Professional Documents
Culture Documents
Untitled 8
Untitled 8
Process requirements
Route selection
Pipeline protection
Fail
Pipeline installation
requirement
Fail
Pipeline stress analysis
requirement
Optimised
design
the requirements. For instance, when reviewing the objectives of the detailed design
(Section 1.2.1), the design should be developed such that the following are
determined:
l
Pipeline wall thickness, grade, coating, and length are specified so that pipeline can be
fabricated.
l
Route is determined such that alignment sheets can be compiled.