694. Completed
Inspection Equipment Maintenance MOOG #2, PN1012-
75 BA24 WO18848804 Completed
(Note: Stop to use report order-British Lloyd-WO18873232)
77 B4S WO18848832 Inspection Equipment Maintenance MOOG #4, PN103694. Completed
Inspection Equipment Maintenance MOOG #2, PN1012-
78 BA24 WO18863637 Completed
(Note: Stop to use report order-British Lloyd-WO18873232)
79 B4S WO18863665 Inspection Equipment Maintenance MOOG #4, PN103694. Completed
80 BA16 WO18873254 Installation of (RH-outboard engine mercury 150hp)-AlKooheji Completed
Inspection Equipment Maintenance MOOG #2, PN1012-
81 BA24 WO18884419 Completed
(Note: Stop to use report order-British Lloyd-WO18873232)
82 B4S WO18884447 Inspection Equipment Maintenance MOOG #4, PN103694. Completed
Inspection Equipment Maintenance MOOG #2, PN1012-
83 BA24 WO18918753 Completed
(Note: Stop to use report order-British Lloyd-WO18873232)
84 B4S WO18918781 Inspection Equipment Maintenance MOOG #4, PN103694. Completed
Inspection Equipment Maintenance MOOG #2, PN1012-
85 BA24 WO18922726 Completed
(Note: Stop to use report order-British Lloyd-WO18873232)
86 B4S WO18922754 Inspection Equipment Maintenance MOOG #4, PN103694. Completed
Inspection Equipment Maintenance MOOG #2, PN1012-
87 BA24 WO18929147 Completed
(Note: Stop to use report order-British Lloyd-WO18873232)
88 B4S WO18929175 Inspection Equipment Maintenance MOOG #4, PN103694. Completed
Inspection Equipment Maintenance MOOG #2, PN1012-
89 BA24 WO18933773 Completed
(Note: Stop to use report order-British Lloyd-WO18873232)
90 B4S WO18933801 Inspection Equipment Maintenance MOOG #4, PN103694. Completed
Inspection Equipment Maintenance MOOG #2, PN1012-
91 BA24 WO18942959 Completed
(Note: Stop to use report order-British Lloyd-WO18873232)
92 B4S WO18942987 Inspection Equipment Maintenance MOOG #4, PN103694. Completed
Inspection Equipment Maintenance MOOG #2, PN1012-
93 BA24 WO18942959 Completed
(Note: Stop to use report order-British Lloyd-WO18873232)
94 B4S WO18942987 Inspection Equipment Maintenance MOOG #4, PN103694. Completed
Inspection Equipment Maintenance MOOG #2, PN1012-
95 BA24 WO18967995 Completed
(Note: Stop to use report order-British Lloyd-WO18873232)
96 B4S WO18968023 Inspection Equipment Maintenance MOOG #4, PN103694. Completed
Inspection Equipment Maintenance MOOG #2, PN1012-
97 BA24 WO18984206 Completed
(Note: Stop to use report order-British Lloyd-WO18873232)
98 B4S WO18984235 Inspection Equipment Maintenance MOOG #4, PN103694. Completed

Report Ref : KFCA-SAFOM-M228-MMR-16-23 Page 66


King Fahd Causeway FM Services Contract (M228)

BRIDGE INSPECTION QA/QC STATUS:


KING FAHD CAUSEWAY AUTHORITY
SAFARI FACILITIES MANAGEMENT
QA-QC MONTHLY AUDIT REPORT - Bahrain Side

PERIOD: 1-30 APRIL 2023

INSPECTION & REPAIR WORKS


SL LOC PM/CM/RM WORK DESCRIPTION OBSERVATION STATUS REMARKS

*(Painting of PH12 up to Pier Connection & PH24) & (Cleaning of Pier Connection &
PH25 up to PH28)-COMPLETED
WO18211615 *(Painting the marking level of PH12 up to PH24)-COMPLETED
Repair works outside girder as per inspection results ON *(Repair of CONS-CS, Girder-outside, G12, G14, G16, G18, G20, G26)-COMPLETED
1 B4S & OK *(Repair of Bearing elastomeric -Crack at HJ19-20N)-COMPLETED
deficiency, (under RI 011-RI 015, B4&B5,N&S); PROGRESS
WO18104972 *(Repair of CONS-CH, Girder-outside, G13Q1, G14Q4)-COMPLETED
*(Cleaning of Expansion joint, EJ3, EJ4, EJ5)-COMPLETED
*(Cleaning & touch up painting of gangway, GW3, GW4, GW5)-COMPLETED

Repair & painting of guardrail with defects as per


2 B5N WO19019922 inspection results deficiency, (under RWA 012, OK DONE Completed
Guardrail-outside & median);

Repair & painting of guardrail with defects as per


3 B5S WO19019915 inspection results deficiency, (under RWA 012, OK DONE Completed
Guardrail-outside & median);

4 BATG-S WO18636353 Inspection of pavement (Bitumin) under WO18027746 OK DONE Completed

5 BATG-N WO18636368 Inspection of pavement (Bitumin) under WO18027761 OK DONE Completed

Inspection of pavement (Bitumin) under


6 E5 WO18636383 OK DONE Completed
WO18441886, WO18027686
Inspection of Guardrails/Crash Barrier at Embankment, E6
7 E6 WO18652802 OK DONE Completed
S&N under WO18027791
Inspection of Guardrails/Crash Barrier at Embankment, E7
8 E7 WO18652817 OK DONE Completed
S&N under WO18027806
Inspection of Guardrails/Crash Barrier at
9 UN WO18652832 OK DONE Completed
Embankment, UN, N under WO18027821
10 B4S WO18573773 Preventive Maintenance of Navigation Lights OK DONE Completed

11 B4S WO18573761 Preventive Maintenance of Navigation Lights OK DONE Completed


Painting of guardrail-scratched cause by accident as
12 UN-Emb WO19100270 per inspection results deficiency, (under RWE 005, OK DONE Completed
Guardrail/Crash Barrier-outside & median);
Painting of guardrail-scratched cause by accident as
13 UN-Emb WO19100271 per inspection results deficiency, (under RWE 005, OK DONE Completed
Guardrail/Crash Barrier-outside & median);

Inspection of guardrails/crash barrier at BATG-S,


14 BATG-S WO18728797 OK DONE Completed
under WO18027836

Inspection of guardrails/crash barrier at BATG-N,


15 BATG-N WO18728782 OK DONE Completed
under WO18027851

Inspection of guardrail/crash barrier at embankment,


16 E5 WO18728812 OK DONE Completed
E5, under WO18027866 & WO18027776
Inspection of slope protection at E6, under
17 E6 WO18737941 OK DONE Completed
WO18027881

Inspection of slope protection at E7, under


18 E7 WO18737956 OK DONE Completed
WO18027896

Inspection Equipment Maintenance Portable


19 BA16 WO18719422 Generator for Boat #1 OK DONE Completed
*(Painting of generator cover)-COMPLETED

Painting of guardrail-scratched under RWE 005,


Guardrail/Crash Barrier-outside & median);
20 E5-S WO19194370 OK DONE Completed
*(Painting of guardrail-scratched cause by accident at
Embankment, E5-S)-COMPLETED

Report Ref : KFCA-SAFOM-M228-MMR-16-23 Page 67


King Fahd Causeway FM Services Contract (M228)

