Download as pdf or txt
Download as pdf or txt
You are on page 1of 82

COMPANY

PROFILE

Bangalore Office: Mumbai office:


Pin No. 560 027 Pin No. 400101
No. 5, (Old No. 21/2), Arekempanahalli, 515 Autumn Grove Lokhadwala Township
Bengaluru - India Akurli Road Kandivali East Mumbai
Mob No: +919845333446
Mob No: +919845333446
Email: sales@pipecoindustries.com
Email: sales@pipecoindustries.com
Web: www.pipecogroup.com Web: www.pipecogroup.com
INDEX

I. ABOUT US ............................................................. 03

II. O U R G R O U P O F C O M PA N I E S . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 0 4

III. OUR PRODUCTS ....................................................... 05

IV. C E R T I F I C AT I O N S . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 0 6

V. G R P H O T P R E S S E D M O U L D E D WAT E R TA N K . . . . . . . . . . . . . . . . . . . . 0 7 - 1 0

VI. C ATA L O G U E . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 1 1 - 2 7

V I I . B O LT E D Z I N C A L U M I N I U M S T E E L WAT E R T A N K . . . . . . . . . . . . . . 2 8

V I I I . G L A S S F U S E D S T E E L WAT E R TA N K . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 2 9

IX. S T E E L TA N K S . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .. . . . . . . . 3 0

X. C ATA L O G U E . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 3 1 - 5 1

XI. S E C T I O N A L S TA I N L E S S S T E E L W E L D I N G WAT E R TA N K . . . . . . . 5 2

X I I . C ATA L O G U E . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 5 3 - 6 1

X I I I . M A N UA L . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 6 2 - 7 6

XIV.PROJECT REFERENCES ............................................... 77 - 80

2
ABOUT US

P I P E C O I N D U S T R I E S i s a c o m p a ny s p e c i a l i z e s i n t h e
d e v e l o p m e n t a n d p r o d u c t i o n o f G R P S e c t i o n a l Wa t e r Ta n k s , B o l t e d
Z i n c A l u m i n u m Wa t e r Ta n k s , G l a s s F u s e d S t e e l Wa t e r Ta n k ,
S e c t i o n a l S t a i n l e s s S t e e l We l d i n g Wa t e r Ta n k s . O u r l a r g e - s c a l e
plant and research center are dedicated to ongoing development
a n d p r o d u c t i o n t o l e a d t h e i n d u s t r y.

O u r a d v a n c e d t e c h n o l o g y h a s r e c e i v e d I S O, W R A S ( U K ) , B S E N
( U K ) , P S B ( S I N G A PO R E ) C e r t i f i c a t e s a n d i s ga r n e r i n g w o r l d
acclaim.

In addition, with a cor porate ideology rooted in placing our


customers f irst, we base our Management and Product
Development upon this foundation of tr ust, contributing to
technological i n n o va t i o n , quality improvement and added
enhancement.

In order to car ry out such customer-oriented management, we


c o n s t a n t l y ke e p i n m i n d t h e p r i o r i t i e s o f s t r i n g e n t q u a l i t y
management and environmental protection. In following, we
adopted ISO product quality and environmental management
standards from the very beginning and our ef forts to grow as an
e n v i r o n m e n t a l f r i e n d l y c o m p a ny a l o n g w i t h o u r c u s t o m e r s a r e
never ending.

We a s k f o r y o u r c o n t i n u i n g i n t e r e s t a n d s u p p o r t . T h a n k y o u .

E xc e l l e n t i n C l e a n & H yg i e n i c a n d N o n - l e a k a g e .
G R P S e c t i o n a l Wa t e r S t o r a g e Ta n k .

3
www.pipecogroup.com
FR

OVER GLOBAL PRESENCE OF PIPECO GROUP

PIPECO GROUP OF COMPANIES

PIPECO KOREA PIPECO TANKS TRADING LLC – DUBAI


PIPECO INDUSTRIES PIPECO INDUSTRIES
PIPECO TANKS PIPECO TANKS EST.
PIPECO FIBERGLASS INDUSTRY LLC PIPECO BAHRAIN W.L.L.
PIPECO TANKS MUSCAT LLC PIPECO TANKS TRADING WLL
PIPECO TANKS TRADING – AJMAN PIPECO EGYPT

4
FR

OUR PRODUCTS
1. GRP Hot Pressed Moulded Sectional Water Tanks

❖ GRP Insulated Sectional Water Tanks

❖ GRP Non-Insulated Sectional Water Tanks

2. Bolted Zinc Aluminum Steel Water Tank

3. Glass Fused Steel Tank

4. Steel Water Tank

5. Sectional Stainless Steel Welding Water Tank

www.pipecogroup.com 5
FR

CERTIFICATES

Add a footer 6
CERTIFICATE
This is to Certify that the Management System of

PIPECO INDUSTRIES
NO . 5, OLD NO. 21/2, AREKEMPANAHALLI, BENGALURU,
URBAN , KARNATAKA- 560027, INDIA

has been audited and


found to comply with the requirement of

ISO 9001: 2015


Quality Management System
For the following activities :

MANUFACTURE AND SERVICE OF GRP WATER TANKS, WATER PUMPS, ZINC ALUMINUM
WATER TANK, HOT DIP GALVANIZED TANKS AND GLS WATER TANKS

The Validity of Certificate is subject to regular surveillance audit on or before above mentioned dates
and it's only valid after successful surveillance with continuation letter issued by UCSPL
Initial Date of Certification : 14/10/2022 Current Date of Certification : 14/10/2022
Date of Expiry : 1st Surveillance Audit Certification Number :
13/10/2025 13 October 2023 UCS8022B00234
2nd Surveillance Audit
13 October 2024

KAB-QC-80
Authorised Signatory
UNIVERSAL CERTIFICATION SERVICES PVT. LTD.
E-mail : universalcertificationservices@gmail.com
Web : www.universalcertification.co.in

This certificate of registration remain the property of Universal Certification Services Pvt. Ltd. and shall be returned immediately upon request.
The validity of this certificate can be verified at http://eng.kab.or,kr
Office Address - #1301, 254, Beotkkot-ro, Geumcheon-gseoul, Republic Of Korea
FR

1. GRP HOT PRESSED MOULDED


SECTIONAL PANEL WATER TANKS
GRP Water tank panel is designed with special shape for
maximizing safety against stress and deformation, so it has
better structural strength than normal circle designed panel.

As GRP water panel is manufactured by oil-hydraulic press


under high temperature and high pressure, it maintains top
water pressure strength and there is no dimensional deviation
by temperature change.

GRP Insulated Sectional GRP Non-Insulated Sectional


Water Tanks Water Tanks

Excellent insulation from 40-50mm There is non-woven fabric with


of GRP material itself with Eco- excellent adhesion inside GRP Non-
friendly Polyurethane heat insulating Insulated panel, ensuring shape
material prevents freeze and water stability of panel throughout longer
condensation. time periods.

There is non-woven fabric with


excellent adhesion inside GRP Non-
Insulated panel, ensuring shape
stability of panel throughout longer
time periods.

www.pipecogroup.com 7
FR

TECHNICAL CHARACTERISTICS

Panel Strength : Hydrostatic Pressure x6 (Safety


Factor)
Wind Velocity : 60 m/sec
Roof Load : 120 Kgf/m
Ambient Temperature : 55 °C (Max)
Water Temperature : 65 °C (Max)
Seismic Load : Peak Ground Acceleration
PGA = 0.25 (Group A)
Seismic Zone : B2
Upgraded Design Available for
Higher Seismic Zones:
(Group B) 0.25 < PGA < 0.40
(Group C) PGA > 0.40

www.pipecogroup.com 8
FR

GRP HOT PRESSED MOULDED SECTIONAL PANEL


WATER TANKS

- INTERNALLY REINFORCED

✓ It is possible that various capacity’s design and flexible space


should be used by GRP panel standardized.

✓ Excellent water tightness, hygienic conditions and non leakage


applied internally reinforced (Stainless).

www.pipecogroup.com 9
FR

GRP HOT PRESSED MOULDED SECTIONAL PANEL


WATER TANKS

- EXTERNALLY REINFORCED

www.pipecogroup.com 10
FR

CATALOGUE

www.pipecogroup.com 11
G R O U P

Pipeco GRP Sectional Water Tank


PIPECO TANKS (KOREA) is a company that specializes in the development and production
of GRP Water tanks. Located in Gimhae, Korea our large-scale plant and research center are
dedicated to ongoing development and production to lead the industry.

