Appendix B: Inspection Reference Plan (IRP) for Static Equipment

Corrosion Location Damage Inspection Interval


RBI Risk Static Equipment / Line No. P&ID Type of Inspection Action Due Date
Group Mechanism (year)

CG - 3 B2 27500-J509 BUN-B-500-DP-4002-002 External Corrosion VI-Ext 100% Coverage 9/1/2021 1

50% of Potential locations by


CG - 3 B2 27500-J509 BUN-B-500-DP-4002-002 External Corrosion UT 9/1/2023 3
Location Category.
CG - 1 C3 840-V-0001 BUN-B-500-DP-4002-002 Internal Corrosion VI-Ext 100% Coverage 9/1/2021 1
50% of Potential locations by
CG - 1 C3 840-V-0001 BUN-B-500-DP-4002-002 Internal Corrosion UT 9/1/2022 2
Location Category.

CG - 1 C3 840-V-0002 BUN-B-500-DP-4002-002 External Corrosion VI-Ext 100% Coverage 9/1/2021 1

50% of Potential locations by


CG - 1 C3 840-V-0002 BUN-B-500-DP-4002-002 External Corrosion UT 9/1/2022 2
Location Category.
CG - 2 C2 840-V-1001 BUN-B-500-DP-4002-002 Internal Corrosion VI-Ext 100% Coverage 9/1/2021 1
50% of Potential locations by
CG - 2 C2 840-V-1001 BUN-B-500-DP-4002-002 Internal Corrosion UT 9/1/2023 3
Location Category.

CG - 17 C3 Deck Boiler BUN-B-500-DP-4002-002 External Corrosion VI-Ext 100% Coverage 9/1/2021 1

50% of Potential locations by


CG - 17 C3 Deck Boiler BUN-B-500-DP-4002-002 External Corrosion UT 9/1/2022 2
Location Category.
CG - 12 B2 FO Diesel tank BUN-B-500-DP-4002-002 Internal Corrosion VI-Ext 100% Coverage 9/1/2021 1
25% of Potential locations by
CG - 12 B2 FO Diesel tank BUN-B-500-DP-4002-002 Internal Corrosion UT 9/1/2023 3
Location Category.

CG - 12 B2 FO Drain Tank BUN-B-500-DP-4002-002 External Corrosion VI-Ext 100% Coverage 9/1/2021 1

25% of Potential locations by


CG - 12 B2 FO Drain Tank BUN-B-500-DP-4002-002 External Corrosion UT 9/1/2023 3
Location Category.
CG - 12 B2 FO Sludge Tank BUN-B-500-DP-4002-002 Internal Corrosion VI-Ext 100% Coverage 9/1/2021 1
25% of Potential locations by
CG - 12 B2 FO Sludge Tank BUN-B-500-DP-4002-002 Internal Corrosion UT 9/1/2023 3
Location Category.

CG - 1 C2 H-T7720 OVL039-PID-01 External Corrosion VI-Ext 100% Coverage 9/1/2021 1

25% of Potential locations by


CG - 1 C2 H-T7720 OVL039-PID-01 External Corrosion UT 9/1/2023 3
Location Category.
CG - 12 B2 MGO Tank OVL039-PID-01 Internal Corrosion VI-Ext 100% Coverage 9/1/2021 1
25% of Potential locations by
CG - 12 B2 MGO Tank OVL039-PID-01 Internal Corrosion UT 9/1/2023 3
Location Category.

CG - 11 B2 SW TreatmentTank BUN-B-500-DP-4002-001 External Corrosion VI-Ext 100% Coverage 9/1/2021 1


Corrosion Location Damage Inspection Interval
RBI Risk Static Equipment / Line No. P&ID Type of Inspection Action Due Date
Group Mechanism (year)

25% of Potential locations by


CG - 11 B2 SW TreatmentTank BUN-B-500-DP-4002-001 External Corrosion UT 9/1/2023 3
Location Category.
CG - 1 C2 V-T7710 BUN-B-500-DP-4002-001 Internal Corrosion VI-Ext 100% Coverage 9/1/2021 1
25% of Potential locations by
CG - 1 C2 V-T7710 BUN-B-500-DP-4002-001 Internal Corrosion UT 9/1/2023 3
Location Category.

Appendix B: Inspection Reference Plan (IRP) for Piping


Corrosion Location Damage Inspection Interval
RBI Risk Static Equipment / Line No. P&ID Type of Inspection Action Due Date
Group Mechanism (year)

CG - 1 B3 4"-FG-1001-AC21B BUN-B-500-DP-4002-001 External Corrosion VI-Ext 100% Coverage 9/1/2021 1


25% of Potential locations by
CG - 1 B3 4"-FG-1001-AC21B BUN-B-500-DP-4002-001 Internal Corrosion UT 9/1/2022 2
Location Category.

CG - 1 B3 4"-FG-1002-AC21B BUN-B-500-DP-4002-001 External Corrosion VI-Ext 100% Coverage 9/1/2021 1

25% of Potential locations by


CG - 1 B3 4"-FG-1002-AC21B BUN-B-500-DP-4002-001 Internal Corrosion UT 9/1/2022 2
Location Category.