Painting of guardrail-scratched under RWE 005,


Guardrail/Crash Barrier-outside & median);
21 E5-N WO19194371 OK DONE Completed
*(Painting of guardrail-scratched cause by accident at
Embankment, E5-N)-COMPLETED

Inspection of slope protection at UN, Embankment,


22 UN WO18841209 OK DONE Completed
RWE 006,under WO18027911
Inspection of slope protection at BATG-S, RWE 006
23 BATG-S WO18841224 OK DONE Completed
under WO18027926
Inspection of slope protection at BATG-S, RWE 006
24 BATG-N WO1884139 OK DONE Completed
under WO18027941
PM for Expansion joint, Cleaning with air compressor, (EJ1-
25 B4&B5,S&N WO19261035 OK DONE Completed
EJ12), N&S, (EJ1-EJ4), N&S
Inspection of Pile/Pier, P2-67, RB 004-COMPLETED 15-3-
26 B4N WO17690570 OK DONE Completed
2023
Inspection of Pile/Pier, P2-67, RB 004-COMPLETED 15-3-
27 B4S WO17690582 OK DONE Completed
2023
PM for Expansion joint, Cleaning with air compressor,
28 B5S&N WO19301924 OK DONE Completed
EJ1-EJ4.
PM for greasing of guardrail moving joint, (guardrail
29 B5S&N WO19301925 OK DONE Completed
joint-outside & median)

PM for greasing of guardrail moving joint; (guardrail


30 B4N WO19325868 OK DONE Completed
joint-outside & median), B4N.

PM for greasing of guardrail moving joint; (guardrail


31 B4S WO19325871 OK DONE Completed
joint-outside & median), B4S.

Repair of girder-inside with deficiency-(CONS-


32 B4S WO19118341 OK DONE Completed
CR>=0.20mm).
Inspection of Pile/Pier, P2-19, RB 004-COMPLETED 15-3-
33 B5S WO17690606 OK DONE Completed
2023

Repair of girder-inside with deficiency-(CONS-


34 B4S WO19118341 OK DONE Completed
CR>=0.20mm).
Installation of (RH-outboard engine mercury 150hp)-
35 BA16 WO18873254 OK DONE Completed
AlKooheji
Repair of girder-inside with deficiency-(CONS-
36 B4N WO19085081 OK DONE Completed
CR>=0.20mm).
Inspection Equipment Maintenance Boat #1,
37 BA16 WO18968066 OK DONE Completed
Mercury150hp
Inspection Equipment Maintenance Boat #2, Suzuki
38 KOOHEJI WO18968079 OK DONE Completed
300hp
Repair of girder-inside with deficiency-(CONS-
39 B4N WO19118360 OK DONE Completed
CR>=0.20mm).

INSPECTION EQUIPMENT MAINTENANCE WORKS

40 BA24 WO18575792 Inspection Equipment Maintenance MOOG #2, PN1012 OK NOT USED Report order-British Lloyd-WO18873232

41 BA24 WO18575820 Inspection Equipment Maintenance MOOG #4, PN103694. OK DONE Completed
Inspection Equipment Maintenance Boat #2, Suzuki 300hp.
42Garage-KoohejiWO18575876 OK Under repair
NOTE; *(Under repair & maintenance, date 25-1-2023).
43 BA16 WO18575863 Inspection Equipment Maintenance MOOG #4, PN103694. OK DONE Completed

44 BA24 WO18667758 Inspection Equipment Maintenance MOOG #2, PN1012 OK NOT USED Report order-British Lloyd-WO18873232

45 BA24 WO18667786 Inspection Equipment Maintenance MOOG #4, PN103694. OK DONE Completed

46 BA24 WO18653506 Inspection Equipment Maintenance MOOG #2, PN1012 OK NOT USED Report order-British Lloyd-WO18873232

47 B4S WO18653534 Inspection Equipment Maintenance MOOG #4, PN103694. OK DONE Completed

48 BA24 WO18636426 Inspection Equipment Maintenance MOOG #2, PN1012 OK NOT USED Report order-British Lloyd-WO18873232

49 B4S WO18636454 Inspection Equipment Maintenance MOOG #4, PN103694. OK DONE Completed

50 BA24 WO18626101 Inspection Equipment Maintenance MOOG #2, PN1012 OK NOT USED Report order-British Lloyd-WO18873232

51 B4S WO18626129 Inspection Equipment Maintenance MOOG #4, PN103694. OK DONE Completed

Report Ref : KFCA-SAFOM-M228-MMR-16-23 Page 68


King Fahd Causeway FM Services Contract (M228)

52 BA24 WO18617558 Inspection Equipment Maintenance MOOG #2, PN1012 OK NOT USED Report order-British Lloyd-WO18873232

53 B4S WO18617587 Inspection Equipment Maintenance MOOG #4, PN103694. OK DONE Completed

54 BA24 WO18685961 Inspection Equipment Maintenance MOOG #2, PN1012 OK NOT USED Report order-British Lloyd-WO18873232

55 B4S WO18685989 Inspection Equipment Maintenance MOOG #4, PN103694. OK DONE Completed

56 BA24 WO18707594 Inspection Equipment Maintenance MOOG #2, PN1012 OK NOT USED Report order-British Lloyd-WO18873232

57 B4S WO18707622 Inspection Equipment Maintenance MOOG #4, PN103694. OK DONE Completed

58 BA24 WO18719377 Inspection Equipment Maintenance MOOG #2, PN1012 OK NOT USED Report order-British Lloyd-WO18873232

59 B4S WO18719405 Inspection Equipment Maintenance MOOG #4, PN103694. OK DONE Completed

60 BA24 WO18728855 Inspection Equipment Maintenance MOOG #2, PN1012 OK NOT USED Report order-British Lloyd-WO18873232

61 B4S WO18728883 Inspection Equipment Maintenance MOOG #4, PN103694. OK DONE Completed

62 BA24 WO18737999 Inspection Equipment Maintenance MOOG #2, PN1012 OK NOT USED Report order-British Lloyd-WO18873232

62 B4S WO18738027 Inspection Equipment Maintenance MOOG #4, PN103694. OK DONE Completed

64 BA24 WO18748250 Inspection Equipment Maintenance MOOG #2, PN1012 OK NOT USED Report order-British Lloyd-WO18873232

65 B4S WO18748278 Inspection Equipment Maintenance MOOG #4, PN103694. OK DONE Completed
Inspection Equipment Maintenance Speed Boat #2 Suzuki
66 GARAGE WO18769961 OK under repair-WO1844286
300hp-(Note: under repair-WO18442868)-ALDHAEN
Inspection Equipment Maintenance Portable Generator for
67 BA16 WO18719422 OK DONE Completed
Boat #1