We are specialized in manufacturing and installing GRP tanks and other GRP Products. Our
advanced technology has received ISO, WARAS (UK), PSB (SINGAPORE) quality certificates. we
have expanded our presence in more than 35 countries and 1 Tank getting completely installed
every 24 hours

In addition, with a corporate ideology rooted in placing our customers first, we base our
Management and Product Development upon this the foundation of trust, contributing to
technological innovation, quality improvement, and added enhancement.

To carry out such customer-oriented management, we constantly keep in mind the priorities of
stringent quality management and environmental protection. In the following, we adopted ISO
product quality and environmental management standards from the very beginning, and our
efforts to Growth as an environmentally friendly company along with our customers are never-
ending.

We ask for your continuing interest and support kindly share your requirements via email at
sales@pipecogroup.com
02
G R O U P

THERMAL CONDUCTIVITY, EXPANSION AND CONTRACTION

Non-insulated panels
have 240 times less
thermal conductivity than
metal, ensuring stable
temperature. Modular panels
with low thermal coefficient
and flexible food grade sealant
ensure a leak-free design

Thermal Properties
1/K(W/M.K)

50mm 25mm Normal Steel


Insulated Insulated

PROTECTION AGAINST UV RAYS


Excellent ultraviolet (UV) resistant
characteristics and performance ensures
high mechanical properties and weather
resistance even after 35 years of use
03
G R O U P

General Specifications

STANDARD:

BS EN 13280:2001 and British


Standard BS 7491 Part 3:1994 01 MATERIALS:
Sheet Moulding Compound (SMC) consists
of below specification Resin - Isophthalic
unsaturated polyester resin conforming to
02 BS 3532 specification Fiber Glass - Low alkali
fiberglass conforming to JIS R3411 to R3417
TESTING METHOD: or BS 3396, BS 3496, and BS 3749
specifications.

BS2782 03
MANUFACTURING PROCESS:

Hot pressed SMC compression


04 moulding

TANK STRUCTURAL SUPPORT:


External : Hot Dipped Galvanised Steel
Internal : SS316 05
Roof Support : GRP Pipes

SEALANT:

BOLT, NUTS, WASHERS: 06 Non-toxic PVC Foam

External Standard : SS316 A4 Grade


(Optional SS304)
Internal Standard : SS316
(In-contact with water) 07 LADDER :
Roof : Standard : SS316
(Optional SS304)
External Standard : Hot Dipped Galvanised
Steel, 300mm width
08 Internal : Standard GRP
Optional : SS 304 and 316,
WATER LEVEL INDICATOR : 300mm width

Standard : Direct Reading Clear Tube Type


Optional : Reversed Reading Mechanical 09
Ball Float Type (Cat & Mouse)
NOZZLE PANEL :

EXTERNAL BRACED SYSTEM : 10 Flat Panels will be provided on request

External : Hot Dipped Galvanized


Steel Internal None
(metal free inside, non 11
-partitioned tank only)
Roof Support : GRP Poles

04
G R O U P

GRP Panel Type and Size

Wall Panel

PIPECO
PIPECO

1Mx2M 0.5Mx2M 1Mx1.5M 0.5Mx1.5M 1Mx1M 1Mx1M 0.5Mx1M 0.5Mx1M 0.3Mx1M 0.5Mx0.5M

Drain Panel Base Panel Roof Panel Manway Panel

1Mx1M 1Mx1M 0.5Mx1M 0.5Mx0.5M 1Mx2M 1Mx1M 0.5Mx1M 0.5Mx0.5M 1Mx1M

GRP Panel Composition by Height

Height of water tank

6.0m.H
5.5m.H
5.0m.H PIPECO
PIPECO
4.5m.H
4.0m.H PIPECO
PIPECO
3.5m.H
3.0m.H PIPECO
PIPECO
2.5m.H
2.0m.H PIPECO
PIPECO
1.5m.H
1.0m.H PIPECO
PIPECO
0.5m.H
0m.H
1x1 E 1x1.5 D 1x2 D 1x1.5 D 1x2 D 1x1.5 D 1x2 D 1x1.5 D 1x2 D 1x1.5 D 1x2 D
1x1 C 1x1 B 1x1 C 1x1 B 1x1 C 1x1 B 1x1 C 1x1 B
1x1 SA 1x1 SA 1x1 SA 1x1 SA 1x1 SA 1x1 SA
1x1 IIA 1x1 IIA 1x1 IIA 1x1 IIA
1x1 IIIA 1x1 IIIA

Grade of base panel E D D C B SA SA IIA IIA IIIA IIIA

Grade of drain panel C C C B SA SA IIA IIA IIA IIIA IIIA

Flat,0.5X1 D B B B B SA SA IIA IIA IIIA IIIA


Grade of
wall-base panel Flat,1X1 D B B SA SA IIA IIA IIIA IIIA IIIA IIIA

Current A grade Unify to SA grade Current IA grade Unify to IIA grade

05
Internally Reinforced System G R O U P

It is possible that various capacity design and flexible space


should be used by GRP panel standardized Excellent water
tightness, hygienic conditions and non-leakage
applied internally reinforced stay (Stainless)

Manway panel
External ladder
1 2

Roof support pipe


11

Internal ladder
3

Internal bracket
4

Internal Tie-Rod
5

Corner bracket External bracket


8 7

6
Flangebar, Flat bar
Water level gauge
15

16
9 Name plate
10
Wall-Bottom bracket 12 Corner frame
Skid base frame
14
13 Sealing tape
Bolts and Nuts

06
G R O U P

Internally Reinforced System

11

5
2
4

6
9 8 16
3

15

10 10
12 13

No. Name Material No. Name Material


1 Manway panel GRP 11 Roof support pipe GRP (Pultrusion)

2 External ladder SS400(HDG) 12 Skid base frame SS400(HDG)

3 Internal ladder GRP (Pultrusion) Internal : STS 316

4 Internal bracket STS 316 Roof : STS 316


13 Bolts and Nuts
5 Internal Tie-Rod STS 316 External : STS 316

6 Flangebar, Flat bar Skid Base : HDG

7 External bracket 14 Sealing tape PVC Sealant+Butyl

8 Corner bracket SS400(HDG) 15 Water level gauge Aluminum Case+PC Clear Tube+Socket

9 Wall-Bottom bracket Aluminum (Water tank safery


16 Name plate
management instructions)
10 Corner frame

07
G G
R R
O O
U U
P P

Externally Reinforced System

Roof support pipe : GRP (Pultrusion)


9

Roof bar Manway panel

5 1

External ladder
2

Internal ladder
3
External main bar
Internal bracket
6
4

External bracket
7

14
Water level gauge Name plate
13

12
8 Sealing tape
10
Corner frame
Base frame
11
Bolt and Nuts

08
G R O U P

Externally Reinforced System

1
2

6
9 13

3 14

8 7 11 12
4

10

No. Name Material No. Name Material


1 Manway panel GRP 10 Base frame SS400(HDG)
2 External ladder SS400(HDG)
Internal : STS 316
3 Internal ladder GRP (Pultrusion)
Roof : STS 316
4 Internal bracket STS 316 11 Bolts and Nuts
External : STS 316
5 Roof bar SS400(HDG)
Skid Base : HDG
6 External main bar
12 Sealing tape PVC Sealant+Butyl
7 External bracket

Corner bracket SS400(HDG) 13 Water level gauge Aluminum Case+PC Clear Tube+Socket
8

Roof support pipe : Name plate


Aluminum(Water tank safety
9 14
GRP (Pultrusion) management instructions)

09
G R O U P
Panel physical Properties
TEST ITEM UNIT SAMPLE RESULT TEST METHOD
Specific Gravity (23°C/23°C) - - 1,806 ASTM D792-13(Test Method A)
Water Absorption % - 0.02 ASTM D570-98(2010)e1 (24 h Immersion)
Tensile Strength MPa - 115 ASTM D638-14( «)
Tensile Elastic Modulus GPa - 17.5 ASTM D638-14( «)
Flexural Strength MPa - 213 ASTM D790-17(Procedure A)
Flexurual Elastic Modulus GPa - 15.9 ASTM D790-17(Procedure A)
Shear Strength MPa - 114 ASTM D732-17
Izod Impact Strength J/m - 923 ASTM D256-10e1(Test Method A)

Compressive Strength MPa - 234 ASTM D695-15(**)

Thermal Conductivity KS L 9016 : 2010


W/(m.k) - 0.115
[Mean Temperature 20°C (By means of the Heat Flow Meter Apparatus)

Thermal Conductivity KS L 9016 : 2010


W/(m.k) - 0.024 (By means of the Heat Flow Meter Apparatus)
[Mean Temperature 20°C

Barcol Hardness - - 53 ASTM D2583-13a


Glass content % - over 42.9% ASTM D2584-11

Stress Analysis of GRP Panel


GRP Water Tank panel is designed with special shape for maximizing safety against stress and deformation,
so it has better structural strength than normal circle designed panel As GRP Water panel is manufactured by
oil-hydraulic press under high temperature and high pressure, it maintains top water pressure strength and there
is no dimensional deviation by temperature change.

