Download as pdf or txt
Download as pdf or txt
You are on page 1of 8

o p y

National Institute for Occupational Safety and Health

C
National Personal Protective Technology Laboratory

d
le
P.O. Box 18070

l
Pittsburgh, PA 15236

r o o p y Revision: 1.1 Date: 13 December 2005

t
Procedure No. CET-APRS-STP-CBRN-0305

o n d C
c e
DETERMINATION OF CBRN ACID GASES (HYDROGEN SULFIDE)

Un o ll SERVICE-LIFE TEST, AIR-PURIFYING RESPIRATORS


STANDARD TEST PROCEDURE (STP)

1.
n t r
PURPOSE
p y
c o C o
Un d
This test establishes the procedure for ensuring that the level of protection provided by

l e
the CBRN Acid Gases (Hydrogen Sulfide) Service Life Test, Air-Purifying Respirators Standard

l
o y
Test Procedure submitted for Approval, Extension of Approval, or examined during

n t r p
Certified Product Audits meet the minimum certification standards set forth in 42 CFR

o
C
Part 84, Subpart G, Section 84.63(a)(c)(d); Volume 60, Number 110, June 8, 1995 and

nc o d
the Statement of Standard for Chemical, Biological, Radiological, and Nuclear (CBRN)

e
l
Full- Facepiece Air- Purifying Respirator (APR) Dated March 7, 2003. .

U r o l
t y
2. GENERAL

o n o p
c C
This STP describes the Determination of CBRN Hydrogen Sulfide Service Life Test, Air-

Un l ed
Purifying Respirators Standard Test Procedure sufficient detail that a person
knowledgeable in the appropriate technical field can select equipment with the necessary

o l y
resolution, conduct the test, and determine whether or not the product passes the test.

r p
3.
n t
EQUIPMENT AND MATERIAL
C o
c o l e d
Un l
3.1. The list of necessary test equipment and materials follows:

tr o y
3.1.1. Miller Nelson Research Model 401 Flow-Temperature-Humidity Control

o n o p
System or equivalent. This system is an automated system to control the

c C
airflow, temperature, and humidity of an air supply for an operating

Un d
system. Laboratory air and distilled water are supplied to the unit. The unit

l e
output is air of the variable volume/flow dependant on the size of unit

l
o y
(10% of max flow to max flow in liters per minute (Lpm) ± 2%), and

n t r o p
relative humidity (10%–98% ± 3%) and temperature (20ºC–30º 0C ±

C
0.3%).

n c o e d
U o l l
n t r
o
Approvals: 1st Level 2nd Level 3rd Level

c
Un
Procedure No. CET-APRS-STP-CBRN-0305
o
Revision: 1.1
p yDate: 13 December 2005 Page 2 of 8

d C
le
3.1.2. EdgeTech Dew Prime II Hygrometer, Model 2000 or equivalent. A micro-

r o l p y
processor based programmable chilled mirror dew point hygrometer . The
hygrometer uses the dew point and ambient temperature to calculate the

n t C o
relative humidity. Ambient temperature range is: -50ºC to 130ºC ± 0.2ºC;

o d
relative humidity is 1% to 95% ± 0.5%.

c l e
Un o l
3.1.3. Labview software developed for NIOSH Service Life Test.

n t r p y
3.1.4. Interscan Corporation Model RM-17-0 hydrogen sulfide detector or

c o o
equivalent. This detector is an electrochemical voltammetric sensor.

C
Un d
Detector range: 0 - 1999 ppm, resolution: 1 ppm.

l l e
3.1.5. Interscan Corporation Model RM-17-2 hydrogen sulfide detector or

t r o p y
equivalent. This detector is an electrochemical voltammetric sensor.

o
n
Detector range: 0 - 19.99 ppm, resolution: 0.01 ppm.

c o d C
U n le
3.1.6. Mass Flow Controller, Brooks Instruments, variable flow rate depending

l on use.

tr o y
o n p
3.1.7. Read out and Control Electronics, Brooks Instruments, Model 0154,

o
C
Power supply and controller for the Brooks Mass Flow Controller or

c d
Un
equivalent. The flow controllers are an integrally mounted control valve

l l e
module with which stable gas flows can be achieved. Various flow rates

y
are used with an accuracy of ± 0.7 % of rate and ± 0.2 % full scale.

t r o o p
n C
3.1.8. Dry Gas Meter. Must have NIST traceable calibration certificate.

