Professional Documents
Culture Documents
Field Training Report
Field Training Report
MULTAN
In The Name of Allah Who is Most Beneficent and Merciful
ii
DEDICATED
TO
iii
ACKNOWLEDGEMENT
This dissertation would not have been possible without the guidance and the help of several
individuals who in one way or another contributed and extended their valuable assistance in
the preparation and completion of this project.
I feel great privilege and pleasure to extend my heartfelt thanks and sense of gratitude to the
respected site Engr. Noman whose profound interest; guidance and encouragement helped
me too much in every respect, his active supervision and inspiring guidance proved to be
essential for the completion of this work.
I would like to express my gratitude to the PM Tahir Imran and Surveyor Mr. Zulfiqar
and Sub Engineer Zafar for their kind co-operation which helps me in completion of this
project.
I would like to express my gratitude to the faculty of Civil Engineering Department and
Dr.Basit Ehsan Khan (HOD) of civil technology department for their kind co-operation
which helps me in completion of this project.
Lastly, I offer my regards and blessings to all of those who supported me in any respect
during the completion of this project.
iv
Abstract
The internship report in bold /spectrum contains four chapters in which I try to explain my
four month experience in my hosting company. The content of all chapter is broadly
explained and its constructed from the practical basis of the site work ended in all months.
In the opening chapter 1 give details to the company background including its mission,
vision, the project those runs through the company consultation. In this chapter 1 put all
record of history of my hosting company with its official address.so it gives detail of the
company in term of reader can easily know and access the company.
In the chapter 2 which explain my schedule of training organization, my duties,
responsibilities and my working timings.
In chapter 3 which broadly explain the working experience of my four month internship.
And it broadly e4xplain the introduction, background, location objectives of the project
with materials and machinery used along with picture.
In chapter 4 which explain the conclusion of my four month internship, and also explain
my references.
v
Table of Contents
1 INTRODUCTION ............................................................................................................. 9
2.2.2 HOLIDAY........................................................................................................ 16
3.1.1 BACKGROUND.............................................................................................. 18
3.2 MACHINERY........................................................................................................... 19
4 CONCLUSION ....................................................................................................... 25
vii
List of Figure
1
Chapter 1
Introduction
2
INTRODUCTION
1.1 BACKGROUND OF TRAINING ORGANIZATION
A.A REHMAN BUILDERS (PRIVATE) LIMITED has come a long way to symbolize
commitment, distinction and professional excellence by meeting the stringent, demand and extra
ordinary work requirement of the client. A.A REHMAN BUILDERS (Pvt.) Limited has
undertaken prestigious project of high engineering national and international importance involving
civil works for the last 60 years.
The company has been working in infrastructure, housing, design and environmental areas other
than its strong standing industrial projects for Power, Aviation, Roads, Motorways, Buildings,
Water Supply.
By virtue of its efficient and quality performance, AA.REHMAN BUILDERS (Pvt.) Limited has
won the trust and confidence of its client. AA.REHMAN BUILDERS (Pvt.) Limited now enjoy
the reputation of being it trend setter in the ever expanding arena of housing and infrastructure in
the last 15 years has earned the name in real estate development of housing and infrastructure.
AA.REHMAN BUILDERS (Pvt.) Limited has added value through a useful engineering
contribution towards the concept of development of housing and infrastructure.
AA.REHMAN BUILDERS (Pvt.) Limited having extended its performance abroad and has been
successful in maintaining the balance and secure job of high engineering and financial value. Today
we stand tall and firm over the strong foundation of reputation and trust with a high value and
number of human and electromechanical resources which give us distinctive edge over the
competitor in the market.
3
1.3 ORGANOGRAM
Pakistan.
Email: hrl@therehmanbuilders.com
URL: www.therehmanbuilders.com
4
1.4 Title and position of the site in charge
Site in charge or team leader is responsible for overseeing a group of employees with in a
professional setting. Their duties include relaying information between their team and
upper management, guiding their team through daily work activities or projects and
monitoring employee performance ensure maximum productivity.