Excellent Heat Insulation


Drawing of the panel Joint Part / Corner Part

Composition of Insulation Panel


Excellent insulation of GRP Material itself with Eco-friendly Polyurethane heat insulating material
prevents freeze & water condensation.
There is non-woven fabric with excellent adhesion inside GRP insulated panel, ensuring shape stability
of panel throughout longer time periods.
GRP insulated panel with 4 layer structure ensure excellent insulating effect
Thickness of insulated panel : 40 - 50 mm
10
Strength & Durability G R O U P

Section Design Standard

Hydrostatic Pressure Water pressure reinforcement 6 times standard


Transformation rate in filled with water : Less than 1% from water tank height

Wind Force 60 m / sec

Earthquake Force Stable and safe till magnitude 5.0 (Over magnitude 5.0, it need additional
reinforcement)

Snow Load 60 Kg/m2, snow fall less than 30cm

Illumination Rate Less than 0.1%

Out-fit-Force No leakage under condition of vertical 100kg after install of 100A fitting
with 70mm span support

Water Temperature Usable temperature : Less than 30° / Limited temperature : Max 70°

Water Quality Tap Water, Well Water : Chlorine below 50mg/L


Seawater : application Externally Reinforced water tank (max 3m height)

Man Load 120 KGF

Comparison with Other Types of Tanks

Feature GRP CONCRETE PLASTIC STEEL

Hygiene & Water Quality

Flexibility

Relocation

Water Tightness

Strength & Durability

Easy & Fast Assembly

Easy to Transportation

Thermal Conductivity

Drainage

Value of Parameter Excellent Good Average Poor

11
G R O U P

Installation Space
Standard of Base Concrete PAD
Installation and Space
For maintenance of GRP tank, it need extra space at least
600mm - 100mm from wall and 1000mm from ceiling

Partition Installation

(Non Partition Type) (Partition Type)

12
G R O U P

Earthquake-Proof Skid Base System


Height of water tank 2.5mH
Height of water tank4m
GRP Sectional Panel, Putting water to 85% of water tank height, Earthquake-Proof Strength 5.0

Result of skid base strength review (Safety Factor 2.0)


Height Contents Bending Stress(kg/cm2) Result Deflection(cm) Result

Long term 1170< 1600(Allowable value) O.K 0.15 < 0.25(Allowable value) O.K
Base frame
Short term 1340< 2400(Allowable value) O.K 0.17 < 0.33(Allowable value) O.K
2.5mH
Long term 1590< 1600(Allowable value) O.K 0.21 < 0.25(Allowable value) O.K
Base cross
Short term 1830< 2400(Allowable value) O.K 0.25 < 0.33(Allowable value) O.K

Long term 790< 1600(Allowable value) O.K 0.06 < 0.25(Allowable value) O.K
Base frame
Short term 900< 2400(Allowable value) O.K 0.27 < 0.33(Allowable value) O.K
4mH
Long term 1540< 1600(Allowable value) O.K 0.15 < 0.25(Allowable value) O.K
Base cross
Short term 1750< 2400(Allowable value) O.K 0.17 < 0.33(Allowable value) O.K

13
G R O U P

Maintenance Control
User Regulation Maintenance Items
1) Caution the damage to the water tank from outside shock
2) Do not use the GRP water tank for other unapproved purpose. (For example chemical storage tank)
3) Do not dismantle internal components or change it to other components without official approval.
4) Prohibit to install unapproved components or non-consent equipment.
5) Keep standard water level at all times. (Uppermost tie rod is soaked in water)

Installation and Caution


1) The water level should be over tie rod position all the time. (Over 85% of tank height)
2) Check the flatness of concrete plinth. (Tolerance: 2mm)
3) Check water tank panel's crack.
4) Check deflection of wall panel. (maximum up to 1% of water tank height)
5) Check generally for leaks or drips.
6) The interior of the tank should be cleaned two or more times a year: after cleaning, you need to
check whether the water quality in the tank is proper or not.
7) Organic solvent including thinner, acetone and chlorine bleach cannot be used to clean the
exterior or interior of the tank.
8) When cleaning once compartment the inside of the tank, keep the water level less than 50%
at the other compartment.
9) The tank cannot store anything except normal temperature drinking water.
10) All internal supports should be checked for corrosion, if corrosion is found it should be rectified
immediately.
11) Check that all tie rod should be tightened.
12) Check that all pipe work connected to tank suitably braced.
13) Check that the structural supports under the tank are in good condition.
14) Check that overflows are fitted.
15) When Cleaning the inside of tank, do not interface with the joint seals.
16) If there are ladders fitted to the tanks, ensure that they have not been damaged and are securely
fastened to the tank.
17) If overflow and / or air inlet screens are fitted, check that they have not become blocked.
18) Pipeco Korea will not bear the responsibility for the problems caused by your failure to fallow the
above mentioned recommendations, inadequate strength or uneven of concrete plinths or
natural disasters.

14
G R O U P

Certificates of GRP Water Tanks


Getting all international certificates and Test reports for GRP Water tank
Realization of customer satisfaction through quality management system
GRP Water tank of best quality with competitive price

GRP Water Tanks Certificates and Test Reports

15
PIPECO AJMAN Tel: +971 6745 9878 PIPECO INDUSTRIES Tel: +91 98453 33446
United Arab Emirates Fax: +971 6745 9877 India www.pipecogroup.com
www.pipecogroup.com sales@pipecogroup.com
sales@pipecogroup.com
PIPECO KOREA www.pipecogroup.com
PIPECO DUBAI Tel: +971 4243 8356 Korea sales@pipecogroup.com
United Arab Emirates Fax: +971 4243 8360
www.pipecogroup.com
sales@pipecogroup.com
PIPECO TANKS UK www.pipecogroup.com
United Kingdom sales@pipecogroup.com
PIPECO GROUP Tel: +971 6748 7714
United Arab Emirates Fax: +971 6745 9877 PIPECO AFRICA Tel: +263 77893 0545
www.pipecogroup.com Zimbabwe www.pipecoafrica.com
sales@pipecogroup.com sales@pipecoafrica.com
PIPECO DOHA Tel: +974 7721 4844
Qatar Tel: +974 7747 5888 PIPECO JOHANNESBURG Tel: +27 83742 8224
Fax: +974 7721 4844 South Africa Fax: +27 67135 5251
www.pipecogroup.com www.pipecoafrica.com
salesqatar@pipecogroup.com sales@pipecoafrica.com
PIPECO RIYADH Tel: +966 55719 8474 PIPECO EGYPT Tel: +20 111 213 0408
Saudi Arabia www.pipecogroup.com Egypt Tel: +20 100 063 0106
sales@pipecotanks.com www.pipecogroup.com
PIPECO BAHRAIN W.L.L Tel: +973 17 300 426 salesegypt@pipecogroup.com
Kingdom of Bahrain Fax: +973 17 742 568
www.pipecogroup.com
PIPECO JORDAN www.pipecogroup.com
Jordan sales@pipecogroup.com
salesbahrain@pipecogroup.com

PIPECO INDUSTRY LLC Tel: +968 9011 5888 PIPECO WEST AFRICA Tel: +233 24 414 1303
PIPECO MUSCAT LLC Tel: +968 9227 7629 Ghana Tel: +233 27 399 8141
Oman www.pipecogroup.com www.pipecogroup.com
salesoman@pipecogroup.com sales@pipecogroup.com
FR

2. BOLTED ZINC ALUMINUM STEEL WATER TANK

Zinc Aluminum Bolted Tanks are manufactured from steel


sheet which has been continuously coated with zinc and
aluminum to provide the excellent corrosion resistance which
is commonly experienced by tanks that are exposed to the
harshest of atmospheric conditions. Aluminum in the coating
provides barrier protection to the steel whilst the zinc
component provides sacrificial cut edge protection.

