PTE - OI - 03 - Initial Supply Control
PTE - OI - 03 - Initial Supply Control
Rev:02
Issue date: 28.08.10
Operative Instruction for Initial supply Control Rev Date.: 31.01.14
Page: 01 of 02
iii) Reduced cycle time for problem solving to 3 Days from 5 days. iv) Re-affirmation of operator skills/WCM Deployment
v) Added roles & responsibilities of managers & supervisors. vi) Enhanced frequency of Sub-supplier audits.
vii) Maintaining input acceptance criteria with line output xii) IQC-100% inspection of critical/Aesthetic parts
x) Quality Gate Deployment. xi) Fire Wall for 200% functional % illumination inspection
4) ∆ All the problems during development from initial stage to SOP at customer end to be summarised in Problem history format
1) Head quality / CFT leader are authorized to terminate Initial control based on satisfying following conditions (as applicable).
3) All problems occurred before SOP are resolved and sorted out
4) All problem/ defects occurred during Initial supply are solved and preventive actions are in place & effective.
6)Δ Sign off to be done based on the above mentioned or agreed conditions and to be approved as per the sign off format
1) Concerned line will be identified by INITIAL SUPPLY CONTROL tag for awareness of all
2) Initial control decided will be displayed and updated daily/ weekly/ monthly basis as applicable
a) Safe launch of new product with 100% visual check/ 3000/3 month for CTQ parameters
e) Sign off to be done based on the above mentioned or agreed conditions and to be approved as per the sign off format
Termination Of Initial Supply Controls
On succesful completetion of all the above controls/3 months; It will be terminated through Head Materials.
ANNEXURE
1) INITIAL PRODUCT CONTROL TAG