INDEX OF DRAWINGS HARDWARE SCHEDULE SUBMIT APPVD FINISH SCHEDULE SUBMIT APPVD
DESCRIPTION
SERIES # DESCRIPTION DWG AMI HINGE 75T1580 - AMI ITEM #153168015 FIBER REINFORCED PLASTIC
QTY
H-1.0 FRP-01
00CS COVER SHEET 1 PLATE BLUM 174H7100E - AMI ITEM #153168016 BLACK COLOR
00FP1A FLOOR PLAN @ LEVEL 1 1 DRAWER SLIDE - AMI ITEM #153211003 3/8" SAFETY GLASS
H-3.2 GL-1
00RCP1A REFLECTED CEILING PLAN @ LEVEL 1 1 KV TRU TRACK, 100LBS FULL E., TEL., SIDE MOUNTED, 14" CLEAR FINISH - VERIFY
01A HOSTESS STAND @ HOSTESS 101 1 DRAWER SLIDE - AMI ITEM #169999003 INTERIOR CABINET FINISH
H-3.4 MEL-1
02A HOSTESS DIVIDER @ HOSTESS 101 1 KV TRU TRACK, 100LBS FULL E., TEL., SIDE MOUNTED, 18" MELAMINE: COLOR BLACK
03A FRONT BAR @ BAR 102 3 AMI SUPPORTS - AMI ITEM #153187029 POWDERCOATED METAL - BRASS FINISH
H-4.0 MT-01
04A BACK BAR @ BAR 102 2 STANDARD SHELF SUPPORT 5mm X 24mm 282.40.708 AGED BRASS LOOK CONTINGENT UPON C.O. APPROVAL
05A SERVER STATION @ MAIN DINING SEATING 105 5 A&M 1" CONCEALED BRACKET - AMI PART #173269068 STAINLESS STEEL
REV
H-7.81 MT-02
D
A
F
06A HANGING PLANTERS @ MAIN DINING SEATING 105 1 W/18" SUPPORT ARM WHITE 1/4" STEEL BRUSHED FINISH - VERIFY
07A ARCHWAY 1 A&M 1" HYBRID BRACKET - AMI PART #173269083 HOLLOW METAL STEEL FRAME
H-7.96 MT-04
08A NOT USED 0 24" X 22", WHITE GALBANIZED FINISH
11A OUTDOOR POS STATION 1 DOOR BUMPERS - AMI ITEM #153166031 PAINT - BENJAMIN MOORE
H-10.0 PT-1
12A FRONT COUNTER @ OPEN FRONT KITCHEN 107 3 PLASTIC TRANSPARENT HIDDEN SAPPHIRE CSP-690 - HIGH GLOSS FINISH
13A KITCHEN CANOPY @ OPEN FRONT KITCHEN 107 3 EMBEDDED DOOR HANDLES W/ AGED BRASS FINISH PAINT - BENJAMIN MOORE
HW-01 PT-2
14A KITCHEN SHELVING UNIT @ OPEN BACK KITCHEN 108 1 AMI TO PROVIDE OPTIONS FOR REVIEW AND APPROVAL FRENCH QUARTER GOLD 287 - HIGH GLOSS FINISH
15A CEILING SUSPENDED SHELVING @ OPEN BACK KITCHEN 108 1 DOOR LOCK AND KNOBS W/ AGED BRASS FINISH 2CM QUARTZ
HW-02 Q-01
AMI TO PROVIDE OPTIONS FOR REVIEW AND APPROVAL TAJ MAHAL QUARTZITE - FINISH TO MATCH CONTROL SAMPLE
TOTAL: 30
DOOR HINGE UPHOLSTERY
HW-03A UPH-01
PLEASE PROVIDE SPECS W/ 3"W. HALF ROUNDS FOAM & MUSTARD COLOR FABRIC TBD
CABINET BOX EDGE BANDING: 0.5 mm PVC OR WOOD VENEER TO MATCH EXTERIOR COLOR BB BROWN BACKER NOJ NOTCH ON JOB 2 WD-1
ELEVATION MARKER FINISH MARKER
SHELVES EDGE BANDING: 0.5 mm PVC TO MATCH INTERIOR FINISH BO BY OTHERS NTS NOT TO SCALE XXA
BACKS: 1/4" PLYWOOD TO MATCH INTERIOR FINISH / 1 SIDE MELAMINE B/N BULLNOSE EDGE PL PLASTIC LAMINATE H-1.0 HARDWARE MARKER
DRAWER BOX BODY: 1/2" PREFINISH MAPLE PLYWOOD CAB CABINET PM PROJECT MANAGER
A
DRAWER BOX BOTTOM: 1/4" PREFINISH MAPLE PLYWOOD CLR CLEARANCE PT PRESSURE TREATED SECTION MARKER GRAIN DIRECTION
XXA
Scope Description
DOORS & DRAWER FRONTS: 3/4" MDF EQ EQUAL RFI REQUEST FOR INFORMATION
PLAN VIEW / PLAN SECTION
DOOR EDGE BANDING: 0.5 mm PVC TO MATCH EXTERIOR FINISH EQPT EQUIPMENT SPL SPLASH
1
COVER SHEET
SCALE: 12"=1'-0" ARCH REF:
TOE KICKS & RETURN: 3/4" PLYWOOD WOOD VENEER OR LAMINATED ON EXP. SURFACES FE FINISHED END SSF SOLID SURFACE
COUNTER TOP: 3/4” STANDARD PLYWOOD LAMINATED AS REQUIRED FD FIELD DIMENSION ST STONE
SECTION
FJ FIELD JOINT TBD TO BE DETERMINED D1
XXA
A SCALE: 12"=1'-0" ARCH REF:
GC GENERAL CONTRACTOR UNO UNLESS NOTED OTHERWISE
SERIES
GROUP
N/A NON APPLICABLE WO WORK ORDER
AREA
Drawn By Date
HD 03/30/20
ALL V.I.F. DIMENSIONS TO BE Project # Submittal #
VERIFIED IN THE FIELD
3413 01
Drawing #
00CS
C:\Users\yilmera.Lenovo-PC\Dropbox\01 HIDDEN DRAFTSMAN LLC\0001 IN-PROGRESS PROJECTS\03- JOINED PROJECTS\20-0302 - ORNO RESTAURANT\01-Working Set (Most Current)\3413 - ORNO RESTAURANT - 00CS - 03-30-20.dwg
INT
1 1 1 1 1 1 1 1 1
09A 04A 07A 03A 01A 02A 05A 12A 14A
DATE
DESCRIPTION
REV
D
A
F
H
C
H
16
SCULLERY
101
111
4/6
MAIN DINING
D
13 SEATING I
BACK PREP
104
KITCHEN
113
CAB.
24
D
10
SR-S30A
TS30IC
D
D
12 LIQUOR
DISPLAY
H
PREP
TSCE12PS
C
KITCHEN
D
C
WALK-IN
COOLER
OPEN BACK 112
D
KITCHEN
HD
BAR 110
102
TSCE12PS
MAIN DINING
D
C
6
12 LIQUOR
SEATING II
DISPLAY
10
TS30IC
6
D
D
CAB.
