Procedure No. CET-APRS-STP-CBRN-0308

o n d C
c e
DETERMINATION OF CBRN NITROGEN OXIDE

Un o ll GASES (NITROGEN DIOXIDE) SERVICE-LIFE TEST,


AIR-PURIFYING RESPIRATORS STANDARD

n t r p y
TEST PROCEDURE (STP)

1.
c o PURPOSE
C o
Un l e d
This test establishes the standard procedure for ensuring that the level of protection

l
o y
provided by CBRN Nitrogen Oxide Gases (Nitrogen Dioxide) Service Life Test, Air-Purifying

n t r p
Respirators Standard Test Procedure submitted for Approval, Extension of Approval, or

o
C
examined during Certified Product Audits meet the certification requirements set forth in

nc o d
42 CFR Part 84, Subpart G, Section 84.63(a)(c)(d); Volume 60, Number 110, June 8,

e
l
1995 and the Statement of Standard for Chemical, Biological, Radiological, and Nuclear

U o l
(CBRN) Full- Facepiece Air- Purifying Respirator (APR) Dated March 7, 2003.

r
2.
n t
GENERAL
o p y
c o d C
Un
This STP describes the Determination of CBRN Nitrogen Dioxide Service Life Test, Air-

l e
Purifying Respirators Standard Test Procedure in sufficient detail that a person

l
r o o py
knowledgeable in the appropriate technical field can select equipment with the necessary

t
resolution, conduct the test, and determine whether or not the product passes the test.

o n d C
c e
3. EQUIPMENT/MATERIAL

Un 3.1.
o ll
The list of necessary test equipment and materials follows:

n tr p y
o o
3.1.1. Miller Nelson Research Model 401 Flow-Temperature-Humidity Control

c C
System or equivalent. This system is an automated system to control the

Un d
airflow, temperature, and humidity of an air supply for an operating

l e
system. Laboratory air and distilled water are supplied to the unit. The unit

l
o y
output is air of the variable volume/flow dependant on the size of unit

n t r o p
(10% of max flow to max flow in liters per minute (Lpm) ± 2%), and

C
relative humidity (10%–98% ± 3%) and temperature (20ºC–30º 0C ±

n c o 0.3%).

e d
U o l l
n t r
o
Approvals: 1st Level 2nd Level 3rd Level

c
Un
Procedure No. CET-APRS-STP-CBRN-0308
o
Revision: 1.1
p yDate: 13 December 2005 Page 2 of 8

d C
le
3.1.2 EdgeTech Dew Prime II Hygrometer, Model 2000 or equivalent. A micro-

r o l p y
processor based programmable chilled mirror dew point hygrometer . The
hygrometer uses the dew point and ambient temperature to calculate the

n t C o
relative humidity. Ambient temperature range is: -50ºC to 130ºC ± 0.2ºC;

o d
relative humidity is 1% to 95% ± 0.5%.

c l e
Un o l
3.1.3 Labview software developed for NIOSH Service Life Testing

n t r 3.1.4
p y
Interscan Corporation Model RM-15-0 nitrogen dioxide detector or

c o o
equivalent. This detector is an electrochemical voltammetric sensor.

C
Un d
Detector range: 0 - 1999 ppm, resolution: 1 ppm.

l l
3.1.5e Interscan Corporation Model RM-15-2 nitrogen dioxide detector or

t r o p y
equivalent. This detector is an electrochemical voltammetric sensor.

o
n
Detector range: 0 - 19.99 ppm, resolution: 0.01 ppm.

c o d C
U n
3.1.6

l le
Interscan Corporation Model RM-54-1 nitrogen oxide detector or
equivalent. This detector is an electrochemical voltammetric sensor.

tr o y
Detector range: 0 - 199.9 ppm, resolution: 0.1 ppm.

o n o p
C
3.1.7 Mass Flow Controller, Brooks Instruments, variable flow rate depending

c d
Un
on use.

l l e
y
3.1.8 Read out and Control Electronics, Brooks Instruments, Model 0154,

t r o o p
Power supply and controller for the Brooks Mass Flow Controller or

n C
equivalent. The flow controllers are an integrally mounted control valve

c o l e d
module with which stable gas flows can be achieved. Various flow rates

Un
are used with an accuracy of ± 0.7 % of rate and ± 0.2 % full scale.

r o l
t y
3.1.9 Dry Gas Meter. Must have NIST traceable calibration certificate.

o n o p
c C
3.1.10 Certified cylinders of 200 parts per million and 1 parts per million

Un d
nitrogen dioxide in nitrogen.

l l e
o y
3.1.11 Certified cylinders of 25 parts per million nitrogen oxide in nitrogen.

n t r o p
C
3.1.12 Nitrogen dioxide cylinder, 2.5 percent purity.

n c o e d
l
3.2 Test fixture for mounting canisters.