Storage for: Fire Fighting, Raw Water Storage, Process Water,


Domestic Water, Potable & Rainwater Applications.

Add a footer 12
FR

3. GLASS FUSED STEEL WATER TANK


GFS Steel Tank technology is one of the premiere coating
technology in the storage tank market.

Molten glass reacts with steel plate surface to form an inert and
inorganic bond, which combines the strength and flexibility of
steel and outstanding corrosion resistance of glass, so GFS
Tanks can provide many advantage over standard
welded and epoxy painted storage tanks.

Add a footer 13
FR

4. STEEL WATER TANK


Pipeco Enamel offers AISI 304/31 steel storage tanks, both bolted
and welded, with wide range of capacities and configurations to
meet the project requirements.

Our steel storage tanks are great options for numerous


applications and can constructed in different and heights for
same capacity, which allows ideal space utilization and integration
of your projects. All our steel tanks meet or exceed AWWA
D103~09, ISO9001, NSF61, FDA and other international standards.

They are used in a variety of applications including:

• Biogas Tanks
• Agricultural Water Tanks
• Wastewater Tanks
• Fire Protection Water Tanks
• Leachate Tanks
• Dry Bulk Storage Tanks
• Potable Water Tanks
• Municipal Sewage Tanks
• Anaerobic Digester

www.pipecogroup.com 14
FR

CATALOGUE

www.pipecogroup.com 15
BOLTED ZINC ALUMINUM, GALVANIZED,
GLASS FUSED TANKS (GLS)

FIRE TANKS | DOMESTIC WATER TANKS


PROCESS WATER TANKS | WASTE WATER TANKS

PIPECO INDUSTRIES
ABOUT US
Pipeco Group is a manufacturer of ‘Water Storages Steel Tanks’, has earned a reputation
for quality and service by manufacturing superior storage systems, which can trace its
origin back to the industrial that sent waves of influence around the world. We were one
of the first suppliers of Metal Water Tanks and our experience in storing liquid and grain
in steel fabricated thin wall cylinder dates back long before the advent of metal tanks.
From then to the present day the company has evolved throughout the years to become
an innovative manufacturer and our intention to remain at forefront of this business sector
has already been established, with key preferred supplier status being achieved with
major companies throughout the world.
Our Products are designed and manufactured under AS1397 Std.
We guarantee our products, and we never compromise with quality standards, and it
beats the best in the market at present. Our products have made their grasp also with the
overseas market and getting excellent feedback.
We are so well connected with our quality of the products that we receive positive
feedback from our valuable customers, and many of our vendors are also immensely
satisfied with our products and services.
We ask for your continuing interest and support. If you have any requirements you can
reach us via sales@pipecogroup.com
BOLTED ZINC ALUMINUM

Why Use Our Water Storage Tanks?


As Tank Suppliers, we ensure that every reservoir suits the specific requirements of our
Clients and that the stored water is clean and odorless.

Our Water Storage Reservoirs are tough and maintenance free

TANK APPLICATIONS

Industrial: Food, beverage, pharma, automobile, engineering, textile, electronics, OEM’s


etc. All the industries need a constant supply of water for different applications like fire,
process, domestic, drinking, DM water and many more applications.

Commercial & Agricultural: it is unthinkable that we can get along today without a
constant supply of water in our daily lives. We do not only need water only for human
survival but also for agriculture & commercial use.

FEATURES: Customized, tough construction, fine finish, durable, reliable water storage
for: firefighting, raw water storage, process water, domestic water, potable & rainwater
applications.

BOLTED TANKS: Zincalume bolted tanks are manufactured from steel sheet which has
been continuously coated with zinc and aluminum to provide the excellent corrosion
resistance which is commonly experienced by tanks that are exposed to the harshest of
atmospheric conditions. Aluminum in the coating provides barrier protection to the steel
whilst the zinc component provides sacrificial cut edge protection.

FIRE PROTECTION: Standard of construction for fire fighting tanks - positive head or
suction lift wherever possible, horizontal centrifugal pumps shall be used, installed with
a positive suction head in accordance with the following:

• At least two thirds of the effective capacity of the suction tank shall be above the
level of the pump center line

• The pump center line shall be no more than 2m above the low water level of the
suction tank

Installing a pipeco fire tank will give you a positive head and suction lift which is always
suggested and ideal for a firefighting system.

INDUSTRIAL WASTEWATER AND PROCESSING: The treatment of wastewater is


essential prior to re injection into the water grid or before water is re-used in processing
works. With ever-increasing water costs tied with limited availability and increasingly
stringent legislation on contamination, globally, this as an area of key interest to clients
in the following sectors: Municipal water treatment, Mining, Food & Beverage, Pharma,
Pulp and Paper, Animal processing, Manufacturing, Automobile and Ancillaries.
TECHNICAL DETAILS

STEEL SPECIFICATIONS

‘Ultra-high tensile low alloy steel’ offers exceptionally high yield strength, very fine
molecular structure of steel and controlled internal purity. It combines outstanding
mechanical properties like extremely high strength, fatigue resistance and toughness
with good formability and weldability. In some applications abrasion / wear can result
from the action of abrasive substances in the steel surface and because of the action of
load, impact etc. This type of steel is capable of resisting abrasion / wear & tear. Due to
low carbon equivalent values ©< 0.42% This type of steel doesn’t require pre or post
heating for welding. Moreover, it is insensitive to cold cracking and suitable for all types
of arc welding.
G300 STEEL TECHNICAL DETAILS
G300 STEEL TECHNICAL DETAILS
G550 STEEL TECHNICAL DETAILS
G550 STEEL TECHNICAL DETAILS
TECHNICAL DETAILS

LINER / TANK MEMBRANE


The liners are made by pvc, reinforced with compressed
multilayer nylon mesh with options like butyl rubber or EPDM.
Liners are pre-fabricated as one piece ‘bag’ to fit inside the
water tank. These are non-sticky and chemically stabilized.
With water inflow, it takes the shape of the tank. These liners
are made of food grade, anti-algae material and are UV
stabilized. These are also made according to anti-cracking
technology and tested up to 600,000 folds before any
cracking.

TECHNICAL DETAILS OF THE LINER:


• Hardness (Test Method BS903A26) : 65 + 5 IRH
• Modulus at 300% Elongation (Test Method BS903A2) : Min. 5.0 Mpa
• Tensile Strength (Test Method BS903A2) : Min. 9.0 Mpa
• Elongation at Break : Min. 400%
• Tear Strength (Test Method BS903A3C) : Min. 30 kn/m
• Adhesion (Test Method DIN-53337) : 12da/N
• Finishing : Glossy Lacquered (Both Face)

ACCESSORIES

NOZZLE SPRIAL LADDER LADDER & SAFETY CAGE GOOSE ROOF VENT ROOF VENT

HOLD DOWN BRACKET TURBINE VENT NUTS & BOLTS ROOF STRUCTURE STIFFENER

APPLICATIONS • Leachate Waste Water Storage • Fire Fighting Water Storage


• Drinking Water Storage • Anaerobic Water Storage • Rain Water Storage
• Industrial Water Storage • Chlorination Water Storage • Agricultural Water Storage
• Raw Water Storage • Sludge Holding Tank • Underground or Basement Water Storage
• Industrial Waste Water Storage • DM Water Storage • Fish Cultivation Water Storage
• Municipal Waste Water Storage • Equalization Water Storage • Coal Wash Tanks
GROSS CAPACITY CHART( IN KILO LITRES), STANDARD SHEET SIZE 3050 MM
GENERAL COMPARISON CHART

FEATURES ZINC ALUMINUM TANKS RCC TANK

Erection Time Extremely Fast, a 5 lac ltr Tank Extremely Long can be Built in 7-10
Working Days

Service Warranty 5 Years N/A

Design Life Tank 30-50 Yrs 30-50 Yrs

Food Grade Certificate Available for the Liner Holding Water Not Available

Water Contact Surface Liner Only Cement, Concrete and TMT Bars

Corrosion/ Algae Formation NO YES, Growth of Algae, Fungus & Bacteria
In the Pores of the Concrete Surface

Relocation Easy Not Possible

Weight Light Very Heavy

Maintenance Very Rare, Only for Sediment Cleaning Very Frequent

Transportation Very Economical Expensive

Complex Piping & Plumbing Possible Not Possible

Approval for FM Design Approved NO

Leakage Problem Least Prone to Leakages, Can Only Plenty of Cracks will Appear Over Time
Develop a Leak if the Liner is Damaged.

