Nile Engineering Consultant Office Project : -

(N.E.C.B)

column ( C 1 )

He = 3.07 m Dim. Of Col. Buck.(b) = 12.28 Buck.(t) = 0.00 Addit. Moment =


Con. of Col. Inner b t Coff.(b)= 1.2 Fcu = 250 b t
30 30 Coff.(t)= 1.2 Fy= 3600 0.00 0.00
Long Column

= Deformation. b 2.26 cm N. Load Moment M / ( b or t ) Pu/(b*a*fcu) = 0.44


b 100.00 2.26 0.08 =β 0.70
t 100.00 0.00 0.00

Pu = 100.00 t Moment = 2.26 m.t e= 0.02


e/t= 0.08
K= 0.44 K* e/t = 0.034 p= 1.00 es= 0.14762 Mx

My
As ( Unform ) = 2.3 cm2 As ( Max) = 36.00 cm2 Ms= 14.76198 Column

b
t

As ( % ) = 0.25% As ( Min) = 8.00 cm2


0.89%
use As min

Designed By :- Checked By :-
Nile Engineering Consultant Office Project : -
(N.E.C.B)

Designed By :- Checked By :-
Nile Engineering Consultant Office
Project :-
(N.E.C.B)

Strap Beam
B.C = 15 t/m2
P1w = 120 t Fcu = 300 Kg/cm2
P2w = 150 t Fy = 3600 Kg/cm2
Col.s Dim.
a b S= 6.5 m
C1 40 70 e= 0.65 m
C2 70 40 Thic. of P.C= 0.4 m
e'= 1 m
Sum. Of loads = 270 t
R1= 133.33 m
R2= 136.67 m

Design of Footings :-
F 1 :-
A p.c = 10.22 m2
B p,c = 3.3 m L p.c = 3.10 m
L r.c = 2.30 m
B r.c = 3.3 m L p.c = 3.1
B p,c = 3.3
F 2 :-
A p.c = 11.50 m2
B p,c = 3.35 m L p.c = 3.44 m
L r.c = 2.80 m L p.c = 3.6
B r.c = 2.50 m B p,c = 3.3

Caculate the ultimate loads and reaction on strap beam :-

P 1u = 180 t R 1u = 200 t
P 2u = 225 t R 2u = 205 t

Checked By :-
Designed By :- MAHMOUD SAAD
Nile Engineering Consultant Office
Project :-
(N.E.C.B)
W 1u = 60.61 t/m'
W 2u = 82.00 t/m'

Design of Strap Beam :- 1.05 B= 70 cm

Point of Zero Shear ( XO ) = 2.97 m


M max - ve = -87.3 m.t 87.3
M max + ve = 45.20 m.t
Max Moment = 87.30 m.t
depth = 101.95 Depth = 100 cm

Check Shear :-

Q1= 67.9 t
Q2= 65.1 t qu= 9.70 Kg/cm2
Q3= 45.10 t q cu = 10.61 Kg/cm2
Q max. = 67.9 t q max = 31.11 Kg/cm2
qs = 4.39 Kg/cm2
Φ (mm) = 8 n= 4
F y ( Kg/cm2) = 2400 Area of Bar = 0.5024 cm2
S= 13.64 cm

Beam R.F.T :-

As top = 29.36 cm2 As min = 21.39 cm2


As bottom = 15.20 cm2
38.16585956 21.38889
Design Footing :- 21.38888889
10.5
F 1 :- q u1 = 26.4 t/m2 X= 0.95 m
Moment = 11.9 m.t
Depth = 31.5 cm Depth of foot. = 28 cm
Check Shear :-

Checked By :-
Designed By :- MAHMOUD SAAD
Nile Engineering Consultant Office
Project :-
(N.E.C.B)
Q= 8.6 t qu= 3.09 Kg/cm2
q cu = 6.93 Kg/cm2 Safe
As (main steel ) = 14.3 cm2 As min = 4.2 cm2

F 2 :- q u2 = 32.1 t/m2 X= 1.02 m


Moment = 16.7 m.t
Depth = 37.3 cm Depth of foot. = 43 cm
Check Shear :-
Q= 10.4 t qu= 2.42 Kg/cm2
q cu = 6.93 Kg/cm2 Safe
As (main steel ) = 13.1 cm2 As min = 6.45 cm2

Checked By :-
Designed By :- MAHMOUD SAAD
Nile Engineering Consultant Office
Project :-
(N.E.C.B)

Checked By :-
Designed By :- MAHMOUD SAAD