Professional Documents
Culture Documents
01-SAADIYAT ITP (Concreting For Super Structure)
01-SAADIYAT ITP (Concreting For Super Structure)
:ITP 003
ARABTEC CONSTRUCTION (L.L.C)
Procedure
Concreting for Super Structures Rev. No. :0
Saadiyat Beach Villa Resort Date :
Sh. Drwg.
1.1 Shop drawings Review Arch.Spec, ,Vol.,Sec. Contract Drawing R - R
Str.Spec.Vol.II, Submittal Sheet
clause 3.1
1 of 12 Form # 17028-Rev 1-Feb 04
Inspection & Test Plan: Document No. :ITP 003
ARABTEC CONSTRUCTION (L.L.C)
Procedure
Concreting for Super Structures Rev. No. :0
Saadiyat Beach Villa Resort Date :
5.0 Reinforcement
Approved shop drawings and
Str.Spec.,Vol.II,
Str. Spec., Vol.II,
5.1 Fixing Rebar to position Visual Sec.03210, P - S Checklist
bar bending
schedules
Approved shop drawings and bar
5.2 Fixing Wire Ties,links,stirrups Visual P - S Checklist
bending schedules
clause 3.6,3.12,3.13
Inspection & Test Plan: Document No. :ITP 003
ARABTEC CONSTRUCTION (L.L.C)
All rust,oil,grease,salt,cuases and Procedure
Concreting for Super Structures Rev. No. :0
Saadiyat Beach Villa Resort Date :
deleterious matter
5.4 Cleaning of steel of any grease & rust Visual Str. Spec.,Vol.II, P - S Checklist
shall be
Sec.03210,
Inspection of reinforcement, level alignment & plumbnet Approved shop drawings and bar
5.5 Visual clause 3.4 removedbending
and exposed bars during H - H Checklist & WIR
for closing schedules
Str. Spec.,Vol.II, concreting operation shall
be removed
Places to receive concrete shall be
6.1 Check area to receive concrete is cleaned properly Visual Sec.03310, cleaned, and surfaces shall be moist P - S Checklist
but free from standing water
Concrete temperature should not
clause
3.02
Method of Statement
3 of 12 Form # 17028-Rev 1-Feb 04
Inspection & Test Plan: Document No. :ITP 003
ARABTEC CONSTRUCTION (L.L.C)
Procedure
Concreting for Super Structures Rev. No. :0
Saadiyat Beach Villa Resort Date :
Str. Spec.,Vol.II,
Protect immature concrete from Inspection Points
Type of Testing Requirement/ Acceptance Verifying / Control
Item No. Inspection Description Reference Document thermal shock ,physical shock,
Inspection Criteria ARABTEC ITA Consultant Data Forms
Sec. ,clause
7.0 Waterproofing Planters
Approved Method of statement
Arch.Spec.,Vol.I,Sec.2,cl
7.1 Apply 4mm modified bitumen Visual ause 4.0 and Approved Method of Statement H - H Checklist & WIR
Method Statement
LEGEND : H-Hold point, W-Witness Point, R- Review Documents only, ARABTEC - Arabtec Construction (L.L.C)
S-Surveillance Inspection, P-Progressive Inspection ITA - Independent Testing Agency
WIR - Work Inspection Request
clause Sect.03310
3.6 Curing Visual 3.2 ,J.3 Approved Method of statement S - S Checklist
Clause
Sec.03310, 3.2.J.3
4.0 Waterproofing (Above Blinding )
Clause
Surface shall be clean
clause
Str. Spec., 3.02
Vol.,
dry and 3.02 : I
Surface preparation for blinding to proceed Str. Spec., Vol., smooth concrete surface,all
4.1 Visual H - H Checklist & WIR
waterproofing
clause 3.1
Sec. Clause
5.3 Erection and fixing of formworks to position Visual P - S Checklist
,
Sec.03110,
clause 3.1
Vol.II,Sec.03110,
5.4 Provide sufficient support & bracing to formwork Visual Approved shop drawings P - S Checklist
and approved shop drawings
5.5 Construct for joints in forms where required Visual Vol.II,Sec.03110, Approved shop drawings P - S Checklist
6.0 Reinforcement
Approved shop drawings and
Str.Spec.,Vol.II,
Str. Spec., Vol.II,
6.1 Fixing Rebar to position Visual Sec.03210, P - S Checklist
bar bending
schedules
Approved shop drawings and bar
6.2 Fixing Wire Ties,links,stirrups Visual P - S Checklist
bending schedules
deleterious matter
6.4 Cleaning of steel of any grease & rust Visual P - S Checklist
shall be
Sec.03210,
Sec.03210,
Final inspection and closing of shutters to proceed clause 3.4 Approvedand
removed shop drawings
exposed and
bars bar
during
6.5 Visual H H Checklist & WIR
concreting bending schedules
concreting operation shall
Str. Spec.,Vol.II,
Ensure that the 150mm concrete cubes samples are Sec.03310, Finishing as per specified.
7.4 Samples Str. Spec.,Vol.II, H - W Checklist
taken for testing of compressive strength
Str. Spec., Sec.03310,
7.5 Concrete placing with proper vibration and placement Visual Sec.03310, H - W Checklist
Types setting and
Sec.3.04,
hardening
table 12
7.6 Concrete Finishing Visual Vol.II,Sec.03310, P - S Checklist
clause
3.02 of
concrete as approved
clause
3.02
Method of Statement
8 of 12 Form # 17028-Rev 1-Feb 04
Inspection & Test Plan: Document No. :ITP 001
ARABTEC CONSTRUCTION (L.L.C)
Procedure
Concreting for Sub-Structures & Relevant Works Rev. No. :0
Saadiyat Beach Villa Resort Date :
Str. Spec.,Vol.II,
Protect immature concrete from
Type of Testingshock
thermal Requirement/ Acceptance
,physical shock, Inspection Points Verifying / Control
Item No. Inspection Description Reference Document
Inspection Criteria ARABTEC ITA Consultant Data Forms
Polythene shall be placed
overloading,movement and
7.7 Protection of Freshly laid concrete Visual Sec.03310, P - S Checklist
vibration as approved
Str. Spec., Vol.II,
immediately after
finishing.After
Method of
clause
Statement
3.02.B
Sec.03310,
7.8 Curing Visual P - S Checklist
Str. Spec., Vol.II,
set,replace with wet hessian and
Protect immature concrete from
thermal shock , physical shock,
overloading,movement and
clause 3.02.I
Sec.03110,
7.9 Striking of Forms Visual Str. Spec., keep permanently P - S Checklist
damp.or vibration as approved
using curing compound as
Str.Spec.,Vol., approved Method of statement
Repair of concrete defects and surface treatment Method of Statement
7.10 Visual Vol.,Sec., P - P Checklist
clause 3.5.C
(if any)
Sec. ,clause
8.0 Waterproofing (Other Areas)
Approved Method of statement
Str. Spec.,
Vol.,Sec. ,clause and
8.1 Apply of two coats rubber modified bitumen Visual Method of Statement H - W Checklist & WIR
Approved Method
Statement
LEGEND : H-Hold point, W-Witness Point, R- Review Documents only, ARABTEC - Arabtec Construction (L.L.C)
S-Surveillance Inspection, P-Progressive Inspection ITA - Independent Testing Agency
WIR - Work Inspection Request
P088
ITP / 00
Document No.:00
Arabtec Construction (LLC) Rev.:00
Inspection & Test Plan Date:0
Concreteing for Super Structures Page:2 of
Revision
revision No. Date Prepared By Reviewed By Approved By
Description
0 For Approval