GENERAL NOTES

FLOOR TYPES

For detailed floor build-ups refer to specification and drawings


23-DTS-001/002.

FL-01 - Floor at ground level

FL-01a - Floor at ground level - block 3


BL-02
BL-02
FFL +6750
FFL +6750
01-02-01
Apartment Type 01B
FL-02 - Floor at first floor level

BL-02
FFL +6750
BL-02 FL-03 - Floor at second floor level
FFL +6750
FL-10A
FFL +6750 02-02-02
Apartment Type 01B
FL-04 - Staircore floor
FL-10A
01-02-02
FFL +6750
Apartment Type 02B

02-02-01
FL-05 - Gym floor
FL-10A Apartment Type 11B
FFL +6750 FL-10A
FFL +6750
FL-10A
FFL +6750 FL-07 - Binstore/ plantroom floor
FL-10A
FFL +6750

FL-08 - Riser

01-02-03 BL-02 FL-10A


Apartment Type 06B FFL +6750 FFL +6750
BL-02
BL-02 FL-09 - Bathroom pods ground floor
FFL +6750
FFL +6750
01-02-07
Apartment Type 04B BL-02
FFL +6750 FL-10 - Bathroom pods first floors
02-02-08 02-02-03
Apartment Type 18B Apartment Type 04B

BL-02
FL-10A FFL +6750
FFL +6750
FL-11 - Bathroom pods first floors
FL-03
FFL +6750
FL-10A
03-02-08
FFL +6750 Apartment Type 11B

FL-10A FLOOR TYPES


FFL +6750

FL-03 FL-10A
FL-03
FL-10A FFL +6750 FFL +6750 For detailed balcony build-ups refer to specification and
FFL +6750
FFL +6750 drawings 27-DTS-0017
FL-10A
FFL +6750
BL - 01 - Balcony Type 01
01-02-06
Apartment Type 04B

FL-10A
BL - 02 - Balcony Type 02
FL-03
FFL +6750 FFL +6750

BL-03 BL - 03 - Balcony Type 03


FFL +3600

FL-10A BL - 04 - Balcony Type 04


FFL +6750

FL-10A FL-10A
01-02-04 FFL +6750
FFL +6750
Apartment Type 05B GROUND FLOOR SLAB EDGE
02-02-07
Apartment Type 15

FL-10 Indicative ground floor setting out (Please refer to engineer's


FFL +3600 BL-02 drawings for detailed toe detail).
01-02-05
FFL +6750
Apartment Type 11B
GRID
FL-10A
FFL +6750 BL-02 02-02-04
FFL +6750 Apartment Type 04B

BL-02
FFL +6750

BL-02 FL-10A
FFL +6750 FFL +6750

BL-02 FL-10A
FFL +6750 FFL +6750

FL-10A 02-02-05
FFL +6750 Apartment Type 02B
Slab edge XXXmm from grid

FL-10A
FFL +6750

TYPICAL FLOOR SLAB EDGE


BL-02
FFL +6750
Indicative upper level floor edge setting out (Please refer to 21
02-02-06 series drawings for external wall build-ups).
Apartment Type 01B
GRID
BL-02
BL-02 FFL +6750
FFL +6750

10mm tolerance to
cemetitious board

SHEET CONTINUED ON: 23-L02-121


Slab edge to align with grid

SERVICE PENETRATIONS

Refer to service engineers information for detailed layouts and pipe


BL-02 sizes
FFL +6750

RWP
Penetration size
300mm x 300mm

SVP
Penetration size
200mm x 200mm for 100mm pipes

03-02-04
NOTES: Apartment Type 08B Elysian Developments
N
Rev Notes Date By Auth
All works are to be carried out in accordance with relevant BS/EN Standards, applicable codes of practice and building regulations. Sustainability: All new build residential works are to be specified and constructed/sealed to achieve an air leakage rate of T1 Stage 3 - Issue 28-07-23 CCA
No responsibility can be taken for errors due to scaling from this drawing. no > 3 m3/(m2 hr)@50pa or less as indicated in the MEP specification.
For all commercial shell elements, all air seals (strips & Flexible sheets following the manufacturer's requirements) must be T2 Stage 4 - Issue 01-12-23 CCA
Packages: Design, materials and construction detailing to be carried out By trade contractors. All trade packages are to be carried out installed to achieve an air leakage rate Of >10m3/m2 hr/@50pa or less, as indicated in the MEP specification. Burston Gardens, St Albans
under warranties by the contractor. Refer to the architect's specification and associated agenda. Any errors, conflicts, disparities, or
omissions should be notified immediately. Consultants: ColladoCollins will co-ordinate (and not set out) consultants/ sub-contractors works.
Structural design is the responsibility of the Structural Engineer
17-19 Foley Street Date: 17.07.2023 Assisted Living - Floor Types - Second floor
0m 4m 6m 8m London W1W 6DW Drawn By: CCA plan
Coordination: The main contractor/management contractor is responsible for coordinating the scope and sequence of all sub ‐ Contractors'
work. All secondary steel packages are indicative and are to be fully Designed and provided by the contractor's steel fabricator.
MEP design is the responsibility of the MEP consultant
Refer to the acoustician's report for acoustic specification 2m 10m T 020 7580 3490 Checked by: CCA

Areas: Refer to area schedule and drawings for convention and approach.
Landscaping layout is indicative only; refer to landscape consultant's drawings and highways consultant's drawings for details
ALL INFORMATION HAS BEEN PREPARED UNDER THE GUIDANCE OF THE PROJECT FIRE CONSULTANTS; REFER TO THE
F 020 7580 2917
info@colladocollins.com
Scale @ A0: As indicated
Scale @ A3:
STAGE 4 T2
STA-CC-14034-23-L02-120
PROJECT FIRE CONSULTANTS' REPORT FOR FURTHER DETAILS.
© Copyright Reserved. ColladoCollins Architects Ltd VISUAL SCALE 1:100 @ A0 www.colladocollins.com Project No: 14034_ Elysian St Albans Revision