1.5.1 MD Message
AA.REHMAN BUILDERS (PVT.) LIMITED once a dream has shaped into an absolute
reality. This has taken an enduring over 26 years of convection and untiring effort to see its
grow into a group of with one of the biggest market clientage within and abroad. The
company has same transformation from conventional to state of the art and highly
demanding mechanized construction.
It is an era of scientific achievements where hearts and mind are control by the machines.
Yet, we stand tall to maintain our composure through dedicated services to our client and
winning their love and satisfaction.
AA.REHMAN BUILDERS (PVT.) LIMITED has always been in forefront to take up the
job and assignment with a cause and service to humanity integrated with innovative and
global outlook. Today we are humbled our achievements in industrial, power,
infrastructure, high rise buildings, environmental at fields. The hallmarks of these efforts
are completion of all the projects ahead of agreed time frames.
I have always been a strong believer in faith and expect our next generation and the
generations after to strove positivity in the direction of the modernization and expansion
with the primary focus on handwork.
5
1.6 Field of specialization
• Project management
• Engineering
• Procurement
• Civil construction
• E and I installation
• Operation and maintenance
6
Chapter 2
Schedule & Duties
2.1 Duties
I performed duty as a trainee engineer at site. I monitor the progress of the construction
site and ensure the use of steel according to the drawing on the site. I examined the whole
steel use on the site.
2.1.1 Responsibilities
• Inspecting construction site to identify the steel .
7
• Supervising and instructing the construction team as well as sub-contractors.
• Evaluating the performance of construction employees.
• Recommending changes to construction operation or procedures to increase
efficiency.
2.2 Timing
2.2.1 Break
2.2.2 Holiday
8
Chapter 3
Working Experience
3 Working Experience
9
3.1 Introduction of project
3.1.1 Background
They are building a convocation hall inside the NFC University with a parking plaza, in
which a ceremony will be held after the completion of the student's degree. Chairs are being
made for it. And there are shops in the ground floor below.A law college and a nursing
college are also being built with the same building. About fifty crores are being spent on it.
3.1.2 Location
NFC University Multan Fertilizer Factory Khanewal Road. These three buildings are being
constructed along with the university's parking plaza, two of which have been completed.
3.1.3 Project objectives
Convocation Hall is a building consists of a basement, ground floor, first floor, second floor, and
top floor. Which provides several facilities to the people. Which are follows:
• Shopes
• Stage
• Male prayer area.
• Working offices.
3.2 Machinery
• Excavator
• Damper
• Transit mixer
• roller
• grader
• tractor trolley
10
• batching plant
11
Fig 3.2.2 transit mixer
12
Fig 3.2.4 grader
13
3.3 CONCRETE
• Raft =2inch
• Columns = 1.5inch
• Retaining walls = 2inch
• Beams =1.5inch
• Slabs =0.75inch
• #3 bars =21inch
• #4 bars = 27inch
• #5 bars = 34inch
• #6 bars = 40inch
• #8 bars =54inch
• Drawing reading.
• Dealing with problems.
• Information about machinery.
15
• Information and use of steel in site.
• Dealing with site workers.
• Team work.
• Confidence build.
16
Chapter 4
Conclusion
4.1 CONCLUSION
During my internship program I have a lot of knowledge in term of including our practical skill.
The various type of orientation program , task and training that I have been undertaking during this
past four month on the site enhanced our knowledge in building construction. I am very glad to see
that what I learned in the university can be repeated in working world. I am able to apply my
17
theoretical knowledge of designing and construction work in real life situation.
This program played an important role to break the convectional thought that field work can be only
implemented by students who hold a degree or people who have an experience in building
construction. I am able to acquire a high level of confidence to deal with problems that are arising
in building construction.
During these past four months, I have been able to see the difference theoretical aspects
methodology. I have been fulfilling my curiosity in learning practical building construction well in
this internship program.
4.2 REFRENCES
• Site drawing
• Oral explanation of project manager
• Picture of site.
• Sub-contractors
18
• Site engineers
• Site surveyor
• Site worker interview
19
20
21
22
23