24
OPEN FRONT
KITCHEN
D
109
16
LIBRARY
MAIN DINING
103 THESIS SEATING III
20
G
A: 3,437 SQ.F 106
12
OUTDOOR OUTDOOR
20
SEATING II SEATING I
108 107
Scope Description
FLOOR PLAN
LEVEL 1
00FP1A 00RCP1A
SERIES
00CS
GROUP
AREA
1 1 1
PREMIUM
Drawn By Date
X CUSTOM ECONOMY
07A 11A 15A
HD 03/30/20
ALL V.I.F. DIMENSIONS TO BE Project # Submittal #
VERIFIED IN THE FIELD
1
FLOOR PLAN - LEVEL 1 3413 01
SCALE: 1/8" = 1'-0" ARCH REF: 1/ID1.01
Drawing #
00FP1A
C:\Users\yilmera.Lenovo-PC\Dropbox\01 HIDDEN DRAFTSMAN LLC\0001 IN-PROGRESS PROJECTS\03- JOINED PROJECTS\20-0302 - ORNO RESTAURANT\01-Working Set (Most Current)\3413 - ORNO RESTAURANT - 00FP - 03-30-20.dwg
1 1 1
10A 06A 13A
INT
DATE
DESCRIPTION
REV
D
A
F
Architect Name and Address
EL. 19'-1"
TO EXISTING EXPOSED CEILING CLG-05
CLG-01
CLG-01
CLG-05
EL. 9'-0"
CLG-04
CLG-02 CLG-05
KITCHEN HOOD
CLG-02
LEVEL 1
00FP1A 00RCP1A
SERIES
GROUP
00CS
AREA
PREMIUM
Drawn By Date
X CUSTOM ECONOMY
E D C B
HD 03/30/2020
ALL V.I.F. DIMENSIONS TO BE Project # Submittal #
VERIFIED IN THE FIELD
3413 01
FLOOR PLAN - RCP Drawing #
2 SCALE: 1/8" = 1'-0" ARCH REF: 1/ID2.01
00RCP1A
C:\Users\yilmera.Lenovo-PC\Dropbox\01 HIDDEN DRAFTSMAN LLC\0001 IN-PROGRESS PROJECTS\03- JOINED PROJECTS\20-0302 - ORNO RESTAURANT\01-Working Set (Most Current)\3413 - ORNO RESTAURANT - 00RCP - 03-30-20.dwg
FINISH SCHEDULE
INTERIOR CABINET FINISH
MEL-1
MELAMINE: COLOR BLACK
COUNTER TOP UPHOLSTERY
UPH-01
W/ 3"W. HALF ROUNDS FOAM & MUSTARD COLOR FABRIC TBD
5
01A STAINED HARDWOOD & VENEER AMERICAN WALNUT
1 WD-01
STAIN FINISH TO MATCH CONTROL SAMPLE
INT
HOSTESS
01A
341 2" 101
2"
3 3
4" 4" 2"
33" MAIN DINING
SEATING I
13
DATE
104
11 2"
8"
61 2"
CAB.
24
WD-01 SHELF PULL
6
SR-S30A
TS30IC
20"
4
D
D
01A
12 LIQUOR
DISPLAY
12"
12"
TSCE12PS
D
C
D
DESCRIPTION
HD
PULL LOCATION
BAR
HARDWARE SCHEDULE
102
TSCE12PS
AT DOOR MAIN DINING AMI HINGE 75T1580 - AMI ITEM #153168015
D
C
6
12 LIQUOR
SEATING II H-1.0
DISPLAY
10
WD-01 COUNTERTOP PLATE BLUM 174H7100E - AMI ITEM #153168016
BELOW
AMI SUPPORTS - AMI ITEM #153187029
LOCATION PLAN - FIRST FLOOR H-4.0
3
01A
K1 SCALE: 1/8"=1'-0" ARCH REF: 1/ID1.01
STANDARD SHELF SUPPORT 5mm X 24mm 282.40.708
REV
SCALE: 3/4"=1'-0" ARCH REF: 1/ID4.01
D
A
F
Architect Name and Address
20"
8" 12"
UPHOLSTERED UPHOLSTERED
UPH-01
UPH-01 PANEL W/ 3" WIDE PANEL "
HALF ROUNDS R1
12"
"
R3
3
341 2" 4"
8"
1
WD-01
8"
3" 3"
11 2"
"
1"
R1
2" 7
1
3"
4"
38"
3
WD-01
20"
MEL-1
19"
46"
STEEL PLATE
1"
26"
MEL-1
4"
2"
1" 2"
THRU-BOLTS
3" 2"
8"
8"
WD-01
3
01A WD-01 SHELF
20"
11 2"
61 2" " 12"
PLAN SECTION - HOSTESS STAND SIDE ELEVATION - HOSTESS STAND R1
2 4
4"
4"
3
4"
SIDE PANEL
WD-01
WD-01 BEYOND
UPHOLSTERED
PANEL W/ 3" WIDE UPH-01
101 2"
HALF ROUNDS
"
WD-01
R3
"
R1
173 4" TOP
4"
3
4"
A
1
A
01B WD-01 SHELF 01A HW-01
341 2" 341 2"
3 3 3 3 WD-01
4" 4" 4" 4"
33" 1 1
33"
01A 01A
331 4"
WD-01
4"
WD-01
171 2" CAB. DEPTH
WD-01 3
12"
4"
46"
Scope Description
16" ADJ. SHELF
HOSTESS STAND
241 8"
UPHOLSTERED
33" TOP
PANEL W/ 3" WIDE UPH-01
HOSTESS 101
34" TOP HEIGHT
4" CAB. HEIGHT
3" HALF ROUNDS
HW-01
H-4.0
2
2" 2"
2 01A
LEVEL 1
01A
331 4"
46"
46"
331
26"
WD-01 H-1.0
13 8" 00FP1A 00RCP1A
SERIES
00CS
GROUP
8"
F.E.
AREA
1
4"
4"
3
4"
3
GRADE REQUIREMENTS:
3
8"
90
°
PREMIUM
Drawn By Date
X CUSTOM ECONOMY
8"
HD 04/15/20
90
Project # Submittal #
VERIFIED IN THE FIELD
01A
G:\Dropbox\Dropbox\0001 IN-PROGRESS PROJECTS\03- JOINED PROJECTS\20-0302 - ORNO RESTAURANT\01-Working Set (Most Current)\3413 - ORNO RESTAURANT - S-01 - 03-30-20.dwg
FINISH SCHEDULE
STAINED HARDWOOD & VENEER AMERICAN WALNUT
CONTINUOUS METAL WD-01
STAIN FINISH TO MATCH CONTROL SAMPLE
T BRACKET
21 2"
21 2"
4"
1
INT
FIXED 1
4"
4" LOUVER 4" 4"
1 HOSTESS
DATE
02A 101
WD-01 WD-01
MAIN DINING
SEATING I
13
104
3
02A
CAB.
24
D
6
SR-S30A
TS30IC
D
50"
DESCRIPTION
D
12 LIQUOR
DISPLAY
25" 25" HARDWARE SCHEDULE
TSCE12PS
4" 17" 4" 4" 17" 4"
D
C
DOOR LOCK AND KNOBS W/ AGED BRASS FINISH
21 2"
D
HW-02
H
BAR AMI TO PROVIDE OPTIONS FOR REVIEW AND APPROVAL
4"
PLAN SECTION - HOSTESS DIVIDER IMAGE - CONCEPT LOCK AND KNOB WD-01
1 SCALE: 3/4"=1'-0" ARCH REF: NONE D1 SCALE: 3/4"=1'-0" ARCH REF: ID4.2
REV
4"
D
A
F
4"
36"
4"
A A
02A 02A
WD-01 TYP. WD-01 TYP.