U
3.3
r o l
The test chamber consisting of a 12" x 11½" x 7" air tight metal box with door

n t
opening lined with gasket material. Two ½" bulkhead Swaglok® fittings located

o
on the backside of the test chamber for the introduction of the test concentration
c
Un
and for the exit of the test fixture. This fixture is not commercially available.
Procedure No. CET-APRS-STP-CBRN-0308
o p
Revision: 1.1 y Date: 13 December 2005 Page 3 of 8

d C
3.4

o l yle
Resistance tester consisting of a vacuum source capable of delivering 85 Lpm, a

t r p
6-inch water column slant manometer or electronic manometer and connections

o
n C
appropriate for items being tested. See description in RCT-APR-003 and RCT-

o d
APR-007.

c l e
Un l
4. TESTING REQUIREMENTS AND CONDITIONS

t r o y
n p
4.1 This test procedure is only valid if the respirator system has first completed

c o o
NIOSH Standard Test Procedure entitled Determination Of Durability Test For

C
Un d
Environmental And Transportation Conditions And Rough Handling Drop Test

l l e
On Chemical Biological Radiological Nuclear (CBRN) Air-Purifying Respirators
(APR) And Canisters Standard Test Procedure (STP).

t r o o p y
n
4.2 Prior to beginning any testing, all measuring equipment to be used must have

c o d C
been calibrated in accordance with the manufacturer's calibration procedure and

U n l le
schedule. At a minimum, all measuring equipment utilized for this testing must
have been calibrated within the preceding 12 months using a method traceable to

tr o
the National Institute of Standards and Technology (NIST).

y
o
4.3
n o p
Any laboratory using this procedure to supply certification test data to NIOSH

c d C
Un
will be subject to the provisions of the NIOSH Supplier Qualification Program

l e
(SQP). This program is based on the tenets of ISO/IEC 17025, the NIOSH

l y
Manual of Analytical Methods and other NIOSH guidelines. An initial complete

r o p
quality system audit and follow on audits are requirements of the program.

t o
n C
Additional details of the Program and its requirements can be obtained directly

c o l e d
from the institute.

Un 4.4
o l
Precision and accuracy (P&A) must be determined for each instrument in

r y
accordance with laboratory procedures and NIOSH/NPPTL guidance. Sound

n t p
practice requires, under NIOSH Manual of Analytical Methods, demonstrating a

o o
c C
tolerance range of expected data performance of a plus or minus 25% of a 95%

Un d
confidence interval of the stated standard requirement. NIOSH/NPPTL P&A

l e
tolerance can be higher but not lower.

l
4.5
r o py
Compressed gas cylinders must meet all applicable Department of Transportation

t o
n C
requirements for cylinder approval as well as retesting / requalification.

n c o e d
l
4.6 Normal laboratory safety practices must be observed. This includes safety

U Program.
r o l
precautions described in the current NIOSH Pittsburgh Health and Safety

o
4.6.1
n t
Safety glasses, lab coats and hard-toe shoes must be worn at all times.

c
Un
Procedure No. CET-APRS-STP-CBRN-0308
o p
Revision: 1.1 y Date: 13 December 2005 Page 4 of 8

d C
le
4.6.2 Workbenches must be maintained free of clutter and non-essential test

r o l p y
equipment.

n t 4.6.3
C o
When handling any broken glass laboratory equipment, lab technicians

o d
and personnel must wear special gloves, which protect against lacerations

c l e
Un
or punctures.

4.7
r o l
Please refer to Material Safety Data Sheets and the NIOSH Health and

n t p y
Safety Manual for the proper protection and care in handling, storing, and

o
c o disposing of the chemicals and gases used in this procedure.

C
Un
5. PROCEDURE

l l e d
t r o p y
Note: Reference Section 3 for equipment, model numbers and manufacturers. For

o
n
calibration purposes use those described in the manufacturer's operation and

c o d C
maintenance manuals.

