column ( C 1 )
My
As ( Unform ) = 2.3 cm2 As ( Max) = 36.00 cm2 Ms= 14.76198 Column
b
t
Designed By :- Checked By :-
Nile Engineering Consultant Office Project : -
(N.E.C.B)
Designed By :- Checked By :-
Nile Engineering Consultant Office
Project :-
(N.E.C.B)
Strap Beam
B.C = 15 t/m2
P1w = 120 t Fcu = 300 Kg/cm2
P2w = 150 t Fy = 3600 Kg/cm2
Col.s Dim.
a b S= 6.5 m
C1 40 70 e= 0.65 m
C2 70 40 Thic. of P.C= 0.4 m
e'= 1 m
Sum. Of loads = 270 t
R1= 133.33 m
R2= 136.67 m
Design of Footings :-
F 1 :-
A p.c = 10.22 m2
B p,c = 3.3 m L p.c = 3.10 m
L r.c = 2.30 m
B r.c = 3.3 m L p.c = 3.1
B p,c = 3.3
F 2 :-
A p.c = 11.50 m2
B p,c = 3.35 m L p.c = 3.44 m
L r.c = 2.80 m L p.c = 3.6
B r.c = 2.50 m B p,c = 3.3
P 1u = 180 t R 1u = 200 t
P 2u = 225 t R 2u = 205 t
Checked By :-
Designed By :- MAHMOUD SAAD
Nile Engineering Consultant Office
Project :-
(N.E.C.B)
W 1u = 60.61 t/m'
W 2u = 82.00 t/m'
Check Shear :-
Q1= 67.9 t
Q2= 65.1 t qu= 9.70 Kg/cm2
Q3= 45.10 t q cu = 10.61 Kg/cm2
Q max. = 67.9 t q max = 31.11 Kg/cm2
qs = 4.39 Kg/cm2
Φ (mm) = 8 n= 4
F y ( Kg/cm2) = 2400 Area of Bar = 0.5024 cm2
S= 13.64 cm
Beam R.F.T :-
Checked By :-
Designed By :- MAHMOUD SAAD
Nile Engineering Consultant Office
Project :-
(N.E.C.B)
Q= 8.6 t qu= 3.09 Kg/cm2
q cu = 6.93 Kg/cm2 Safe
As (main steel ) = 14.3 cm2 As min = 4.2 cm2
Checked By :-
Designed By :- MAHMOUD SAAD
Nile Engineering Consultant Office
Project :-
(N.E.C.B)
Checked By :-
Designed By :- MAHMOUD SAAD