Ra-24 MDCC Vs Mvac Vs Boq
Ra-24 MDCC Vs Mvac Vs Boq
39 RA-14
74 74 0
(18-10-2023) (03-11-2023)
40
RA-14
(19-10-2023) 66 66 0
(03-11-2023)
818
300 44 300 0 RA-14
(11-09-2023) 14 14 0
(18-10-2023) (03-11-2023)
48 RA-14
80 80 0
(18-10-2023) (03-11-2023)
50 RA-14
66 66 0
(19-10-2023) (03-11-2023)
82
24 RA-24 24 0
(29-12-2023)
LS 1 Total No of 13 Mtr GI WPB Pole No 8205
83
2 RA-24 2 0
(29-12-2023)
84
94 RA-24 94 0
(30-12-2023)
995 85
636 62 284 352 RA-24 62 0
(07-12-2023) (29-12-2023)
86
66 RA-24 66 0
(30-12-2023)
87
10 RA-24 10 0
(09-01-2024)
88
26 RA-24 26 0
(09-01-2024)
687 13 Ra-07
60.654 60.654 60.654 0 60.654 0
(30-06-2023) (11-08-2023) (04-09-2023)
53 RA-19
32.325 32.325 0
823 (06-12-2023) (14-12-2023)
80.831 80.831 0
(14-09-2023) 57 RA-19
48.506 48.506 0
(06-12-2023) (14-12-2023)
LS 10 Supply of 148mm2 AAAC Km 1028.753 301.473 727.2805
74 RA-22
33.669 33.669 0
906 (16-12-2023) (06-01-2024)
69.997 69.997 0
(27-10-2023) 76 RA-22
36.328 36.328 0
(16-12-2023) (06-01-2024)
951 90
89.991 72.734 72.734 17.257 RA-24 72.734 0
(21-11-2023) (06-01-2024)
Supply of Mid Span Compression Joints suitable 455 03 RA-06
LS 11 No. 994 430 430 564 430 430 0 430 0
for 148 mm2 AAAC (04.05.2023) (06-06-2023) (20-07-2023)
Supply of H.T. stay set complete icludes anchor 02 RA-06
2050 2050 0
rod, anchor plate, turn buckle and 2 nos 455 (06-06-2023) (20-07-2023)
LS 12 Set. 3930 2400 2400 1530 2400 0
thimble as per technical specification and scope (04.05.2023) 03 RA-06
350 350 0
of work. (06-06-2023) (20-07-2023)
339 01 RA-06
1000 1000 1000 0 1000 0
(31.03.2023) (10-05-2023) (20-07-2023)
563 08 RA-06
Supply of HT stay Insulator 33kV as per 1000 1000 1000 0 1000 0
(30.05.2023) (17-06-2023) (20-07-2023)
LS 13 technical specification and scope of Set 7860 5000 2860 RA-17
905 64
work(1set=2Nos) 1500 1500 1500 0 (24-11-2023) 1500 0
(27-10-2023) (16-11-2023)
975 73 RA-22
1500 1500 1500 0 1500 0
(29-11-2023) (16-12-2023) (06-01-2024)
RA-17
808 45
1880 392.5 392.5 1487.5 (24-11-2023) 392.5 0
(02-09-2023) (16-10-2023)
Supply of HT Stay clamp as per technical RA-17
LS 14 Kg 11790 818 7520 4270 46
specification and scope of work 5640 1177.49 1177.49 4462.51 (24-11-2023) 1177.49 0
(11-09-2023) (16-10-2023)
Supply of 7/8 SWG stay wire as per technical 759 23 RA-10
LS 15 Kg 58950 11250 11250 47700 11250 11250 0 11250 0
specification and scope of work (07-08-2023) (07-09-2023) (06-10-2023)
PKG-5 (MDCC Vs MVAC Vs BILL) MDCC MVAC BILL
1St Amnd Cumm
Item MDCC MDCC Balance MVAC MVAC Cumm MVAC Balance Supply Bill Balance (MVAC
Category Description of Supply & Erection Items Units Quantity MDCC Supply Bill No Remarks
Sl No NO & DATE QTY MDCC NO & DATE QTY Qty MVAC Qty vs Bill)
QTY
339 01 RA-06
1276 1276 1276 0 1276 0
(31.03.2023) (10-05-2023) (20-07-2023)
563 08 RA-06
