LEGAL REQUIREMENTS:

DIMENSIONS, DESCRIPTIONS AND QUANTITIES ON THESE DRAWINGS TO BE VERIFIED ON SITE


BEFORE ORDERING MATERIAL OR COMMENCING WITH WORK
ALL WORK TO BE CARRIED OUT IN STRICT ACCORDANCE WITH THE NATIONAL BUILDING
REGULATIONS AND STANDARDS ACT (ACT 103 OF 1977 AND SANS 10400)
ALL TIMBER SIZES AND GRADES TO BE VERIFIED AND APPROVED BY SUPPLIER’S ENGINEER
ALL TRUSSES TO BE IN ACCORDANCE WITH SUPPLIER’S/ENGINEER’S DESIGN AND APPROVAL
BY CLIENT
ALL MATERIALS TO BE BUILT IN/APPLIED STRICTLY IN ACCORDANCE WITH MANUFACTURER’S
SPECIFICATIONS AND INSTRUCTIONS
ALL LOCAL AUTHORITY, UTILITY SERVICE PROVIDES REQUIREMENTS TO BE ESTABLISHED IN
ADVANCE AND ADHERED TO
ALL BOUNDARY PEGS TO BE LOCATED, AND MARKED, BEFORE WORK IS TAKEN IN HAND
ANY DISCREPANCIES BETWEEN THESE DRAWINGS AND LEGISLATION, LOCAL AUTHORITY,
UTILITY SERVICE PROVIDER AND GOOD CONSTRUCTION PRACTICE TO BE REFERRED TO THE
ARCHITECT BEFORE CONSTRUCTION COMMENCES
ANY ASPECT DEEMED TO BE UNCLEAR TO BE REFERRED TO THE ARCHITECT FOR CLARITY
THESE DRAWINGS DO NOT CONSTITUTE A COMPREHENSIVE SPECIFICATION FOR THE WORKS
NO DIMENSIONS TO BE SCALED FROM THESE DRAWINGS

GENERAL NOTES:
ALL MATERIALS AND CONSTRUCTION METHODS
TO COMPLY WITH THE NATIONAL BUILDING
REGULATIONS (ACT No. 103 OF 1997) INCLUDING
ALL REVISIONS AND ALL APPLICABLE BYLAWS
OF THE CONCERNED LOCAL AUTHORITY ALL
DIMENSIONS TO BE VERIFIED ON SITE AND NO
DRAWING IS TO BE SCALED. ANY DISCREPANCIES
OR CONTRADICTIONS MUST IMMEDIATELY BE POINTED OUT TO THE ARCHITECT FOR
CORRECTION OR EXPLANATIONS BEFORE ANY CONSTRUCTION PROCEED

EPCM BONISANA (PTY) LTD.


THIS DRAWING TAKES INTO ACCOUNT THE PARTICULAR INSTRUCTIONS AND REQUIREMENTS
OF OUR CLIENT
IT IS NOT INTENDED FOR AND SHOULD NOT BE RELIED UPON BY ANY THIRD PARTY AND NO
RESPONSIBILITY IS UNDERTAKEN TO ANY THIRD PARTY

NOTES:
ALL WORK TO COMPLY WITH SANS 10089-2:2010 AND SANS 10400-T:2011 SECTION 4.52
EACH INSTALLATION SHALL BE REGISTERED WITH AND APPROVED BY THE LOCAL AUTHORITY
BEFORE BEING COMMISSIONED FOR OPERATION SANS 10089-3:2010 SECTION 5

DRAINAGE NOTES:
ALL GUTTER IN OPEN AIR
ALL SOILPIPES TO HAVE MINIMUM FALL OF 1:40
IE's AT ALL CHANGES OF DIRECTIONS AND JOINTS
IE's TO HAVE MARKED COVERS AT GROUND LEVEL
PIPES UNDER BUILDINGS OR WALLS TO HAVE REINFORCED FOUNDATION OVER CROSSINGS
NO CHANGE OF DIRECTION OR JUNCTION UNDER BUILDING
ALL WASTEPIPES TO BE 50Ømm & FULLY ACCESSIBLE
ALL WASTEPIPE APPLICATIONS ON STUBSTACKS TO BE INDIVIDUALLY ANTI-SIPHONED WITH
51mm ANTI-VACUME TRAP
ALL WASTEWATER APPLICATIONS TO HAVE WATERTRAPS
SOIL & SEWERPIPES TO BE 100Ømm
GEYSERS TO BE ACCORDING TO SABS 0254
GLAZING ACCORDING TO SABA 0137
CHIMNEYS ACCORDING TO PART VV1-VV4 OF NBR
SHOWERS TO HAVE BRASS TRAPS
10 YEAR WATERPROOFING GUARENTEE TO BE CEDED TO THE CLIENT BY THE CONTRACTOR
NO CEMENT BRICKS TO BE USED UNLESS SPECIFIED BY CLIENT, ARCHITECT OR PRINCIPAL
AGENT.

