Builder’s work in connection
Attendance.
Bill of quantities.
To help develop this article, click ‘Edit this article’ above.
Building regulations.
Construction contract.
The term ‘builder’s work in connection’ (BWIC) refers to builders work that is necessary as a
Preliminaries.
result of other works, typically mechanical and electrical services but also specialist installations
Sub-contractor.
such as; lifts, escalators, roller shutters, hoists and cleaning cradles and so on.
For example, the installation of mechanical and electrical services might require:
Cutting, forming or drilling through walls, floors or ceilings to allow services to pass.
Ensuring structural integrity is not compromised.
Chasing block and brickwork for conduits or pipes. Featured articles and news
Lifting and replacing floors.
Asbestos removal. Westminster Industrial Estate regeneration
Plant moving services.
Sealing holes.
Reinstating fire, thermal or acoustic separation.
Constructing plinths.
Making good plaster and other finishes.
Maintenance access requirements such as access panels, decking, platforms, cat ladders
and handrails.
This may involve works that require building regulations approvals and possibly testing
certificates (for example cleaning cradle restraining bolts).
Builders work in connection is generally carried out by the main contractor for a mechanical and
electrical sub-contractor and other such specialist trades. However, sometimes, the mechanical
U and I partner with Galliard Homes to
and electrical works might be part of the main contract and the builders work in connection sub-
transform Charlton estate into creative urban
contracted.
village.
Builder’s work in connection should not be confused general site preliminaries such as; welfare
provisions, site offices, plant, site waste clearance and so on which are priced separately.
Queensferry Crossing
Estimators typically price builder's work in connection as 7% of the specialist work value.
Bill of quantities.
Building regulations.
Construction contract.
Preliminaries.
Sub-contractor.
Due to open in May 2017, Scotland's new
Forth estuary road bridge has achieved huge
cost savings.
Share Add a comment Send us feedback
Brownfield land
Wellbeing
© Designing Buildings Ltd. 2016 About Help Privacy Policy T&Cs Contact Feed Report Abuse Press