4"
4"
5" 5"
R2 R2
4"
4"
25"
25"
4"
4"
21 2"
4"
1
15"
15"
2"
4"
4"
8"
43
1 1
4"
02A 02A
4"
4"
4"
13
16 "
40"
4"
138"
FIXED TO DOOR W/ ANTIQUE
4"
BRASS FINISH
4"
40"
40"
4"
138"
4"
FIXED LOUVERS FIXED LOUVERS WD-01
4"
DOOR LOCK
HW-02
AND KNOBS
4"
4"
4"
4"
WD-01 FIXED LOUVERS
4"
HOSTESS DIVIDER
4"
Scope Description
4"
HOSTESS 101
40"
4"
40"
40"
LEVEL 1
4"
4"
00FP1A 00RCP1A
SERIES
00CS
GROUP
4"
AREA
HIDDEN FASTENER SYSTEM. GRADE REQUIREMENTS:
4"
10"
4" 17" 4" 4" 17" 4" 4" 17" 4" 4" 17" 4" ALL V.I.F. DIMENSIONS TO BE Project # Submittal #
25" 25" 25" 25" VERIFIED IN THE FIELD
50" 50" FASTENER SYSTEM
3413 01
ANCHORED TO FLOOR Drawing #
ELEVATION - HOSTESS DIVIDER ELEVATION - HOSTESS DIVIDER SECTION
2 3 A
SCALE: 3/4"=1'-0" ARCH REF: 1/ID4.02 SCALE: 3/4"=1'-0" ARCH REF: 3/ID4.02 SCALE: 1"=1'-0" ARCH REF: 2/ID4.02
02A
G:\Dropbox\Dropbox\0001 IN-PROGRESS PROJECTS\03- JOINED PROJECTS\20-0302 - ORNO RESTAURANT\01-Working Set (Most Current)\3413 - ORNO RESTAURANT - S-02 - 03-30-20.dwg
MAIN DINING
SEATING I
FINISH SCHEDULE
13
104
FIBER REINFORCED PLASTIC
FRP-01
1 BLACK COLOR
CAB.
24
03A
D
POWDERCOATED METAL - BRASS FINISH
6
MT-01
SR-S30A
TS30IC
D
AGED BRASS LOOK CONTINGENT UPON C.O. APPROVAL
12 LIQUOR
DISPLAY
2CM QUARTZ
TSCE12PS
Q-01
D
C
TAJ MAHAL QUARTZITE - FINISH TO MATCH CONTROL SAMPLE
INT
D
STAINED HARDWOOD & VENEER AMERICAN WALNUT
HD
BAR
WD-01
102 STAIN FINISH TO MATCH CONTROL SAMPLE
TSCE12PS
MAIN DINING
DATE
D
C
6
SEATING II
12 LIQUOR
DISPLAY
10
105
SR-S30A
TS30IC
D
D
CAB.
24
D
DESCRIPTION
REFER TO SERIES 04A
FOR BACK BAR DETAILS HARDWARE SCHEDULE
A&M 1" CONCEALED BRACKET - AMI PART #173269068
LOCATION PLAN - FIRST FLOOR H-7.81
K1 SCALE: 1/8"=1'-0" ARCH REF: 1/ID1.01
W/18" SUPPORT ARM WHITE 1/4" STEEL
REV
24"
D
A
F
42" A.F.F. 4" 24"
19"
83"
DRINK RAIL
2061 4" DRINK RAIL
48" TYP.
8"
4"
24"
24"
FIELD SEAM
H-7.81 41" 2301 4"
2711 4"
51 4"
EQUIPMENT
BY OTHERS
11 4"
181 2"
151 2"
203 4"
11 2"
21" 6 7 8
03B 03B 03B
11 2"
EQUIPMENT
4" FOOTRAIL
673 4"
33"
BY OTHERS 5
731 4"
4"
3 FRP-01 INTERIOR TYP.
Scope Description
731
203 4"
03B
68"
03B
FRONT BAR
112"
53 4"
BAR 102
LEVEL 1
203 4"
8"
11 2"
8"
00FP1A 00RCP1A
SERIES
GROUP
00CS
AREA
29" 251 2" 251 2" 251 2" 251 2" 251 2" 251 2" 251 2" 251 2"
11 2" 11 2" 13 4" 11 2" 11 2" 11 2" 11 2" 11 2" 11 2" 11 2" 13 4" Drawn By Date
PREMIUM X CUSTOM ECONOMY
2141 2" FOOTRAIL
HD 03/13/20
93 4" 32" 218"
ALL V.I.F. DIMENSIONS TO BE Project # Submittal #
2593 4" VERIFIED IN THE FIELD
WD-01 FRAME & LOUVERS MT-01 FOOTRAIL & BRACKETS 3413 01
4 Drawing #
PLAN SECTION - BAR 03B
2 SCALE: 1/2"=1'-0" ARCH REF: 1/ID4.03.1
03A
C:\Users\yilmera.Lenovo-PC\Dropbox\01 HIDDEN DRAFTSMAN LLC\0001 IN-PROGRESS PROJECTS\03- JOINED PROJECTS\20-0302 - ORNO RESTAURANT\01-Working Set (Most Current)\3413 - ORNO RESTAURANT - S-03 - 03-30-20.dwg
FINISH SCHEDULE
A 2
Q-01 TOP FIBER REINFORCED PLASTIC
03C 03C FRP-01
BLACK COLOR
83" Q-01 TOP
POWDERCOATED METAL - BRASS FINISH
MT-01
19" 32" 8" 24" AGED BRASS LOOK CONTINGENT UPON C.O. APPROVAL
1 1
03A 83" 03A 2CM QUARTZ
Q-01
TAJ MAHAL QUARTZITE - FINISH TO MATCH CONTROL SAMPLE
INT
STAINED HARDWOOD & VENEER AMERICAN WALNUT
93 4" WD-01 FRAME & LOUVERS WD-01
LIFT-A-SYST RECOMMENDED STAIN FINISH TO MATCH CONTROL SAMPLE
DUE TO WEIGHT & VIBRATIONS
93
DATE
OF STONE FLIP TOP 4"
OPEN 2 2
03A 03A
42"
42"
34"
FRAME & LOUVERS WD-01
BASE MT-01
DESCRIPTION
11 2" 151 2" 11 2" 203 4" 203 4" 203 4"
11 2" 11 2" 11 2" 11 4" MT-01 BASE
HARDWARE SCHEDULE
181 2" 33" 53 4" 8" 8"
68" 51 4" A&M 1" CONCEALED BRACKET - AMI PART #173269068
H-7.81
731 4" 731 4" W/18" SUPPORT ARM WHITE 1/4" STEEL
C B
03C 03C Q-01 TOP
REV
2711 4" 1
D
A
F
41" 2301 4" 03A
93 4"
13 4"
2
03A
42"
34"
11 2" 63 4" 29" 251 2" 251 2" 251 2" 251 2" 251 2" 251 2" 251 2" 251 2"