c o l e d
Un
3.1.9. Certified cylinders of 5 parts per million and 1000 parts per million

r o l
hydrogen sulfide in nitrogen.

n t p y
3.1.10. Hydrogen sulfide cylinder, 99 percent purity.

o
c o C
Un d
3.2 Test fixture for mounting canisters.

l l e
o y
3.3 The test chamber consisting of a 12" x 11½" x 7" air tight metal box with door

n t r o p
opening lined with gasket material. Two ½" bulkhead Swaglok® fittings located

C
on the backside of the test chamber for the introduction of the test concentration

n c o d
and for the exit of the test fixture. This fixture is not commercially available.

e
U
3.4
o l l
Resistance tester consisting of a vacuum source capable of delivering 85 Lpm, a

n t r
6-inch water column slant manometer or electronic manometer and connections
appropriate for items being tested. See description in RCT-APR-003 and RCT-

o
APR-007.
c
Un
Procedure No. CET-APRS-STP-CBRN-0305
o p
Revision: 1.1 y Date: 13 December 2005 Page 3 of 8

d C
le
4. TESTING REQUIREMENTS AND CONDITIONS

r o l
4.1.
p y
This test procedure is only valid if the respirator system has first completed

n t o
NIOSH Standard Test Procedure entitled Determination Of Durability Test For

C
o d
Environmental And Transportation Conditions And Rough Handling Drop Test

c e
On Chemical Biological Radiological Nuclear (CBRN) Air-Purifying Respirators
l
Un l
(APR) And Canisters Standard Test Procedure (STP).

t r o y
n p
4.2. Prior to beginning any testing, all measuring equipment to be used must have

c o o
been calibrated in accordance with the manufacturer's calibration procedure and

C
Un
schedule. At a minimum, all measuring equipment utilized for this testing must

e d
have been calibrated within the preceding 12 months using a method traceable to

l
l
the National Institute of Standards and Technology (NIST).

t
4.3.
r o o p y
Any laboratory using this procedure to supply certification test data to NIOSH

c o n C
will be subject to the provisions of the NIOSH Supplier Qualification Program

d
n e
(SQP). This program is based on the tenets of ISO/IEC 17025, the NIOSH

U l l
Manual of Analytical Methods and other NIOSH guidelines. An initial complete

o
r
quality system audit and follow on audits are requirements of the program.

n t p y
Additional details of the Program and its requirements can be obtained directly

o
o
from the institute.

c d C
Un e
4.4. Precision and accuracy (P&A) must be determined for each instrument in

l l y
accordance with laboratory procedures and NIOSH/NPPTL guidance. Sound

o
r p
practice requires, under NIOSH Manual of Analytical Methods, demonstrating a

t o
n C
tolerance range of expected data performance of a plus or minus 25% of a 95%

o d
confidence interval of the stated standard requirement. NIOSH/NPPTL P&A

c l e
Un
tolerance can be higher but not lower.Compressed gas cylinders must meet all

o l
applicable Department of Transportation requirements for cylinder approval as

r
well as retesting / requalification.

n t o p y
4.5.

c o
Compressed gas cylinders must meet all applicable Department of Transportation

C
Un d
requirements for cylinder approval as well as retesting / requalification.

4.6.
l l e
Normal laboratory safety practices must be observed. This includes safety

t r o py
precautions described in the current NIOSH Pittsburgh Health and Safety

o
n
Program.

c o d C
U n le
4.6.1. Safety glasses, lab coats and hard-toe shoes must be worn at all times.

l
r o
4.6.2. Workbenches must be maintained free of clutter and non-essential test

t
n
equipment.

c o
Un
4.6.3. When handling any broken glass laboratory equipment, lab technicians
Procedure No. CET-APRS-STP-CBRN-0305
o p
Revision: 1.1 y Date: 13 December 2005 Page 4 of 8

d C
le
and personnel must wear special gloves, which protect against lacerations

r o l p y
or punctures.

n t 4.7.
C o
Please refer to Material Safety Data Sheets and the NIOSH Health and

o d
Safety Manual for the proper protection and care in handling, storing, and

c l e
Un
disposing of the chemicals and gases used in this procedure.

5.
r o l
PROCEDURE

n t o p y
c o Note: Reference Section 3 for equipment, model numbers and manufacturers. For

C
Un d
calibration purposes use those described in the manufacturer's operation and

l e
maintenance manuals.

l
5.1.

t r o p y
Follow individual instruction manuals for set up and maintenance of equipment

o
n
used in this procedure prior to beginning testing. Malfunctioning equipment must

c o d C
be repaired or replaced and properly set up and calibrated before starting all tests.

