TOUAT GAZ project

JOB SAFETY ANALYSIS (JSA)


JSA DOC. No: HSE.JSA.019 JSA TEAM MEMBERS

DATE: 23/10/2017 1. Eng.saif ALI . Project Manager


2. BENZAID Mustapha Technical office manager
REVISION NO: HSE-00 3. mohamed elkomy . HSE Manager.

AUTHORISATION: (Team Leader / Coordinator / Supervisor) Signed : (JSA Team Leader)

Signed :______ _______________________________

JOB LOCATION: Batching Plant

JOB DESCRIPTION: Dismantling of batching plant

WORK TEAM MEMBERS PERSONAL PROTECTIVE PLANT, EQUIPMENT & ISOLATION, TAGGING, Environmental Controls
EQUIPMENT REQUIREMENTS TOOLS BARRICADES, SIGNS & (Bunding, Waste
LICENSES Disposal, Discharge
Prevention, etc)
NAME (print) Helmet Generator LOTO if required Cssi Will follow the
MSDS instructions
Black Safety Glasses or clear Tower light Caution taps And project
enviromenet procedure
Gloves Hand tools Relevant safety signs
Safety shoes Cad weld Equipment certified
Dust musk if necessary Clear access

1 rev 00
Mandatory PPE
PERMITS
Confined Spaces Work
Excavation Gas
Isolation Hot Work
Others please specify:

JOB SAFETY ANALYSIS (JSA) WORK SHEET


JOB STEP (Activity) HAZARD/Risk Who REQUIRED HAZARD CONTROL FINAL
AT P S R P S R ASSESMENT
RISK
PTW  Major injury (If All 2 2 4  PTW should be issued before work 1 1 1 Acceptable
work start without start.
PTW).
JSA  Personal Injury All 2 2 4  JSA should be conducted prior 1 1 1 Acceptable
work start by area supervisor and
briefed for all the involved persons.
 Area/Construction supervisor
should be on site full time.
 JSA will be changed/ cancelled in
case of work steps/equipment or
people changed.
 Injury to workers All 2 2 4  Required PPE shall be worn at all 1 1 1 Acceptable
due to non- times while working at cable
availability of PPE. Pulling operation

 Lack of awareness All 2 2 4  All employees should be given 1 1 1 Acceptable


safety induction and trained for
particular work.
 Toolbox talk must be conducted
prior to start work. All works are
being done only by appropriate
work permit
2 rev 00
Mandatory PPE
 Rotating all 2 3 6  Make sure guards are fitted to
equipment all moving parts
 Sparks.  .Ensure the proper use of
guards
 .Damaged  .Inspect the grinding discs prior
grinding disc
to starting work (ring test)
 .Electrocution.  .Make sure that disc is
compatible with the grinding
 .Flying object/eye machine
injuries  .Proper PPE.
 .Correct installation of Grinder
Cutting & Grinding
 .Fire hazard Wheel.
 .Harmful dust  .Only experienced personnel to
use the equipment.
 .Wear a face shield while
grinding
 .All combustible & inflammable
materiel should kept away from
the hot work area.
 .Cut operation should be done
in well-ventilated area and dust
mask should be worn.
 Fall of the load all 2 2 4  Lifting operations should be 1 1 1 acceptable
performed by competent
persons (operator, rigger, &
banks man)
Lifting operations  No operation could be
performed in the bad weather
conditions
 Lifting gears should be
inspected before start the work
Concrete chipping  .Falling and flying all 2 2 4  Ensure work area is clear of 1 1 1 acceptable
3 rev 00
Mandatory PPE
debris other workers to avoid co-
activity
 . User shall wear a hard hat, eye
 .Harmful Dust protection and ear plugs.
(Silica)  . The work should be done in
well-ventilated area and use of
 .Tool Malfunction dust mask is mandatory for all
workers who can be affected by
 .Electric Shock
generated dust
 . Inspect and test the electrical
 .Loss of control tool and cord prior to use.
over  . Make sure all manufacturer’s
 Tool protective devices
 (guards) are in place and
operational.
 .Vibratory Fatigue  .The tool should be approved,
double-insulated.
 .Excessive Noise  . Make sure that cords are not
lying in water.
 .The operator should make sure
that he sets
 his feet properly before
beginning to chip.
 .Take regular breaks from
chipping or switch with
 another worker (if chipping for a
prolonged period
 of time) to relieve vibratory
fatigue.
Walking and  Fall from height  All workers should be medically
working at height  Falling objects fit to work at height
 All workers have to attend safe
4 rev 00
Mandatory PPE
working at height training
 Full body harness with two
lanyards & shock absorber must
be worn while ascending,
descending, walking & working
at height
 Full body harnesses should be
inspected in daily basis by the
users
 Daily toolbox talk should be
conducted by the area
supervisor & HSE officer
 Safe access & egress should
be installed prior to start the
work
 Safe guard rails should be
installed prior to perform the
work( if needed )
 Roof parapet (more than 50 cm
height) is useful as toe boards

PREPARED BY: APPROVED BY: REVIEWED BY: APPROVED BY:


SUBCONTRACTOR CONST. SUBCONTRACTOR HSE. CONTRACTOR CONST CONTRACTOR HSE

DELFI Bouakaz Mohamed Elkoumy

5 rev 00
Mandatory PPE

You might also like