Storage Capacity From 10 KL to 2000 KL Ltr’s 30,000 Ltr’s to 50,00,000 Ltr’s

Fittings Flexibility to Fix in 360 Degrees to the Can be Fixed at Any Location But
Tank at Later Stage Also Only at 90 Degree

Need Painting /Coating NO (Pre Painted) YES

Quality Water Very Good Poor

Expandable YES NO

Space Relatively Less for Larger Capacities Equivalent


Due to Use of Vertical Height

Fire Application YES YES

Robust Structure YES YES

Aesthetics YES NO

Positive Head Always NO


ADVANTAGES

• MAGNELIS/ZAM/Zinc Alume or 600gm/sq.meter Galvanized Steel as options for


ultimate corrosion protection even at costal area or at any harsh and aggressive
environment.

• Ultra-High Tensile Strength Low Alloy Steel with exceptionally high yield strength and
outstanding mechanical properties like good formability, weldability, exceptional/
wear & tear resistance for heavy duty industrial applications.

• Water Tanks can be designed for 250km/Hr wind speed and highest seismic zone
consideration.

• JS 1000 Coated or 300 Series Stainless Steel Fasteners and Nozzles for highest
corrosion resistance, high lubricity and less stress, Non Toxic and FDA approved for
use around food products.

• Chemically compatible, food grade, UV stabilized lined made of Pvc compressed with
multi-layer nylon mesh and liner-anti-crack technology, tested for crack prevention up
to 600,000 folds.

• Extremely heavy duty and complete hot dipped galvanized roof structure with ‘I’ or ’Z’
beam roof rafters, multiple compression beams, curved spreaders, and tensioned rings.
Roof peak load can be achieved up to 22,000 kg.

• Ultra-High Tensile steel makes the tanks extremely light weight which transfer low
load to the platform and make it suitable for overhead installations with minimum
foundation requirement and fast installation tank.

• Extremely High base steel hardness.

• Extremely Low solar heat absorption.

• Up to 3 Stiffeners per wall sheet with ‘W’ profile or ‘Round Column’ profile.
GLASS FUSED STEEL TANKS

WHAT IS GLASS - FUSED - TO - STEEL TANKS?

After firing at 8200 C-9300 C high temperature, the


molten glass reacts with the steel plate surface to
form an inert and inorganic bond, which combines
the strength & flexibility of steel and outstanding
corrosion resistance of glass, therefore GFS tanks
can provide many advantages over standard
epoxy or welded painted storage tanks. Glass-
Fused- to Steel technology is the premium coating
technology in the storage tanks market, and GFS
tanks are widely used in bio-energy, municipal
sewage, landfill leachate, industrial wastewater
treatment and other applications.

GFS/ENAMEL SHEET SPECIFICATIONS

CATEGORY SPECIFICATION

Coating Color Black blue, Grey olive, Forest green, Cobalt blue, Desert tan etc

Coating Thickness 10-18 mils, 250-450 microns

Acid and Alkalinity Proof Standard PH: 3~11 Special PH: 1~14

Adhesion 3,450N/cm2

Elastic 7.9*104 MPA

Hardness 6.0 Mohs

Service Life >30 Years

Holiday Test >1500V

Easy to Cean Smooth, Glossy, Inert, Anti-adhesion

Corrosion Resistance Excellent, Suitable for harsh environment


TANKS COMPARISON CHART

Feature GFS Tank Concrete Tank Carbon Steel Tank

Corrosion Resistance a a

Low Lifetime Maintenance Cost a

Simple and Fast Construction a a

Removed and Relocated Possibility a

Expand Volume Easily a

Beautiful Appearance a

GLASS FUSED TO STEEL TANKS PRODUCTION INSTRUCTION

Plate CNC Cutting


Inputting the confirmed drawing into the computer,
bolt holes and openings will be cut by CNC laser cutting
machine automatically.

Automatic Enamel Spraying


Spray the glass coating on both sides of the steel panels
automatically. Coasting thickness is controlled within
250 microns to 450 microns.

High Temperature Firing


After enameling and drying, then firing steel panels in
the oven at the temperatures ranging from 820 ºC -
930 ºC, which facilitates the interfacial fusion reactions
that combine the two materials.

Quality Inspection
Quality inspection is conducted during and after
fabrication, including coating thickness test, 1500V
test, anti-acid test and color consistency test etc.
ADVANTAGES
• Short construction period, cost effective tank solution.
• Superior corrosion resistance, service life more than 30 years.
• Easy to install, no need for big installation equipment and /or very skilled labors.
• Tank volume is easily expanded.
• It can be dismantled, remove, and relocated.
• Elegant appearance, tank color can be customized.

WHY CHOOSE PIPECO ENAMEL GLASS-FUSED -TO-STEEL TANKS

a More than 30 years’ experience in Enameling Technology R & D


The only GFS tank manufacturer which has ability to produce enamel frit as well

a Strict Engineering Design Standard: AWWA D103, OSHA, NSF61, ISO28765 etc.
The only Asian GFS manufacture which can be widely accepted in UAS market

a Professional Experience with International Market


Successful GFS tanks projects references in more than 80 countries worldwide.
GFS TANKS APPLICATION FIELDS

Power and Energy

• Biogas • Fly Ash Silo • Boiler Feedwater

• Biomass Energy • DI Water • Reverse Osmosis Water

• Process Water • Coal Storage • Fermentation Tank

Waste Water Treatment

• Buffer Pool • Aerobic Reactor • Biological Filter

• Regulation Tank • Anaerobic Reactor • Leachate Storage

• Water Purifying Tank • Sedimentation Container • Sludge Tank

• Effluent Treatment • Irrigation Water • Animal Wastes

Water Supply and Treatment

• Potable Water • Bitter-Brackish Water • Biological Filter

• Water Purifying Tank • Disinfecting Water • Sedimentation Container

• RO Water • Sea Water Desalinization • Raw Water/Fresh Water

• Fire-Fighting Water • Irrigation Water • Clarification Pool

• Lime Silo • Saline Water/Brine Water • Aeration Tank

Industrial Dry Bulk Storage

• Mineral • Wood Product • Stone / Clay / Glass

• Chemicals • Petrochemicals • Mining Industry

• Food • Plasthetics • Grain / Seeds


STEEL TANKS

Pipeco Enamel offers AISI 304/31 steel storage tanks, both bolted and welded, with wide
range of capacities and configurations to meet the project requirements. Our steel
storage tanks are great options for numerous applications and can constructed in
different and heights for same capacity, which allows ideal space utilization and integration
of your projects. All our steel tanks meet or exceed AWWA D103~09, ISO9001, NSF61,
FDA and other international standards. They are used in a variety of applications including:

• Biogas Tanks • Agricultural Water Tanks • Wastewater Tanks • Fire Protection Water
Tanks • Leachate Tanks • Dry Bulk Storage Tanks • Potable Water Tanks • Municipal
Sewage Tanks • Anaerobic Digester

01 • Friendly to the environment, no painting, no rust, and no solvents.

02 • Superior corrosion resistance, service life is more than 30 years.

u ADVANTAGES 03 • Virtually maintenance free, does not requires coating.

04 • Green materials and can be recyclable.

05 • Hygienic materials – maintains drinking water quality integrity.