U n 5.2.
l le
After the manufacturer's specified warm-up period, calibrate both hydrogen

tr o y
sulfide analyzers using the certified gas cylinder containing the 5 or 1000 ppm.

o n o p
C
5.3 Set up test equipment as shown in Figure 1. The humidity reading controlled by

c d
Un
the Miller Nelson system and monitored the Dew Point Hygrometer. The sample

l e
pickup for the hygrometer is place into the air stream via a tee after the Miller

l y
Nelson and before the introduction point of challenge agent. The thermocouple

r o o p
for the hygrometer is placed in the challenge gas stream immediately before the

t
n C
test chamber.

c o l e d
Un
5.4. Verify the following equipment is on:

r o l
t y
5.4.1 Miller Nelson Unit.

o n o p
c C
5.4.2 Air and water supplies.

Un 5.4.3
l ed
NIOSH Service Life Apparatus Controller software program.

l
5.4.4

t r o py
Hydrogen sulfide cylinder, 99 percent purity.

o
5.5
c o n d C
Establish the correct humidity and temperature as per the test standard in

U n
paragraph 6.3.

l le
5.6
r o
Set the airflow to the required airflow for the test. Verify the airflow from the test

t
n
fixture using the appropriate dry test meter.

c o
Un
5.7 Weigh and record initial weight of the test canister on Test Data Sheet.
Procedure No. CET-APRS-STP-CBRN-0305
o p
Revision: 1.1 y Date: 13 December 2005 Page 5 of 8

d C
5.8

o l le
y
Take initial inhalation and exhalation resistances of the canister mounted on the

t r p
facepiece and canister alone as described in RCT-APR-003 and RCT-APR-007.

o
n C
Record the values on Test Data Sheet.

c o l e d
Un
5.9 Make sure that the diverter valve in the system is diverting the challenge

r o l
concentration airflow to discharge and not into the testing chamber.

n t
5.10
p y
Mount canister onto test fixture and place in testing chamber.

o
c o C
Un d
5.11 Divert 0.5 Lpm airflow from air flow line to the hydrogen sulfide challenge

l e
detector.

l
5.12

t r o p y
Ensure that the nitrogen gas is ready for immediate flushing of regulator through

o
n
the purge valve.

c o d C
U n
5.13
le
Turn on hydrogen sulfide cylinder.

l
5.14

tr o y
Establish the test concentration of 1000 ppm hydrogen sulfide.

o n o p
C
5.15 Once the hydrogen sulfide concentration has been established, testing may begin.

c d
Un 5.16
l e
Direct challenge concentration airflow into test chamber.

l y
5.17
r o o p
Start timer. Airflow out of the test chamber is directed into the breakthrough

t
n C
detector. Monitor and record the upstream and downstream temperatures of the

c o l e d
airflow throughout test.

Un 5.18
o l
Run test until breakthrough of 5 ppm is observed or minimum service life is

r
t y
surpassed. Record this data on the test data sheet.

o n o p
c C
5.19 Direct challenge concentration airflow out of the test chamber.

Un
5.20
l ed
Weigh and record final weight of the test canister on Test Data Sheet.

l
5.21
r o py
Take final inhalation and exhalation resistances of the canister mounted on the

t o
n C
facepiece and canister alone at 85 liters per minute. Record the values on Test

n c o
Data Sheet.

e d
U
5.22
o l l
Allow clean air to purge through system for 5 minutes.

5.23
n t r
Repeat steps 5.5 through 5.22 for each test described in section 6.3.

c o
Un
5.24 When all tests are completed turn off hydrogen sulfide cylinder, set temperature
Procedure No. CET-APRS-STP-CBRN-0305
o p
Revision: 1.1 y Date: 13 December 2005 Page 6 of 8

d C
le
and humidity to zero and allow air to pass through the system for 30 minutes.

6.
r o l
PASS OR FAIL CRITERIA
p y
n t C o
o d
6.1. The criterion for passing this test is set forth in 42 CFR Part 84, Subpart G,

c l e
Un
Section 84.63(a)(c)(d); Volume 60, Number 110, June 8, 1995.

r
6.2.
o l
This test establishes the standard procedure for ensuring that:

n t o p y
c o 84.63 Test requirements; general.