3
11 2" 1 4" 11 2" 11 2" 11 2" 11 2" 11 2" 11 2" 11 2" 13 4"
11 2" 11 2"
93 4" 32" 218"
2593 4"
121 2"
42"
223 4"
223 4"
4"
4"
81 8" 81 8" 33" 57 8" 125 8" 3313 16" 3315 16"
REMOVABLE 51 2" 673 4" 301 8" 301 8" 673 4" 51 2" REMOVABLE
FRP-01 FRP-01
PANELS PANELS
1033 8" 1033 8"
Scope Description
STAINLESS STEEL
DRINK RAIL
2711 4"
FRONT BAR
1
28" 2021 4" 17" 24" 03A
BAR 102
LEVEL 1
2 00FP1A 00RCP1A
SERIES
GROUP
00CS
AREA
03A
42"
223 4"
2CM QUARTZ
Q-01
TAJ MAHAL QUARTZITE - FINISH TO MATCH CONTROL SAMPLE
INT
STAINED HARDWOOD & VENEER AMERICAN WALNUT
WD-01
STAIN FINISH TO MATCH CONTROL SAMPLE
DATE
Q-01 TOP
24"
21 2"
21 2"
163 4"
11 2"
13 4"
2"
DESCRIPTION
131 2" HARDWARE SCHEDULE
A&M 1" CONCEALED BRACKET - AMI PART #173269068
H-7.81
WD-01 FRAME W/18" SUPPORT ARM WHITE 1/4" STEEL
LOUVERS
1
REMOVABLE
FRP-01 WD-01 LOUVERS
REV
281 2"
321 2"
PANELS
D
A
F
42"
391 2"
D1
03C
RIBS
2"
8"
1
51 2"
4"
4"
51 2"
SECTION
A SCALE: 1-1/2"=1'-0" ARCH REF: 5/ID4.03.1
Q-01 TOP
21 2"
93 4"
2"
123 4"
11
Q-01 TOP
2"
LED LIGHTING
H-7.158 24" BY OTHERS
131 2"
11 2"
21 2"
WD-01 FRAME
21 2"
3
4"
173 4"
51 2"
2"
BEHIND FRAMED
WD-01 H-7.81
LOUVERS
8"
8"
1
1
30°
WD-01 FRAME
REMOVABLE REMOVABLE WD-01 LOUVERS
FRP-01 WD-01 LOUVERS FRP-01
Scope Description
281 2"
321 2"
PANELS PANELS
42"
403 8"
BEHIND FRAMED
WD-01
LOUVERS
FRONT BAR
201 2"
241 2"
13 4"
2"
34"
34"
311 2"
4"
4"
BAR 102
LEVEL 1
223
223
WD-01 LOUVERS
FOOTRAIL
MT-01 WD-01 FRAME
& BRACKETS
WD-01 FRAME
00FP1A 00RCP1A
SERIES
GROUP
00CS
2"
D1 D1
AREA
03C 03C
RIBS RIBS
2"
2"
11 2"
Drawn By Date
8"
1
1
BEHIND FRAMED
51 2"
HD 03/13/20
6"
WD-01
8"
LOUVERS
4"
4"
4"
41
13
104
POWDERCOATED METAL - BRASS FINISH
MT-01
1 AGED BRASS LOOK CONTINGENT UPON C.O. APPROVAL
CAB.
24
04A
D
2CM QUARTZ
6
Q-01
SR-S30A
2711 4"
TS30IC
D
TAJ MAHAL QUARTZITE - FINISH TO MATCH CONTROL SAMPLE
12 LIQUOR
DISPLAY
13 4" 5" 701 2" 24" 701 2" 24" 701 2" 5"
TSCE12PS
D
C
INT
D
HD
BAR
102
TSCE12PS
MAIN DINING
DATE
D
C
6
SEATING II
12 LIQUOR
DISPLAY
10
105
301 8" V.I.F.
SR-S30A
TS30IC
D
D
CAB.
24
D
DESCRIPTION
D1 HARDWARE SCHEDULE
REFER TO SERIES 03A 04B 3
A&M 1" HYBRID BRACKET - AMI PART #173269083
FOR FRONT BAR DETAILS 04A MAIN DINING
THESIS SEATING III H-7.96
20
24" X 22", WHITE
REV
D
A
F
2711 4"
8"
301 8" V/I/F/
301 4"
42" A.F.F. 42" A.F.F. 42" A.F.F.
8"
10"
A
04B
FRAMED ARCHES
BY OTHERS
18" 1
701 2" V.I.F. 04A
18"
144" V.I.F.
Scope Description
TILE FINISH TILE FINISH TILE FINISH
BY OTHERS BY OTHERS BY OTHERS
25"
2
Q-01 TOP
BACK BAR
24" 531 4" 471 2" 28" 04A
BAR 102
LEVEL 1
00FP1A 00RCP1A
SERIES
GROUP
H-7.96 00CS
AREA
42"
GRADE REQUIREMENTS:
EQUIPMENT EQUIPMENT EQUIPMENT
BY OTHERS BY OTHERS BY OTHERS
PREMIUM X CUSTOM ECONOMY
Drawn By Date
HD 04/15/20
ALL V.I.F. DIMENSIONS TO BE Project # Submittal #
5" 701 2" V.I.F. 24" V.I.F. 701 2" V.I.F. 24" V.I.F. 701 2" V.I.F. 5" VERIFIED IN THE FIELD
2691 2" V.I.F. 3413 01
ELEVATION - BACK BAR Drawing #
3 SCALE: 1/2"=1'-0" ARCH REF: 2/ID4.03.1
04A
G:\Dropbox\Dropbox\0001 IN-PROGRESS PROJECTS\03- JOINED PROJECTS\20-0302 - ORNO RESTAURANT\01-Working Set (Most Current)\3413 - ORNO RESTAURANT - S-04 - 03-30-20.dwg
FINISH SCHEDULE
POWDERCOATED METAL - BRASS FINISH
MT-01
AGED BRASS LOOK CONTINGENT UPON C.O. APPROVAL
2CM QUARTZ
Q-01
TAJ MAHAL QUARTZITE - FINISH TO MATCH CONTROL SAMPLE
INT
TILE FINISH
BY OTHERS
DATE
301 8" V.I.F.
401 4"
2" 261 8" 2"
41"
DESCRIPTION
LED LIGHTING
HARDWARE SCHEDULE
11 2"
BY OTHERS
11 2"
A&M 1" HYBRID BRACKET - AMI PART #173269083
4"
H-7.96
24" X 22", WHITE
2"
1
MT-01 1 2" x 2"
ANGLE
161 2"
18"
D2 4"x4" FLANGE
04B
REV
D
A
F
DETAIL
11 2" D2
3 1
4"x4" FLANGE MT-01 1" x 4" MT-01 1 2" x 2" TILE FINISH LED LIGHTING
ANGLE ANGLE BY OTHERS BY OTHERS
144" V.I.F.