1275 1275 1275 0 1275 0
(30.05.2023) (17-06-2023) (20-07-2023)
Supply of Polymer Disc Insulator 33kV, 70 KN
LS 16 No 5964 4551 1413 RA-17
for DP,Angle Point 905 64
1000 1000 1000 0 (24-11-2023) 1000 0
(27-10-2023) (16-11-2023)
975 73 RA-22
1000 1000 1000 0 1000 0
(29-11-2023) (16-12-2023) (06-01-2024)
Supply of 4 bolted (M-16) type single tension
564 05 RA-06
LS 17 H/W fitting for (148 mm² AAAC) / DP No 5964 1000 1000 4964 1000 1000 0 1000 0
(30.05.2023) (13-06-2023) (20-07-2023)
339 01 RA-06
3587 3587 3587 0 3587 0
(31.03.2023) (10-05-2023) (20-07-2023)
563 08 RA-06
3587 3587 3587 0 3587 0
(30.05.2023) (17-06-2023) (20-07-2023)
RA-17
LS 18 Supply of 33 kV Polymer Pin Insulator Set 18651 905 17174 1477 64
5000 5000 5000 0 (24-11-2023) 5000 0
(27-10-2023) (16-11-2023)
RA-17
50x50x6mm GI Bracing Angle, as per technical 808 45
LS A.4.4 Kg 25402.56 4584 4584 20818.56 4581.36 4581.36 2.64 (24-11-2023) 4581.36 0
specification and scope of work. (02-09-2023) (16-10-2023)
RA-17
Supply of HT Stay clamp as per technical 808 45
LS A.4.9 Kg 2256 1805 1805 451 470.99 470.99 1334.01 (24-11-2023) 470.99 0
specification and scope of work (02-09-2023) (16-10-2023)
09 RA-06
92 92 0
665 (07-07-2023) (20-07-2023)
266 266 0
(23.06.2023) 10 RA-06
174 174 0
(07-07-2023) (20-07-2023)
18 RA-10
90 90 0
(05-09-2023) (06-10-2023)
19 RA-10
178 178 0
731 (05-09-2023) (06-10-2023)
391 360 31
(24-07-2023) 43 RA-14
46 46 0
(18-10-2023) (03-11-2023)
54 RA-14
LS 29 Total No of 11 Mtr GI WPB Pole No 2478 1072 1406 46 46 0
(19-10-2023) (03-11-2023)
39 RA-14
106 106 0
(18-10-2023) (03-11-2023)
818 44 RA-14
315 100 315 0 100 0
(11-09-2023) (18-10-2023) (03-11-2023)
49 RA-14
109 109 0
(18-10-2023) (03-11-2023)
80
58 RA-24 58 0
976 (22-12-2023)
100 100 0
(29-11-2023) 81
42 RA-24 42 0
(22-12-2023)
RA-17
756 21
AB Switch (11KV,400A.3pole) Polymer 17 17 17 0 (24-11-2023) 17 0
(04-08-2023) (26-10-2023)
LS 30 Insulator, as per technical specification and No 76 45 31
scope of work. 997 91
28 28 28 0 RA-24 28 0
(07-12-2023) (06-01-2024)
RA-17
818 46
2200 2198.8 2198.8 1.2 (24-11-2023) 2198.8 0
100X50X6mm (GI) Top Channel as per technical (11-09-2023) (16-10-2023)
LS 31 Kg 43121.1 4400 38721.1
specification and scope of work. 976 79
2200 2198.8 2198.8 1.2 RA-24 2198.8 0
(29-11-2023) (22-12-2023)
RA-17
75X40X 4.8mm (GI) Channel for Double Pole 818 46
2660 2660 2660 0 (24-11-2023) 2660 0
Bracing and Support channel for Isolator (GI), (11-09-2023) (16-10-2023)
LS 32 Kg 50800.2 5320 45480.2
as per technical specification and scope of 976 79
work. 2660 2660 2660 0 RA-24 2660 0
(29-11-2023) (22-12-2023)
RA-17
818 46
2360 2359.8 2359.8 0.2 (24-11-2023) 2359.8 0
(11-09-2023) (16-10-2023)
50x50x6mm GI Bracing Angle, as per technical
LS 33 Kg 36279.72 4720 31559.72
specification and scope of work.
