A concrete pump was inspected to ensure it is safe for use. The inspection checked that the pump is physically sound with no damage to tires, rotary parts are guarded, outriggers work properly, emergency stops function correctly, panels and hoppers are secure, proper mesh guards moving parts, hooks can withstand weight, pipe joints are tight, electricity aspects are safe if powered, the operator is trained, and pipes are undamaged. The pump was deemed fit for use by inspectors who signed off on the inspection.
A concrete pump was inspected to ensure it is safe for use. The inspection checked that the pump is physically sound with no damage to tires, rotary parts are guarded, outriggers work properly, emergency stops function correctly, panels and hoppers are secure, proper mesh guards moving parts, hooks can withstand weight, pipe joints are tight, electricity aspects are safe if powered, the operator is trained, and pipes are undamaged. The pump was deemed fit for use by inspectors who signed off on the inspection.
A concrete pump was inspected to ensure it is safe for use. The inspection checked that the pump is physically sound with no damage to tires, rotary parts are guarded, outriggers work properly, emergency stops function correctly, panels and hoppers are secure, proper mesh guards moving parts, hooks can withstand weight, pipe joints are tight, electricity aspects are safe if powered, the operator is trained, and pipes are undamaged. The pump was deemed fit for use by inspectors who signed off on the inspection.
Company Name : Date of Inspection : Make : Model : Number : Owned/Hired/Contractor : SN Details Yes/No Comments 1 Concrete Pump should be physically sound and in good condition. 2 Tire should be free from damage. 3 All Rotatory part should be covered with fixed guard. 4 Outrigger should be in working condition and free from damage. 5 Emergency Stop button should be checked and in working condition. It should be clearly marked and identifiable. 6 Panel should be covered properly. 7 Hopper should be in good condition. 8 Suitable mesh should be available at hopper to avoid contact with moving part. 9 Hook should be proper and in good condition which can withstand while shifting of Concrete pump. 10 All pipe joint should be tight with the help of proper clamp. 11 In case of electricity operated, electrical connection should be taken properly and machine should be grounded. 12 Operator should be competent and authorised. 13 All pipes to be used should be free from damages and physically sound.
Fit for use: Yes/No
Inspection Done By:
Name: Department: Designation: Signature: Date:
Inspection Done By:
Name: Department: Designation: Signature: Date:
For Information purpose only https://globalehs.co.in | Page 1 of 1