68 BA24 WO18769877 Inspection Equipment Maintenance MOOG #2, PN1012 OK NOT USED Report order-British Lloyd-WO18873232

69 B4S WO18769905 Inspection Equipment Maintenance MOOG #4, PN103694. OK DONE Completed

70 BA24 WO18796040 Inspection Equipment Maintenance MOOG #2, PN1012 OK NOT USED Report order-British Lloyd-WO18873232

71 B4S WO18796068 Inspection Equipment Maintenance MOOG #4, PN103694. OK DONE Completed

72 BA24 WO18832894 Inspection Equipment Maintenance MOOG #2, PN1012 OK NOT USED Report order-British Lloyd-WO18873232

72 B4S WO18832922 Inspection Equipment Maintenance MOOG #4, PN103694. OK DONE Completed

74 BA24 WO18841282 Inspection Equipment Maintenance MOOG #2, PN1012 OK NOT USED Report order-British Lloyd-WO18873232

75 B4S WO18841310 Inspection Equipment Maintenance MOOG #4, PN103694. OK DONE Completed

76 BA24 WO18848804 Inspection Equipment Maintenance MOOG #2, PN1012 OK NOT USED Report order-British Lloyd-WO18873232

77 B4S WO18848832 Inspection Equipment Maintenance MOOG #4, PN103694. OK DONE Completed

78 BA24 WO18863637 Inspection Equipment Maintenance MOOG #2, PN1012 OK NOT USED Report order-British Lloyd-WO18873232

79 B4S WO18863665 Inspection Equipment Maintenance MOOG #4, PN103694. OK DONE Completed
Installation of (RH-outboard engine mercury 150hp)-
80 BA16 WO18873254 OK DONE Completed
AlKooheji
81 BA24 WO18884419 Inspection Equipment Maintenance MOOG #2, PN1012 OK NOT USED Report order-British Lloyd-WO18873232

82 B4S WO18884447 Inspection Equipment Maintenance MOOG #4, PN103694. OK DONE Completed

83 BA24 WO18918753 Inspection Equipment Maintenance MOOG #2, PN1012 OK NOT USED Report order-British Lloyd-WO18873232

84 B4S WO18918781 Inspection Equipment Maintenance MOOG #4, PN103694. OK DONE Completed

85 BA24 WO18922726 Inspection Equipment Maintenance MOOG #2, PN1012 OK NOT USED Report order-British Lloyd-WO18873232

86 B4S WO18922754 Inspection Equipment Maintenance MOOG #4, PN103694. OK DONE Completed

87 BA24 WO18929147 Inspection Equipment Maintenance MOOG #2, PN1012 OK NOT USED Report order-British Lloyd-WO18873232

88 B4S WO18929175 Inspection Equipment Maintenance MOOG #4, PN103694. OK DONE Completed

89 BA24 WO18933773 Inspection Equipment Maintenance MOOG #2, PN1012 OK NOT USED Report order-British Lloyd-WO18873232

90 B4S WO18933801 Inspection Equipment Maintenance MOOG #4, PN103694. OK DONE Completed

91 BA24 WO18942959 Inspection Equipment Maintenance MOOG #2, PN1012 OK NOT USED Report order-British Lloyd-WO18873232

92 B4S WO18942987 Inspection Equipment Maintenance MOOG #4, PN103694. OK DONE Completed

93 BA24 WO18942959 Inspection Equipment Maintenance MOOG #2, PN1012 OK NOT USED Report order-British Lloyd-WO18873232

94 B4S WO18942987 Inspection Equipment Maintenance MOOG #4, PN103694. OK DONE Completed

95 BA24 WO18967995 Inspection Equipment Maintenance MOOG #2, PN1012 OK NOT USED Report order-British Lloyd-WO18873232

96 B4S WO18968023 Inspection Equipment Maintenance MOOG #4, PN103694. OK DONE Completed

97 BA24 WO18984206 Inspection Equipment Maintenance MOOG #2, PN1012 OK NOT USED Report order-British Lloyd-WO18873232

98 B4S WO18984235 Inspection Equipment Maintenance MOOG #4, PN103694. OK DONE Completed

Report Ref : KFCA-SAFOM-M228-MMR-16-23 Page 69


King Fahd Causeway FM Services Contract (M228)

Report Ref : KFCA-SAFOM-M228-MMR-16-23 Page 70


King Fahd Causeway FM Services Contract (M228)

Report Ref : KFCA-SAFOM-M228-MMR-16-23 Page 71


King Fahd Causeway FM Services Contract (M228)

Report Ref : KFCA-SAFOM-M228-MMR-16-23 Page 72


King Fahd Causeway FM Services Contract (M228)

Report Ref : KFCA-SAFOM-M228-MMR-16-23 Page 73


King Fahd Causeway FM Services Contract (M228)

INSPECTION PROGRESS REPORT AS PER PLAN


Planned ACTUAL COMPLETION
Activity ID Activity Name ROUTE # LOCATION Duration Start Finish DATE DATE %
IP2023-1 KING FAHAD CAUSEWAY INSPECTION PLAN 2023
IP2023-1.01 132 1-Jan-23 7-Jun-23
MILESTONES 132 1-Jan-23 7-Jun-23
MS001 Inspection Start 0 1-Jan-23
MS002 Inspection Complete 0 7-Jun-23