U n 5.1.
l le
Follow individual instruction manuals for set up and maintenance of equipment

tr o
used in this procedure prior to beginning testing. Malfunctioning equipment must

y
p
be repaired or replaced and properly set up and calibrated before starting all tests.

c o n C o
Un d
5.2. After the manufacturer's specified warm-up period, adjust instruments to read

l e
zero and make adjustment for Labview software to read 0 ppm. Calibrate both

l y
nitrogen dioxide analyzers and the nitrogen oxide analyzer using the certified gas

r o p
cylinder containing the 1 ppm or 200 ppm nitrogen dioxide and 25 ppm nitrogen

t o
n C
oxide. During calibration make adjustment for Labview software to read the

c o l e d
appropriate concentration for each detector.

Un 5.3
o l
Set up test equipment as shown in Figure 1. The humidity reading controlled by

r y
the Miller Nelson system and monitored the Dew Point Hygrometer. The sample

n t p
pickup for the hygrometer is place into the air stream via a tee after the Miller

o o
c C
Nelson and before the introduction point of challenge agent. The thermocouple

Un d
for the hygrometer is placed in the challenge gas stream immediately before the
test chamber.

l l e
5.4
r o py
Verify the following equipment is on:

t o
c o n
5.4.1
d C
Miller Nelson Unit.

U n 5.4.2
l le
Air and water supplies.

t r o
n
5.4.3 NIOSH Service Life Apparatus Controller software program.

c o
Un
5.4.4 Nitrogen dioxide cylinder, 2.5 percent purity.
Procedure No. CET-APRS-STP-CBRN-0308
o p
Revision: 1.1 y Date: 13 December 2005 Page 5 of 8

d C
5.5

o l le
y
Establish the correct humidity and temperature as per the test standard in

t r
paragraph 6.3.

o p
o n 5.6
d C
Set the airflow to the required airflow for the test and the number of test being run

c l e
Un
at one time. Verify the airflow from the test fixture using the appropriate dry test

r o l
meter.

n t
5.7
p y
Weigh and record initial weight of the test canister on Test Data Sheet.

o
c o C
Un d
5.8 Take initial inhalation and exhalation resistances of the canister mounted on the

l e
facepiece and canister alone as described in RCT-APR-003 and RCT-APR-007.

l
Record the values on Test Data Sheet.

t r o o p y
n
5.9 Mount canister onto test fixture and place in testing chamber.

c o d C
U n
5.10
le
Divert 0.5 Lpm airflow from airflow line to the nitrogen dioxide challenge

l
detector.

tr o y
o n
5.11
p
Ensure that the nitrogen gas is ready for immediate flushing of regulator through

o
C
the purge valve.

c d
Un 5.12
l e
Turn on nitrogen dioxide cylinder.

l y
5.13
r o o p
Establish the test concentration of 200 ppm nitrogen dioxide.

t
o
5.14
n d C
Direct challenge concentration airflow into test chamber.

c l e
Un 5.15
o l
Start timer. Monitor effluent concentration using both the nitrogen dioxide and

r
t y
nitrogen oxide analyzers. Monitor upstream and downstream temperatures

n p
throughout testing, record beginning and final temperatures on the test data sheet.

o o
c C
Un d
5.16 Run test until breakthrough of 1 ppm nitrogen dioxide or 25 ppm nitrogen oxide is

l e
observed or minimum service life is surpassed. Record this data on the test data

l
o y
sheet.

n t r o p
C
5.17 Direct challenge concentration airflow away from test chamber.

n c o e d
l
5.18 Weigh and record final weight of the test canister on Test Data Sheet.

U
5.19
r o l
Take final inhalation and exhalation resistances of the canister mounted on the

n t
facepiece and canister alone as described in RCT-APR-003 and RCT-APR-007.

o
Record the values on Test Data Sheet.
c
Un
Procedure No. CET-APRS-STP-CBRN-0308
o p
Revision: 1.1 y Date: 13 December 2005 Page 6 of 8

d C
le
5.20 Repeat steps 5.7 through 5.21 for each test described in section 6.3.

r o l
5.21
p y
Allow clean air to purge through system for 10 - 15 minutes.

n t C o
o d
6. PASS/FAIL CRITERIA

c l e
Un l
6.1. The criterion for passing this test is set forth in 42 CFR Part 84, Subpart G,

t r o Section 84.63(a)(c)(d); Volume 60, Number 110, June 8, 1995.

y
o n6.2.
o p
This test establishes the standard procedure for ensuring that:

c C
Un e d
84.63 Test requirements; general.

l l
t r o p y
(a) Each respirator and respirator component shall when tested by the applicant

o
n
and by the Institute, meet the applicable requirements set forth in subparts H

c o d C
through L of this part.