MASONARY, CEMENT AND CONCRETE NOTES:


ALL MASONRY UNITS TO HAVE A COMPRESSIVE STRENGTH NOT LESS THAN 7MPa.
BURNT CLAY MASONRY UNITS SHALL COMPLY WITH THE REQUIREMENTS OF SANS 227.
CONCRETE MASONRY UNITS SHALL COMPLY WITH THE REQUIREMENTS OF SANS 1215.
MASONRY WALLING SHALL COMPLY WITH THE REQUIREMENTS OF SANS 2001-CMI: 2007

CEMENT USED FOR MORTAR SHALL BE COMMON CEMENTS COMPLYING WITH THE
REQUIREMENTS OF SABS ENV 197-1 & MASONRY CEMENTS COMPLYING WITH THE
REQUIREMENTS OF SABS ENV 413-1

MORTAR SHALL BE CLASS II HAVING A MIN. COMPRESSIVE STRENGTH AT 28 DAYS OF 7MPa


AS PER SABS 0164-1

PRECAST CONCRETE LINTELS USED FOR STRUCTURAL PURPOSES SHALL COMPLY WITH THE
REQUIREMENTS OF SANS 1504

AMENDMENTS
No. Description Date
000 Access ramp added, FHR 21/02/22
moved
LEGEND - SECTION
New M90 Concrete blocks

New concrete

New Steel

New timber

4 3 New drywalling Zoning classification/zonering: High Risk Industrial - Mining

Occupation classification/okkupasie: D1

D E F Waterproofing Client/Kliënt:

DPM - 250 Microns

DPC - 375 Microns

T/O Parapet T/O Parapet


10000 10000 Beira, Mozambique

U/S Soffit U/S Soffit Client representative/Kliënt verteenwoordiger:


9490 9490
Date / Datum
3780
1100 220 920 220 1100 Owner signature/Eienaar handtekening:
6000 1500
U/S Lintel U/S Lintel Design architect/Ontwerpsargitek:
8490 Drainage duct inside walls be 8490
plastered to receive COPROX
waterproofing Cement additive
mixed into mortar or similar
approved by Architect.

Balustrade wall with stainlesteel top Equipment Room Balustrade wall with stainlesteel top handrail, height
handrail, height 1100mm to SANS
Balustrade wall with stainlesteel top 1000mm to SANS 10400
10400
handrail, height 1000mm to SANS
10400
RAMP:

Reinforced concrete slab to EPCM Holdings | B9 Central Park, 13 Esdoring Nook, Centurion, South Africa
6.310 m FFL
L0_Ground Storey engineers' detail with brick L0_Ground Storey M +27 82 364 7422 | T +27 12 665 1085|email: info@epcmholdings.com
1080

upstand.
6290 Landing 6290 RAMP: FOR CONSTRUCTION
960

Complies according to SANS INFRASET - Bevel Concept/design Marketing


540

5.769 m FFL SDP

1:12
10 400 Part S 4.8.2 (a & f) & 200mmx100x50mm paving laid in Reinforced concrete slab to engineers' detail Konsep/ontwerp Bemarking
herringbone pattern
1060

4.10. with brick upstand.

140
for walkway only.

180
Municipal Submission Construction As-built
80

TOC Pum Station 1:12 All floor surfaces of ramps and TOC Pum Station Paving to fall away from building. Munisipale Indiening Konstruksie Bestaande struktuur
520

NGL landing to be stable, firm and NGL Complies according to SANS 10 400 Part S

340
5462 slip resistant (see SANS 784), 5462 Planter
4.8.2 (a & f) & 4.10.
5300 under wet and dry conditions. 5300 All floor surfaces of ramps and landing to be Professional/professioneel: L.O Bezuidenhout
stable, firm and slip resistant (see SANS 784),
under wet and dry conditions. SACAP no: PrArch44109301

INFRASET - Bevel
200mmx100x50mm paving laid in
herringbone pattern Foundation and surface bed to
for walkway only. structural engineer detail and L-1_Basement Storey L-1_Basement Storey
Paving to fall away from building. specification. Foundation and surface bed to
3910 3910 Architect signature/argitek handtekening:
structural engineer detail and
specification.
Project/ Projek
4780 1500
19088

Control Room for CPMZ, Beira, Mozambique

Drawing Number / tekening nommer Revision / Wysiging

009 Typical Concrete ramp 000


Section GG Section HH Date / Datum
section
Drawn / Geteken Paper size/ Papier grootte

1 : 50 1 : 50 2022/02/22 11:10:43 Author A1

Checked by / Gemerk deur Scale / Skaal


Checker
As indicated/soos getoon

You might also like