IP2023-1.02 SAUDI SIDE


IP2023-1.02.1
132 1-Jan-23 7-Jun-23

(RI BY MOOG) 74 1-Jan-23 27-Mar-23


RI001 B3 N (G101-G66) RI 001 B3 N (G101-G66) 8 1-Jan-23 9-Jan-23 2-Jan-23 19-Jan-23 100%
RI002 B3 N (G65-G36) RI 002 B3 N (G65-G36) 7 10-Jan-23 17-Jan-23 19-Jan-23 28-Jan-23 100%
RI003 B3 N (G01-G35) RI 003 B3 N (G01-G35) 8 18-Jan-23 26-Jan-23 29-Jan-23 4-Feb-23 100%
RI004 B2 N (G12-G41) RI 004 B2 N (G12-G41) 7 28-Jan-23 4-Feb-23 5-Feb-23 11-Feb-23 100%
RI005 B1 N (G1-G19) & B2 N (G01-G11) RI 005 B1 N (G1-G19) 7 5-Feb-23 12-Feb-23 11-Feb-23 15-Feb-23 100%
RI006 B1 S(G01-G19) & B2 S(G01-G11) RI 006 B2 S(G01-G11) 7 13-Feb-23 20-Feb-23 21-Feb-23 1-Mar-23 100%
RI007 B2 S (G12-G41) RI 007 B2 S (G12-G41) 7 21-Feb-23 28-Feb-23 4-Mar-23 12-Mar-23 100%
RI008 B3 S (G01-G35) RI 008 B3 S (G01-G35) 8 1-Mar-23 9-Mar-23 14-Mar-23 22-Mar-23 100%
RI009 B3 S (G65-G36) RI 009 B3 S (G65-G36) 7 11-Mar-23 18-Mar-23 22-Mar-23 28-Mar-23 100%
RI010
IP2023-1.02.2 B3 S (G101-G66) RI 010 B3 S (G101-G66) 8 19-Mar-23 27-Mar-23 29-Mar-23 18-Apr-23 100%
ROUTE BY 33 18-Feb-23 27-Mar-23
RB001 Pile/Pier-Foundation Grid B3 (Pile 45-101 N&S) RB 001 B3 (Pile 45-101 N&S) 10 18-Feb-23 28-Feb-23 16-Apr-23 On-going 90%
RB002 Pile/Pier-Foundation Grid B3 (Pile 22- 44 N&S) RB 002 B3 (Pile
B3,2&1 (Pile 02-21,
22-44 N&S)
02-41, 02- 8 1-Mar-23 9-Mar-23 0%
RB003
IP2023-1.02.3 Slope Protection (Sea) - Pile / Pier B3,2&1 (Pile 02-21, 02-41, 02-19N&S) RB 003 19N&S) 15 11-Mar-23 27-Mar-23 0%
ROUTE BY 58 28-Mar-23 7-Jun-23
RWA001 Edge Beams-Outside & Median/Kerbs/Bitumin/Drain Pipes B3 N&S (101 Girder) RWA 001 B3 (101 Girder) 13 28-Mar-23 11-Apr-23 8-Feb-23 27-Mar-23 100%
RWA002 Edge Beams-Outside & Median/Kerbs/Bitumin/Drain Pipes B2 N&S (41 Girder) RWA 002 B2(41 Girder) 5 12-Apr-23 17-Apr-23 15-Mar-23 27-Mar-23 100%
RWA003 Edge Beams-Outside & Median/Kerbs/Bitumin/Drain Pipes B1N&S (19 Girder) RWA 003 B1 (19 Girder) 4 18-Apr-23 26-Apr-23 15-Mar-23 27-Mar-23 100%
RWA004 Expansion Joints Above (B1,B2&B3) RWA 004 B1/B2/B3 7 27-Apr-23 4-May-23 15-Apr-23 16-Apr-23 100%
RWA005 Guardrails (B1/B2/B3) N RWA 005 B1/B2/B3 7 6-May-23 13-May-23 25-Mar-23 25-Mar-23 100%
RWA006 Guardrails (B1/B2&B3)S RWA 006 B1/B2/B3 7 14-May-23 21-May-23 25-Mar-23 25-Mar-23 100%
RWA007 Deck/Edge Beam/Guardrail-All Above (AZ Flyover) RWA 007 AZ Flyover 5 22-May-23 27-May-23 3-Apr-23 03-Arpil-23 100%
RWA008
IP2023-1.02.4 Deck/Edge Beam/Guardrail-All Above (SA Fly Over-1) RWA 008 SA Fly Over-1 10 28-May-23 7-Jun-23 30-Mar-23 1-Apr-23 100%
ROUTE BY 28 28-Mar-23 3-May-23
RWB001 Abutment/Gangways/Expansion Joints at Abutment/Security Enclosure (B1/B2/B3) RWB 001 B1/B2/B3 8 28-Mar-23 5-Apr-23 5-Apr-23 5-Apr-23 100%
RWB002 Piers/Bearing/Abutment/Deck-All Below AZ Flyover RWB 002 AZ Flyover 8 6-Apr-23 15-Apr-23 2-Apr-23 2-Apr-23 100%
RWB003
IP2023-1.02.5 Piers/Bearing/Abutment/Deck-All Below SA Fly Over-1 RWB 003 SA Fly Over-1 12 16-Apr-23 3-May-23 1-Apr-23 1-Apr-23 100%
ROUTE BY 18 4-May-23 24-May-23
RWE001 Pavement Bitumin E1/E2/E3/SATG RWE 001 E1/E2/E3/SATG 5 4-May-23 9-May-23 28-Mar-23 30-Mar-23 100%
RWE002 Guardrails/Crash Barrier (E1/E2/E3/SATG) RWE 002 E1/E2/E3/SATG 8 10-May-23 18-May-23 29-Mar-23 29-Mar-23 100%
RWE003
IP2023-1.02.6 Slope Protection Bitumin, Guardrail & Slope Protect (E1/E2/E3/E4/SATG) RWE 003 E1/E2/E3/E4/SATG 5 20-May-23 24-May-23 9-Mar-23 On-going 90%
ROUTE (WI) 41 1-Jan-23 16-Feb-23
RWI001 B3 (G101-G65 N&S) RWI 001 B3 (G101-G65 N&S) 8 1-Jan-23 9-Jan-23 3-Jan-23 9-Jan-23 100%
RWI002 B3(G64-G31 N&S) RWI 002 B3(G64-G31 N&S)
B3&B2(G30-G1/G41-G35 7 10-Jan-23 17-Jan-23 11-Jan-23 16-Jan-23 100%
RWI003 B2&B3 (G30-G1/G41-G35 N&S) RWI 003 N&S) 8 18-Jan-23 26-Jan-23 17-Jan-23 24-Jan-23 100%
RWI004 B2(G34-G01 N&S) RWI 004 B2(G34-G01 N&S) 7 28-Jan-23 4-Feb-23 25-Jan-23 31-Jan-23 100%
RWI005 B1(G19-G01 N&S) RWI 005 B1(G19-G01 N&S) 4 5-Feb-23 8-Feb-23 1-Feb-23 4-Feb-23 100%
RWI006
IP2023-1.02.7 & Hammer Head-Inside B3-M.Span(MS 1,2,3,&4 N&S) RWI 006 B3-M.Span(MS 1,2,3,&4 N&S) 7 9-Feb-23 16-Feb-23 6-Feb-23 7-Feb-23 100%
ACTS SAUDI 14 1-Mar-23 16-Mar-23
A ACTS01 ACTS inspection & testing by Moog 14 01-Mar-23* 16-Mar-23

IP2023-1.03 BAHRAIN SIDE


IP2023-1.03.1
80 1-Jan-23 3-Apr-23

(RI BY MOOG) 38 1-Jan-23 13-Feb-23


RI011 B4 S (G01-G36) RI 011 B4 S(G01-G36) 8 1-Jan-23 9-Jan-23 2-Jan-23 9-Jan-23 100%
RI012 B4 S (G37-G67) RI 012 B4 S(G37-G67) 7 10-Jan-23 17-Jan-23 14-Jan-23 17-Jan-23 100%
RI013 B5 S& N (G01-G19) RI 013 B5 S&N(G01-G19) 8 18-Jan-23 26-Jan-23 19-Jan-23 23-Jan-23 100%
RI014 B4 N (G37-G67) RI 014 B4 N(G37-G67) 8 28-Jan-23 5-Feb-23 24-Jan-23 30-Jan-23 100%
RI015
IP2023-1.03.2 B4 N (G01-G36) RI 015 B4 N(G01-G36) 7 6-Feb-23 13-Feb-23 31-Jan-23 5-Feb-23 100%
ROUTE BY B4&B5 S&N (Pile 02-67)(Pile 22 22-Jan-23 15-Feb-23
RB004
IP2023-1.03.3 Slope Protection (Sea) - Pile / Pier B4&B5 N&S ( Pile 02-67, Pile 02-19) RB004 02-19) 22 22-Jan-23 15-Feb-23 5-Mar-23 15-Mar-23 100%
ROUTE BY 42 14-Feb-23 3-Apr-23
RWA009 Edge Beams-Outside & Median/Kerbs/Bitumin/Drain Pipes B4 N&S(G01TO 67) RWA 009 B4(G01-G67 N&S) 17 14-Feb-23 5-Mar-23 31-Jan-23 23-Feb-23 100%
RWA010 Edge Beams-Outside & Median/Kerbs/Bitumin/Drain Pipes B5 N&S (G01 TO G19 ) RWA 010 B5(G01-G19 N&S)
B4&B5(EJ01-12; EJ01-04 5 6-Mar-23 11-Mar-23 8-Feb-23 14-Feb-23 100%
RWA011 Expansion Joints Above B4&B5 N&S (EJ 01 TO EJ12 & EJ01 TO EJ04) RWA 011 N&S)
B4&B5(G01-G67)(G01-G19 5 12-Mar-23 16-Mar-23 11-Feb-23 20-Feb-23 100%
RWA012 Guardrails B4&B5 N&S (G01-67 & G01-19) RWA 012 N&S) 7 18-Mar-23 25-Mar-23 12-Feb-23 27-Feb-23 100%
RWA013
IP2023-1.03.4 Deck/Edge Beam/Guardrail-All Above (BA Flyover A to Z) RWA 013 BA Flyover 2 8 26-Mar-23 3-Apr-23 13-Feb-23 4-Mar-23 100%
ROUTE BY 14 16-Feb-23 4-Mar-23
RWB004 Abutment/Gangways/Expansion Joints at Abutment/Security Enclosure (B4&B5 N&S) RWB 004 B4&B5 S&N 7 16-Feb-23 23-Feb-23 16-Feb-23 20-Feb-23 100%
RWB005
IP2023-1.03.5 Piers/Bearing/Abutment/Deck-All Below BA Fly Over-2 RWB 005 BA Flyover 2 7 25-Feb-23 4-Mar-23 16-Feb-23 21-Feb-23 100%
ROUTE BY 24 5-Mar-23 1-Apr-23
RWE004 Guardrails/Crash Barrier (E5/E6/UN/E7 BATG) RWE 004 E5/E6/UN/E7/BATG 10 5-Mar-23 15-Mar-23 21-Feb-23 2-Mar-23 100%
RWE005 Slope Protection Bitumin, Guardrail & Slope Protect (E5/E6/UN/E7/BATG) RWE 005 E5/E6/UN/E7/BATG 7 16-Mar-23 23-Mar-23 27-Feb-23 18-Mar-23 100%
RWE006
IP2023-1.03.6 Pavement Bitumin E5/E7/UN/E7/BATG RWE 006 E5/E6/UN/E7/BATG 7 25-Mar-23 1-Apr-23 2-Mar-23 16-Mar-23 100%
ROUTE (WI) 18 1-Jan-23 21-Jan-23
RWI007 B4(G01-G34 N&S) RWI 007 B4 S&N(G01-34) 7 1-Jan-23 8-Jan-23 2-Jan-23 10-Jan-23 100%
RWI008 B4(G35-G67 N&S) RWI 008 B4 S&N(G35-67) 7 9-Jan-23 16-Jan-23 11-Jan-23 19-Jan-23 100%
RWI009
IP2023-1.03.7 B5 (G01-G19 N&S) RWI 009 B5 N&S(G01-19) 4 17-Jan-23 21-Jan-23 21-Jan-23 31-Jan-23 100%
ACTS BAHRAIN 14 18-Mar-23 2-Apr-23
A1000 ACTS Inspection & testing by Moog 14 18-Mar-23 2-Apr-23