2"
11 2"
62" GLASS
11 2"
4"
TILE FINISH
BY OTHERS
25"
241 4"
301 8"
261 8"
8"
181
H-7.96
EQUIPMENT
BY OTHERS
Scope Description
11 2"
4"
42"
391 2"
BACK BAR
BAR 102
LEVEL 1
4"
00FP1A 00RCP1A
SERIES
GROUP
00CS
AREA
2"
GRADE REQUIREMENTS:
11 8" 621 4" 11 8"
PREMIUM X CUSTOM ECONOMY
Drawn By Date
3" 641 2" 3"
701 2"
HD 04/15/20
ALL V.I.F. DIMENSIONS TO BE Project # Submittal #
VERIFIED IN THE FIELD
3413 01
Drawing #
SECTION DETAIL
A D1
SCALE: 1-1/2"=1'-0" ARCH REF: 3/ID4.03.1 SCALE: 3"=1'-0" ARCH REF: 5/ID4.03
04B
G:\Dropbox\Dropbox\0001 IN-PROGRESS PROJECTS\03- JOINED PROJECTS\20-0302 - ORNO RESTAURANT\01-Working Set (Most Current)\3413 - ORNO RESTAURANT - S-04 - 03-30-20.dwg
FINISH SCHEDULE
16
6
WD-01 CABINET END 05B WD-01 CABINET END
4/6
INTERIOR CABINET FINISH
MAIN DINING MEL-1
SEATING I MELAMINE: COLOR BLACK
104
72" POWDERCOATED METAL - BRASS FINISH
21" 30" 21" MT-01
AGED BRASS LOOK CONTINGENT UPON C.O. APPROVAL
2CM QUARTZ
6
4"
11 2"
10
Q-01
3
TAJ MAHAL QUARTZITE - FINISH TO MATCH CONTROL SAMPLE
INT
MT-01 METAL MESH STAINED HARDWOOD & VENEER AMERICAN WALNUT
WD-01 1 WD-01
STAIN FINISH TO MATCH CONTROL SAMPLE
20"
05A
213 8"
MEL-1
DATE
MT-01
MAIN DINING
6
SEATING II
10
383 4"
105
45"
6
OPEN FRONT
KITCHEN
21"
109
MEL-1
DESCRIPTION
213 8"
MEL-1
HARDWARE SCHEDULE
16
EMBEDDED DOOR HANDLES W/ AGED BRASS FINISH
7 5 HW-01
82"
11 2"
4"
DOOR HINGE
LOCATION PLAN - FIRST FLOOR
3
HW-03A
K1 SCALE: 1/8"=1'-0" ARCH REF: 1/ID1.01
PLEASE PROVIDE SPECS
MEL-1 DRAWER SLIDE - AMI ITEM #169999003
21"
H-3.4
KV TRU TRACK, 100LBS FULL E., TEL., SIDE MOUNTED, 18"
24"
COLUMN
H-4.0
STANDARD SHELF SUPPORT 5mm X 24mm 282.40.708
383 4"
REV
MAGNETIC CATCH - AMI ITEM #163219220
D
A
F
H-5.0
22" V.I.F.
7"
4-5kg, BLACK 246.29.301
MT-01
13"
WD-01
11 2"
74" 74"
23" 28" 23" 31 2" 16" SHELF 35" SHELF 16" SHELF 31 2" 1" x 1"
1" 1" 1" 1" MT-01
SQUARE TUBE
14" 14"
31 2"
31 2"
1"
1"
1"
Q-01 TOP
19"
BELOW BY OTHERS
39" SHELF
31 2"
FOUNTAIN
37"
46"
37"
BY OTHERS
36" A.F.F.
1"
7 5 7 5
84"
44"
84"
84"
1"
SERVER STATION
Scope Description
24" V.I.F.
24"
COLUMN COLUMN
37"
2"
31
LEVEL 1
4"
3
1"
22" V.I.F.
20"
1"
73 4"
93 4"
14"
1"
1"
00FP1A 00RCP1A
SERIES
GROUP
00CS
31 2"
31 2"
AREA
GRADE REQUIREMENTS:
WD-01 WOOD SHELF
MT-01 2 21"
x2 1
2"
4 4 METAL FLANGE PREMIUM X CUSTOM ECONOMY
Drawn By Date
05B 05B HD 04/15/20
ALL V.I.F. DIMENSIONS TO BE Project # Submittal #
VERIFIED IN THE FIELD
3413 01
COUNTER PLAN - SERVER STATION UPPER SHELF PLAN - SERVER STATION Drawing #
2 SCALE: 3/4"=1'-0" ARCH REF: 2/ID4.05
3 SCALE: 3/4"=1'-0" ARCH REF: 1/ID4.05
05A
G:\Dropbox\Dropbox\0001 IN-PROGRESS PROJECTS\03- JOINED PROJECTS\20-0302 - ORNO RESTAURANT\01-Working Set (Most Current)\3413 - ORNO RESTAURANT - S-05 - 03-30-20.dwg
FINISH SCHEDULE
INTERIOR CABINET FINISH
E D C B MEL-1
MELAMINE: COLOR BLACK
05D 1 05D 05C 05C
1" 1" 1" 3 4"1" 1" 1" 1" 1" 1" POWDERCOATED METAL - BRASS FINISH
14" 303 4" 14" 73 4" 281 4" 37" MT-01
AGED BRASS LOOK CONTINGENT UPON C.O. APPROVAL
1" x 1" 1" x 1"
13 4" 31 4"
13 4" 31 4"
MT-01 MT-01 2CM QUARTZ
SQUARE TUBE SQUARE TUBE Q-01
TAJ MAHAL QUARTZITE - FINISH TO MATCH CONTROL SAMPLE
INT
WINE RACKS WINE RACKS STAINED HARDWOOD & VENEER AMERICAN WALNUT
WD-01
BY OTHERS BY OTHERS
141 2"
141 2"
STAIN FINISH TO MATCH CONTROL SAMPLE
DATE
OPEN OPEN OPEN 3 OPEN OPEN 3
05A 05A
13 4"
13 4"
52"
52"
141 2"
WOOD SHELF WD-01 WOOD SHELF WD-01 TILE CLADDED COLUMN
OPEN OPEN OPEN OPEN BY OTHERS OPEN
DESCRIPTION
13 4"
303 4"
HARDWARE SCHEDULE
2 2 EMBEDDED DOOR HANDLES W/ AGED BRASS FINISH
05A 05A HW-01
OPEN OPEN OPEN OPEN AMI TO PROVIDE OPTIONS FOR REVIEW AND APPROVAL
88"
88"
141 2"
TOP Q-01 TOP Q-01
DOOR HINGE
74" 84"
HW-03A
23" 28" 23" 14" 24" V.I.F. 46" PLEASE PROVIDE SPECS
REV
HW-03A
MAGNETIC CATCH - AMI ITEM #163219220
D
A
F
H-5.0
CABINET END WD-01 4-5kg, BLACK 246.29.301
36"
36"
CABINET END WD-01
72" 82"
4"
13 4" 3 4"
MT-01 MT-01
31
1
134"
WINE RACKS WINE RACKS
BY OTHERS BY OTHERS
141 2"
141 2"
13 4"
13 4"
52"
52"
141 2"
141 2"
OPEN OPEN OPEN OPEN OPEN
WOOD SHELF WD-01
303 4"
4"
13 4"
13
2 2
05A 05A
OPEN OPEN OPEN OPEN
88"
88"
141 2"
141 2"