CG - 1 B3 4"-FG-1004-AC21B BUN-B-500-DP-4002-001 External Corrosion VI-Ext 100% Coverage 9/1/2021 1

25% of Potential locations by


CG - 1 B3 4"-FG-1004-AC21B BUN-B-500-DP-4002-001 Internal Corrosion UT 9/1/2022 2
Location Category.

CG - 1 B3 4"-FG-1003-AC21B BUN-B-500-DP-4002-001 External Corrosion VI-Ext 100% Coverage 9/1/2021 1

25% of Potential locations by


CG - 1 B3 4"-FG-1003-AC21B BUN-B-500-DP-4002-001 Internal Corrosion UT 9/1/2022 2
Location Category.

CG - 1 B3 4"-FG-1005-AC21B BUN-B-500-DP-4002-002 External Corrosion VI-Ext 100% Coverage 9/1/2021 1

25% of Potential locations by


CG - 1 B3 4"-FG-1005-AC21B BUN-B-500-DP-4002-002 Internal Corrosion UT 9/1/2022 2
Location Category.

CG - 1 B3 2"-BL-T76001-01C02 DTT77103 External Corrosion VI-Ext 100% Coverage 9/1/2021 1

25% of Potential locations by


CG - 1 B3 2"-BL-T76001-01C02 DTT77103 Internal Corrosion UT 9/1/2022 2
Location Category.

CG - 1 B3 2"-BL-T76002-01C02 DTT77103 External Corrosion VI-Ext 100% Coverage 9/1/2021 1


Corrosion Location Damage Inspection Interval
RBI Risk Static Equipment / Line No. P&ID Type of Inspection Action Due Date
Group Mechanism (year)

25% of Potential locations by


CG - 1 B3 2"-BL-T76002-01C02 DTT77103 Internal Corrosion UT 9/1/2022 2
Location Category.

CG - 1 B3 2"-BL-T76003-01C02 DTT77103 External Corrosion VI-Ext 100% Coverage 9/1/2021 1

25% of Potential locations by


CG - 1 B3 2"-BL-T76003-01C02 DTT77103 Internal Corrosion UT 9/1/2022 2
Location Category.

CG - 1 B3 2"-FG-T77008-01C02 DTT77103 External Corrosion VI-Ext 100% Coverage 9/1/2021 1

25% of Potential locations by


CG - 1 B3 2"-FG-T77008-01C02 DTT77103 Internal Corrosion UT 9/1/2022 2
Location Category.

CG - 1 B3 2"-FG-T77007-01C02 DTT77103 External Corrosion VI-Ext 100% Coverage 9/1/2021 1

25% of Potential locations by


CG - 1 B3 2"-FG-T77007-01C02 DTT77103 Internal Corrosion UT 9/1/2022 2
Location Category.

CG - 1 B3 2"-FG-T77004-01C02 DTT77103 External Corrosion VI-Ext 100% Coverage 9/1/2021 1

25% of Potential locations by


CG - 1 B3 2"-FG-T77004-01C02 DTT77103 Internal Corrosion UT 9/1/2022 2
Location Category.

CG - 1 B3 4"-FG-T77005-01C02 DTT77103 External Corrosion VI-Ext 100% Coverage 9/1/2021 1

25% of Potential locations by


CG - 1 B3 4"-FG-T77005-01C02 DTT77103 Internal Corrosion UT 9/1/2022 2
Location Category.

CG - 1 B3 4"-FG-T77006-01C02 DTT77103 External Corrosion VI-Ext 100% Coverage 9/1/2021 1

25% of Potential locations by


CG - 1 B3 4"-FG-T77006-01C02 DTT77103 Internal Corrosion UT 9/1/2022 2
Location Category.

CG - 1 B3 4"-FG-T77002-01C02 DTT77103 External Corrosion VI-Ext 100% Coverage 9/1/2021 1

25% of Potential locations by


CG - 1 B3 4"-FG-T77002-01C02 DTT77103 Internal Corrosion UT 9/1/2022 2
Location Category.

CG - 1 B3 4"-FG-T77001-01C02 DTT77101 External Corrosion VI-Ext 100% Coverage 9/1/2021 1

25% of Potential locations by


CG - 1 B3 4"-FG-T77001-01C02 DTT77101 Internal Corrosion UT 9/1/2022 2
Location Category.

CG - 1 B3 2"-FG-T77003-01C02 DTT77101 External Corrosion VI-Ext 100% Coverage 9/1/2021 1

25% of Potential locations by


CG - 1 B3 2"-FG-T77003-01C02 DTT77101 Internal Corrosion UT 9/1/2022 2
Location Category.

CG - 2 C2 10"-OC-0001-AC21B BUN-B-500-DP-4002-001 External Corrosion VI-Ext 100% Coverage 9/1/2021 1

25% of Potential locations by


CG - 2 C2 10"-OC-0001-AC21B BUN-B-500-DP-4002-001 Internal Corrosion UT 9/1/2023 3
Location Category.
Corrosion Location Damage Inspection Interval
RBI Risk Static Equipment / Line No. P&ID Type of Inspection Action Due Date
Group Mechanism (year)

CG - 2 C3 3"-OC-0006-AC21B BUN-B-500-DP-4002-002 External Corrosion VI-Ext 100% Coverage 9/1/2021 1

25% of Potential locations by


CG - 2 C3 3"-OC-0006-AC21B BUN-B-500-DP-4002-002 Internal Corrosion UT 9/1/2022 2
Location Category.

