Professional Documents
Culture Documents
Sherwood Smiles
Sherwood Smiles
Safran. Piece is knitted top down with double neck edge, saddle shoulder…
DROPS 239-16
DROPS design: Pattern e-351
Yarn group A
----------------------------------------------------------
SIZE:
S - M - L - XL - XXL - XXXL
DROPS 239-16
YARN:
DROPS SAFRAN from Garnstudio (belongs to yarn group A)
300-350-350-400-400-450 g colour 58, amethyst
NEEDLES:
DROPS CIRCULAR NEEDLE SIZE 3.5 mm: Length 40 and 80 cm.
DROPS CIRCULAR NEEDLE SIZE 2.5 mm: Length 40 and 80 cm.
DROPS DOUBLE POINTED NEEDLES SIZE 3.5 mm
DROPS DOUBLE POINTED NEEDLES SIZE 2.5 mm
The technique MAGIC LOOP can be used – you then only need circular needle
of 80 cm in each size.
KNITTING TENSION:
24 stitches in width and 32 rows vertically in stocking stitch = 10 x 10 cm.
NOTE! Remember that needle size is only a suggestion. If you have too many
stitches on 10 cm switch to larger needles. If you have too few stitches on 10
cm switch to smaller needles.
Magic loop – See the technique here
Knitting tension – See how to measure it and why here
Alternative Yarn – See how to change yarns here
Yarn Groups A to F – Use the same pattern and change the yarn here
Yarn usage using an alternative yarn – Use our yarn converter here
-------------------------------------------------------
https://www.garnstudio.com/includes/pattern-print.php?id=11341&cid=19 1/8
7/18/23, 11:48 AM Sherwood Smiles - Knitted jumper with short sleeves in DROPS Safran. Piece is knitted top down with double neck edge, saddle shoulder…
----------------------------------------------------------
PATTERN:
See diagram A.1.
----------------------------------------------------------
----------------------------------------------------------
https://www.garnstudio.com/includes/pattern-print.php?id=11341&cid=19 2/8
7/18/23, 11:48 AM Sherwood Smiles - Knitted jumper with short sleeves in DROPS Safran. Piece is knitted top down with double neck edge, saddle shoulder…
the short circular needle size 2.5 mm (cast is done like this to get an elastic cast-on edge).
Work rib (knit 1/purl 1) for 7 cm.
Now fold the rib in towards the wrong side to form a double edge - then work next round in rib as before
while at the same time working every approx. 4th stitch together with equivalent approx. every 4th stitch
from cast-on edge. You now have a double neck edge.
Knit 1 round while increasing 26-26-30-32-34-38 stitches evenly = 142-146-154-166-174-186 stitches.
Then work A.1 in the round over all stitches.
When A.1 has been worked, insert 1 marker in the middle of round (mid front). Work yoke as explained
below – measure yoke from this marker.
https://www.garnstudio.com/includes/pattern-print.php?id=11341&cid=19 3/8
7/18/23, 11:48 AM Sherwood Smiles - Knitted jumper with short sleeves in DROPS Safran. Piece is knitted top down with double neck edge, saddle shoulder…
The short rows are now done, and you have increased 6 times in total for saddle shoulders at every marker
= 166-170-178-190-198-210 stitches on row. I.e. it has only been increased on front piece and back piece
and number of shoulder stitches is the same.
Continue working in stocking stitch in the round over all stitches. REMEMBER THE KNITTING TENSION!
AT THE SAME TIME continue increase for saddle shoulder the same way as before on EVERY round until
increase has been done 20-22-26-28-28-28 times in total including the 6 times in neck line = 222-234-
258-278-286-298 stitches.
After last increase piece measures approx. 6-7-8-9-9-9 cm from marker at the front by the neck.
Work next round as follows: Work as before until 1st marker, cast off the 15-15-15-19-19-19 shoulder
stitches, work in stocking stitch until 3rd marker, cast off the 15-15-15-19-19-19 saddle shoulder, work as
before the rest of round = 192-204-228-240-248-260 stitches. Keep the markers in the piece - use the
markers when increasing for sleeves.
Work 48-51-57-60-62-65 stitches in stocking stitch (half back piece), cast on 52-52-52-66-66-66 new
stitches on needle for sleeve, work 96-102-114-120-124-130 stitches in stocking stitch (front piece), cast
on 52-52-52-66-66-66 new stitches on needle for sleeve, work 48-51-57-60-62-65 stitches in stocking
stitch (half back piece) = 296-308-332-372-380-392 stitches. Then increase for sleeves as explained
below.
SLEEVE INCREASE:
Work in stocking stitch in the round. AT THE SAME TIME on next round increase 4 stitches for sleeves as
follows:
Increase AFTER 1st and 3rd marker and increase BEFORE 2nd and 4th marker – remember INCREASE TIP-
1.
Increase now only on sleeves and number of stitches on front pieces and back piece is the same. Work the
increased stitches in stocking stitch.
Increase like this every other round 23-24-25-21-27-25 times in total, then increase on every round 0-0-5-
9-0-0 times in total = 388-404-452-492-488-492 stitches.
Piece measures approx. 20-22-25-25-26-25 cm from marker by the neck. Then increase for yoke as
explained below.
YOKE INCREASE:
Move the 4 marker so that they are in each side on sleeves (markers are now in a stitches and there are
96-98-110-124-118-114 stitches between stitches with marker).