976 79
2360 2359.8 2359.8 0.2 RA-24 2359.8 0
(29-11-2023) (22-12-2023)
PKG-5 (MDCC Vs MVAC Vs BILL) MDCC MVAC BILL
1St Amnd Cumm
Item MDCC MDCC Balance MVAC MVAC Cumm MVAC Balance Supply Bill Balance (MVAC
Category Description of Supply & Erection Items Units Quantity MDCC Supply Bill No Remarks
Sl No NO & DATE QTY MDCC NO & DATE QTY Qty MVAC Qty vs Bill)
QTY
26 RA-10
3781.2 3781.2 0
(18-09-2023) (06-10-2023)
27 RA-14
8280 8280 0
765 (03-10-2023) (03-11-2023)
21569 21169.2 399.8
(10-08-2023) 28 RA-12
634.8 634.8 0
LS 35 supply of 11 kV G.I. 'V' Cross arm Kg 37170 29849 7321 (16-09-2023) (19-10-2023)
29 RA-12
8473.2 8470 3.2
(03-10-2023) (19-10-2023)
RA-17
858 59
8280 8280 8280 0 (24-11-2023) 8280 0
(30-09-2023) (09-11-2023)
Supply of 100mm2 AAAC 687 13 Ra-07
LS 38 Km 555.9624 299.784 299.784 256.1784 299.784 299.784 0 299.784 0
(30-06-2023) (11-08-2023) (04-09-2023)
Supply of Mid Span Compression Joints 455 03 RA-06
LS 39 No. 537 250 250 287 250 250 0 250 0
suitable for 100 mm2 AAAC (04.05.2023) (06-06-2023) (20-07-2023)
Supply of H.T. stay set complete icludes anchor 03 RA-06
1000 Deduction from 2400 to
rod, anchor plate, turn buckle and 2 nos 455 (06-06-2023) (20-07-2023)
LS 40 2400 2400 -180 2400 0 1776 624
thimble as per technical specification and scope Set. 2220
(04.05.2023) 04 RA-06
1776 due to exceed of
of work. 1400 80% BOQ Qty
(06-06-2023) (20-07-2023)
339 01 RA-06
975 975 975 0 975 0
(31.03.2023) (10-05-2023) (20-07-2023)
563 08 RA-06
975 975 975 0 975 0
Supply of HT stay Insulator 11kV (1set=2 Nos) (30.05.2023) (17-06-2023) (20-07-2023)
LS 41 Set 4440 2340 2100 RA-17
as per technical specification and scope of work 905 64
100 100 100 0 (24-11-2023) 100 0
(27-10-2023) (16-11-2023)
975 73 RA-22
290 290 290 0 290 0
(29-11-2023) (16-12-2023) (06-01-2024)
RA-17
Supply of HT Stay clamp as per technical 818 46
1880 392.496 392.496 1487.504 (24-11-2023) 392.496 0
specification and scope of work (11-09-2023) (16-10-2023)
LS 42 Kg 6660 3760 2900
976 79
1880 392.496 392.496 1487.504 RA-24 392.496 0
(29-11-2023) (22-12-2023)
339 01 RA-06
624 624 624 0 624 0
(31.03.2023) (10-05-2023) (20-07-2023)
563 08 RA-06
624 624 624 0 624 0
(30.05.2023) (17-06-2023) (20-07-2023)
Supply of Polymer Disc Insulator 11kV,70 KN
LS 44 Set 3222 3222 0 RA-17
for DP, Angle Point (more than 100) 905 64
1000 1000 1000 0 (24-11-2023) 1000 0
(27-10-2023) (16-11-2023)
975 73 RA-22 Due to Exceed of 80%
