Download as docx, pdf, or txt
Download as docx, pdf, or txt
You are on page 1of 1

Siam Rubber Industry Sialkot Pvt. Ltd.

Request for Replacement of Leave


Date: 08-12-2023
1. Respected HR
2. Engr. Harider sb
3. Qamar sb
4. Amjad sb

Respected Sir,
I have a holiday on 22nd November For this reason the PV Diesel team has to come on 23
November for PV Gen Synchronization. I returned to duty on 23rd November in lieu of this
leave. And my attendance is present in the system records on 23 November but, it didn't
replace my vacation. Due to which this one day leave has been deducted from my salary.
Because of this I don't even get my yearly vacation money.
I have a request to replace this leave of mine. And my one day salary should be returned. And
my absence should be ended.
I didn't know about this policy.
I will avoid such mistakes in the future.
I am very thankful to you.

Regards,
Muhammad Haroon
Solar Engineer
Job Code: 5-02-08-0025
Siam Rubber Industry Sialkot.
Ningbo Green Light Energy.
Date: ___08-12-2023 ___

Signature: ____________

You might also like