CFTS Exep Ins Phi 00000 02 - R01
CFTS Exep Ins Phi 00000 02 - R01
TABLE OF CONTENTS
1 INTRODUCTION .................................................................................................................................................... 3
2 UNITS .................................................................................................................................................................... 9
1 INTRODUCTION
1.1 General
Designated within the realm of the Federal Government of Nigeria
initiative and in alignment with the regulations set forth by the
petroleum (Amendment) Decree No. 23 of 1996, the Eremor field
emerges as one among the collection of twenty-four marginal
fields entrusted to indigenous companies engaged in oil
exploration and production. Excel Exploration and Production, a
Nigerian Company operating within the upstream domain of the oil
and gas industry, was granted ownership of this field. Nestled in
the onshore swamp expanse of Bayelsa state, specifically within
Shell's OML 46 at the South Forcados region, the Eremor field
occupies a pivotal position. It is positioned 4 kilometres to the
north of the Tunu/Kanbo field and approximately 70 kilometres to
the south of Warri. Encompassing a span of roughly 64.7 square
kilometres, this field remains a noteworthy presence in the area.
Excel E&P Facility is located at Eremor, near Ekeremor community
in Ekeremor Local Government Area of Bayelsa State, Nigeria.
3. International Standards
The Oil Pipelines Act (1990) Supplement to the Nigerian Oil and
Gas Pipelines Regulations (1995).
API 602 Gate, Globe, and Check Valves for Sizes DN 100
(NPS 4) and Smaller for the Petroleum and Natural
Gas Industries.
1.10 Abbreviations
The Acronyms and abbreviations used within this document are
listed below:
Abbreviation Description
ft Feet/foot
GA General Arrangement
2 UNITS
Area ft²(m2)
Density lb/ft³(Kg/m3)
Viscosity cP
Rev No. Page 10 of
R01 12
the plant.
a gauge pole that is installed through the roof into the tank.
Rev No. Page 12 of
R01 12
control panel F&G system through a 3-15 psi fusible loop plug.