TRANSMITTAL SHEET
Address : Total E&P Nigeria Limited Issue Date : 2-Sep-10 Address : 1/7 Avenue San Fernando
Plein Jour, 12 bis rue Jean Jaurès Montigny le Bretonneux
PUTEAUX 92800 Remarks : 78 884 SAINT QUENTIN EN YVELINES Cedex
Tél. : 01 47 44 84 17 Tél. : 01 61 37 69 36
CD Acknowledgement of receipt :
E-mail Date :
Courier Signature : 03/09/2010
DMZ X
We are pleased to deliver to your Company the following documents. For CPY ~ Company
Prior to be sent, these documents have been checked as per contract requirements.
Information included in this transmittal for each document is in accordance with the document itself.
Approval Class
CONTRACTOR
Return Code
Remarks
DocNber
Document Number Rev Stat. Rev. Date Title Disc. Type
NG22-282-PIM-PSL-100012 C0 IFR 7/72010 WELDING - INSPECTION AND TEST PLAN FOR WELDING OF STORAGE PIM PLN 2 2
NG22-282-PIM-PSL-100013 C0 IFR 7/72010 WELDING - INSPECTION AND TEST PLAN FOR DOCUMENT REVIEW AND PIM PLN 2 2
Comments Summary for document
NG22-282-PIM-PSL-100012 Rev. C0
Date of comments : Aug. 19 2010
Comments performed / validated by: QC Head
Return Code is 2 ~ Proceed with comments
WL 0103 01 Joint Visual Inspec- NG22-280-VHX-SPD- NG22-280-VHX- MDT.WL.CDQ.01 P H S W (1) CC shall m aintain
tion: 005391 SPD-005391 50 Quality Records in a
Pre-Welding & Weld WPSs TBQ API 650 (1) register at QC/CC office
Joint Fit-Up NG22-280-CST-SPD- to submit to CONTRAC-
GS PVV 611
Inspection 002102 TOR.
ASME IX
NG22-282-CST-PSL-
100017 (TBI) WPSs (TBQ)
WL 0103 04 In-Process NDE In- NG22-280-VHX-SPD- NG22-280-VHX- MDT.WL.CDQ.01 P W S P W In case of NDE car-
spection (including 005391 SPD-005391 49 ried out by CC Sub-
verification of weld (1) Contractor
and welder ID per- API 650 (1) CC shall m aintain
NG22-282-CST-PSL-
manent markings GS PVV 611 Quality Records in a
presence) 100007 (TBI)
register at QC/CC office
to submit to CONTRAC-
TOR.
“This document is the property of TEP NG. It must not be reproduced or transmitted to others without written authorization from the Company’’.
NG22-282-PIM-PSL-100012_C0
JOB UN
COMPANY: TOTAL E&P NIGERIA LIMITED
ITP No NG
PLANT LOCATION: OBITE TC
QCP No NG
RC326229 SHEET No RE
PROJECT TITLE: OML 58 UPGRADE PHASE 1 PROJECT
PETRA SERVICES LIMITED 11 OF 22 C0
ITS WL-0103
DISCIPLINE ITEM DESCRIPTION
TITLE:
“This document is the property of TEP NG. It must not be reproduced or transmitted to others without written authorization from the Comp