Download as pdf or txt
Download as pdf or txt
You are on page 1of 2

INSPECTION REPORT

Date: 28.11.2022
CUSTOMER DETAILS: IR # 1005 – RP – 2022
Company Name :Oleo Corp Pvt Ltd

Location: Karachi – Pakistan

EQUIPMENT DETAILS:
Equipment brand/Name: Hyundai Battery Operated Fork lifter

Model # 20B-9F

Serial # HHKHKE000K0000377

Date of Inspection: Inspection on 16.11.2021

OBSERVATIONS:
Observation # 1

 Equipment is showing Errors as MF5, SFB, & PFB

MF5: ‘’The battery voltage does not correspond to SET BATTERY programming’’

SFB: ‘’Master Controller signals that other controllers are in alarm status’’

PFB: ‘’The battery voltage does not correspond to SET BATTERY programming’’

 Rectification of Above Errors: Battery Bank is in weak condition may be due to not proper chargin

and operation so it needs BOOST CHARGING, SERVICE & ELECTROLYTE REPLACEMENT

Observation # 2

 Equipment is showing Error PF0

PF0: Hardware Fault: ‘the mosfets driver are not switched off with watch-dog signal in alarm status’

 Rectification of Above Error: Hydraulic Pump and Control Valve need overhaul, Pump Controller

needs repairing, harness needs repairing, and sensor’s operation (Pump & Temp) troubleshooting

with rectification.

 Drive Operation is slow so it needs to be rectified may be due to sensor or drive motor service

required.

Sakoon Pneumatics (Pvt.) Ltd.


DarulUloom Plot # 9, Shahrah-e-DarulUloom, Sector 28, Korangi Industrial Area, Karachi-75180, Pakistan.

Ph: +92 21 35 123 112| Email: info@sakoon.com.pk | Web: www.sakoon.com.pk


Observation # 3

 Complete Service required.

 Preventive Maintenance with replacement of Consumables and Oil-s.

REMARKS:

:  Quotation will be submitted for repair and maintenance.

 Job will be done at our Workshop.

Sakoon Pneumatics (Pvt.) Ltd.


DarulUloom Plot # 9, Shahrah-e-DarulUloom, Sector 28, Korangi Industrial Area, Karachi-75180, Pakistan.

Ph: +92 21 35 123 112| Email: info@sakoon.com.pk | Web: www.sakoon.com.pk

You might also like