EXCAVATION AND

BACK FILLING NOTES.


HOOKES - BAR DETAILS
CONCRETE & REINFORCED COCRETE GENERAL
BOTTOM REINFT.
(LONG DIRECTION)
TOP REINFT.
BOTTOM REINFT. (SHORT DIRECTION)
(SHORT DIRECTION) BOTTOM REINFT.

WIDTH " W"


WIDTH "W"
(SHORT DIRECTION)

DAMP PROOFING & WATERPROOFING:

TOP REINFT. BOTTOM REINFT.


LENGTH "L" (LONG DIRECTION) (LONG DIRECTION)
LENGTH "L"

PLAN PLAN
TIE BEAM
FINISHED GROUND LEVEL

AVERAGE NATURAL
F.F.L. GROUND LVL F.F.L.

SCHEDULE OF LINTELS REINFORCEMENT

(MIN 1.5m FROM LOWEST FGL OR NGL.


NECK COLUMN TO BE 50mm
WATERPROOFING/CONCRETE LINKS WATERPROOFING/CONCRETE
SPECIFIED IN THE SOIL REPORT
MORE THAN SCHEDULE SIZE
LINKS
AND AS VERIFIED AT SITE
PROTECTION REGIME. PROTECTION REGIME.
FOUNDATION DEPTH AS
IN WIDTH & BREDTH
BLOCKWORK WALLS & HOURDIS BLOCKS:
BY THE ENGINEER.
300
(TYP)
Y12 ALL AROUND Y12 ALL AROUND
300

THICK

THICK
"T"

"T"
(TYP)

FORMATION LEVEL FORMATION LEVEL

SHORT REINFORCEMENT LONG REINFORCEMENT 75mm CONCRETE BLINDING


(TYPICAL)
SOIL IMPROVEMENT TO BE DONE SHORT REINFORCEMENT
LONG REINFORCEMENT & AS PER SOIL INVESTIGATION REPORT.
75mm CONCRETE BLINDING THE REQUIRED MINIMUM SBC=160kN/m2
(TYPICAL)

SINGLE FOOTING COMBINED FOOTING


(NOTE: LEVELS TO BE RECONFIRMED AT SITE.) FOUNDATIONS

COLUMN GROUND SLAB TIE BEAM GROUND SLAB

RCC GROUND SLAB

COVER
50mm
THICKNESS
SLAB
WATERPROOFING
PROTECTION BOARD TO MEMBRANE PROTECTION BOARD TO WATERPROOFING MEMBRANE
SPECIFICATION TO SPECIFICATION SPECIFICATION TO SPECIFICATION

FOUNDATION
25mm PROTECTION SCREED 50mm CONCRETE BLINDING IN 1:3:6 MIX/OR
SOLID BLOCKWORK REFER DETAILS
POLYTHENE SHEET 1000g

25mm PROTECTION 50mm CONCRETE BLINDING


SCREED IN 1:3:6 MIX TOP SURFACE OF EXCAVATED AREA LEVELLED &
COMPACTED 95% MDD
POLYTHENE IF REQUIRED WELL GRADED GRANULAR
SHEET MATERIAL TO BE ADDED

FOUNDATION TIE BEAM SLAB ON GRADE

WATERPROOFING & CONCRETE PROTECTION REGIME TYPE I


(WITH MEMBRANE)

ELASTOMETRIC SEALANT REINFORCEMENT


EXPANDED POLYETHYLENE SAW CUT GROOVE 5mm WIDEx25mm DEEP FILLED 5Y12 (TYP) BLOCK WORK (TYP) COATED HALF
CIRCULAR BACKUP STRIP WITH POLYESTER SEALANT BITUMEN IMPREGNATED COMPRESSIBLE FILLER
Y8@200 (TYP) BOARD 20mm THICK
INDUCED CRACK REINFORCEMENT 25
GROUND SLAB
MID-DEPTH

END CAP FILLED WITH


SLAB

COMPRESSIBLE MATERIAL
EQ EQ

20MM MOVEMENT JOINT


R20-250 DOWEL BAR 600 LONG HALF LUBRICATED OR COATED
WITH DEBONDING AGENT

600 200 250 250 200 600

CONTRACTION JOINT SLAB ON GRADE UNDER BLOCK WALL EXPANSION JOINT


(SAW CUT JOINT) (BASIC MODULE OF 6mx6m) (BASIC MODULE OF 20mx20m MAXIMUM)

SURFACE GROOVE 10mm ELASTOMETRIC SEALANT BLOCK WORK (TYP)


WIDE x 25mm DEEP FILLED ELASTOMETRIC SEALANT BLOCK WORK (TYP)
EXPANDED POLYETHYLENE WITH POLYESTER SEALANT
REINFORCEMENT REINFORCEMENT PRECAST PANEL
CIRCULAR BACKUP STRIP

BITUMEN IMPREGNATED BITUMEN IMPREGNATED


REINFORCEMENT COMPRESSIBLE FILLER BOARD COMPRESSIBLE FILLER BOARD
20mm THICK 20mm THICK

GROUND BEAM
SLAB

SLAB

20MM MOVEMENT JOINT GROUND BEAM


DOWEL BARS Y12-500, 900mm LONG, 20MM MOVEMENT JOINT
LUBRICATED OR COATED
WITH DEBONDING AGENT

CONSTRUCTION JOINT
(BASIC SPACING OF 10m c/c)
ISOLATION JOINT ISOLATION JOINT
COLUMN SUPPORTED ON BEAM
SLAB JOINTS