Calculation of Run-off Width(T) & Run-off Depth (d) ‫لمعرفة المسافة المسموح بها للجريان السطحي عند أول

بلوعة مطر‬

To define the location of the first of catch basin, you should first calculate runoff depth
In case d < 15 cm then, No need CB
In case d ≥ 15 cm then, Need CB
n:Manning Cofficient Manning Cofficient
Ss:Road Cross Slope Soft Asphalt 0.013
Sl:Road Long. Slope Rough Asphalt 0.016
T(m):Run-off Width Soft Concrete 0.014
Q(m3/sec):Run-off Discharge Rough Concrete 0.016
d:Run-off Depth at Curb(m) Fine Sand,Colloidal 0.02
v:Run-off Velocity(m/sec) Sndy Loam,non-Colloidal 0.02
Small Fine Gravel 0.02
Big Fine Gravel 0.025 ≤3m ≤15cm ≤3m/s
Column [1] [2] [3] [4] [5] [6] [7] [8] [9] [10]
Catch basin# / I A Q Ss Sl T d V Check
Cavg* n
Section# (mm/hr) (hec) (m³/s) (m/m) (m/m) (m) (cm) (m/s)

0.8 85 0.0417 0.0079 0.013 0.02 0.0054 1.420097 3 0.39103393 No Need


CB-01 Or Sec. 1

0.5 85 20 2.3611 0.013 0.015 0.015 11.91675 18 2.23525425 Need


CB-02 Or Sec. 2

CB-01-01-Double
0.8 85 0.1273 0.0240 0.013 0.02 0.0054 2.15813 4 0.51759896 FALSE
grate
Notes:
[1] Cavg* = (Croad * Aroad + Cwalkway * Awalkway + Cgreen* Agreen + Cbuilding * Abuilding)
(Aroad + Awalkway + Agreen + Abuilding)
[2] I(mm/hr) = from I.D.F curve top of walking T
[3] A(hec)= Catchment Area from Autocad
[4] (Q = CIA / 360)
d Ss
[5] n:Manning Cofficient= from above table
[6] Ss:Road Cross Slope= from Road Eng.
[7] Sl:Road Long. Slope = from Road Eng.
[8] T(Run-off Width) Spread(m)= ((Q x n)/ (0.376 Ss^1.67 Sl^0.5))^0.375 → ≤ width of one of lane
[9] d:Run-off Depth at Curb(m) = Ss *T * 100 →In case d < 15 cm then, No need CB & In case d ≥ 15 cm then, Need CB
[10] V =( 0.752 x Ss^0.67 x Sl^0.5 XT^0.67) / n → (0.7-3)m/s
Calculation of using catch basin double grate or single grate‫لمعرفةهنستخدم بلوعة مطر من النوع المزدوج أم النوع المفرد‬

*CB-01 Discharge Capacity: *CB-02 Discharge Capacity:


n= 0.013 n= 0.013
Ss= 0.02 Ss= 0.015
Sl= 0.0054 Sl= 0.015
Q= 0.0079 m3/sec Q= 2.3611 m3/sec
T= 1.420097 m T= 11.91675 m
d= 0.028402 m Tc d= 0.178751 m
v= 0.391034 m/sec v= 2.235254 m/sec
Curbed Road= 1 1 or 0
=1/52∗ 〖 (𝐿^0.77)/(𝑃^ Curbed Road= 1 1 or 0
Cross-Fall Section
Roads
Length of Inlet= 0.6 m 0.38) 〗 ^ Cross-Fall Section Roads Length of Inlet= 0.6 m
Width of inlet= 0.6 m Width of inlet= 0.6 m
P(Curbed Road)= 0.9 m 0.9 P(Curbed Road)= 0.9 m 0.9 #VALUE!
P(Non-Curbed Road)= 0 m 1.2 P(Non-Curbed Road)= 0 m 1.2 #VALUE!
P(final)= 0.9 m P(final)= 0.9 m
Qweir= 0.251782 m3/sec Qweir= 0.631648 m3/sec
Ag= 0.18 m2 𝑄=0.315/ Ag= 0.18 m2
Qo= 0.090027 m3/sec (𝑛∗𝑆𝑐)∗(𝐻)^(8/3)∗(𝑆)^(1/2) Qo= 0.225851 m3/sec
Final Critical Q= 0.090027 m3/sec Final Critical Q= 0.225851 m3/sec

