Doc. No.

: HSE/FRM-22
Rev.: 00
JOB SAFETY ANALYSIS Date: 04/01/2024
Page: 1 of 3

Project: Cedilla Pharmaceuticals Project#: 1161 Area: Udaipur


General Comments: Proper PPE, TBT should be conducted before start the job,
Rajasthan
Access control authority would be DEL Site Manager/Site Engineer
Date: 04-01-2024 Supervisor: Umar Salim (Safety Supervisor)

Job Description: Work In Night Shift


Equipment & Severity
Item Detail of Activity Risk Involved Preventive Measure Responsible Person
Tools used Rating
 Suitable Lighting Must Be Arranged
 Safety Task Must Be Conducted Before
Stating Activity.
Personal Injury
1    Competent Supervision
(Hand, Body Parts)
 Mandatory & Required PEEs Must Be
Wearing.
 Proper Handling of material.
 Equipment Inspection should be carried
out as per schedule.
2 Property Damage  
 Tag line must be used while lifting of
material.
 Full body harness must be worn while
working above 1.8 meter height.

3 Personal Fall    100 % tie off should be ensured.


 Safety precaution must be taken while
work at height.

 Objects should be secured with manila


4 Fall Objects  
ropes while

 Not Allowed in Restricted Area (Such as


out of boundaries)
 Adequate & Suitable Lighting Must Be

You might also like