CG - 2 C2 10"-OC-0002-AC21B BUN-B-500-DP-4002-002 External Corrosion VI-Ext 100% Coverage 9/1/2021 1

25% of Potential locations by


CG - 2 C2 10"-OC-0002-AC21B BUN-B-500-DP-4002-002 Internal Corrosion UT 9/1/2023 3
Location Category.

CG - 2 C2 8"-OC-0005-AC21B BUN-B-500-DP-4002-002 External Corrosion VI-Ext 100% Coverage 9/1/2021 1

25% of Potential locations by


CG - 2 C2 8"-OC-0005-AC21B BUN-B-500-DP-4002-002 Internal Corrosion UT 9/1/2023 3
Location Category.

CG - 2 C2 8"-OC-0004-AC21B BUN-B-500-DP-4002-002 External Corrosion VI-Ext 100% Coverage 9/1/2021 1

25% of Potential locations by


CG - 2 C2 8"-OC-0004-AC21B BUN-B-500-DP-4002-002 Internal Corrosion UT 9/1/2023 3
Location Category.

CG - 2 C2 8"-OC-0010-AC21B BUN-B-500-DP-4002-002 External Corrosion VI-Ext 100% Coverage 9/1/2021 1

25% of Potential locations by


CG - 2 C2 8"-OC-0010-AC21B BUN-B-500-DP-4002-002 Internal Corrosion UT 9/1/2023 3
Location Category.

CG - 2 C2 10"-OC-0003-AC21B BUN-B-500-DP-4002-002 External Corrosion VI-Ext 100% Coverage 9/1/2021 1

25% of Potential locations by


CG - 2 C2 10"-OC-0003-AC21B BUN-B-500-DP-4002-002 Internal Corrosion UT 9/1/2023 3
Location Category.

CG - 2 C3 3"-OC-0009-AC21B BUN-B-500-DP-4002-002 External Corrosion VI-Ext 100% Coverage 9/1/2021 1

25% of Potential locations by


CG - 2 C3 3"-OC-0009-AC21B BUN-B-500-DP-4002-002 Internal Corrosion UT 9/1/2022 2
Location Category.

CG - 2 C3 3"-OC-0008-AC21B BUN-B-500-DP-4002-002 External Corrosion VI-Ext 100% Coverage 9/1/2021 1

25% of Potential locations by


CG - 2 C3 3"-OC-0008-AC21B BUN-B-500-DP-4002-002 Internal Corrosion UT 9/1/2022 2
Location Category.

CG - 2 C2 Metering Piping System 1 - 12" OVL039-PID-01 External Corrosion VI-Ext 100% Coverage 9/1/2021 1

25% of Potential locations by


CG - 2 C2 Metering Piping System 1 - 12" OVL039-PID-01 Internal Corrosion UT 9/1/2023 3
Location Category.

CG - 2 C2 Metering Piping System 2 OVL039-PID-01 External Corrosion VI-Ext 100% Coverage 9/1/2021 1

25% of Potential locations by


CG - 2 C2 Metering Piping System 2 OVL039-PID-01 Internal Corrosion UT 9/1/2023 3
Location Category.

CG - 2 B3 Metering Piping System 3 OVL039-PID-01 External Corrosion VI-Ext 100% Coverage 9/1/2021 1
Corrosion Location Damage Inspection Interval
RBI Risk Static Equipment / Line No. P&ID Type of Inspection Action Due Date
Group Mechanism (year)

25% of Potential locations by


CG - 2 B3 Metering Piping System 3 OVL039-PID-01 Internal Corrosion UT 9/1/2022 2
Location Category.

CG - 2 C3 Metering Piping System 4 OVL039-PID-01 External Corrosion VI-Ext 100% Coverage 9/1/2021 1

25% of Potential locations by


CG - 2 C3 Metering Piping System 4 OVL039-PID-01 Internal Corrosion UT 9/1/2022 2
Location Category.

CG - 2 C2 Metering Piping System 1 - 20" OVL039-PID-01 External Corrosion VI-Ext 100% Coverage 9/1/2021 1

50% of Potential locations by


CG - 2 C2 Metering Piping System 1 - 20" OVL039-PID-01 Internal Corrosion UT 9/1/2023 3
Location Category.

CG - 2 C3 Cargo Oil System Piping 1 102-MP-DC-015 External Corrosion VI-Ext 100% Coverage 9/1/2021 1

25% of Potential locations by


CG - 2 C3 Cargo Oil System Piping 1 102-MP-DC-015 Internal Corrosion UT 9/1/2022 2
Location Category.

CG - 2 C3 Cargo Oil System Piping 2 102-MP-DC-015 External Corrosion VI-Ext 100% Coverage 9/1/2021 1

25% of Potential locations by


CG - 2 C3 Cargo Oil System Piping 2 102-MP-DC-015 Internal Corrosion UT 9/1/2022 2
Location Category.

CG - 2 C3 Cargo Oil System Piping 3 102-MP-DC-015 External Corrosion VI-Ext 100% Coverage 9/1/2021 1

25% of Potential locations by


CG - 2 C3 Cargo Oil System Piping 3 102-MP-DC-015 Internal Corrosion UT 9/1/2022 2
Location Category.