U n l le
(c) In addition to the minimum requirements set forth in subparts H through L of

tr o
this part, the Institute reserves the right to require, as a further condition of

y
p
approval, any additional requirements deemed necessary to establish the quality,

c o n o
effectiveness, and safety of any respirator used as protection against hazardous

C
Un d
atmospheres.

l l e
y
(d) Where it is determined after receipt of an application that additional

r o p
requirements will be required for approval, the Institute will notify the applicant

t o
n C
in writing of these additional requirements, and necessary examinations,

c o l e d
inspections, or tests, stating generally the reasons for such requirements,

Un
examinations, inspections, or tests.

r o l
y
6.3 Nitrogen oxide gases (Nitrogen dioxide) test for CBRN canisters

o n t o p
c C
6.3.1. Resistance to airflow of both canister and system will be taken before and

Un d
after each test.

l l e
y
6.3.2 Three canisters will be tested at 64 Lpm, continuous air flow, 25 % ± 5 %

t r o p
relative humidity (RH), 25 oC ± 5 oC, and 200 ppm nitrogen dioxide.

o
n C
Minimum service life will be 15, 30, 45, 60, 90 or 120 minutes as per

n c o e d
manufacturer request.

U 6.3.3
l l
Three canisters will be tested at 64 Lpm, continuous air flow, 80 % ± 5 %

o
r
relative humidity (RH), 25 oC ± 5 oC, and 200 ppm nitrogen dioxide.

o n t
Minimum service life will be 15, 30, 45, 60, 90 or 120 minutes as per
manufacturer request.

c
Un
Procedure No. CET-APRS-STP-CBRN-0308
o p
Revision: 1.1 y Date: 13 December 2005 Page 7 of 8

d C
le
6.3.4 Three canisters will be tested at 100 Lpm, continuous air flow, 50 % + 5

r o l % relative humidity (RH), 25 oC + 5 oC, and 200 ppm nitrogen dioxide.

p y
Minimum service life of 5 minutes.

n t C o
o d
6.3.5 End of service life concentration is 1 ppm nitrogen dioxide or 25 ppm

c l e
Un
nitric oxide.

7.
r o l
RECORDS AND TEST SHEETS

n t o p y
c o 7.1. All test data will be recorded on the NITROGEN DIOXIDE SERVICE LIFE test

C
Un d
data sheet.

7.2.
l l e
All videotapes and photographs of the actual test being performed, or of the tested

t r o p y
equipment shall be maintained in the task file as part of the permanent record.

o
c o n7.3.
d C
All equipment failing any portion of this test will be handled as follows:

U n l le
7.3.1. If the failure occurs on a new certification application, or extension of

tr o y
approval application, send a test report to the RCT Leader and prepare the

o n p
hardware for return to the manufacturer.

o
c d C
Un
7.3.2. If the failure occurs on hardware examined under an Off-the-Shelf Audit

l l e
the hardware will be examined by a technician and the RCT Leader for

y
cause. All equipment failing any portion of this test may be sent to the

t r o o p
manufacturer for examination and then returned to NIOSH. However, the

n C
hardware tested shall be held at the testing laboratory until authorized for

c o l e d
release by the RCT Leader, or his designee, following the standard

Un
operating procedures outlined in Procedure for Scheduling, and Processing

r o l
Post-Certification Product Audits,

t y
RB-SOP-0005-00.

o n o p
c C
8. ATTACHMENTS

Un
8.1
l ed
Bench Top Set-Up.

l
8.2
r o
Data Sheet.

t o py
c o n d C
U n l le
t r o
c o n
Un
Procedure No. CET-APRS-STP-CBRN-0308
o p
Revision: 1.1 y Date: 13 December 2005 Page 8 of 8

d C
le
Revision History

r o
Revision l Date
p y Reason for Revision
00

n t C o
20 September 2004 Historic document

o d
1.1 13 December 2005 Update header and format

c l e
Un
No changes to method

r o l
n t o p y
c o C
Un l l e d
t r o o p y
c o n d C
U n l le
tr o y
o n o p
c d C
Un l l e
y
t r o o p
o n d C
c l e
Un r o l
n t o p y
c o C
Un l l ed
t r o o py
c o n d C
U n l le
t r o
c o n
Un

You might also like