ACCOMPLISHMENT TO DATE AS PER 95.77%


2023 SCHEDULE

Report Ref : KFCA-SAFOM-M228-MMR-16-23 Page 74


Inspection of Girder Out side/Edge beam/Con’ty/bearings /expansion joints
Outside Girder, under Bridge B1, B2, B3, B4 & B5, N&S

Route by Unit (Moog)-RI 001 up to RI 010 (SA) and RI 011 up to RI 015 (BA)

Report Ref :
RI005
BRIDGE 1
No. 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19

North Side
South Side
RI004
BRIDGE 2
No. 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 41

North Side
South Side
RI006 RI007

RI003 RI002
BRIDGE 3
No. 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 41 42 43 44 45 46 47 48 49 50 51 52 53 54 55

KFCA-SAFOM-M228-MMR-16-23
North Side
South Side
RI008 RI009
RI001
56 57 58 59 60 61 62 63 64 65 66 67 68 69 70 71 72 73 74 75 76 77 78 79 80 81 82 83 84 85 86 87 88 89 90 91 92 93 94 95 96 97 98 99 100 101

RI010
King Fahd Causeway FM Services Contract (M228)

BRIDGE 4
Girder No. 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 41 42 43 44 45 46 47 48 49 50 51 52 53 54 55
North Side
South Side

56 57 58 59 60 61 62 63 64 65 66 67

BRIDGE 5
Girder No. 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19
North Side
South Side

SUBMITTED BY:
LEGEND

Completed Inspection
Osman Abusinaina
As of April 30, 2023

Page 75
RWI Inspection of Girder-inside diaphrams, End blocks,Bearings,expansion joints
Inside Girder, B1, B2, B3, N&S

Route Walking Inside RWI 001 up to RWI 006 (SA)

Report Ref :
BRIDGE 1
No. 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19
RWI 005

North Side
South Side

BRIDGE 2
No. 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 41
RWI 004 RWI 003
North Side
South Side

BRIDGE 3

KFCA-SAFOM-M228-MMR-16-23
No. 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 41 42 43 44 45 46 47 48 49 50 51 52 53 54 55
RWI 003 RWI 002 RWI 006 RWI 002
North Side
South Side
RWI 002 RWI 001
56 57 58 59 60 61 62 63 64 65 66 67 68 69 70 71 72 73 74 75 76 77 78 79 80 81 82 83 84 85 86 87 88 89 90 91 92 93 94 95 96 97 98 99 100 101
King Fahd Causeway FM Services Contract (M228)

BRIDGE 4
Girder No. 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 41 42 43 44 45 46 47 48 49 50 51 52 53 54 55
North Side
South Side

56 57 58 59 60 61 62 63 64 65 66 67

BRIDGE 5
Girder No. 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19
North Side
South Side

SUBMITTED BY:
LEGEND

Completed inspection Osman Abusinaina

Page 76
As of April 30, 2023
King Fahd Causeway FM Services Contract (M228)

Report Ref : KFCA-SAFOM-M228-MMR-16-23 Page 77


King Fahd Causeway FM Services Contract (M228)

Report Ref : KFCA-SAFOM-M228-MMR-16-23 Page 78


King Fahd Causeway FM Services Contract (M228)

ACTS INSPECTION OBSERVATION


I. RWI = ROUTE INSIDE GIRDER SAUDI SIDE (ACTS INSPECTION OBSERVATION)-BRIDGE 3 NORTH
TOWARDS SAUDI SIDE
Reported Defects
Inspected Rusted Cracks
Element Air Voids / Exposed Cracks <
Segregation Honeycombs Spalling Steel >
Bugholes Steel 0.2mm
Ties 0.2mm
Girder 101 Yes No No No No No Yes No
Girder 100 Yes No No No No Yes Yes Yes
Girder 99 Yes No No No No No Yes No
Girder 98 Yes No No No No No Yes Yes
Girder 97 Yes No No No No No Yes No
Girder 96 Yes No No No No No Yes No
Girder 95 Yes No No No No No Yes Yes
Girder 94 Yes No No No No No Yes No
Girder 93 Yes No No No No No Yes No
Girder 92 Yes No No No No No Yes No
Girder 91 Yes No No No No No Yes No
Girder 90 Yes No No No No No Yes Yes
Girder 89 Yes Yes No No No No Yes Yes
Girder 88 Yes No No No No No Yes Yes
Girder 87 Yes Yes No No No No Yes No
Girder 86 Yes No No No No No Yes Yes
Girder 85 Yes No No No No No Yes Yes
Girder 84 Yes No No No No No Yes Yes
Girder 83 Yes Yes No No No No Yes Yes
Girder 82 Yes Yes No No No No Yes Yes
Girder 81 Yes Yes No No No No Yes No
Girder 80 Yes No No No No No Yes Yes
Girder 79 Yes No No No No No Yes Yes
Girder 78 Yes No No No No No Yes Yes
Girder 77 Yes No No No No No Yes Yes
Girder 76 Yes No No No No No Yes Yes
Girder 75 Yes Yes No No No No Yes Yes
Girder 74 Yes Yes No No No No Yes Yes
Girder 73 Yes Yes No No No No Yes No
Girder 72 Yes Yes No No No No Yes Yes
Girder 71 Yes Yes No No No No Yes No
Girder 70 Yes Yes No No No No Yes Yes
Girder 69 Yes Yes No No No No Yes Yes