CG - 2 C3 Cargo Oil System Piping 4 102-MP-DC-015 External Corrosion VI-Ext 100% Coverage 9/1/2021 1

25% of Potential locations by


CG - 2 C3 Cargo Oil System Piping 4 102-MP-DC-015 Internal Corrosion UT 9/1/2022 2
Location Category.

CG - 2 C2 Offloading System Piping 1 102-MP-DC-015 External Corrosion VI-Ext 100% Coverage 9/1/2021 1

25% of Potential locations by


CG - 2 C2 Offloading System Piping 1 102-MP-DC-015 Internal Corrosion UT 9/1/2023 3
Location Category.

CG - 2 C3 Offloading System Piping 2 102-MP-DC-015 External Corrosion VI-Ext 100% Coverage 9/1/2021 1

25% of Potential locations by


CG - 2 C3 Offloading System Piping 2 102-MP-DC-015 Internal Corrosion UT 9/1/2022 2
Location Category.

CG - 3 C3 3"-Recirculate J509-27550 External Corrosion VI-Ext 100% Coverage 9/1/2021 1

25% of Potential locations by


CG - 3 C3 3"-Recirculate J509-27550 Internal Corrosion UT 9/1/2022 2
Location Category.

CG - 3 A3 3"-Water Discharge J509-27550 External Corrosion VI-Ext 100% Coverage 9/1/2021 1

25% of Potential locations by


CG - 3 A3 3"-Water Discharge J509-27550 Internal Corrosion UT 9/1/2023 3
Location Category.
Corrosion Location Damage Inspection Interval
RBI Risk Static Equipment / Line No. P&ID Type of Inspection Action Due Date
Group Mechanism (year)

CG - 3 B3 1.5"- Oil Discharge J509-27550 External Corrosion VI-Ext 100% Coverage 9/1/2021 1

25% of Potential locations by


CG - 3 B3 1.5"- Oil Discharge J509-27550 Internal Corrosion UT 9/1/2022 2
Location Category.

CG - 3 B3 1"- Oil Bleed J509-27550 External Corrosion VI-Ext 100% Coverage 9/1/2021 1

25% of Potential locations by


CG - 3 B3 1"- Oil Bleed J509-27550 Internal Corrosion UT 9/1/2022 2
Location Category.

CG - 3 C3 4"-System Inlet J509-27550 External Corrosion VI-Ext 100% Coverage 9/1/2021 1

25% of Potential locations by


CG - 3 C3 4"-System Inlet J509-27550 Internal Corrosion UT 9/1/2022 2
Location Category.

CG - 3 C3 3"-Drain J509-27550 External Corrosion VI-Ext 100% Coverage 9/1/2021 1

25% of Potential locations by


CG - 3 C3 3"-Drain J509-27550 Internal Corrosion UT 9/1/2022 2
Location Category.

CG - 4 A2 2"-GN-5004-AC21B BUN-B-500-DP-4002-001 External Corrosion VI-Ext 100% Coverage 9/1/2021 1

25% of Potential locations by


CG - 4 A2 2"-GN-5004-AC21B BUN-B-500-DP-4002-001 Internal Corrosion UT 9/1/2023 3
Location Category.

CG - 4 A2 2"-GN-5003-AC21B BUN-B-500-DP-4002-002 External Corrosion VI-Ext 100% Coverage 9/1/2021 1

25% of Potential locations by


CG - 4 A2 2"-GN-5003-AC21B BUN-B-500-DP-4002-002 Internal Corrosion UT 9/1/2023 3
Location Category.

CG - 4 A2 2"-GN-5001-AC21B BUN-B-500-DP-4002-002 External Corrosion VI-Ext 100% Coverage 9/1/2021 1

25% of Potential locations by


CG - 4 A2 2"-GN-5001-AC21B BUN-B-500-DP-4002-002 Internal Corrosion UT 9/1/2023 3
Location Category.

CG - 4 A2 2"-GN-5002-AC21B BUN-B-500-DP-4002-002 External Corrosion VI-Ext 100% Coverage 9/1/2021 1

25% of Potential locations by


CG - 4 A2 2"-GN-5002-AC21B BUN-B-500-DP-4002-002 Internal Corrosion UT 9/1/2023 3
Location Category.

CG - 5 A2 1"-AI-T18001-01E01 DTT77101 External Corrosion VI-Ext 100% Coverage 9/1/2021 1

25% of Potential locations by


CG - 5 A2 1"-AI-T18001-01E01 DTT77101 Internal Corrosion UT 9/1/2023 3
Location Category.

CG - 6 A2 1"-AP-6003-AC21B BUN-B-500-DP-4002-001 External Corrosion VI-Ext 100% Coverage 9/1/2021 1

25% of Potential locations by


CG - 6 A2 1"-AP-6003-AC21B BUN-B-500-DP-4002-001 Internal Corrosion UT 9/1/2023 3
Location Category.

