Download as pdf or txt
Download as pdf or txt
You are on page 1of 1

Hallway, Ramp, Bldg. Admin EE room and Maker and Made Jan 1.

0 –17, 2024

Installation of Hangers and Support, Roughing and Wiring ins and Replacement of Panel Board.

1. Scaffolding equipment 1. Fall 1 . Used of ladders and PPE. 1 . Safety harness and wearing of
positioning. 2. Fall, inhaling of dusts and 2. Used of ladders and PPE. Proper PPE.
exposing to sharp object. 3. Used of ladders and PPE.
2. Opening of existing walls for the 4. Used of ladders and PPE. 2. Safety harness and wearing of
roughing ins. 3. Fall, inhaling of dusts and 5. Used of ladders and PPE. Proper PPE.
exposing to sharp object. 6. Used of ladders and PPE.
3. Drilling of holes at the slab for 4. Fall, inhaling of dusts and 7. Used of ladders and PPE. 3. Safety harness and wearing of
Hangers and supports. exposing to sharp object. 8. Used of ladders and PPE. Proper PPE.
5. inhaling of dusts and exposing to 9. Used of ladders and PPE.
4. Installation of roughing ins sharp object. 4. Safety harness and wearing of
including wiring ins 6. Fall, inhaling of dusts and Proper PPE.
exposing to sharp object.
5. Scanning and coring works. 5. Wearing of Proper PPE.
6. Continuation of roughing and 7. Fall, inhaling of dusts and 6. Safety harness and wearing of
wiring ins exposing to sharp object. Proper PPE.

7. Restoration of Ceiling and coring 8. Fall, inhaling of dusts, exposing 7. Safety harness and wearing of
affected slab. to sharp object and electrocution. Proper PPE.

8. Shut down of office, 9. Fall, inhaling of dusts, exposing 8. Wearing of Proper PPE and
replacement of existing panel to sharp object and electrocution. Trained personnel to do the tasks.
board and tapping of installed new
feeder wires 9. Wearing of Proper PPE and
9. Retapping of existing wires to Trained personnel to do the tasks.
the new panel board.

Jan 10-17, 2024

Arjay Castro