NOTES:
I I

REFER TO NAWCPF-MSBI-CA01-950-HV-DRW-59266

WATER COOLING FLOW DIAGRAM:

H H

Typical connection
FANCOILS UNITS

G G

F F

E E

VENTILATION FLOW DIAGRAM: COB_AHU1.1 COB_AHU1.2

PS PS PS PS

TT RH RH TT
G4 G4

S S

G4 F7 F7 G4

S S

TT TT RH TT RH RH TT RH TT TT

COOLING WATER COOLING WATER


PS 6/12°C PS PS PS PS 6/12°C PS

D D

REFERENCE DOCUMENTS:
DRAWING NO.: DRAWING TITLE:
NAWCPF-MSBI-CA01-950-HV-DRW-59266 Acoserv-NAC Control Building-HVAC PID
NAWCPF-MSBI-CA01-930-AR-DRW-30179 HVAC Construction Drawing
C

001 25.06.2020 As Built Yassine.Y Youssef.B Jhed.A

000 13.11.2015 Issued for Information Hosenseidl Pistek Lübcke-H.

B01 20.8.2015 Issued for IDC P.H. R.P.

A01 14.8.2015 Draft P.H.

REV DATE ISSUE, SCOPE OF REVISION PREPARED CHECKED APPROVED

PROJECT TITLE:

B Nawara and South Tunisia Gas Development


Central Process Facility (CPF), Flowlines and Wellpads
COMPANY:

OMV (Tunesien)
Production GmbH
CONTRACTOR:

STREICHER - BOUCHAMAOUI
MAX STREICHER GmbH & Co. KG aA
BOUCHAMAOUI INDUSTRIES SA

ORIGINATOR:

ILF CONSULTING ENGINEERS


A
DRAWING TITLE :

CONTROL BUILDING
ORIGINAL SHEET SIZE - A0

NAWARA ACCOMODATION CAMP


PROJECT No. - 3170211

"Copying of this document and giving it to others and the use HVAC FLOW DIAGRAM
or communication of the contents thereof are forbidden
without express authority. Offenders are liable to the payment SCALE: DRAWING NO: SHEET OF
of damages. All rights are reserved in the event of the grant of
a patent or the registration of a utility model of design" - NAWCPF-MSBI-CA01-970-HV-PFD-30178 1 3
12 11 10 9 8 7 6 5 4 3 Printing: 25.06.2020
12 11 10 9 8 7 6 5 4 3 2 1
NOTES:
I I

REFER TO NAWCPF-MSBI-CA01-950-HV-DRW-59266

H H

G G

F F

E
"control system schema - FCU BUS circuit" E

D D

REFERENCE DOCUMENTS:
DRAWING NO.: DRAWING TITLE:
NAWCPF-MSBI-CA01-950-HV-DRW-59266 Acoserv-NAC Control Building-HVAC PID
NAWCPF-MSBI-CA01-930-AR-DRW-30179 HVAC Construction Drawing
C

CONTROL BUILDING WAREHOUSE WORKSHOP GUARD HOUSE ELECTRICAL SUBSTATION

SB COB SB WHS SB WOS SB GSH SB ELS

001 25.06.2020 As Built Yassine.Y Youssef.B Jhed.A

000 13.11.2015 Issued for Information Hosenseidl Pistek Lübcke-H.

B01 20.8.2015 Issued for IDC P.H. R.P.

A01 14.8.2015 Draft P.H.

REV DATE ISSUE, SCOPE OF REVISION PREPARED CHECKED APPROVED

PROJECT TITLE:

B Nawara and South Tunisia Gas Development


Central Process Facility (CPF), Flowlines and Wellpads
COMPANY:

OMV (Tunesien)
Production GmbH
CONTRACTOR:

STREICHER - BOUCHAMAOUI
MAX STREICHER GmbH & Co. KG aA
BOUCHAMAOUI INDUSTRIES SA

ORIGINATOR:

ILF CONSULTING ENGINEERS


A
DRAWING TITLE :

CONTROL BUILDING
ORIGINAL SHEET SIZE - A0

NAWARA ACCOMODATION CAMP


PROJECT No. - 3170211

"Copying of this document and giving it to others and the use HVAC FLOW DIAGRAM
or communication of the contents thereof are forbidden
without express authority. Offenders are liable to the payment SCALE: DRAWING NO: SHEET OF
of damages. All rights are reserved in the event of the grant of
a patent or the registration of a utility model of design" - NAWCPF-MSBI-CA01-970-HV-PFD-30178 2 3
12 11 10 9 8 7 6 5 4 3 Printing: 25.06.2020
12 11 10 9 8 7 6 5 4 3 2 1
NOTES:
I I

REFER TO NAWCPF-MSBI-CA01-950-HV-DRW-59266

H
"control system schema" H

COB_AHU1.1 COB_AHU1.2

PS PS PS PS

TT RH RH TT
G4 G4

S S

G4 F7 F7 G4

S S

TT TT RH TT RH RH TT RH TT TT

COOLING WATER COOLING WATER


PS PS PS PS PS PS
G 6/12°C 6/12°C G

AI 7 7 1 1 1 AI
DI 1 1 18 18 4 1 4 5 5 DI
AO 4 4 AO
DO 1 1 8 8 3 3 2 2 DO

F F

E E
AI AI
DI 4 4 4 4 4 4 4 4 4 4 4 4 4 4 5 5 5 2 2 5 5 2 2 5 DI
AO AO
DO 1 1 1 1 1 1 1 1 1 1 1 1 1 1 2 2 3 3 3 3 DO

D D

REFERENCE DOCUMENTS:
DRAWING NO.: DRAWING TITLE:
NAWCPF-MSBI-CA01-950-HV-DRW-59266 Acoserv-NAC Control Building-HVAC PID
NAWCPF-MSBI-CA01-930-AR-DRW-30179 HVAC Construction Drawing
C

001 25.06.2020 As Built Yassine.Y Youssef.B Jhed.A

000 13.11.2015 Issued for Information Hosenseidl Pistek Lübcke-H.

B01 20.8.2015 Issued for IDC P.H. R.P.

A01 14.8.2015 Draft P.H.

REV DATE ISSUE, SCOPE OF REVISION PREPARED CHECKED APPROVED

PROJECT TITLE:

B Nawara and South Tunisia Gas Development


Central Process Facility (CPF), Flowlines and Wellpads
COMPANY:

OMV (Tunesien)
Production GmbH
CONTRACTOR:

AI 21 1 1 1 1 AI STREICHER - BOUCHAMAOUI
DI 195 7 7 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 5 DI
MAX STREICHER GmbH & Co. KG aA
AO 8 AO
BOUCHAMAOUI INDUSTRIES SA
DO 63 2 2 1 DO
ORIGINATOR:

ILF CONSULTING ENGINEERS


A
DRAWING TITLE :

CONTROL BUILDING
ORIGINAL SHEET SIZE - A0

NAWARA ACCOMODATION CAMP


PROJECT No. - 3170211

"Copying of this document and giving it to others and the use HVAC FLOW DIAGRAM
or communication of the contents thereof are forbidden
without express authority. Offenders are liable to the payment SCALE: DRAWING NO: SHEET OF
of damages. All rights are reserved in the event of the grant of
a patent or the registration of a utility model of design" - NAWCPF-MSBI-CA01-970-HV-PFD-30178 3 3