TOP Q-01 TOP Q-01
74"
1 1
SERVER STATION
Scope Description
05A OPEN OPEN 05A
36"
LEVEL 1
METAL MESH MT-01 OPEN OPEN
FE FE FE FE
00FP1A 00RCP1A
SERIES
GROUP
TOE KICK MT-01 TOE KICK MT-01 00CS
AREA
21" 30" 21" 383 4" 383 4" GRADE REQUIREMENTS:
11 2" 11 2" 11 2"
72" PREMIUM X CUSTOM ECONOMY
Drawn By Date
82"
HD 04/15/20
ELEVATION - SERVER STATION ELEVATION - SERVER STATION ALL V.I.F. DIMENSIONS TO BE Project # Submittal #
6 SCALE: 3/4"=1'-0" ARCH REF: 5/ID4.05
7 SCALE: 3/4"=1'-0" ARCH REF: 4/ID4.05
VERIFIED IN THE FIELD
3413 01
Drawing #
05B
G:\Dropbox\Dropbox\0001 IN-PROGRESS PROJECTS\03- JOINED PROJECTS\20-0302 - ORNO RESTAURANT\01-Working Set (Most Current)\3413 - ORNO RESTAURANT - S-05 - 03-30-20.dwg
FINISH SCHEDULE
INTERIOR CABINET FINISH
MEL-1
MELAMINE: COLOR BLACK
2CM QUARTZ
Q-01
TAJ MAHAL QUARTZITE - FINISH TO MATCH CONTROL SAMPLE
INT
STAINED HARDWOOD & VENEER AMERICAN WALNUT
WD-01
STAIN FINISH TO MATCH CONTROL SAMPLE
DATE
DESCRIPTION
HARDWARE SCHEDULE
EMBEDDED DOOR HANDLES W/ AGED BRASS FINISH
HW-01
AMI TO PROVIDE OPTIONS FOR REVIEW AND APPROVAL
DOOR HINGE
HW-03A
PLEASE PROVIDE SPECS
31 4"
31 4"
H-3.4
16" 16" KV TRU TRACK, 100LBS FULL E., TEL., SIDE MOUNTED, 18"
4"
4"
4"
AMI SUPPORTS - AMI ITEM #153187029
3
3
H-4.0
1"
1"
1"
STANDARD SHELF SUPPORT 5mm X 24mm 282.40.708
REV
MAGNETIC CATCH - AMI ITEM #163219220
D
A
F
WINE RACKS WINE RACKS WINE RACKS H-5.0
4-5kg, BLACK 246.29.301
BY OTHERS BY OTHERS BY OTHERS
141 2"
141 2"
WD-01 WOOD SHELF WD-01 WOOD SHELF
4"
4"
4"
D1 D1 D1
3
3
1"
1"
1"
05E 05E 05E
52"
52"
52"
141 2"
FOUNTAIN
16" BY OTHERS
4"
303 4"
303 4"
3
1"
88"
88"
141 2"
2"
2"
2"
2"
2"
10" VERIFY
11 2"
8"
8"
1" 1" 1"
1
1
1" 1"
1" HW-5.0 HW-5.0
WD-01
123 4"
WOOD OPEN
WD-01 MT-01 METAL MESH MT-01 METAL MESH
CABINET & SHELF
29"
11 2"
30"
30"
30"
30"
30"
30"
SERVER STATION
Scope Description
1
8"
193 8" HW-03A HW-03A
123 4"
H-4.0
LEVEL 1
D4 D4
05E 05E
8"
8"
1
1
11 2"
00FP1A 00RCP1A
SERIES
GROUP
00CS
4"
4"
3
AREA
4"
4"
4"
4"
4"
4"
GRADE REQUIREMENTS:
05C
G:\Dropbox\Dropbox\0001 IN-PROGRESS PROJECTS\03- JOINED PROJECTS\20-0302 - ORNO RESTAURANT\01-Working Set (Most Current)\3413 - ORNO RESTAURANT - S-05 - 03-30-20.dwg
FINISH SCHEDULE
INTERIOR CABINET FINISH
MEL-1
MELAMINE: COLOR BLACK
2CM QUARTZ
Q-01
TAJ MAHAL QUARTZITE - FINISH TO MATCH CONTROL SAMPLE
INT
STAINED HARDWOOD & VENEER AMERICAN WALNUT
WD-01
STAIN FINISH TO MATCH CONTROL SAMPLE
DATE
DESCRIPTION
HARDWARE SCHEDULE
EMBEDDED DOOR HANDLES W/ AGED BRASS FINISH
HW-01
AMI TO PROVIDE OPTIONS FOR REVIEW AND APPROVAL
DOOR HINGE
HW-03A
PLEASE PROVIDE SPECS
31 4"
31 4"
H-3.4
KV TRU TRACK, 100LBS FULL E., TEL., SIDE MOUNTED, 18"
4"
4"
AMI SUPPORTS - AMI ITEM #153187029
3
H-4.0
1"
1"
STANDARD SHELF SUPPORT 5mm X 24mm 282.40.708
REV
MAGNETIC CATCH - AMI ITEM #163219220
D
A
F
WINE RACKS H-5.0
4-5kg, BLACK 246.29.301
BY OTHERS
141 2"
WD-01 WOOD SHELF
4"
4"
D2
3
3
1"
1"
05E
52"
52"
141 2"
141 2"
37"
93 4" 181 2" 181 2"
4"
4"
D3
3
3
1"
1"
05E
88"
141 2"
141 2"
Q-01 TOP Q-01 TOP
3 1" 1" MT-01 2 2" x 2 2" 1" 1" MT-01 2 2" x 2 2"
4" 73 4" 31 2" METAL FLANGE 31 2" 35" 31 2" METAL FLANGE
2"
2"
11 2"
8"
1"
1
1"
1" WD-01 WD-01 HW-5.0
8"
8"
HW-01
6"
111 2"
36" TOP HEIGHT
30"
30"
SERVER STATION
18"
Scope Description
18"
6"
6"
HW-03A
123 4"
LEVEL 1
18" 18"
D4
05E
6"
6"
8"
1
11 2"
00FP1A 00RCP1A
SERIES
GROUP
00CS
4"
3
AREA
4"
4"
GRADE REQUIREMENTS:
05D
G:\Dropbox\Dropbox\0001 IN-PROGRESS PROJECTS\03- JOINED PROJECTS\20-0302 - ORNO RESTAURANT\01-Working Set (Most Current)\3413 - ORNO RESTAURANT - S-05 - 03-30-20.dwg
FINISH SCHEDULE
INTERIOR CABINET FINISH
MEL-1
MELAMINE: COLOR BLACK
2CM QUARTZ
Q-01
TAJ MAHAL QUARTZITE - FINISH TO MATCH CONTROL SAMPLE
INT
STAINED HARDWOOD & VENEER AMERICAN WALNUT
WD-01
STAIN FINISH TO MATCH CONTROL SAMPLE
DATE
DESCRIPTION
HARDWARE SCHEDULE
EMBEDDED DOOR HANDLES W/ AGED BRASS FINISH
HW-01
AMI TO PROVIDE OPTIONS FOR REVIEW AND APPROVAL
DOOR HINGE
NOTE: HW-03A
PLEASE PROVIDE SPECS
FINAL DESIGN PENDING COORDINATION WITH
WD-01 SHELF WD-01 SHELF DRAWER SLIDE - AMI ITEM #169999003
INTERIOR DESIGNER AND LIGHTING DESIGNER.