C
Un l l e d
(a) Each respirator and respirator component shall when tested by the applicant
and by the Institute, meet the applicable requirements set forth in subparts H

t r o p y
through L of this part.

o
c o n d C
(c) In addition to the minimum requirements set forth in subparts H through L of

U n le
this part, the Institute reserves the right to require, as a further condition of

l
approval, any additional requirements deemed necessary to establish the

tr o y
quality, effectiveness, and safety of any respirator used as protection against

o n p
hazardous atmospheres.

o
c d C
Un
(d) Where it is determined after receipt of an application that additional

l e
requirements will be required for approval, the Institute will notify the

l y
applicant in writing of these additional requirements, and necessary

t r o o p
examinations, inspections, or tests, stating generally the reasons for such

n C
requirements, examinations, inspections, or tests.

c o l e d
Un
6.3. Acid Gas (Hydrogen Sulfide) test for CBRN canisters

r o l
t y
6.3.1. Resistance to airflow of both canister and system will be taken before and

o n
after each test.

o p
c C
Un d
6.3.2. Three canisters will be tested at 64 Lpm, continuous air flow, 25 % + 5 %

l l e
relative humidity (RH), 25 oC + 5 oC and 1000 ppm hydrogen sulfide.

o y
Minimum service life will be 15, 30, 45, 60, 90 or 120 minutes as per

n t r o p
manufacturer request.

c o d C
6.3.3. Three canisters will be tested at 64 Lpm, continuous air flow, 80 % + 5 %

U n l le
relative humidity (RH), 25 oC + 5 oC and 1000 ppm hydrogen sulfide.

o
Minimum service life will be 15, 30, 45, 60, 90 or 120 minutes as per

n t r
manufacturer request.

o
6.3.4. Three canisters, or pairs of canisters, will be tested at 100 Lpm,
c
Un
continuous air flow, 50 % + 5 % relative humidity (RH), 25 oC + 5 oC and
Procedure No. CET-APRS-STP-CBRN-0305
o p
Revision: 1.1 y Date: 13 December 2005 Page 7 of 8

d C
le
1000 ppm hydrogen sulfide. Minimum service life must be 5 minutes.

r o l p y
6.3.5. End of service life concentration is 5 ppm hydrogen sulfide.

n t C o
o d
7. RECORDS OR TEST SHEETS

c l e
Un o l
7.1. All test data will be recorded on the HYDROGEN SULFIDE SERVICE LIFE test

r
data sheet.

n t o p y
c o 7.2. All videotapes and photographs of the actual test being performed, or of the tested

C
Un d
equipment shall be maintained in the task file as part of the permanent record.

7.3.
l l e
All equipment failing any portion of this test will be handled as follows:

t r o o p y
n
7.3.1. If the failure occurs on a new certification application, or extension of

c o d C
approval application, send a test report to the RCT Leader and prepare the

U n l le
hardware for return to the manufacturer.

tr o y
7.3.2. If the failure occurs on hardware examined under an Off-the-Shelf Audit

o n p
the hardware will be examined by a technician and the RCT Leader for

o
C
cause. All equipment failing any portion of this test may be sent to the

c d
Un
manufacturer for examination and then returned to NIOSH. However, the

l l e
hardware tested shall be held at the testing laboratory until authorized for

y
release by the RCT Leader, or his designee, following the standard

t r o o p
operating procedures outlined in Procedure for Scheduling, and Processing

n C
Post-Certification Product Audits,

c o l e d
RB-SOP-0005-00.

8.
Un ATTACHMENTS

r o l
8.1
n t
Bench Top Set-Up.

o p y
c o C
Un d
8.2 Data Sheet.

l l e
t r o o py
c o n d C
U n l le
t r o
c o n
Un
Procedure No. CET-APRS-STP-CBRN-0305
o p
Revision: 1.1 y Date: 13 December 2005 Page 8 of 8

d C
le
Revision History

r o
Revision l Date
p y Reason for Revision
00

n t C o
20 September 2004 Historic document

o d
1.1 13 December 2005 Update header and format

c l e
Un
No changes to method

r o l
n t o p y
c o C
Un l l e d
t r o o p y
c o n d C
U n l le
tr o y
o n o p
c d C
Un l l e
y
t r o o p
o n d C
c l e
Un r o l
n t o p y
c o C
Un l l ed
t r o o py
c o n d C
U n l le
t r o
c o n
Un

You might also like