This document is a slab formwork checklist for the construction of various buildings at the Gujarat Technological University campus in Gandhinagar, India. It lists 14 check items to inspect things like column alignment, bracing, concrete cover, construction joints, embedded items, and safety measures. The checklist is to be completed by representatives of the contractor, third party inspection consultant, and authority during construction to ensure all formwork is in compliance with drawings before pouring concrete.
This document is a slab formwork checklist for the construction of various buildings at the Gujarat Technological University campus in Gandhinagar, India. It lists 14 check items to inspect things like column alignment, bracing, concrete cover, construction joints, embedded items, and safety measures. The checklist is to be completed by representatives of the contractor, third party inspection consultant, and authority during construction to ensure all formwork is in compliance with drawings before pouring concrete.
This document is a slab formwork checklist for the construction of various buildings at the Gujarat Technological University campus in Gandhinagar, India. It lists 14 check items to inspect things like column alignment, bracing, concrete cover, construction joints, embedded items, and safety measures. The checklist is to be completed by representatives of the contractor, third party inspection consultant, and authority during construction to ensure all formwork is in compliance with drawings before pouring concrete.
CONSTRUCTION OF VARIOUS BUILDINGS MAINLY ADMINISTRATIVE, SCHOOL OF
ENGINEERING, PHARMACY, HOSTELS, LIBRARY RESIDENTIAL BUILDING INCLUDING NAME OF WORK: INFRASTRUCTURE FACILITIES LIKE OVERHEAD TANK, UNDERGROUND SUMP, STP, CHILLING PLANT, ROAD ETC. FOR GUJARAT TECHNOLOGICAL UNIVERSITY AT LEKAWADA GANDHINAGAR. AUTHORITY: Capital Project Division - 4 , Gandhinagar CONTRACTOR: Katira Construction Ltd, Ahmedabad. TPI CONSULTANT: Mcway Managements Ltd, Gandhinagar. Location : Floor : Date :
SL.NO. CHECK ITEM
Refference YES NO NA Comments Special check for columns: Setting out, alignment, elevation and 1 dimension as per drawing 2 Check bracing/side support are stable Formwork surface must be cleaned and 3 residual substance have been removed Concrete slab thickness marked properly 4 Check existing concrete is clean and 5 ready to be received new concrete Close any gaps in formwork with suitable 6 material Check all embedded items and concrete 7 cover are in place Ensure construction joints are prepared 8 as per drawing Ensure all MEP equipment installed as 9 per drawing If location of shuttering height exceeds 10 12 feet, special type of scaffolding with cross bracing is provided or not? Fresh shuttering oil applied properly or 11 not? Reinforcement provided as per drawing 12 Position ring in column provided or not? 13 14 Necessary safety provided or not? Inspected by Contractor's Representative TPI's Representative R&B's Representative Date: Date: Date: Name: Name: Name: Signature: Signature: Signature: For Contractor's Representative For TPI Representative For R&B Representative