974 974 974 0 329 645
(29-11-2023) (16-12-2023) (06-01-2024) Amd. BOQ Qnty
Supply of 4 bolted (M-16) type single tension 564 05 RA-06
LS 45 Set 3222 1000 1000 2222 1000 1000 0 1000 0
H/W fitting for (100 mm² AAAC) (30.05.2023) (13-06-2023) (20-07-2023)
339 01 RA-06
1618 1618 1618 0 1618 0
(31.03.2023) (10-05-2023) (20-07-2023)
563 08 RA-06
1617 1617 1617 0 1617 0
(30.05.2023) (17-06-2023) (20-07-2023)
LS 46 Supply of 11 kV Polymer Pin Insulator Set 9045 8235 810 RA-17
905 64
2500 2500 2500 0 (24-11-2023) 2500 0
(27-10-2023) (16-11-2023)
975 73 RA-22 Due to Exceed of 80%
2500 2500 2500 0 1501 999
(29-11-2023) (16-12-2023) (06-01-2024) Amd. BOQ Qnty
PKG-5 (MDCC Vs MVAC Vs BILL) MDCC MVAC BILL
1St Amnd Cumm
Item MDCC MDCC Balance MVAC MVAC Cumm MVAC Balance Supply Bill Balance (MVAC
Category Description of Supply & Erection Items Units Quantity MDCC Supply Bill No Remarks
Sl No NO & DATE QTY MDCC NO & DATE QTY Qty MVAC Qty vs Bill)
QTY
Supply of 3 bolted (M-12) P.G Clamp for 100 455 03 RA-06
LS 47 No. 4995 2525 2525 2470 2525 2525 0 2525 0
mm² AAAC (04.05.2023) (06-06-2023) (20-07-2023)
455 03 RA-06
LS 51 Supply of Coil type earthing device Set 2478 1700 1700 778 1700 1700 0 1700 0
(04.05.2023) (06-06-2023) (20-07-2023)
Different size GI Nuts & Bolts for supply of 464 11 Ra-07
LS 55 MT 22.2 7.72 7.72 14.48 7.72 7.72 0 7.72 0
materials (08.05.2023) (26-07-2023) (04-09-2023)
RA-17
818 46
261 260.4 260.4 0.6 (24-11-2023) 260.4 0
B.B.1 (11-09-2023) (16-10-2023)
LS Fish Plate -Flat( 65mm x 0.26 mtr , 6 mm thk ) - Kg 2577.6 522 2055.6
(New)
976 79
261 260.4 260.4 0.6 RA-24 260.4 0
(29-11-2023) (22-12-2023)
Supply of Polymer Disc Insulator 11kV,70 KN 975 73 RA-22
LS B.4.12 No 324 26 26 298 26 26 272 26 0
for DP, Angle Point (more than 100) (29-11-2023) (16-12-2023) (06-01-2024)
RA-17
630 Amp Double break turn and twist center 864 56
9 9 9 0 (24-11-2023) 9 0
rotating isolator without earth switch out door (04-10-2023) (07-11-2023)
LS 57 No 22 10 12
type polymer insulator (as per technical
997 91
specification) 1 1 1 0 RA-24 1 0
(07-12-2023) (06-01-2024)
787 24 RA-10
LS 65 Supply of 120mm2 AAAC Covered conductor Km 86.94 15.09 15.09 71.85 15.09 15.09 0 15.09 0
(23-08-2023) (07-09-2023) (06-10-2023)
AB Switch (11KV,400A.3pole) Polymer RA-17
756 21
LS 87 Insulator, as per technical specification and No 4 2 2 2 2 2 0 (24-11-2023) 2 0
(04-08-2023) (26-10-2023)
scope of work.