GFS/SS TANK ROOF OPTIONS

Glass – Fused – To – Steel Roof

• Air-tightness, often utilized for pressurized structures and


provide a suitable option for odour control
• Cone shape roof with external / internal beams
• Viable solution for demanding applications

Aluminum Alloy Trough Deck Roof

• Economical option for potable water, waste water, and fire


water storage etc.
• Keep out rain and wind, odour control
• Without air-tightness

Single & Double Membrane Roof

• Superior option for anaerobic digestion processed and


biogas applications
• Air tightness, utilized for biogas collection and odour
control
• Integrated AD tank with the cover on top, cost effective

FRP Roof

• Suitable for no air-tightness required situation such as


drinking water, agriculture, fire water, and wastewater
storage
• The Shape of FRP roof can be dome or flat

Stainless Steel Roof

• Air-tightness, often utilized for pressurized structures and


provides a suitable option for odour control
• Super anti-corrosion performance and long service life
• Viable solution for harsh environments

Aluminum Dome Roof

• Self Support without support columns


• Without air-tightness
ACCESSORIES

Roof Handrails

Full perimeter / partiall roof handrails can be constructed on


tanks according to related safety regulation.

Material options: HDG carbon steel /SS304 / SS316

Access Ladders

HDG / SS ladder with step off platform is availabe, all the


design conform to OSHA and other International safety
specification.

Types: Vertical / Spiral / Rotatory

Manways and Nozzles

CEC tanks include manways and nozzles, which provide


access for man / liquid to enter or get out of the tanks.

Material options: HDG carbon steel / SS304 / SS316 /


FRP / Epoxy

Three-Phase Separator (GLSS)

UASB reactors are commonly equipped with Three-Phase


Separator (GLSS) to separate gas, liquid and solid, the struc-
ture materials can be PP, stainless, GRP, PVC and carbon steel.

Mixing System and Other Systems

CSTR / AD tanks are generally equipped with mixing system


like mechanicals agitator or hydraulic agitator. furthermore,
pumping system, insulation system, cathodic protection,
heating system, biogas purification system and other
equipment can be provided as requested.
PIPECO AJMAN Tel: +971 6745 9878 PIPECO INDUSTRIES Tel: +91 98453 33446
United Arab Emirates Fax: +971 6745 9877 India Tel: +91 98450 81115
www.pipecogroup.com www.pipecogroup.com
sales@pipecogroup.com sales@pipecogroup.com
PIPECO DUBAI Tel: +971 4243 8356 PIPECO KOREA www.pipecogroup.com
United Arab Emirates Fax: +971 4243 8360 Korea sales@pipecogroup.com
www.pipecogroup.com
sales@pipecogroup.com PIPECO www.pipecogroup.com
PIPECO GROUP Tel: +971 6748 7714 United Kingdom sales@pipecogroup.com
United Arab Emirates Fax: +971 6745 9877
PIPECO AFRICA Tel: +263 77893 0545
www.pipecogroup.com
Zimbabwe www.pipecoafrica.com
sales@pipecogroup.com
sales@pipecoafrica.com
PIPECO DOHA Tel: +974 7721 4844
Qatar Tel: +974 7747 5888 PIPECO JOHANNESBURG Tel: +27 83742 8224
Fax: +974 7721 4844 South Africa Fax: +27 67135 5251
www.pipecogroup.com www.pipecoafrica.com
salesqatar@pipecogroup.com sales@pipecoafrica.com
PIPECO RIYADH Tel: +966 55719 8474 PIPECO EGYPT Tel: +20 111 213 0408
Saudi Arabia www.pipecogroup.com Egypt Tel: +20 100 063 0106
sales@pipecotanks.com www.pipecogroup.com
PIPECO BAHRAIN W.L.L Tel: +973 17 300 426 salesegypt@pipecogroup.com
Kingdom of Bahrain Fax: +973 17 742 568
www.pipecogroup.com PIPECO JORDAN www.pipecogroup.com
salesbahrain@pipecogroup.com Jordan sales@pipecogroup.com

PIPECO INDUSTRY L.L.C Tel: +968 9011 5888 PIPECO WEST AFRICA Tel: +233 24 414 1303
PIPECO MUSCAT L.L.C Tel: +968 9227 7629 Ghana Tel: +233 27 399 8141
Oman www.pipecogroup.com www.pipecogroup.com
salesoman@pipecogroup.com sales@pipecogroup.com

PIPECO INDUSTRIES
UNITED ARAB EMIRATES
E-mail: sales@pipecogroup.com
FR

5. SECTIONAL STAINLESS STEEL WELDING


WATER TANK
Stainless steel grades, such as the 316 or 304 types which are
generally suitable for storing both cold and heat drinking waters.

The Stainless Steel welding water tank, it is connected through


argon welding way and it is more fast to installation completion.

Stainless steel water tank could meet the high precise science and
technology water storing or somewhere with strict water quality
demands.

In addition,stainless steel welding water tank is afraid of high


chloride concentration water. Welding point will reduce the nickle
content and lose the ability to prevent corrosion from high
chloride water.

www.pipecogroup.com 16
FR

CATALOGUE

www.pipecogroup.com 17
Stainless steel welding water tank
Stainless 6teel :elding :ater 7ank

Introduction

6tainless steel water tank adopt the import food level SUS stainless steel plate,
interdicts the sunlight thoroughly and maintains the water quality and no algae growing.
Factory use unique stainless steel plate and the high difficulty ramming formation craft to
achieve the high strength requirements with the smallest material consumption.The weight
only be one third of the ordinary panel.

Insulate panel fully in line through the overall locking and


covering the surface. We can accord your requirement to model different size of the panel, t
he volume can meet all designrequirements. And if the installation site has no special reque
st we can provide insulation services.
Stainless steel welding water tank

Advantages

1. Never Rusted
Imported food-grade SUS304,SUS316, stainless steel,unique anti-rusting performance.

2. Never Leaked
Unique structure and all-welding operation, excellent strength.

3.Free Combination
Pattern and capacity can be customized according to actual usage environment, no
demanding requirement, especially suitable for upgrading project.

4. Reasonable Structure
Unique board design and press processing, reasonable inside supporter and high-strength
stainless steel material makes the water tanks have an excellent strength and streamlined
outlook.

5. Light & Cost-efficient


Adopting 1-3.0mm stainless steel panel, significantly reduce the weight of the water tanks,
make it more cost-efficient.
Stainless steel welding water tank

Matching thickness

Thickness of each panel (mm)

TankHeig cove
1st 2nd 3rd 4th
ht(mm) r
bottom panel layerside layerside layerside layerside
pan
panel panel panel panel
el

1000 2.5 1.5 / / /

1500 2.5 1.5 1.5 / /

2000 2.5 2 1.5 / /


2500 3 2.5 2 1.5 / 1.5

3000 3 2.5 2 1.5 /


3500 3 2.5 2.5 2 1.5
4000 4 3 2.5 2 1.5
Stainless steel welding water tank

Bottom and base structure

Fasten the outlet flange


Stainless steel welded tank installation instructions

Step 1: Install the base channel basis


First, correct channel base diagonal size to ensure each base size of inner square being
970mm. Weld the skid base together with the fixed angle iron. Check the base is horizontal
or not after welding is completed. If not, increase the iron piece and keep base pad be
horizon.

Step 2: Install the tank bottom panel


Put the bottom panel on the skid base, ensure on each side of the panel is on the base and
then spot welding.

Step 3: The tank side panel welding


Firstly fix four corners of each plate and weld. Welding should serious and careful to ensure
no missing point(voids). Then, put each side panels together on the flat according the
thickness. Plate angle to align together to ensure that the appearance of tank plate flat and
neat, then weld.

Step 4: Installation of the side panel with bottom panel


Erected the tank four whole side panels on the floor, side panels align at bottom panels. Fix
them by spot welding, then weld four sides integrally .
Stainless steel welded tank installation instructions

Step 5:Lacing bar welding inside the tank


Lacing bar weld at the two opposite tank side of the cross. Each cross has a main lacing bar;
four auxiliary short lacing bars connect the side tank with the main lacing bar; the distance
between the side panel and the welding point on the main lacing bar is 500mm. Each head
main bar has four auxiliary short bar.

Step 6: welding tank cover panel


The cover panel connections is same with third steps, spot welding side panel and cover
panel from inside. Each cross of the cover panel(bottom panel) weld support(bracing). Just
a support stick, no auxiliary lacing bar.