CG - 6 A2 1"-AP-6002-AC21B BUN-B-500-DP-4002-002 External Corrosion VI-Ext 100% Coverage 9/1/2021 1


Corrosion Location Damage Inspection Interval
RBI Risk Static Equipment / Line No. P&ID Type of Inspection Action Due Date
Group Mechanism (year)

25% of Potential locations by


CG - 6 A2 1"-AP-6002-AC21B BUN-B-500-DP-4002-002 Internal Corrosion UT 9/1/2023 3
Location Category.

CG - 6 A3 2"-AP-6001-AC21B BUN-B-500-DP-4002-002 External Corrosion VI-Ext 100% Coverage 9/1/2021 1

25% of Potential locations by


CG - 6 A3 2"-AP-6001-AC21B BUN-B-500-DP-4002-002 Internal Corrosion UT 9/1/2023 3
Location Category.

CG - 6 A3 1.5"-AP-6004-AC21B BUN-B-500-DP-4002-002 External Corrosion VI-Ext 100% Coverage 9/1/2021 1

25% of Potential locations by


CG - 6 A3 1.5"-AP-6004-AC21B BUN-B-500-DP-4002-002 Internal Corrosion UT 9/1/2023 3
Location Category.

CG - 6 A2 1"-AP-6005-AC21B BUN-B-500-DP-4002-002 External Corrosion VI-Ext 100% Coverage 9/1/2021 1

25% of Potential locations by


CG - 6 A2 1"-AP-6005-AC21B BUN-B-500-DP-4002-002 Internal Corrosion UT 9/1/2023 3
Location Category.

CG - 6 A3 1.5"-AP-6006-AC21B BUN-B-500-DP-4002-002 External Corrosion VI-Ext 100% Coverage 9/1/2021 1

25% of Potential locations by


CG - 6 A3 1.5"-AP-6006-AC21B BUN-B-500-DP-4002-002 Internal Corrosion UT 9/1/2023 3
Location Category.

CG - 7 C3 2"-PL-T77011-01C02 DTT77103 External Corrosion VI-Ext 100% Coverage 9/1/2021 1

25% of Potential locations by


CG - 7 C3 2"-PL-T77011-01C02 DTT77103 Internal Corrosion UT 9/1/2022 2
Location Category.

CG - 7 C2 2"-DC-T13003-01C02 DTT77103 External Corrosion VI-Ext 100% Coverage 9/1/2021 1

25% of Potential locations by


CG - 7 C2 2"-DC-T13003-01C02 DTT77103 Internal Corrosion UT 9/1/2023 3
Location Category.

CG - 7 C2 2"-DC-T13001-01C02 DTT77101 External Corrosion VI-Ext 100% Coverage 9/1/2021 1

25% of Potential locations by


CG - 7 C2 2"-DC-T13001-01C02 DTT77101 Internal Corrosion UT 9/1/2023 3
Location Category.

CG - 7 C2 2"-DC-T13002-01C02 DTT77101 External Corrosion VI-Ext 100% Coverage 9/1/2021 1

25% of Potential locations by


CG - 7 C2 2"-DC-T13002-01C02 DTT77101 Internal Corrosion UT 9/1/2023 3
Location Category.

CG - 8 C2 2"-DC-2008-AC21B BUN-B-500-DP-4002-001 External Corrosion VI-Ext 100% Coverage 9/1/2021 1

25% of Potential locations by


CG - 8 C2 2"-DC-2008-AC21B BUN-B-500-DP-4002-001 Internal Corrosion UT 9/1/2023 3
Location Category.

CG - 8 C2 2"-DC-2001-AC21B BUN-B-500-DP-4002-001 External Corrosion VI-Ext 100% Coverage 9/1/2021 1

25% of Potential locations by


CG - 8 C2 2"-DC-2001-AC21B BUN-B-500-DP-4002-001 Internal Corrosion UT 9/1/2023 3
Location Category.
Corrosion Location Damage Inspection Interval
RBI Risk Static Equipment / Line No. P&ID Type of Inspection Action Due Date
Group Mechanism (year)

CG - 8 C2 2"-DC-2002-AC21B BUN-B-500-DP-4002-001 External Corrosion VI-Ext 100% Coverage 9/1/2021 1

25% of Potential locations by


CG - 8 C2 2"-DC-2002-AC21B BUN-B-500-DP-4002-001 Internal Corrosion UT 9/1/2023 3
Location Category.

CG - 8 C2 2"-DC-2003-AC21B BUN-B-500-DP-4002-001 External Corrosion VI-Ext 100% Coverage 9/1/2021 1

25% of Potential locations by


CG - 8 C2 2"-DC-2003-AC21B BUN-B-500-DP-4002-001 Internal Corrosion UT 9/1/2023 3
Location Category.

CG - 8 C2 2"-DC-2007-AC21B BUN-B-500-DP-4002-001 External Corrosion VI-Ext 100% Coverage 9/1/2021 1

25% of Potential locations by


CG - 8 C2 2"-DC-2007-AC21B BUN-B-500-DP-4002-001 Internal Corrosion UT 9/1/2023 3
Location Category.

CG - 8 C3 1"-GV-3007-AC21B BUN-B-500-DP-4002-001 External Corrosion VI-Ext 100% Coverage 9/1/2021 1

25% of Potential locations by


CG - 8 C3 1"-GV-3007-AC21B BUN-B-500-DP-4002-001 Internal Corrosion UT 9/1/2022 2
Location Category.

