The document appears to be a table containing production data across multiple days including the date, total parts produced, total cubic meters (m3) of material used, and daily, monthly, and total production metrics. Key details include:
- Production data is shown for 21 days ranging from dates 21 to 31 and then 1, 2, 4-8, 11-15, and 18-20.
- Metrics presented are total parts, total m3 of material, daily production in m3, monthly production in m3, and total production in m3.
- Total parts produced across all days was 229,447 while total m3 of material was 68,390.1.
The document appears to be a table containing production data across multiple days including the date, total parts produced, total cubic meters (m3) of material used, and daily, monthly, and total production metrics. Key details include:
- Production data is shown for 21 days ranging from dates 21 to 31 and then 1, 2, 4-8, 11-15, and 18-20.
- Metrics presented are total parts, total m3 of material, daily production in m3, monthly production in m3, and total production in m3.
- Total parts produced across all days was 229,447 while total m3 of material was 68,390.1.
The document appears to be a table containing production data across multiple days including the date, total parts produced, total cubic meters (m3) of material used, and daily, monthly, and total production metrics. Key details include:
- Production data is shown for 21 days ranging from dates 21 to 31 and then 1, 2, 4-8, 11-15, and 18-20.
- Metrics presented are total parts, total m3 of material, daily production in m3, monthly production in m3, and total production in m3.
- Total parts produced across all days was 229,447 while total m3 of material was 68,390.1.