5 Laboratory Incubator

You might also like

Download as pdf or txt
Download as pdf or txt
You are on page 1of 2

Repubtic of the phitippines

Department of Health
MARGOSATUBIG REGIONAL HOSPITAL
Margosatubig, Zamboanga del Sur
Cotltact No. (O917,) 7t5-0041 / e.mait actd: nrt\gov@r,tiltoo.coit phhtIhgav@gtnail.cottl website:hUp:/lntrh.<loh,gov,ptt

Technica I Req uirements for


Laboratory lncubator

o LCD

o 999 hours or 999 minutes

o 70t5"C

o 300liters

o 22Oyac
o Not more than looowatts

DARD IES:

2 shelves
online UPS that matches the erectricar requirements of the
machine

r operation manual with soft copy 2 pcs soft


copy must be included in the submission
of bidding documents
o Service manual with soft copy 2
pcs
> Training program
r for end-user on equipment,s operation with
certificate
o Technicaltraining with certificate (When
necessary)
> Two (2) years warranty on parts and service
after commissioning and acceptance

manufacturer.
Repubtic of the phitippines
Department of Health
MARGOSATUBIG REGIONAI. HOSPITEI
Margosatubig, Zamboanga del Sur
Conract No. (091f.) 715-OO4t / o4nait add: n t ri t
-"gQ v@y"al I o o. t; ot n. {) tln r h g ov(@ g co r rt
t tt $ t !. webs ite : hltp ://nth. doh.gov. ptl

years

necessary)

> Section V. SpeeialConditions of the Contract


o Derivery prace: Margosatubig Regionar Hospitar,
Zamboanga der sur

> Section Vtschedule of Requirements


o Completion/Delivery period: 120 carendar days
upon receipt of the Notice to
Proceed incruding the derivery, instailation,
testing and commissioning, paftiar
delivery allowed within the completion/delivery period. e

PREPARED BY:

ANNIE N V. MARATA, RMT, MPA

REVIE

LUNA L ANO, ECE


tr
Member

CRIS RA, MPA UE, ECE


r Member

APPROVED BY:

RICHARD B. SISON, MD HA, FPCHA, FPSMS


Medical Center Chief il

You might also like