Girder 68 Yes Yes No No No No Yes Yes

Report Ref : KFCA-SAFOM-M228-MMR-16-23 Page 79


King Fahd Causeway FM Services Contract (M228)

INSPECTED Air Voids / Exposed Rusted Cracks < Cracks >


Segregation Honeycombs Spalling
ELEMENT Bugholes Steel Steel Ties 0.2mm 0.2mm

Girder 67 Yes Yes No No No No Yes No


Girder 66 Yes Yes No No No No Yes Yes
Girder 65 Yes Yes No No No No Yes No
Girder 64 Yes No No No No No Yes Yes
Girder 63 Yes Yes No No No No Yes No
Girder 62 Yes No No No No No Yes Yes
Girder 61 Yes Yes No No No No Yes Yes
Girder 60 Yes Yes No No No No Yes Yes
Girder 59 Yes Yes No No No No Yes No
Girder 58 Yes No No No No No Yes Yes
Girder 57 Yes No No No No No Yes No
Girder 56 Yes Yes No No No No Yes No
Girder 55 Yes No No No No No Yes Yes
Girder 54 Yes No No No No No Yes Yes
Girder 53 Yes No No No No No Yes Yes
Girder 52 Yes No No No No No Yes Yes
Girder 51 Yes No No No No No Yes Yes
Girder 50 Yes No No No No No Yes Yes
Girder 49 Yes No No No No No Yes Yes
Girder 48 Yes No No No No No Yes Yes
Girder 47 Yes No No No No No Yes No
Girder 46 Yes No No No No No Yes No
Girder 45 Yes No No No No No Yes Yes
Girder 44
Girder 43
Girder 42
Girder 41 Yes No No No No No Yes Yes
Girder 40 Yes No No No No No Yes Yes
Girder 39 Yes No No No No No Yes No
Girder 38 Yes No No No No No Yes Yes
Girder 37 Yes No No No No No Yes No
Girder 36 Yes No No No No No Yes No
Girder 35 Yes No No No No No Yes No
Girder 34 Yes No No No No No Yes Yes
Girder 33 Yes No No No No No Yes No
Girder 32 Yes No No No No No Yes No
Girder 31 Yes Yes No No No No Yes No
Girder 30 Yes No No No No No Yes No
Girder 29 Yes No No No No No Yes No
Girder 28 Yes No No No No No Yes No
Report Ref : KFCA-SAFOM-M228-MMR-16-23 Page 80
King Fahd Causeway FM Services Contract (M228)

INSPECTED Air Voids / Exposed Rusted Cracks < Cracks >


Segregation Honeycombs Spalling
ELEMENT Bugholes Steel Steel Ties 0.2mm 0.2mm

Girder 27 Yes No No No No No Yes No


Girder 26 Yes No No No No No Yes No
Girder 25 Yes No No No No No Yes No
Girder 24 Yes No No No No No Yes Yes
Girder 23 Yes No No No No No Yes No
Girder 22 Yes No No No No No Yes No
Girder 21 Yes Yes No No No No Yes No
Girder 20 Yes No No No No No Yes No
Girder 19 Yes Yes No No No No Yes No
Girder 18 Yes No No No No No Yes No
Girder 17 Yes No No No No No Yes No
Girder 16 Yes No No No No No Yes No
Girder 15 Yes No No No No No Yes No
Girder 14 Yes No No No No No Yes No
Girder 13 Yes No No No No No Yes No
Girder 12 Yes No No No No No Yes No
Girder 11 Yes No No No No No Yes No
Girder 10 Yes No No No No No Yes No
Girder 9 Yes No No No No No Yes No
Girder 8 Yes No No No No No Yes No
Girder 7 Yes No No No No No Yes No
Girder 6 Yes No No No No No Yes No
Girder 5 Yes No No No No No Yes No
Girder 4 Yes No No No No No Yes No
Girder 3 Yes No No No No No Yes No
Girder 2 Yes No No No No No Yes No
Girder 1 Yes No No No No No Yes No

II. RWI – ROUTE WALKING INSIDE GIRDER - BRIDGE 3 SOUTH TOWARDS BAHRAIN SIDE

Reported Defects
Inspected Cracks
Element Air Voids / Exposed Rusted Cracks <
Segregation Honeycombs Spalling >
Bugholes Steel Steel Ties 0.2mm
0.2mm
Girder 101 Yes No No No No No Yes No
Girder 100 Yes Yes No No No No Yes No
Girder 99 Yes No No No No No Yes No
Girder 98 Yes No No No No No Yes No
Girder 97 Yes No No No No No Yes No
Girder 96 Yes No No No No No Yes No
Girder 95 Yes No No No No No Yes No
Report Ref : KFCA-SAFOM-M228-MMR-16-23 Page 81
King Fahd Causeway FM Services Contract (M228)

Cracks
INSPECTED Air Voids / Exposed Rusted Cracks <
Segregation Honeycombs Spalling >
ELEMENT Bugholes Steel Steel Ties 0.2mm
0.2mm
Girder 94 Yes No No No No No Yes No
Girder 93 Yes No No No No No Yes No
Girder 92 Yes No No No No No Yes No
Girder 91 Yes No No No No No Yes No
Girder 90 Yes No No No No No Yes No
Girder 89 Yes No No No No No Yes No
Girder 88 Yes No No No No No Yes No
Girder 87 Yes No No No No No Yes No
Girder 86 Yes No No No No No Yes No
Girder 85 Yes No No No No No Yes No
Girder 84 Yes No No No No No Yes No
Girder 83 Yes No No No No No Yes No
Girder 82 Yes No No No No No Yes No
Girder 81 Yes No No No No No Yes No
Girder 80 Yes No No No No No Yes No
Girder 79 Yes No No No No No Yes No
Girder 78
Girder 77
Girder 76
Girder 75 Yes No No No No No Yes No
Girder 74 Yes No No No No No Yes No
Girder 73 Yes No No No No No Yes No
Girder 72 Yes No No No No No Yes No
Girder 71 Yes No No No No No Yes No
Girder 70 Yes No No No No No Yes No
Girder 69 Yes No No No No No Yes No
Girder 68 Yes No No No No No Yes No
Girder 67 Yes No No No No No Yes No
Girder 66 Yes No No No No No Yes No
Girder 65 Yes No No No No No Yes No
Girder 64 Yes No No No No No Yes No
Girder 63 Yes No No No No No Yes No
Girder 62 Yes No No No No No Yes No
Girder 61 Yes No No No No No Yes No
Girder 60 Yes No No No No No Yes Yes
Girder 59 Yes No No No No No Yes No
Girder 58 Yes No No No No No Yes No
Girder 57 Yes No No No No No Yes No
Girder 56 Yes No No No No No Yes No
Girder 55 Yes No No No No No Yes No
Report Ref : KFCA-SAFOM-M228-MMR-16-23 Page 82
King Fahd Causeway FM Services Contract (M228)