H-3.4
KV TRU TRACK, 100LBS FULL E., TEL., SIDE MOUNTED, 18"
REV
MAGNETIC CATCH - AMI ITEM #163219220
D
A
F
H-5.0
16" 93 4" 4-5kg, BLACK 246.29.301
21 21 71 4" 21 2"
2" 11" 2"
4"
3
3
4"
4"
13
13
LED LIGHTING LED LIGHTING LED LIGHTING
1"
1"
BY OTHERS BY OTHERS BY OTHERS
WD-01 SHELF
37"
21 2" 16" 16" 21 2"
4"
2"
3
1
13 4"
1 1
2" LED LIGHTING LED LIGHTING 2"
1"
BY OTHERS BY OTHERS
MT-01 TAB WELDED TO TUBE TAB WELDED TO TUBE MT-01 TAB WELDED TO TUBE MT-01
1" 1" 1" 1" 1" 1" 1"
DETAIL
D3 SCALE: 6"=1'-0" ARCH REF: 8/ID4.05
SERVER STATION
Scope Description
HW-03A
1
4"
MT-01 METAL MESH
LEVEL 1
4"
1
1 1
4"x 4" ANGLE MT-01
4"
3
00FP1A 00RCP1A
SERIES
GROUP
1 1
2"x 2" METAL
00CS
MT-01
AREA
CABINET DOOR FRAME
8"
1
3
4"
GRADE REQUIREMENTS:
Drawn By Date
4"
HD 04/15/20
ALL V.I.F. DIMENSIONS TO BE Project # Submittal #
VERIFIED IN THE FIELD
3413 01
DETAIL Drawing #
D4 SCALE: FULL ARCH REF: NONE
05E
G:\Dropbox\Dropbox\0001 IN-PROGRESS PROJECTS\03- JOINED PROJECTS\20-0302 - ORNO RESTAURANT\01-Working Set (Most Current)\3413 - ORNO RESTAURANT - S-05 - 03-30-20.dwg
TO EXISTING EXPOSED CEILING 1 FINISH SCHEDULE
06A
CLG-01 STAINED HARDWOOD & VENEER AMERICAN WALNUT
CLG-01 WD-01
132" STAIN FINISH TO MATCH CONTROL SAMPLE
24" O.C. 84" O.C. 24" O.C. POWDERCOATED METAL - BRASS FINISH
1 MT-01
4"
120 AGED BRASS LOOK CONTINGENT UPON C.O. APPROVAL
83
3
°
°
120
2"
3 7°
°
54°
2
WD-01
INT
4
121 2"
4 5
18"
2 3
06A CLG-02
06A
DATE
2"
4"
3
1
4" x 4'' STEEL BRACKET MT-01
3 7 143° 11
10 2°
06A 6 8 CLG-02
97
°
43 °
9 11
20°
PLAN SECTION - HANGIN PLANTER
43°
1
DESCRIPTION
SCALE: 3/4"=1'-0" ARCH REF: 1/ID4.13 HARDWARE SCHEDULE
STEEL SQUARE PAD EYE
229" A.F.F.
BOLTED TO SOFFIT W/ POWDER
COAT BRASS FINISH.
A PROVIDED BY AMI.
06A INSTALLED BY G.C.
LOCATION PLAN - FIRST FLOOR
K1 SCALE: 1/8"=1'-0" ARCH REF: 1/ID2.01
VERIFY
1
4''STEEL CABLE PLANTER HEIGHT A.F.F.
1
4"
x 4'' CONTINUOUS MT-01 # HEIGHT A.F.F. ROTATION
BENT STEEL BRACKET VERIFY
REV
WD-01 1 83°
D
A
F
2 VERIFY 37°
1 VERIFY
3 120°
5"
06A
4 VERIFY 54°
141 4"
1
5 VERIFY 120°
16"
5"
1
X 41''2'' VERIFY
6 97°
2"
WD-01 CONTINUOUS
1
7 VERIFY 43°
4"
ROUTING CHANNEL
5"
3
HEIGHT A.F.F. 8 VERIFY 143°
1"
REFER TO TABLE
211 211 9 VERIFY 20°
4" 4" 80" 4" 4"
3 3
4" 4" 10 VERIFY 112°
132" 2'' X 2'' X 81''
PRIMED STEEL ANGLE 11 VERIFY 43°
1
4''STEEL CABLE
1
4"
x 4'' CONTINUOUS MT-01
BENT STEEL BRACKET
229" A.F.F. STEEL SQUARE PAD EYE
PLANTS BOLTED TO SOFFIT W/ POWDER
BY OTHERS COAT BRASS FINISH.
PROVIDED BY AMI.
1 INSTALLED BY G.C.
06A
16"
1 1
VERIFY
22" 4" 80" 4" 22"
132"
WD-01
ELEVATION - HANGING PLANTER
3 SCALE: 3/4"=1'-0" ARCH REF: 3/ID4.13
1
4''STEEL CABLE
HANGING PLANTERS
1
23 4"
4''STEEL CABLE
Scope Description
5"
SYSTEM
2"
1
181 2"
1
2 MT-01 4"x 4'' CONTINUOUS WD-01
BENT STEEL BRACKET 1 2'' X 2'' X 81''
16"
11"
4" x 4'' CONTINUOUS
5"
181 2"
LEVEL 1
BENT STEEL BRACKET 1 1
ANGLE 2'' X 4''
2"
WD-01 CONTINUOUS
1
ROUTING CHANNEL
2"
WD-01
5"
1
X 14'' CONTINUOS ROUTING
2''
23 4"
00FP1A 00RCP1A
SERIES
00CS
GROUP
1"
CHANNEL
AREA
16"
18"
3 161 2" 3 GRADE REQUIREMENTS:
THRU BOLT FOR BRACKET FASTENING 1 4" 4"
4" 18 2" 18"
SYSTEM Drawn By Date
PREMIUM X CUSTOM ECONOMY
18" WD-01
HD 04/15/20
ALL V.I.F. DIMENSIONS TO BE Project # Submittal #
ELEVATION - HANGING PLANTER ISOMETRIC - METAL STRAP SECTION VERIFIED IN THE FIELD
4 ISO A
SCALE: 3/4"=1'-0" ARCH REF: 4/ID4.13 SCALE: 1-1/2"=1'-0" ARCH REF: NONE SCALE: 1-1/2"=1'-0" ARCH REF: 5/ID4.13
3413 01
Drawing #
06A
G:\Dropbox\Dropbox\0001 IN-PROGRESS PROJECTS\03- JOINED PROJECTS\20-0302 - ORNO RESTAURANT\01-Working Set (Most Current)\3413 - ORNO RESTAURANT - S-06 - 03-30-20.dwg
FINISH SCHEDULE
2 HOSTESS
101
07A
13
CAB.
24
INT
D
6
SR-S30A
TS30IC
D
D
12 LIQUOR
DISPLAY
TSCE12PS
DATE
D
C
D CAB.
2
LIBRARY 07A
DESCRIPTION
103 THESIS
20
HARDWARE SCHEDULE
A: 3,437 SQ.F
21 2"
REV
D
4"
F
11 2"
3
4"
3 3
4" 4"
721 2"
3
21 2" 21 2"
V.I.F.