Supply of 99mm2 AAAC Covered Conductor 787 24 RA-10
LS 95 with supply of distribution Tie used for pin Km 11.34 9.068 9.068 2.272 9.065 9.065 0.003 9.065 0
(23-08-2023) (07-09-2023) (06-10-2023)
binding
Differentassize
perGI
REC std.& Bolts for supply of
Nuts 464 11 Ra-07 Due to Exceed of 80%
LS 115 MT 0.44 0.4 0.4 0.04 0.4 0.4 0.0 0.352 0.048
materials (08.05.2023) (26-07-2023) (04-09-2023) Amd. BOQ Qnty
RA-17
864 56
Center Rotating, 33kV, 1250A, 25kA, Beam 10 10 10 0 (24-11-2023) 10 0
(04-10-2023) (07-11-2023)
Mounted Single Isolator
( Motorised) Double break Double Tandem
SS 3 Set 57 59 -2
operating pipe Without Earth Switch, Base
997 91 Due to Exceed of Amd.
channel, Post insulator (For Incoming Line) - 49 49 49 0 RA-24 47 2
(07-12-2023) (06-01-2024) BOQ Qnty
Outdoor Type - Outdoor Type
RA-17
33kV, 200A, Horizontal type AB Switch 756 21
4 4 4 0 (24-11-2023) 4 0
complete Set with post insulators, operating (04-08-2023) (26-10-2023)
SS 4 Set 19 16 3
pipe, base channel etc (for Station Trf. 100KVA, 997 91
33/0.433kV) 12 12 12 0 RA-24 12 0
(07-12-2023) (06-01-2024)
RA-17
756 21
33kV HG Fuse with horn gap, support insulator 4 4 4 0 (24-11-2023) 4 0
(04-08-2023) (26-10-2023)
SS 5 and channel (for Station Trf. 100KVA, Set 19 16 3
33/0.433kV) 997 91
12 12 12 0 RA-24 12 0
(07-12-2023) (06-01-2024)
06 RA-06
18 18 0
617 (15-06-2023) (20-07-2023)
24 24 0
(07-06-2023) 07 RA-06
6 6 0
33KV, 1250A, 25 KA/3 sec, Vacuum Circuit (15-06-2023) (20-07-2023)
SS 6 No 76 75 1 RA-17
Breaker (Outdoor Type) 61
23 (24-11-2023) 23 0
924 (09-11-2023)
51 51 0
(03-11-2023) 62 RA-19
28 28 0
(16-11-2023) (14-12-2023)
PKG-5 (MDCC Vs MVAC Vs BILL) MDCC MVAC BILL
1St Amnd Cumm
Item MDCC MDCC Balance MVAC MVAC Cumm MVAC Balance Supply Bill Balance (MVAC
Category Description of Supply & Erection Items Units Quantity MDCC Supply Bill No Remarks
Sl No NO & DATE QTY MDCC NO & DATE QTY Qty MVAC Qty vs Bill)
QTY
Control Relay Panel for 33 KV Feeder Bay
1014 89
SS 7 Vacuum Circuit Breaker No 38 4 4 34 4 4 0 RA-24 4 0
(20-12-2023) (06-01-2024)
( Inside Control Room)
Control Relay Panel for 33 KV Transformer Bay
1014 89
SS 8 Vacuum Circuit Breaker No 38 6 6 32 6 6 0 RA-24 6 0
(20-12-2023) (06-01-2024)
( Inside Control Room)
700 12 RA-10
9kV, 5kA, Metal Oxide, Surge Arrester with out 27 27 27 0 27 0
(06-07-2023) (16-09-2023) (06-10-2023)
SS 11 surge counter( For Transformers & Out Going No 342 342 0
Feeders) - Outdoor type 944 68 RA-19
315 315 315 0 315 0
(18-11-2023) (06-12-2023) (14-12-2023)