Cracks
INSPECTED Air Voids / Exposed Rusted Cracks <
Segregation Honeycombs Spalling >
ELEMENT Bugholes Steel Steel Ties 0.2mm
0.2mm
Girder 54 Yes No No No No No Yes Yes
Girder 53 Yes No No No No No Yes No
Girder 52 Yes No No No No No Yes No
Girder 51 Yes No No No No No Yes No
Girder 50 Yes No No No No No Yes No
Girder 49 Yes No No No No No Yes No
Girder 48 Yes No No No No No Yes No
Girder 47 Yes No No No No No Yes No
Girder 46 Yes No No No No No Yes No
Girder 45 Yes No No No No No Yes Yes
Girder 44
Girder 43
Girder 42
Girder 41 Yes No No No No No Yes No
Girder 40 Yes No No No No No Yes Yes
Girder 39 Yes No No No No No Yes No
Girder 38 Yes No No No No No Yes No
Girder 37 Yes No No No No No Yes No
Girder 36 Yes No No No No No Yes No
Girder 35 Yes No No No No No Yes No
Girder 34 Yes No No No No No Yes Yes
Girder 33 Yes No No No No No Yes No
Girder 32 Yes No No No No No Yes No
Girder 31 Yes No No No No No Yes No
Girder 30 Yes No No No No No Yes Yes
Girder 29 Yes No No No No No Yes Yes
Girder 28 Yes No No No No No Yes Yes
Girder 27 Yes No No No No No Yes No
Girder 26 Yes No No No No No Yes No
Girder 25 Yes No No No No No Yes No
Girder 24 Yes No No No No No Yes No
Girder 23 Yes No No No No No Yes No
Girder 22 Yes No No No No No Yes No
Girder 21 Yes No No No No No Yes No
Girder 20 Yes No No No No No Yes No
Girder 19 Yes No No No No No Yes No
Girder 18 Yes No No No No No Yes Yes
Girder 17 Yes No No No No No Yes No
Girder 16 Yes No No No No No Yes Yes
Girder 15 Yes No No No No No Yes No
Report Ref : KFCA-SAFOM-M228-MMR-16-23 Page 83
King Fahd Causeway FM Services Contract (M228)

Cracks
INSPECTED Air Voids / Exposed Rusted Cracks <
Segregation Honeycombs Spalling >
ELEMENT Bugholes Steel Steel Ties 0.2mm
0.2mm
Girder 14 Yes No No No No No Yes No
Girder 13 Yes No No No No No Yes No
Girder 12 Yes No No No No No Yes No
Girder 11 Yes No No No No No Yes No
Girder 10 Yes No No No No No Yes Yes
Girder 9 Yes No No No No No Yes No
Girder 8 Yes No No No No No Yes No
Girder 7 Yes No No No No No Yes No
Girder 6 Yes No No No No No Yes No
Girder 5 Yes No No No No No Yes No
Girder 4 Yes No No No No No Yes No
Girder 3 Yes No No No No No Yes No
Girder 2 Yes No No No No No Yes Yes
Girder 1 Yes No No No No No Yes No

III. RWI = ROUTE INSIDE GIRDER SAUDI SIDE (ACTS INSPECTION OBSERVATION)-BRIDGE 2 NORTH
TOWARDS SAUDI SIDE

Reported Defects
Inspected Rusted Cracks
Element Air Voids / Exposed Cracks <
Segregation Honeycombs Spalling Steel >
Bugholes Steel 0.2mm
Ties 0.2mm
Girder 01 Yes No No No No No Yes No
Girder 02 Yes No No No No No Yes No
Girder 03 Yes No No No No No Yes No
Girder 04 Yes No No No No No Yes No
Girder 05 Yes No No No No No Yes No
Girder 06 Yes No No No No No Yes No
Girder 07 Yes No No No No No Yes No
Girder 08 Yes No No No No No Yes No
Girder 09 Yes No No No No No Yes No
Girder 10 Yes No No No No No Yes No
Girder 11 Yes No No No No No Yes No
Girder 12 Yes No No No No No Yes No
Girder 13 Yes No No No No No Yes No

Girder 14 Yes No No No No No Yes No


Girder 15 Yes No No No No No Yes No
Girder 16 Yes No No No No No Yes Yes
Girder 17 Yes No No No No No Yes No

Report Ref : KFCA-SAFOM-M228-MMR-16-23 Page 84


King Fahd Causeway FM Services Contract (M228)

Rusted Cracks
Inspected Air Voids / Exposed Cracks <
Segregation Honeycombs Spalling Steel >
Element Bugholes Steel 0.2mm
Ties 0.2mm
Girder 18 Yes No No No No No Yes No
Girder 19 Yes No No No No No Yes No
Girder 20 Yes No No No No No Yes No
Girder 21 Yes No No No No No Yes No
Girder 22 Yes No No No No No Yes No
Girder 23 Yes No No No No No Yes No
Girder 24 Yes No No No No No Yes No
Girder 25 Yes No No No No No Yes No
Girder 26 Yes No No No No No Yes No
Girder 27 Yes No No No No No Yes No
Girder 28 Yes No No No No No Yes Yes
Girder 29 Yes No No No No No Yes No
Girder 30 Yes No No No No No Yes Yes
Girder 31 Yes No No No No No Yes No
Girder 32 Yes No No No No No Yes No
Girder 33
Girder 34 Yes No No No No No Yes Yes
Girder 35 Yes No No No No No Yes No
Girder 36 Yes No No No No No Yes Yes
Girder 37
Girder 38 Yes No No No No No Yes No
Girder 39 Yes No No No No No Yes No
Girder 40 Yes No No No No No Yes Yes
Girder 41 Yes No No No No No Yes No

IV. RWI = ROUTE INSIDE GIRDER SAUDI SIDE (ACTS INSPECTION OBSERVATION)-BRIDGE 2 SOUTH
TOWARDS BAHRAIN SIDE
Reported Defects
Inspected Rusted Cracks
Element Air Voids / Exposed Cracks <
Segregation Honeycombs Spalling Steel >
Bugholes Steel 0.2mm
Ties 0.2mm
Girder 01 Yes No No No No No Yes No
Girder 02 Yes No No No No No Yes No
Girder 03 Yes No No No No No Yes No
Girder 04 Yes No No No No No Yes No
Girder 05 Yes No No No No No Yes No
Girder 06 Yes No No No No No Yes Yes
Girder 07 Yes No No No No No Yes No
Report Ref : KFCA-SAFOM-M228-MMR-16-23 Page 85
King Fahd Causeway FM Services Contract (M228)

Rusted Cracks
Inspected Air Voids / Exposed Cracks <
Segregation Honeycombs Spalling Steel >
Element Bugholes Steel 0.2mm
Ties 0.2mm
Girder 08 Yes No No No No No Yes No
Girder 09 Yes No No No No No Yes No
Girder 10 Yes No No No No No Yes No
Girder 11 Yes No No No No No Yes No
Girder 12 Yes No No No No No Yes No
Girder 13 Yes No No No No No Yes No
Girder 14 Yes No No No No No Yes No
Girder 15 Yes No No No No No Yes No
Girder 16 Yes No No No No No Yes No
Girder 17 Yes No No No No No Yes No
Girder 18 Yes No No No No No Yes Yes
Girder 19 Yes No No No No No Yes No
Girder 20 Yes No No No No No Yes No
Girder 21 Yes No No No No No Yes No
Girder 22 Yes No No No No No Yes No
Girder 23 Yes No No No No No Yes No
Girder 24 Yes No No No No No Yes No
Girder 25 Yes No No No No No Yes No
Girder 26 Yes No No No No No Yes No
Girder 27 Yes No No No No No Yes No
Girder 28 Yes No No No No No Yes Yes
Girder 29 Yes No No No No No Yes No
Girder 30 Yes No No No No No Yes Yes
Girder 31 Yes No No No No No Yes No
Girder 32 Yes No No No No No Yes No
Girder 33 Yes No No No No No Yes No
Girder 34 Yes No No No No No Yes Yes
Yes
Girder 35 No No No No No Yes No
Girder 36 Yes No No No No No Yes Yes
Girder 37 Yes No No No No No Yes No
Girder 38 Yes No No No No No Yes No
Girder 39 Yes No No No No No Yes No
Girder 40 Yes No No No No No Yes Yes
Girder 41 Yes No No No No No Yes No