Step 7: internal weld treatment tank


After finish of welding tanks, wipe special decontamination cream at each weld place.
Rinse it after ten minutes in order to avoid corrosion caused by poor water quality.

Step 8: The tank flange welding


Determine the location of the opening hole, the opening diameter not larger than the pipe
diameter.

Step 9: welding tank ladder


Inside ladder placed the inner tank, weld the outer ladder near manhole side.
FR

OPERATION & MAINTENANCE MANUAL

www.pipecogroup.com 18
Installation and Maintenance Instructions

SECTIONAL STAINLESS STEEL WELDING WATER TANK

INSTALLATION &
MAINTENANCE
INSTRUCTIONS

Page 1 of 14
Installation and Maintenance Instructions

Customer : ____________________________________________________
Project Reference : ____________________________________________________

Tank Size : _______________ x _______________ x _______________ mm


External Dimensions : _________________________________________________ litres.
Nominal Capacity : _________________________________________________ gallons.

Tank Type : Uninsulated


Insulated to Format 30
Other_____________________________

Internal Under Water Structure : Stainless Steel 304


Stainless Steel 316

External Structure : U-steel for external reinforcement


H-steel for external reinforcement

Internal Under Water Stay System : Flange


Female Thread
Male Thread

Optional Extras : Across Tank Divider


Along Tank Divider
Pump House Divider
Insulated Base
Internal Ladder
External Ladder
Sump

Tank Serial No.: __________________________________________________________________

Approximate Delivery Date: _________________________________________________________

Other Information: __________________________________________________________________

Page 2 of 14
Installation and Maintenance Instructions

1. GUIDELINES ON LOCATING WATER TANKS

The following recommendations are generally for elevated tanks, as tanks at elevated positions can cause
serious damage to the surrounding area in the event of wall, pipe or structural support failure resulting in water
spilling out at a fast rate. Consideration must be given to minimize the effects of such an occurrence, in terms
of the positioning of the tank and regular inspection for defects.

o Water tanks should be located so as to prevent water damage or consequential loss in the event of
leakage howsoever occurring.
o All tanks which are located above water sensitive areas should have a bund wall around them with
adequate evacuation ducts.
o All other tanks should have Condensation or Drip trays to prevent nuisance damage and to keep floors
dry.

Over the years we have seen tanks fail due to age, lack of maintenance, failure of the structural supports
underneath the tanks, contaminated water attacking the internal fittings, ball valve failure where overflows were
not fitted, vandalism etc.

1.1 Handrails on tank roofs – Health & Safety requirements


Handrails may be necessary to satisfy Health & Safety Regulations. The type of railing required is
dependant on the tank height, distance from ground level, access etc. Please confirm which handrail
arrangement is required so that we can make the necessary inclusion. We can supply and install ladders
and railings but we must be informed of the exact details prior to quoting the job. We assume that the end
user is making his own arrangements unless we are informed otherwise.

1.2 Water Tanks on top of buildings


Water tanks located on top of any building should be sited at least 1.2 meters away from the edge of the
building.It would be preferable if the water tank was sited 1.5 times the height of the tank away from the
edge of the building. In the event of failure, this would allow the water to spread itself over a much wider
area before spilling over the edge of the building and possibly taking personnel or debris with it.

1.3 Water Tanks on elevated structures


For water tanks located on top of elevated structures, a walkway of at least 1 meter should be provided all
round the water tank to allow for maintenance and inspection. This walkway should comply with health and
safety regulations..

1.4 Potable Water Tanks


To comply with the Health & Safety Executive regulations on the Control of Legionellosis 1998, Cold Water
Storage Tanks must be located in areas that are “readily accessible for cleaning”.
Regular Maintenance and Inspections as required by Health & Safety Legislation.

Page 3 of 14
Installation and Maintenance Instructions

2. TANKS COMPONENTS

2.1 Type of the U-Steel Base


Standard Tanks come complete with Q235B U-steel painting to color for base frame, we recommend hot dip
galvanized instead painting.

2.2 Panel
The panels is stainless steel 304 or 316 food grade complete with GB/T 5750.8-2006.

2.3 Dividers
In any situation where there is only one water storage tank in a building and the capacity is greater that1000
litres
(220 gallons), BS 6700 states “To avoid interruption of the water supply when carrying out repairs or
maintenance, the cistern shall be provided with compartments or standby cistern”. Where drinking water is
being
stored, two separate tanks are recommended as it is difficult detect cross contamination from one side of a
division wall to another.

2.4 Ball Valve Hosing


Enclosed chamber containing an access hatch above the level of the cover, permitting the level control
mechanism to be mounted at a higher level than would otherwise be possible. The overflow(s) must be placed
on the tank side wall and not on the Ball Valve Housing. Water must be kept below tank roof level. Ball Valve
Housings are only necessary where very large ball valves are used.

2.5 Ladders
Where tank depth is 1.5 m or greater, internal and external ladders should be specified. If the tank is on a
raised platform then ladders may be required on tanks lower than this height.

Page 4 of 14
Installation and Maintenance Instructions

3. THICKNESS OF PANEL
6000 x 3000 x 4500 mm 81,000 Litre (21,400 Gallons) Water Tank

Thickness of each panel (mm)


Tank Height 1st 2nd 3rd 4th
Bottom Cover
Layerside Layerside Layerside Layerside
Panel Panel
Panel Panel Panel Panel
1000 2.5 1.5 / / /

1500 2.5 1.5 1.5 / /

2000 2.5 2 1.5 / /

2500 3 2.5 2 1.5 / 1.5

3000 3 2.5 2 1.5 /

3500 3 2.5 2.5 2 1.5

4000 4 3 2.5 2 1.5

Page 5 of 14
Installation and Maintenance Instructions

4. GENERAL BASE DETAILS / DESIGN CONSIDERATIONS METRIC

Standard base tanks (internally flanged base panels) may be laid directly on a concrete plinth having
atrowelled finish, brushed clean and free from any local protuberances. It should be flat, level and not vary
more than 6 mm in any 6 m, measured laterally or diagonally with a maximum variance of 2 mm per metre.
The plinth must exceed the nominal tank dimensions by a minimum of 175 mm.

Tanks erected on elevated structures (RSJ beams or brick courses in one direction only). Bearers must be
at 500 mm centres.

Bearer length must exceed nominal tank dimensions by a minimum of 150 mm plus any extra for fixings. All
bearer walls to be flat and level.

For bearer width see chart below.

Page 6 of 14
Installation and Maintenance Instructions

5. INSTALL METHOD

5.1 Weld the Skid Base


A. Four corners of channel steel groove all outward, vertical of channel steel all turn to right, and
the horizontal all upwards.
B. According to the size of tank, before welding channel steel, firstly, measurement the length of
two diagonals , it’s less than 3 cm, then begin welding channel steel.
C. After finish welding channel steel,weld the 50mm angle bar in the middle of 2 C-channel
according to the foundation drawing.

5.2 Weld the Bottom Panel


The size of bottom panel are all 2x1m or 1x1m flat panel, just weld the flat panels together by argon
arc welding.

Make sure the welding seam is uniform and tidy, there shall be no crater and bubble.

5.3 Weld the Bottom Panel


The 45°angle is for the panel at the corner, the 90°angle is for the panel by panel.
(Before weld the tank, just make sure full welding the 4 corners of each single panel first)
Spot weld the folder corner of each tank panel. The position of the welding is corner inset. Spot
welding the bottom around first, and then survey the length of diagonal line for this square. The
tolerance can not more than 2mm., and make sure the panel after welding is to be horizontally and
vertically straight.

Page 7 of 14
Installation and Maintenance Instructions

5.4 Weld the Bottom Panel


Weld the 2nd layer panel: method same as 1st layer panel.

5.5 Weld the Lacing Bar


Step 1: All the long lacing bar is 2meters length, and the dimension is 45*45*2mm thickness.

Weld the part lacing bar according to the length of water tank

Step 2: Weld the long lacing bar on the panel according to the drawing we provide.

(Sometimes extra bracing in the 0.5m position)

Step 3: Weld the short lacing bar as the picture, make sure the water tank four square and shape

retention.
Page 8 of 14
Installation and Maintenance Instructions

Step 4: All the vertical support are 2meters length, and the dimension is 28*28*1.5mm thickness,

weld in the middle of every stitch for top panel and bottom panel.