CG - 8 C2 2"-DC-2004-AC21B BUN-B-500-DP-4002-001 External Corrosion VI-Ext 100% Coverage 9/1/2021 1

25% of Potential locations by


CG - 8 C2 2"-DC-2004-AC21B BUN-B-500-DP-4002-001 Internal Corrosion UT 9/1/2023 3
Location Category.

CG - 8 C3 2"-GV-3005-AC21B BUN-B-500-DP-4002-002 External Corrosion VI-Ext 100% Coverage 9/1/2021 1

25% of Potential locations by


CG - 8 C3 2"-GV-3005-AC21B BUN-B-500-DP-4002-002 Internal Corrosion UT 9/1/2022 2
Location Category.

CG - 8 C2 3"-DC-9002-AC21B BUN-B-500-DP-4002-002 External Corrosion VI-Ext 100% Coverage 9/1/2021 1

25% of Potential locations by


CG - 8 C2 3"-DC-9002-AC21B BUN-B-500-DP-4002-002 Internal Corrosion UT 9/1/2023 3
Location Category.

CG - 8 C2 1"-DC-9006-AC21B BUN-B-500-DP-4002-002 External Corrosion VI-Ext 100% Coverage 9/1/2021 1

25% of Potential locations by


CG - 8 C2 1"-DC-9006-AC21B BUN-B-500-DP-4002-002 Internal Corrosion UT 9/1/2023 3
Location Category.

CG - 8 C2 2"-DC-9001-AC21B BUN-B-500-DP-4002-002 External Corrosion VI-Ext 100% Coverage 9/1/2021 1

25% of Potential locations by


CG - 8 C2 2"-DC-9001-AC21B BUN-B-500-DP-4002-002 Internal Corrosion UT 9/1/2023 3
Location Category.

CG - 8 C2 2"-DC-9005-AC21B BUN-B-500-DP-4002-002 External Corrosion VI-Ext 100% Coverage 9/1/2021 1

25% of Potential locations by


CG - 8 C2 2"-DC-9005-AC21B BUN-B-500-DP-4002-002 Internal Corrosion UT 9/1/2022 2
Location Category.

CG - 8 C2 3"-DC-9004-AC21B BUN-B-500-DP-4002-002 External Corrosion VI-Ext 100% Coverage 9/1/2021 1


Corrosion Location Damage Inspection Interval
RBI Risk Static Equipment / Line No. P&ID Type of Inspection Action Due Date
Group Mechanism (year)

25% of Potential locations by


CG - 8 C2 3"-DC-9004-AC21B BUN-B-500-DP-4002-002 Internal Corrosion UT 9/1/2022 2
Location Category.

CG - 8 C2 3"-DC-9003-AC21B BUN-B-500-DP-4002-002 External Corrosion VI-Ext 100% Coverage 9/1/2021 1

25% of Potential locations by


CG - 8 C2 3"-DC-9003-AC21B BUN-B-500-DP-4002-002 Internal Corrosion UT 9/1/2022 2
Location Category.

CG - 8 C3 Closed Drain Piping System 1 OVL039-PID-01 External Corrosion VI-Ext 100% Coverage 9/1/2021 1

25% of Potential locations by


CG - 8 C3 Closed Drain Piping System 1 OVL039-PID-01 Internal Corrosion UT 9/1/2023 3
Location Category.

CG - 9 C3 1"GV-3008-AC21B BUN-B-500-DP-4002-001 External Corrosion VI-Ext 100% Coverage 9/1/2021 1

25% of Potential locations by


CG - 9 C3 1"GV-3008-AC21B BUN-B-500-DP-4002-001 Internal Corrosion UT 9/1/2023 3
Location Category.

CG - 9 C3 2"-GV-3001-AC21B BUN-B-500-DP-4002-001 External Corrosion VI-Ext 100% Coverage 9/1/2021 1

25% of Potential locations by


CG - 9 C3 2"-GV-3001-AC21B BUN-B-500-DP-4002-001 Internal Corrosion UT 9/1/2022 2
Location Category.

CG - 9 C3 2"-GV-3003-AC21B BUN-B-500-DP-4002-001 External Corrosion VI-Ext 100% Coverage 9/1/2021 1

25% of Potential locations by


CG - 9 C3 2"-GV-3003-AC21B BUN-B-500-DP-4002-001 Internal Corrosion UT 9/1/2022 2
Location Category.

CG - 9 C3 2"-GV-3002-AC21B BUN-B-500-DP-4002-001 External Corrosion VI-Ext 100% Coverage 9/1/2021 1

25% of Potential locations by


CG - 9 C3 2"-GV-3002-AC21B BUN-B-500-DP-4002-001 Internal Corrosion UT 9/1/2022 2
Location Category.

CG - 9 C3 2"-GV-3004-AC21B BUN-B-500-DP-4002-002 External Corrosion VI-Ext 100% Coverage 9/1/2021 1

25% of Potential locations by


CG - 9 C3 2"-GV-3004-AC21B BUN-B-500-DP-4002-002 Internal Corrosion UT 9/1/2022 2
Location Category.

