HOSPITAL
ARCHITECTURAL DESIGN
Problem Solution
Deteriorated Rooms specially
Toilet and Bath Room Areas Renovating and Maintaining
Lack or shortage of some Spaces to solve the current
important rooms like Staff problems
Duty Room Provide New Lift and Maintain
Rooms with less natural light Existing Ones
access Provide New Space for
Not functioning lift areas and Electrical Board
spaces that need lift access Creating Spaces that consider
Semi basement Hazardous current and future functions.
space and Main Electrical Addition of Services
Board Problem due to storm Similar functions grouped
water together
Current and future function
conflict
Scattered Functions
1
DENTISTRY, ENT, PATHOLOGY
Proposed
Dentistry/Emergency Lab/Pathology and ENT Ground Floor
OPD
Dentistry/Emergency Minor OR
Pathology/Laboratory
Standards
3
IPD
Nurse Station
Ward
Ortho A
Duty Room Pop Room 1st Floor
Proposed/Interior
IPD
VIP Ward
Existing/Proposed 2nd Floor
IPD
VIP Ward
Reception
VIP Ward
Proposed/ Interior 2nd Floor
4
IPD
Electrical
Board Space
Change
Hazardous
Area Changed
to Store
Proposed/Interior
Store
Ground Floor/Semi Basement
IPD
Toilet
Lobby
ICU/Lift
Ward
Proposed/ Interior Surgical Ward A and ICU with Medical Ward B 1st Floor
IPD
Proposed/ ICU Surgical Ward A and ICU with Medical Ward B 1st Floor
5
NEURO SURGICAL GROUND FLOOR (KITCHEN)
Existing
NEURO SURGICAL GROUND FLOOR (KITCHEN)
Existing/Proposed
NEURO SURGICAL GROUND FLOOR (KITCHEN)
Proposed
NEURO SURGICAL GROUND FLOOR (KITCHEN)
NEURO SURGICAL GROUND FLOOR (KITCHEN)
Hand
Wash
Gent’s
and
Ladies’
Staff
Toilet
Library
Medical
Director
Office
Staff Toilet
Store
Meeting Hall
Directorate Office
Toilet
Officer Ward
Proposed/Ward 2nd Floor
7
IPD
Bacteriology Toilet
Proposed/Interior Entrance
Semi - Basement
OPHTHALMOLOGY
Existing/Proposed
Ground Floor
OPHTHALMOLOGY
Existing/Proposed
Ground Floor
IPD
Utility Room
Ward
Ward
Proposed/ Interior 2nd Floor
8
EQUIPMENT STORE HR
Concerns
Concerns
- Sanitary and toilet renovation
- Small room demolition
- Interior design for all rooms
- Interior design for all rooms
- Keep the room arrangement as it is.
- Keep the room arrangement Eye Glass W/S
as it is.
Neuro
Concerns
- Sanitary and toilet renovation
- Interior design for all rooms and corridor
- Keep the room arrangement as it is.
Mini media
NURSE
STATION
MEETING ROOM
PRIVATE WARD
ADMISTRATION
admiration
9
CAFÉ
Proposed 3D
10
STORE
RENOVATION:-
- interior design for all rooms and corridor
- minimizing the size
- furniture
COMMON TOILET
11
FINANCE BLOCK
RENOVATION:-
- interior design for all rooms and corridor
- furniture
- toilet and sanitary work for staff and finance head
FINANCE BLOCK
12
PSYCHIATRY
Nurse station
concern
- toilet, duty rooms, nurse station, kitchen
- interior design for all rooms and corridor as per md
ward standard.
Kitchen
14
LAUNDRY
renovation:-
- New staff area
- Toilet, kitchen
- Interior design for all rooms and corridor
Existing Plan
LAUNDRY
Proposed Plan
RENOVATION:-
- New Staff Area
- Toilet, kitchen
- Interior Design For All Rooms And Corridor
15’ 15
MEDICAL-E & OFFICE
1m
1m extended
Proposed Plan
E-Ward
MEDICAL-E & OFFICE
Proposed Plan
Medical E & Office( Interior Spaces)
Ward
Offices
Ward
Utility Block
Plan
3D
Car Shade
3D
Plan
16
OPERATION ROOM AND MORGUE
OPERATION ROOM AND MORGUE
OPERATION ROOM AND MORGUE
OPERATION ROOM AND MORGUE
Existing Plan
Proposed Plan
PHYSIOTHERAPY
PHYSIOTHERAPY
Proposed Plan
Existing Plan
OLD MRI (Interior Spaces)
Proposed Plan
Radiology
Existing Plan
MATERNITY & PAEDIATRICS
Proposed Plan
Maternity
Existing Plan
MATERNITY & PAEDIATRICS
Proposed Plan
MATERNITY & PAEDIATRICS (Interior Spaces)
Garage
Site Layout
Proposed Design
WORKSHOPS
Health
Science
College
Rehabilitation
GATE 3 Centre
GATE 2
Ambulance
PROPOSED DESIGN GATE 1 Gate Floor Plan
VCT Block
Plan
3D
Guard House
3D
Plan
MAIN FENCE
Proposed
Design
3D
23
Design Considerations
- It Should Be Iconic And Bold As It Is Located On Potential Place
- Can Be Seen In Multi Sides Of The Main Road
- It Contributes To The Legacy Of Defence In The Surrounding Area.