Continue in stocking stitch. AT THE SAME TIME on first round increase 8 stitches for yoke as follows:
Increase BEFORE and AFTER each of the 4 markers - remember INCREASE TIP-1.
Increase stitches on both on front piece, back piece and sleeves. Increase like this EVERY round 6-6-4-7-
11-15 times in total.
After last increase there are 436-452-484-548-576-612 stitches on row and piece measures approx. 22-
24-26-27-29-29 cm from marker mid front.
On next round divide yoke for body and sleeves as follows: Work 54-57-61-67-73-80 stitches (= half back
piece), slip the next 110-112-120-140-142-146 stitches on a thread for sleeve, cast on 8-10-12-12-14-16
new stitches on needle (in the side under sleeve), work 108-114-122-134-146-160 stitches (front piece),
slip the next 110-112-120-140-142-146 stitches on a thread for sleeve, cast on 8-10-12-12-14-16 new
stitches on needle (in the side under sleeve), work the last 54-57-61-67-73-80 stitches (= half back
piece). Finish body and sleeves separately. Now measure piece from here!
https://www.garnstudio.com/includes/pattern-print.php?id=11341&cid=19 4/8
7/18/23, 11:48 AM Sherwood Smiles - Knitted jumper with short sleeves in DROPS Safran. Piece is knitted top down with double neck edge, saddle shoulder…
BODY:
= 232-248-268-292-320-352 stitches. Work stocking stitch in the round until piece measures 20-20-20-
20-20-22 cm from division. Knit 1 round while increasing 63-73-77-83-93-97 stitches evenly = 296-320-
344-376-412-450 stitches.
Switch to circular needle size 2.5 mm. Work rib (knit 1/purl 1) for 5 cm. Cast off. Jumper measures approx.
50-52-54-56-58-60 cm from shoulder.
SLEEVES:
Slip the 110-112-120-140-142-146 stitches from thread in one side of piece a short circular needle size 3.5
mm – pick in addition up 1 stitch in each of the 8-10-12-12-14-16 new stitches cast on under sleeve =
118-122-132-152-156-162 stitches.
Insert 1 marker thread mid under sleeve – in the middle of the 8-10-12-12-14-16 stitches. Move the
marker thread upwards when working - it should be used for decrease.
Begin round at the marker thread, and work stocking stitch in the round. AT THE SAME TIME on first round
decrease 12-14-16-18-20-22 stitches evenly = 106-108-116-134-136-140 stitches.
When piece measures 1 cm from division, decrease 2 stitches mid under sleeve - read DECREASE TIP.
Decrease like this every cm 9-8-6-6-5-5 times in total = 88-92-104-122-126-130 stitches. After last
decrease knit 1 round while decreasing 10-12-22-36-36-38 stitches evenly = 78-80-82-86-90-92 stitches.
Work A.1 in the round over all stitches. When A.1 has been worked, switch to double pointed needles size
2.5 mm. Work rib (knit 1/purl 1) for 3 cm. Cast off. Sleeve measures approx. 13-12-10-10-9-9 cm from
division. Work the other sleeve the same way.
ASSEMBLY:
Baste a strand up and down through cast-on edge at the top on sleeve . Wrinkle the sleeve cap so that it
fits in the opening where stitches were cast off on shoulder. Sew sleeve cap to shoulder stitches that were
cast off. Repeat in the other side.
Diagram explanations
= shoulder increase
= sleeve increase
= yoke increase
= knitting direction
= knit
= purl
= between 2 stitches make 1 yarn over, on next round knit yarn over to make a hole
= knit 2 together
https://www.garnstudio.com/includes/pattern-print.php?id=11341&cid=19 5/8
7/18/23, 11:48 AM Sherwood Smiles - Knitted jumper with short sleeves in DROPS Safran. Piece is knitted top down with double neck edge, saddle shoulder…
https://www.garnstudio.com/includes/pattern-print.php?id=11341&cid=19 6/8
7/18/23, 11:48 AM Sherwood Smiles - Knitted jumper with short sleeves in DROPS Safran. Piece is knitted top down with double neck edge, saddle shoulder…
Have you made this or any other of our designs? Tag your pictures in social media with #dropsdesign so
we can see them!
To get the measurement tape to be 100 % accurate, you have to print out the pattern in full scale (and not use the print option
"fit to page").
If we get a report of a potential error, we will review the pattern and make the correction if necessary. This will be done normally
within 7 to 10 working days. If no correction is made, it means that we weren't able to find any error/mistake.
Wondering where you can buy the yarn for this pattern?
Try a DROPS Super Store!
- LindeHobby
- Wool Warehouse Direct Ltd
https://www.garnstudio.com/includes/pattern-print.php?id=11341&cid=19 7/8
7/18/23, 11:48 AM Sherwood Smiles - Knitted jumper with short sleeves in DROPS Safran. Piece is knitted top down with double neck edge, saddle shoulder…
- Purple Sheep Yarns
- The Wool Factory
© 1982-2023 DROPS Design A/S. We reserve all rights. This document, including all its sub-sections, has copyrights. Read more about what you can
do with our patterns at the bottom of each pattern on our site.
https://www.garnstudio.com/includes/pattern-print.php?id=11341&cid=19 8/8