CG - 9 C3 1"-GV-3006-AC21B BUN-B-500-DP-4002-002 External Corrosion VI-Ext 100% Coverage 9/1/2021 1

25% of Potential locations by


CG - 9 C3 1"-GV-3006-AC21B BUN-B-500-DP-4002-002 Internal Corrosion UT 9/1/2022 2
Location Category.

CG - 10 A3 3"-WA-8001-AC21B BUN-B-500-DP-4002-002 External Corrosion VI-Ext 100% Coverage 9/1/2021 1

25% of Potential locations by


CG - 10 A3 3"-WA-8001-AC21B BUN-B-500-DP-4002-002 Internal Corrosion UT 9/1/2023 3
Location Category.

CG - 10 A3 Fresh Water Generation Piping 1 102-MP-580-104 External Corrosion VI-Ext 100% Coverage 9/1/2021 1

25% of Potential locations by


CG - 10 A3 Fresh Water Generation Piping 1 102-MP-580-104 Internal Corrosion UT 9/1/2023 3
Location Category.
Corrosion Location Damage Inspection Interval
RBI Risk Static Equipment / Line No. P&ID Type of Inspection Action Due Date
Group Mechanism (year)

CG - 10 A3 Fresh Water Generation Piping 2 102-MP-580-104 External Corrosion VI-Ext 100% Coverage 9/1/2021 1

25% of Potential locations by


CG - 10 A3 Fresh Water Generation Piping 2 102-MP-580-104 Internal Corrosion UT 9/1/2023 3
Location Category.

CG - 10 A3 Fresh Water Distilled Piping 1 102-MP-DC-127 External Corrosion VI-Ext 100% Coverage 9/1/2021 1

25% of Potential locations by


CG - 10 A3 Fresh Water Distilled Piping 1 102-MP-DC-127 Internal Corrosion UT 9/1/2023 3
Location Category.

CG - 10 A3 Fresh Water Distilled Piping 2 102-MP-DC-127 External Corrosion VI-Ext 100% Coverage 9/1/2021 1

25% of Potential locations by


CG - 10 A3 Fresh Water Distilled Piping 2 102-MP-DC-127 Internal Corrosion UT 9/1/2023 3
Location Category.

CG - 10 A3 Fresh Water Distilled Piping 3 102-MP-DC-127 External Corrosion VI-Ext 100% Coverage 9/1/2021 1

25% of Potential locations by


CG - 10 A3 Fresh Water Distilled Piping 3 102-MP-DC-127 Internal Corrosion UT 9/1/2023 3
Location Category.

CG - 11 A3 Firewater System Piping 1 102-MP-810202 External Corrosion VI-Ext 100% Coverage 9/1/2021 1

25% of Potential locations by


CG - 11 A3 Firewater System Piping 1 102-MP-810202 Internal Corrosion UT 9/1/2023 3
Location Category.

CG - 11 A3 Firewater System Piping 2 102-MP-810202 External Corrosion VI-Ext 100% Coverage 9/1/2021 1

25% of Potential locations by


CG - 11 A3 Firewater System Piping 2 102-MP-810202 Internal Corrosion UT 9/1/2023 3
Location Category.

CG - 11 A3 Firewater System Piping 3 102-MP-810202 External Corrosion VI-Ext 100% Coverage 9/1/2021 1

25% of Potential locations by


CG - 11 A3 Firewater System Piping 3 102-MP-810202 Internal Corrosion UT 9/1/2023 3
Location Category.

CG - 11 A2 Seawater Cooling Sys. Piping 1 102-MP-DC-132 External Corrosion VI-Ext 100% Coverage 9/1/2021 1

25% of Potential locations by


CG - 11 A2 Seawater Cooling Sys. Piping 1 102-MP-DC-132 Internal Corrosion UT 9/1/2023 3
Location Category.

CG - 11 A2 Seawater Cooling Sys. Piping 2 102-MP-DC-132 External Corrosion VI-Ext 100% Coverage 9/1/2021 1

25% of Potential locations by


CG - 11 A2 Seawater Cooling Sys. Piping 2 102-MP-DC-132 Internal Corrosion UT 9/1/2023 3
Location Category.

CG - 11 A2 Seawater Cooling Sys. Piping 3 102-MP-DC-132 External Corrosion VI-Ext 100% Coverage 9/1/2021 1

25% of Potential locations by


CG - 11 A2 Seawater Cooling Sys. Piping 3 102-MP-DC-132 Internal Corrosion UT 9/1/2023 3
Location Category.

CG - 11 A3 Seawater Cooling Sys. Piping 4 102-MP-DC-132 External Corrosion VI-Ext 100% Coverage 9/1/2021 1
Corrosion Location Damage Inspection Interval
RBI Risk Static Equipment / Line No. P&ID Type of Inspection Action Due Date
Group Mechanism (year)

25% of Potential locations by


CG - 11 A3 Seawater Cooling Sys. Piping 4 102-MP-DC-132 Internal Corrosion UT 9/1/2023 3
Location Category.

CG - 12 B2 Diesel System Piping 1 102-MP-DC-114 External Corrosion VI-Ext 100% Coverage 9/1/2021 1

25% of Potential locations by


CG - 12 B2 Diesel System Piping 1 102-MP-DC-114 Internal Corrosion UT 9/1/2022 2
Location Category.

