This Notice contains important information about the operation of your product. Elekta recommends that all
users of the product follow the instructions or recommendations in this Notice.
This Notice must be put in the Important Notice section of the applicable manual.
If you have any queries about this Notice, contact your local Elekta office.
Clinical impact: There will be no clinical mistreatment as the gantry positioning encoder is separate to this
system.
If the bolts for all drive wheels fail during gantry movement while a patient is being treated
with a table position of 0º and at isocentric height, then there is no risk of collision with the
patient.
If the bolts for all drive wheels fail during gantry movement while a patient is being treated
o
with a table position other than 0 or other than isocentric height, then there is a remote
risk of collision with the patient.
Solution: An inspection procedure and modification kit is available and must be completed as soon
as possible. Refer to Important Field Safety Modification 200 02 103 067
Your local Elekta office will be in contact with you to arrange to carry out this
inspection/modification.
FCO 200 01 103 068 VID: 1.0 Elekta Limited, Linac House, Fleming Way, Crawley, Page 1 of 3
West Sussex RH10 9RR, UK
Tel: +44 (0)1293 544422 Fax: +44 (0)1293 654321
Copyright ©2011 Elekta AB. All rights reserved www.elekta.com DID: gPOL0007_1 VID: 01
Figure 1: Location of drive wheel and bolts
FCO 200 01 103 068 VID: 1.0 Elekta Limited, Linac House, Fleming Way, Crawley, Page 2 of 3
West Sussex RH10 9RR, UK
Tel: +44 (0)1293 544422 Fax: +44 (0)1293 654321
Copyright ©2011 Elekta AB. All rights reserved www.elekta.com DID: gPOL0007_1 VID: 01
FCO ACTION NOTIFICATION REPORT
<Give this Notice to the customer, and then complete and return this report to your local Elekta Office or Representative
for the Configuration Database.>
Classification: Important Field Safety Notice FCO Ref: 200 01 103 068
FCO
description:
Modification of the Synergy Base Drive Wheel Assembly
Hospital:
Action on this unit/device was: (select one) Note: If you use a work-order in the CLM configuration
database, then you do not have to complete this
section. The work-order will be used to add the
Completed as per instructions on: <date day/month/year]> information to the system.
Acknowledgement by customer:
This notification to be signed by the customer.
Signature: Date:
FCO 200 01 103 068 VID: 1.0 Elekta Limited, Linac House, Fleming Way, Crawley, Page 3 of 3
West Sussex RH10 9RR, UK
Tel: +44 (0)1293 544422 Fax: +44 (0)1293 654321
Copyright ©2011 Elekta AB. All rights reserved www.elekta.com DID: gPOL0007_1 VID: 01
IMPORTANT FIELD SAFETY MODIFICATION
This FCO supersedes Important Field Safety Modification 200 02 103 053.
Description: This document provides instructions for adding friction shims and screw sleeves to
Synergy Gantry Base Drive Wheel Assemblies.
Tools & test equipment: Gantry Wheel Tool Kit – Part Number 1502421
6 Tonne Lifting Jack (Enerpac or similar) (supplied locally)
Loctite 243 (supplied locally)
Torque Wrench to 40Nm
6mm Hex Socket for Torque Wrench
Parts required: Gantry Drive Wheel Mod Kit – Part Number 1500653
__________________________________________________________________
Details:
Before you do this procedure, inspect the A-side rear gantry base wheel. If there is no paint in the area
indicated (as shown in the picture below), you do not need to do the modification.
If the surface is painted, obtain the parts listed above and do the instructions in the modification kit.
Elekta recommends that at least one Gantry Wheel Tool Kit is purchased by each affected Business Unit in
order to complete the modifications as quickly as possible.
FCO 200 02 103 067 VID: 1.0 Elekta Limited, Linac House, Fleming Way, Crawley, Page 1 of 3
West Sussex RH10 9RR, UK
Tel: +44 (0)1293 544422 Fax: +44 (0)1293 654321
Copyright ©2011 Elekta AB. All rights reserved www.elekta.com DID: gPOL0007_2 VID: 01
Safety reference:
The following warnings and cautions are associated with this notice:
1. Do not let the full weight of the gantry drum sit on any lifting device. Suitable supports must be used at all
times.
2. Safety straps must be attached to the gantry drum during these procedures.
Procedure:
1 Read the instructions in the modification kit (ModKit) before you start to implement the change. Make sure
that all the parts on the dispatch list are delivered.
2 Use the drawing(s) supplied and/or the installation instructions, and follow the step by step instructions and
implement the modification.
3 When the modification is complete update the modification record label on the applicable assembly with
the ECO number in the Technical Reference Number, if applicable.
4 If applicable, put the modification instructions and the FCO in the service documentation for reference.
5 If required by local procedures, make sure that all paperwork is completed in full and sent to the local
Elekta Office and/or representative, to add to the Configuration Database.
6 Make sure that any parts to be returned to Elekta Limited are packaged correctly, and dispatched without
delay using a Returns Authorization (RA) number. An RA number is supplied by the Spares Department
on request.
NOTE: Parts that have come into contact with body fluids (for example, top of treatment table) or constitute a
radiation hazard must have a signed Declaration of Contamination Status included with the part BEFORE it
is returned.
FCO 200 02 103 067 VID: 1.0 Elekta Limited, Linac House, Fleming Way, Crawley, Page 2 of 3
West Sussex RH10 9RR, UK
Tel: +44 (0)1293 544422 Fax: +44 (0)1293 654321
Copyright ©2011 Elekta AB. All rights reserved www.elekta.com DID: gPOL0007_2 VID: 01
FCO ACTION NOTIFICATION REPORT
<Give this Notice to the customer, and then complete and return this report to your local Elekta Office or Representative for
the Configuration Database.>
Classification: Important Field Safety Modification FCO Ref: 200 02 103 067
FCO
description:
Modification of the Synergy Base Drive Wheel Assembly
Hospital:
Action on this unit/device was: (select one) Note: If you use a work-order in the CLM configuration
database, then you do not have to complete this
section. The work-order will be used to add the
Completed as per instructions on: <date day/month/year]> information to the system.
Signature: Date:
Name: Title:
Signature: Date:
FCO 200 02 103 067 VID: 1.0 Elekta Limited, Linac House, Fleming Way, Crawley, Page 3 of 3
West Sussex RH10 9RR, UK
Tel: +44 (0)1293 544422 Fax: +44 (0)1293 654321
Copyright ©2011 Elekta AB. All rights reserved www.elekta.com DID: gPOL0007_2 VID: 01