NAME OF WORKS : PROVN OF GUARD ROOM WITH SENTRY POST FOR 25 ARTY BDE CAMP AT RAJOURI.
Ser Description of items Unit Qty Remarks
No 1 Mobilisation of manual drilling equipment/rig and shifting of Each 1.00 entire arrangement from one bore to another hole location Job and setting of boring/ drilling rig as required/ directed by Engineer-in charge. 2 Boring 150mm dia bores holes to given depth or refusal Mtr 16.00 strata through any type of soil as under :- (a) 08 Mtr depth- 02 No 3 Collection of undisturbed soil sample at 1.50 M intervals or at Each 1.00 any change of strata in 1.50 mm bore thin walled tube incl Job waxing sealing, packing and transporting to the slab. 4 Carrying out standard penetration test incl collecting of Each 1.00 disturbed soil samples in bore holes at every 1.5m depth or Job any change of strata and submit the report with all requisite data. 5 Conducting necessary tests as per relevant IS codes/NBC 2005/SP 36 on all collected samples which incl the determination of :-
(a) Atterberg Limits.
(b) Natural moisture content. (c) Wet and dry density. (d) Soil particle size distribution using sieve/ hydrometer analysis. (e) Shrinkage limit. (f) Consolidation test. (g) Specific gravity test for sand rock. (h) Crushing str of rock samples. (j) Permeability test. (k) Chemical analysis of ground water sample (min 02 samples). (l) Free soil index. (m) Chemical analysis of soil. (n) 'N' value of an interval of 1.5 mtr of 6 mtr depth. (o) Tri axial shear test C&C determination
6. Maintaining photographic record (min three photographs per
hole duly annotated) 7. Submission of report of soil investigation in pentaplicate alongwith photographic record duly annotated Note: ltems 6 and 7 be executed with no extra cost as obligation but will be part of entire work