- Enhances Commercial Activity Of Habitants
APARTMENT TYPOLOGY
ROAD LAYOUT
EXTENSTION 7 2 4
LARGE GREEN
AREAS
1
2. COURT YARDS
3
3. LINEAR GREEN AREAS
1
DESIGN APPROACH
2. COURT YARDS
2. COURT YARDS
COURT YARDS 3D
COURT YARDS 3D Male’s Psychiatry Courtyard
PSYCHIATRY
4 Supporting Facilities - -
4.1. Main Drug store G 352 37.5 1,875,000.00 1,760,000.00 3,635,000.00 - - - - 1,760,000.00 - 5,395,000.00
4.2. New Store G 379 243 12,150,000.00 1,895,000.00 14,045,000.00 - - - - 1,895,000.00 - 15,940,000.00
4.3. Store (Expired Drugs) S.B 85 4.25 212,500.00 425,000.00 637,500.00 - - - - 425,000.00 - 1,062,500.00
4.4. Equipment Store B 500 16 800,000.00 2,500,000.00 3,300,000.00 - - - - 2,500,000.00 - 5,800,000.00
4.5. General Store G 270 80 4,000,000.00 1,350,000.00 5,350,000.00 - - - - 1,350,000.00 - 6,700,000.00
4.6. Garaje G 323 209 10,450,000.00 1,615,000.00 12,065,000.00 - - - - 1,615,000.00 - 13,680,000.00
4.7. Biomedical Workshop With Cafeteria & Store G 563 28 1,400,000.00 2,815,000.00 4,215,000.00 - - - - 2,815,000.00 - 7,030,000.00
4.8. Workshop G/1st 1241 600 30,000,000.00 6,205,000.00 36,205,000.00 - - - - 6,205,000.00 - 42,410,000.00
4.9. Laundery G 535 50 2,500,000.00 2,675,000.00 5,175,000.00 - - - - 2,675,000.00 - 7,850,000.00
4.10. Guard Room G 225 1,125,000.00 1,125,000.00 1,125,000.00 2,250,000.00
4.11. VCT Block G 665 3,325,000.00 3,325,000.00 3,325,000.00 6,650,000.00
4.12. Common Toilet G 50 50 250,000.00 250,000.00 250,000.00
4.13. Power Plant G 170 8,500,000.00 8,500,000.00
123,517,500.00
5 Offices - -
5.1. Adminstration Block 550 35 1,750,000.00 2,750,000.00 4,500,000.00 - 2,750,000.00 - - 2,750,000.00 - 10,000,000.00
5.2. Finance Block G 340 30 1,500,000.00 1,700,000.00 3,200,000.00 - 1,700,000.00 - - 1,700,000.00 - 6,600,000.00
5.3. Old MIR ( Serve Office Block) G 212.73 0 - 1,063,650.00 1,063,650.00 - 1,063,650.00 - - 1,063,650.00 - 3,190,950.00
19,790,950.00
6 Items Priced (L/S) -
6.1. Sanitary -
6.1.1 Ground Reservoir and Pump Station - 11,000,000.00
6.1.2. Domestic Water supply Booster Pumps - 3,500,000.00
6.1.3. Fire Water pumps and accessories - 27,500,000.00
6.1.4. Waste Water Treatment Plant - 95,500,000.00
6.1.5. Water Supply Treatment Plant - 12,500,000.00
6.1.6. Central Water Heater System - 2,500,000.00
152,500,000.00
6.2.Data SIM -
6.2.1. Cabling - 7,000,000.00
6.2.2. Components Of IT - 40,000,000.00
- 47,000,000.00
6.3. Fire Alarm -
6.3.1. Cabling - 10,000,000.00
6.3.2. System Components - 25,000,000.00
6.4. Nurse Calling System - 15,000,000.00
6.5. Road 1.5km 100,000,000.00 - 100,000,000.00
6.6. Landscape (20% of 10.8 hac.) 108,000,000.00 - 108,000,000.00
6.7. External Furniture 125 in No - 1,875,000.00 1,875,000.00
6.8. fance and Main Gate (1.8km) 27,372,560.00 - 27,372,560.00
- 287,247,560.00
210,735,500.00 135,040,235.00 337,275,735.00 171,050,100.00 109,350,235.00 100,000,000.00 27,372,560.00 108,000,000.00 135,040,235.00 1,875,000.00 1,247,963,865.00