*CB-3 Discharge Capacity: *CB-4 Discharge Capacity:


n= 0.013 n= 0.013
Ss= 0.02 Ss= #REF!
Sl= 0.0054 Sl= 0.0054
Q= 0.0240 m3/sec Q= #REF! m3/sec
T= 2.15813 m T= #REF! m
d= 0.043163 m d= #REF! m
v= 0.517599 m/sec v= #REF! m/sec
Curbed Road= 1 1 or 0 Curbed Road= 1 1 or 0
Cross-Fall Section Length of Inlet= 0.6 m Length of Inlet= 0.6 m
Cross-Fall Section Roads
Roads
Width of inlet= 0.6 m Width of inlet= 0.6 m
P(Curbed Road)= 0.9 m 0.9 P(Curbed Road)= 0.9 m 0.9 #VALUE!
P(Non-Curbed Road)= 0 m 1.2 P(Non-Curbed Road)= 0 m 1.2 #VALUE!
P(final)= 0.9 m P(final)= 0.9 m
Qweir= 0.310388 m3/sec Qweir= #REF! m3/sec
Ag= 0.18 m2 Ag= 0.18 m2
Qo= 0.110981 m3/sec Qo= #REF! m3/sec
Final Critical Q= 0.110981 m3/sec Final Critical Q= #REF! m3/sec
Return Period Rainfall Intensities (mm/hr) with respect to Storm Duration
(years) 10 min 15 min 30 min 60 min 120 min 180 min 360 min 720 min 1440 min
100 161 130 92 56 36 27 16 9 5
50 150 121 85 52 34 25 15 8 4
25 137 110 78 48 31 23 14 8 4
20 133 107 76 46 30 22 13 7 4
10 118 95 67 41 27 20 12 6 3
5 100 81 57 35 23 17 10 6 3
3 84 68 48 29 19 14 8 5 2
2 69 68 39 24 15 11 7 4 2

100 year 50 year 25year 10 year 5 year


10 min 161 150 137 118 100
15 min 130 121 110 95 81
30 min 92 85 78 67 57
60 min 56 52 48 41 35
120 min 36 34 31 27 23
180 min 27 25 23 20 17
360 min 16 15 14 12 10
720 min 9 8 8 6 6
1440 min 5 4 4 3 3

RAINFALL INTENSITY FOR JAZAN


180

160

140
SITY (mm/ hour))

120

100
160

140

RAINFALL INTENSITY (mm/ hour))


120

100

80

60

40

20

0
0 10 15 30 60 120
STORM DURATION (MINUTES)
RAINFALL INTENSITY FOR JAZAN
180

160

140
RAINFALL INTENSITY (mm/ hour))

120

100

80

60

40

20

0
0 1 2 3 4 5 6 7 8 9

STORM DURATION (MINUTES)

L INTENSITY FOR JAZAN

100
50
25
100
50
25
10
5

120 180 360 720 1440


RM DURATION (MINUTES)
100
50
25
10
5

6 7 8 9 10

UTES)
A HEC
CB-01 417 0.0417
CB-02 222 0.0222
CB-01-01 2546 0.2546
CB-03 74 0.0074
CB-04 302 0.0302
CB-04-01 1510 0.151
CB-05 342 0.0342
CB-05-1 1738 0.1738
CB-05-2 2667 0.2667
CB-06 437 0.0437
CB-06-1 1112 0.1112
CB-06-2 848 0.0848
CB-06-3 394 0.0394
CB-06-1A 830 0.083
CB-06-1-1 210 0.021
CB-06-1-2 410 0.041
CB-07 239 0.0239
CB-08 508 0.0508
CB-09 1461 0.1461
CB-08-1 629 0.0629
CB-09-1 607 0.0607
CB-10 471 0.0471
CB-11 2894 0.2894
CB-12 257 0.0257
CB-13 398 0.0398
CB-13-1 563 0.0563
CB-13-2 3742 0.3742
CB-14 420 0.042
CB-14-1 435 0.0435
CB-14-2 560 0.056
CB-15 912 0.0912
CB-16 198 0.0198
CB-15-1 1451 0.1451