VIII. Sanctioned length: 5.400 km, Flexible pavement: 1.519 km,Rigid/Semi-Rigid pavement: 3.381 km
IX. Executed length: 0.000 km, Flexible pavement: 0.00 km, Rigid/Semi-Rigid pavement: 0.00 km
(in case of completed works only)
3. QUALITY CONTROL:
I. Location of field laboratory: * Taramba Village
II. Geo-tagged photograph of laboratory uploaded on: (date/ month/ year) * 10/09/2022
V. Details of contractor’s engineer available at site: (Responsible for maintaining quality control register part-1) *
Sl. Name of contractor’s Duration of posting at site
no. Identity number Mobile number
engineer at site From To
✔ 1 VIJAY KUMAR CH128340 9934564049 23/09/2022 11/01/2024
2
3
VI. Details of contractor’s lab technician: *
Sl. Name of contractor’s Duration of posting at site
no. Identity number Mobile number
lab technician From To
✔ 1 AMIT YADAV 378060 7870612845 23/09/2022 11/01/2024
2
VII. Details of Head of PIU supervising the work: *
Sl. Head of PIU Duration of posting at site
no. Employ number
(Executive engineer) From To
✔ 1 Shyam sunder Murmu RDD1290 23/09/2022 11/01/2024
2
3
*
VIII. Details of Assistant engineer supervising the work and maintaining quality control register Part-II:
Sl.
Name of Junior Duration of posting at site
no. Employ number Mobile number
engineer
From To
✔ 1 B BAGE B0628B 9113717122 23/09/2022 11/01/2024
2
3
X. List of equipments available in field lab:* SIEVE SET CORE CUTTER RAPID MOISTURE METER SAND
POURING SYLINDER CONE AIV FALKINESS REBOUND
HAMMER CUBE CASTING MOULD MEASURING TAPES
Table (IX) a TOOLS DIGITAL WEIGHT CAMBER PLATE SPIRIT LEVEL.
Available equipments that are in working condition Available equipments that are not in working
(1) * condition (2)*
All Equipments are in working condition N.A
XII. Reasons put forth by PIU for non availability of equipments in field lab:
N.A
XIII. Equipments and documents ready to be made available to QM before or during the inspection:*
QCR 1 2 DPR AGGREMENT AND SQM PART I COPIES
Date Name and Road distance Level of Major observations Action taken by PIU
of Designation of (RD) work at the with date
visit inspecting officer time of
(NQM/SQM/CE/ From To inspection
(1) SE)(2) (3) (4) (6) * (7) *
(5) *
Lalan Prasad Singh, E SATISFACTORY NA
26/11/2022 E retired 0.000 5.400 Preparatory work
Base Course
CD Works