Report Ref : KFCA-SAFOM-M228-MMR-16-23 Page 86


King Fahd Causeway FM Services Contract (M228)

V. RWI = ROUTE INSIDE GIRDER SAUDI SIDE (ACTS INSPECTION OBSERVATION)-BRIDGE 1 NORTH
TOWARDS SAUDI SIDE

Reported Defects
Inspected Rusted Cracks
Element Air Voids / Exposed Cracks <
Segregation Honeycombs Spalling Steel >
Bugholes Steel 0.2mm
Ties 0.2mm
Girder 01 Yes No No No No No Yes No
Girder 02 Yes No No No No No Yes No
Girder 03 Yes No No No No No Yes No
Girder 04 Yes No No No No No Yes Yes
Girder 05 Yes No No No No No Yes No
Girder 06 Yes No No No No No Yes No
Girder 07 Yes No No No No No Yes No
Girder 08 Yes No No No No No Yes No
Girder 09 Yes No No No No No Yes No
Girder 10 Yes No No No No No Yes No
Girder 11 Yes No No No No No Yes No
Girder 12 Yes No No No No No Yes No
Girder 13 Yes No No No No No Yes No
Girder 14 Yes No No No No No Yes No
Girder 15 Yes No No No No No Yes No
Girder 16 Yes No No No No No Yes No
Girder 17 Yes No No No No No Yes No
Girder 18 Yes No No No No No Yes No
Girder 19 Yes No No No No No Yes No

VI. RWI = ROUTE INSIDE GIRDER SAUDI SIDE (ACTS INSPECTION OBSERVATION)-BRIDGE 1 SOUTH
TOWARDS SAUDI SIDE

Reported Defects
Inspected Rusted Cracks
Element Air Voids / Exposed Cracks <
Segregation Honeycombs Spalling Steel >
Bugholes Steel 0.2mm
Ties 0.2mm
Girder 01 Yes No No No No No Yes No
Girder 02 Yes No No No No No Yes No
Girder 03 Yes No No No No No Yes No
Girder 04 Yes No No No No No Yes No
Girder 05 Yes No No No No No Yes No
Girder 06 Yes No No No No No Yes No
Girder 07 Yes No No No No No Yes No
Girder 08 Yes No No No No No Yes No
Girder 09 Yes No No No No No Yes No
Report Ref : KFCA-SAFOM-M228-MMR-16-23 Page 87
King Fahd Causeway FM Services Contract (M228)

Rusted Cracks
Inspected Air Voids / Exposed Cracks <
Segregation Honeycombs Spalling Steel >
Element Bugholes Steel 0.2mm
Ties 0.2mm
Girder 10 Yes No No No No No Yes No
Girder 11 Yes No No No No No Yes No
Girder 12 Yes No No No No No Yes No
Girder 13 Yes No No No No No Yes No
Girder 14 Yes No No No No No Yes No
Girder 15 Yes No No No No No Yes No
Girder 16
Girder 17
Girder 18
Girder 19

NOTE: NO ACTS ACTIVITY REPORT BEING SUBMITTED FOR THE MONTH OF APRIL, 2023

Report Ref : KFCA-SAFOM-M228-MMR-16-23 Page 88


King Fahd Causeway FM Services Contract (M228)

ATTACHMENT PHOTOS

Report Ref : KFCA-SAFOM-M228-MMR-16-23 Page 89


King Fahd Causeway FM Services Contract (M228)

Report Ref : KFCA-SAFOM-M228-MMR-16-23 Page 90


King Fahd Causeway FM Services Contract (M228)

Report Ref : KFCA-SAFOM-M228-MMR-16-23 Page 91


King Fahd Causeway FM Services Contract (M228)

Report Ref : KFCA-SAFOM-M228-MMR-16-23 Page 92


King Fahd Causeway FM Services Contract (M228)

Bridge inspection equipment maintenance Boat #3 portable generator oil filter ,


fuel filter an air filter , 80 AH battery.

Report Ref : KFCA-SAFOM-M228-MMR-16-23 Page 93


King Fahd Causeway FM Services Contract (M228)

BAHRAIN SIDE

Report Ref : KFCA-SAFOM-M228-MMR-16-23 Page 94


King Fahd Causeway FM Services Contract (M228)

Painting of Pier Connection, B4S

Painting of PH, marking the level of PH, Repair of CONS-CS, Girder-outside &
Cleaning of Expansion joint, EJ #3, B4S

Report Ref : KFCA-SAFOM-M228-MMR-16-23 Page 95


King Fahd Causeway FM Services Contract (M228)

Repair of Bearing elastomeric -Crack at HJ19-20N, B4S

Cleaning of Expansion joint & greasing of bearing

Cleaning & touch up painting of gangway, GW3, B4S

Report Ref : KFCA-SAFOM-M228-MMR-16-23 Page 96


King Fahd Causeway FM Services Contract (M228)

Cleaning & touch up painting of gangway, GW4 & Painting the marking level of PH22, B4S

Repainting of guardrail with defects/scratched due to accident, B5N&S & curb stone approached B5N&S

Report Ref : KFCA-SAFOM-M228-MMR-16-23 Page 97


King Fahd Causeway FM Services Contract (M228)

PM for Expansion joint, Cleaning with air compressor, B5, (EJ1-EJ4), N&S

Report Ref : KFCA-SAFOM-M228-MMR-16-23 Page 98


King Fahd Causeway FM Services Contract (M228)

PM for greasing of guardrail moving joint, (guardrail joint-outside & median), B4&B5, N&S

Report Ref : KFCA-SAFOM-M228-MMR-16-23 Page 99


King Fahd Causeway FM Services Contract (M228)

Repair of girder-inside with deficiency-(CONS-CR>=0.20mm), G2S, B4S

Report Ref : KFCA-SAFOM-M228-MMR-16-23 Page 100


King Fahd Causeway FM Services Contract (M228)

Preventive Maintenance of Navigation Lights B4, N&S

Inspection Equipment Maintenance (MOOG #2, PN1012) & (MOOG #4, PN103694)

Inspection Equipment Maintenance BOAT #1, Mercury150hp

Report Ref : KFCA-SAFOM-M228-MMR-16-23 Page 101


King Fahd Causeway FM Services Contract (M228)

Inspection Equipment Maintenance Portable Generator for Boat #1 (Painting of generator cover)

Painting of generator cover for boat #1

Inspection Equipment Maintenance Boat #4, Mercury 150hp

Report Ref : KFCA-SAFOM-M228-MMR-16-23 Page 102


King Fahd Causeway FM Services Contract (M228)

THE END