CG - 12 B2 Diesel System Piping 2 102-MP-DC-114 External Corrosion VI-Ext 100% Coverage 9/1/2021 1

25% of Potential locations by


CG - 12 B2 Diesel System Piping 2 102-MP-DC-114 Internal Corrosion UT 9/1/2022 2
Location Category.

CG - 12 B2 Diesel System Piping 3 102-MP-DC-114 External Corrosion VI-Ext 100% Coverage 9/1/2021 1

25% of Potential locations by


CG - 12 B2 Diesel System Piping 3 102-MP-DC-114 Internal Corrosion UT 9/1/2022 2
Location Category.

CG - 12 B2 Diesel System Piping 4 102-MP-DC-114 External Corrosion VI-Ext 100% Coverage 9/1/2021 1

25% of Potential locations by


CG - 12 B2 Diesel System Piping 4 102-MP-DC-114 Internal Corrosion UT 9/1/2022 2
Location Category.

CG - 12 B2 Diesel System Piping 5 102-MP-DC-114 External Corrosion VI-Ext 100% Coverage 9/1/2021 1

25% of Potential locations by


CG - 12 B2 Diesel System Piping 5 102-MP-DC-114 Internal Corrosion UT 9/1/2022 2
Location Category.

CG - 13 C3 Slop Oil System Piping 1 102-MP-DC-015 External Corrosion VI-Ext 100% Coverage 9/1/2021 1

25% of Potential locations by


CG - 13 C3 Slop Oil System Piping 1 102-MP-DC-015 Internal Corrosion UT 9/1/2022 2
Location Category.

CG - 13 C3 Slop Oil System Piping 2 102-MP-DC-015 External Corrosion VI-Ext 100% Coverage 9/1/2021 1

25% of Potential locations by


CG - 13 C3 Slop Oil System Piping 2 102-MP-DC-015 Internal Corrosion UT 9/1/2022 2
Location Category.

CG - 13 C3 Slop Oil System Piping 3 102-MP-DC-015 External Corrosion VI-Ext 100% Coverage 9/1/2021 1

25% of Potential locations by


CG - 13 C3 Slop Oil System Piping 3 102-MP-DC-015 Internal Corrosion UT 9/1/2022 2
Location Category.

CG - 14 C3 Inert Gas System Piping 1 102-MP-370201 External Corrosion VI-Ext 100% Coverage 9/1/2021 1

25% of Potential locations by


CG - 14 C3 Inert Gas System Piping 1 102-MP-370201 Internal Corrosion UT 9/1/2022 2
Location Category.

CG - 14 B2 Inert Gas System Piping 2 102-MP-370201 External Corrosion VI-Ext 100% Coverage 9/1/2021 1

25% of Potential locations by


CG - 14 B2 Inert Gas System Piping 2 102-MP-370201 Internal Corrosion UT 9/1/2023 3
Location Category.
Corrosion Location Damage Inspection Interval
RBI Risk Static Equipment / Line No. P&ID Type of Inspection Action Due Date
Group Mechanism (year)

CG - 14 B2 Inert Gas System Piping 3 102-MP-370201 External Corrosion VI-Ext 100% Coverage 9/1/2021 1

25% of Potential locations by


CG - 14 B2 Inert Gas System Piping 3 102-MP-370201 Internal Corrosion UT 9/1/2023 3
Location Category.

CG - 14 B2 Inert Gas System Piping 4 102-MP-370201 External Corrosion VI-Ext 100% Coverage 9/1/2021 1

25% of Potential locations by


CG - 14 B2 Inert Gas System Piping 4 102-MP-370201 Internal Corrosion UT 9/1/2023 3
Location Category.

CG - 15 B3 Steam & Condensate Sys. Piping 1 102-MP-DC-100 External Corrosion VI-Ext 100% Coverage 9/1/2021 1

25% of Potential locations by


CG - 15 B3 Steam & Condensate Sys. Piping 1 102-MP-DC-100 Internal Corrosion UT 9/1/2022 2
Location Category.

CG - 15 B3 Steam & Condensate Sys. Piping 2 102-MP-DC-100 External Corrosion VI-Ext 100% Coverage 9/1/2021 1

25% of Potential locations by


CG - 15 B3 Steam & Condensate Sys. Piping 2 102-MP-DC-100 Internal Corrosion UT 9/1/2022 2
Location Category.

CG - 15 B3 Steam & Condensate Sys. Piping 3 102-MP-DC-100 External Corrosion VI-Ext 100% Coverage 9/1/2021 1

25% of Potential locations by


CG - 15 B3 Steam & Condensate Sys. Piping 3 102-MP-DC-100 Internal Corrosion UT 9/1/2022 2
Location Category.

CG - 15 B3 Steam & Condensate Sys. Piping 4 102-MP-DC-100 External Corrosion VI-Ext 100% Coverage 9/1/2021 1

25% of Potential locations by


CG - 15 B3 Steam & Condensate Sys. Piping 4 102-MP-DC-100 Internal Corrosion UT 9/1/2022 2
Location Category.

CG - 16 A3 Ballast System Piping 1 102-MP-DC-102 External Corrosion VI-Ext 100% Coverage 9/1/2021 1

25% of Potential locations by


CG - 16 A3 Ballast System Piping 1 102-MP-DC-102 Internal Corrosion UT 9/1/2022 2