STEP 1 STEP 2 STEP 3 STEP 4

5.6 Full welding


Important: Don't forget full welding the panel by panel which are spot welding.

5.7 Weld Top Panel


Welding the top panel. Make sure the place of the manhole. After welding the top, weld the support
inside the tank.

Page 9 of 14
Installation and Maintenance Instructions

5.8 Check
Double check the welding seam are all welding already and full welding.

5.9 Open the Hole of Pipe Terminal


A. Use the mark pen mark the circle on the panel according to the size of pipe.
B. Cut the circle along the mark line with argon arc welding.
Method: Regulate the current of welding machine to the maximum, then weld the circle along the
mark line.

5.10 Weld the Pipe Terminal inside of Hole

Page 10 of 14
Installation and Maintenance Instructions

6. MAINTENANCE RECOMMENDATIONS FOR SECTIONAL TANKS

6.1 Water Tank Temperature Maintenance Interval: 6 Monthly


Check List
1. In accordance with the “The control of legionella bacteria in water systems. Approved Code
of Practice and guidance” (L8) - 2000, (see Appendix I) if there is a reasonable foreseeable
risk of exposure to legionella bacteria then water tank temperatures need to be taken by
competently trained personnel, recorded in a logbook and kept for 5 years.
2. Both mains temperature at ball valve and a temperature remote from ball valve to be taken.
Temperature should be below 20ºC
3. Fill Out Log Book
4. Inform Supervisor of any Anomalies.
5. Do not stand on internal stays while maintenance is being carried out.

6.2 Tank Maintenance & Inspection Interval: Annually


Check List
1. If there is a reasonable foreseeable risk of exposure to legionella bacteria then water tank
temperatures need to be taken by competently trained personnel, recorded in a logbook and
kept for 5 years.
2. Do not stand on internal stays while maintenance is being carried out.
3. All internal supports should be checked for corrosion, if corrosion is found it should be
rectified immediately.
4. Check generally for leaks or drips.
5. Check that all pipe work connected to the tank is suitably braced.
6. Check that the structural supports under the tank are in good condition.
7. When cleaning the inside of the tank, do not interfere with the joint seals.
8. Check that an overflow is filled. If overflow and/or air inlet screens are fitted, check that they
have not become blocked.
9. If insulated check that insulation and the manhole is securely fixed and not damaged,
damaged then the tank is not in compliance with GB/T 5750.8-2006.
10. If not insulated in accordance with GB/T 5750.8-2006, ensure that people cannot consume
water from the tank. We can advise on upgrading the tank to Byelaw 30 standard.
11. If there is a Condensation Tray with the tank, ensure that it has an overflow fitted and that it
has not been damaged.
12. If there are ladders fitted to the tank, ensure that they have not been damaged and are
securely fastened to the tank.
13. If the tank has a light duty cover and sited out of doors, check that the cover has not suffered
structural damage. (This type of cover is not suitable for potable water, outdoor use or for
the storage of water for use in buildings).
14. If the area underneath / adjacent to the tank has become water sensitive check that the tank
room is bunded with adequate escape ducts.
15. If the tank room is bunded, check that it is in good condition.
16. With tanks for drinking water, check that the water surface is clean and shiny and that the
water doesn’t contain any debris or contamination.
Page 11 of 14
Installation and Maintenance Instructions

17. Check for evidence of stagnation of the water.


18. Check for excessive build up of sediment.
19. Check for presence of algae, biofilm.
20. Check for scaling on the tank sidewalls.
21. The cold water storage tank should be cleaned, disinfected and faults rectified, if considered
necessary.
22. After maintenance of the tank is complete, ensure that the manhole seal is in tact and the
manhole is securely closed.
23. Fill Out Log Book.
24. Inform Supervisor of any Anomalies.

6.3 Maintenance on tanks with dividers


Extra care should be taken during the maintenance of tanks with divisions, as maintenance staff will
be working in an enclosed space, adjacent to a large volume of water in relation to the size of the
space.

Notes:

o Further information on the Health & Safety aspect, reference water quality is available in BS
6700:2006.
o Legal. (L8) (L8) supersedes earlier editions and guidance published with ISBNs
0118821504, 0717604519, 0717607321 (HSG70) (HSG 70) (HS G 70) entitled, 'The control
of legionellosis including Legionnaires’ disease'. It also replaces guidance note
environmental health 48. (GNEH48) (GNEH 48) (GN EH48) (GN EH 48) ISBN 011883939X
supplemented by MISC150 (MISC 150) entitled, 'The control of legionellosis in hot and cold
water systems.'

Page 12 of 14
Installation and Maintenance Instructions

7. MAINTENANCE RECOMMENDATIONS FOR SECTIONAL TANKS

Sectional Tank:

Rectangular fixed container assembled from panels for the storage of water at atmospheric pressure.

Nominal Capacity:

Volume contained in a tank, measured up to the top edge of the side walls.

Actual Capacity:

Volume contained in a tank, measured up to the maximum working level, this can be between 10 and

50% less than the Nominal Capacity.

Bund Wall:

Structure situated underneath water tanks. It’s purpose is to protect the building from water damage. All

water tanks located above areas that are water sensitive should be bunded.

Vent:

Opening to the atmosphere to allow for the movement of air resulting from changes in the water level so

That the water always remains at atmospheric pressure.

Warning Pipe:

Pipe so fixed that it’s outlet, whether inside or outside a building, is in a conspicuous position were the

discharge of water can be readily seen.

Overflow Pipe:

Pipe connected to the tank to discharge any overflow therefrom.

Division Plate:

Construction of one or more panels within a tank which divides the tank into two separate compartments.

Note: In any situation where there is only one water storage tank in a building, it is to be recommend that
a weir or a division plate be used. This will facilitate maintenance of the tank without effecting the water
supply to the building.

Page 13 of 14
Installation and Maintenance Instructions

Weir:

Construction of one or more panels within a tank, which divides the tank but to less than its full depth
such that the contents can spill over from one side of the weir to the other.

Baffle:

Construction of one or more panels within a tank, which partially subdivides the tank in order to increase
the length of the flow path between the inlet and the outlet from the tank.

Leakage Test:

Before we fill water,we have to go leakage testing:

Step 1: Oil testing

1.Test the welding position, spray the kerosene or diesel along the welding connection.

After spraying with kerosene or diesel, kindly check opposite side of spaying (less than 3 minutes), If
there are no oil stains, it means no leaking.

Step 2: Water testing

The duration of the test should be a minimum of 24 hours, commencing at least 2 hours after the tank
has been filled. The test shall be carried out within 10 days of erection unless the manufacturer agrees
to a longer period after assembly. The tank should be inspected at regular intervals and not deserted
during commissioning (first filling with water).

Page 14 of 14
FR

Ongoing Major Projects

www.pipecogroup.com 19
FR

Projects Photos

MINISTRY OF HUMAN RESOURCES AND


EMIRATISATION DUBAI

OMAN PROJECT

MINISTRY OF HUMAN
RESOURCES AND
EMIRATISATION
DUBAI

LEHBAB POLICE STATION

PRIVATE VILLA AT NAD AL SHEBA

20
ETHIOPIA PROJECT
AL SHAMKHA SECTOR – ABU DHABI
FR

Projects Photos

21
FR

Projects Photos

COMMERCIAL & RESIDENTIAL BUILDING


BLOCK AL MUTEENA, DUBAI
BAHRAIN PROJECT
ICD BROOKFIELD PALACE

PROPOSED B + G + 7 + GYM / SWIMMING


POOL RESIDENTIAL ON PLOT NO.317-1114
AT ANKHOOL DUBAI

RESIDENTIAL VILLAS
(40 NOS.) + CLUBHOUSE +
GUARD ROOM (2NOS.)
AT UMM SUQEIM 3RD, DUBAI

MASJID AT LEHBAB FIRST DUBAI

BAHRAIN PROJECT

MARINA VIEW HOTEL, DUBAI

22
Thank You.
Mr. Saleem Pasha
Executive Director

+91 98453 33446

saleem@pipecogroup.com

www.pipecogroup.com

You might also like