8"
D1
11" 07A
8" V.I.F.
11"
2
07A
PLAN - ARCHWAY
1 SCALE: 1/2"=1'-0" ARCH REF: 1/ID1.01
4" V
51
PAINT GRADE.
JAMB AND CASING
PAINT
BY OTHERS
1441 2" V.I.F.
1451 2"
OPEN
Scope Description
1
07A
ARCHWAY
LEVEL 1
00FP1A 00RCP1A
SERIES
00CS
GROUP
AREA
GRADE REQUIREMENTS:
701 2" V.I.F.
PREMIUM
Drawn By Date
X CUSTOM ECONOMY
671 2"
21 2" 21 2" HD 04/15/20
721 2"
ALL V.I.F. DIMENSIONS TO BE Project # Submittal #
VERIFIED IN THE FIELD
ELEVATION - ARCHWAY 3413
2 SCALE: 1/2"=1'-0" ARCH REF: 1/ID3.01
01
Drawing #
07A
G:\Dropbox\Dropbox\0001 IN-PROGRESS PROJECTS\03- JOINED PROJECTS\20-0302 - ORNO RESTAURANT\01-Working Set (Most Current)\3413 - ORNO RESTAURANT - S-07 - 03-30-20.dwg
12 LIQUOR
DISPLAY
FINISH SCHEDULE
SR-S30A
TS30IC
D
D
PAINT - BENJAMIN MOORE
CAB.
24
PT-1
HIDDEN SAPPHIRE CSP-690 - HIGH GLOSS FINISH
D
PAINT - BENJAMIN MOORE
PT-2
FRENCH QUARTER GOLD 287 - HIGH GLOSS FINISH
1
09A
INT
LIBRARY
103 THESIS
20
A: 3,437 SQ.F
DATE
OUTDOOR
20
SEATING II
DESCRIPTION
108
HARDWARE SCHEDULE
PT-2
THIS TRIM DOESN'T BUTT JOINT
AGAINST BASE. VERIFY IF ACCEPTABLE LOCATION PTAN - FIRST FLOOR
K1 SCALE: 1/8"=1'-0" ARCH REF: 1/ID1.01
4"
3
4"
3
2"
21 4"
1
11""
2
REV
PT-1 TRIM
D
A
F
13 4" 3
4"
3
4" 13 4"
21 2" 3" 21 2" 1" PT-1
1
2"
PT-1
201 2" 201 2" 201 2" 201 2" 201 2" 201 2" 201 2" 201 2" 201 2" 201 2" 201 2" 201 2" 201 2"
103 4"
103 4"
OPEN OPEN OPEN OPEN OPEN OPEN OPEN OPEN PT-2 TYP. OPEN OPEN OPEN OPEN
4"
INTERIOR
3
11 2"
8" 19" 19" 19" 19" 19" 19" 19" 19" 19" 19" 19" 19" 19"
8"
11 2"
11 2" 11 2" 11 2" 11 2" 11 2" 11 2" 11 2" 11 2" 11 2" 11 2" 11 2" 11 2" 11 2" 11 2"
19"
OPEN 3
09B
11 2"
201 2"
OPEN
19"
11 2"
PT-1 TRIM
201 2"
OPEN
19"
1"
11 2"
2"
1
144"
2
11 2"
13 4"
09B
21 2"
PT-2
LIBRARY BOOKCASE
4"
201 2"
19"
TYP. PT-2
Scope Description
INT.
11 2"
3"
8"
LIBRARY 103
PT-1 TRIM
201 2"
OPEN
19"
4"
3
LEVEL 1
21 2"
13 4"
11 2"
OPEN
201 2"
19"
103 4" 3
00FP1A 00RCP1A
SERIES
GROUP
4" 00CS
AREA
PT-1 SIDE PANEL 13 4" 3
4"
3
4" 13 4"
1" 21 2" 3" 21 2" GRADE REQUIREMENTS:
4"
11 2"
1
3
8"
2" 8"
Drawn By
PREMIUM X CUSTOM ECONOMY
Date
103 4"
3
4"
TRIM PT-1 HD 04/15/20
ALL V.I.F. DIMENSIONS TO BE Project # Submittal #
VERIFIED IN THE FIELD
1
PTAN VIEW - LIBRARY BOOKCASE 3413 01
SCALE: 1/2"=1'-0" ARCH REF: 1/ID4.07
Drawing #
09A
G:\Dropbox\Dropbox\0001 IN-PROGRESS PROJECTS\03- JOINED PROJECTS\20-0302 - ORNO RESTAURANT\01-Working Set (Most Current)\3413 - ORNO RESTAURANT - S-09 - 03-30-20.dwg
FINISH SCHEDULE
A
PAINT - BENJAMIN MOORE
09C FRAME PT-1 PT-1
HIDDEN SAPPHIRE CSP-690 - HIGH GLOSS FINISH
4"
PT-2
FRENCH QUARTER GOLD 287 - HIGH GLOSS FINISH
131 2"
131 2"
INT
OPEN OPEN OPEN OPEN OPEN OPEN
DATE
TRIM PT-1
441 2"
1
OPEN OPEN OPEN OPEN OPEN OPEN 09A
DESCRIPTION
PT-2 HARDWARE SCHEDULE
OPEN OPEN OPEN OPEN OPEN
TYP.
INTERIOR
156" V.I.F.
146"
1421 2"
2"
1421
OPEN OPEN OPEN OPEN OPEN OPEN
REV
D
A
F
98"
9
09C
293" V.I.F.
11 2" 11 2" 11 2" 11 2" 11 2" 11 2" 11 2" 11 2" 11 2" 11 2" 11 2" 11 2" 11 2" 11 2"
103 4" 8" 19" 19" 19" 19" 19" 19" 19" 19" 19" 19" 19" 19" 19" 8"
4"
1
OPEN OPEN OPEN OPEN OPEN OPEN OPEN OPEN OPEN OPEN OPEN OPEN OPEN 09A
FRAME PT-1
1 "
3 4
R2
31 R2
156" V.I.F.
4"
146"
LIBRARY BOOKCASE
Scope Description
FRAME PT-1
LIBRARY 103
LEVEL 1
00FP1A 00RCP1A
SERIES
GROUP
00CS
AREA
GRADE REQUIREMENTS:
INT
DATE
103 4" 103 4"
D1 D1
IN-WALL BLOCKING
IN-WALL BLOCKING
09C 09C
4"
4"
131 2"
131 2"
BY OTHERS
BY OTHERS
PT-1 FRAME PT-1 FRAME
91 2"
91 2"
DESCRIPTION
HARDWARE SCHEDULE
INTERIOR
PT-2
191 2"
191 2"
103 4" CAB.
INTERIOR DEPTH
OPEN
OPEN PT-2 FIXED SHELF
REV
D
A
F
11 2"
11 2"
441 2"
FRAME'S
PT-2
18"
1 8"
791 4" CAB. HEIGHT
1 11 8"
4"
11 2"
51 2"
PT-1 FRAME'S FRONT EDGE
8"
8"
OPEN FRAME'S
3
PT-1 FRONT
EDGE
18"
2"
103 4" CAB.
1
DEPTH
1"
11 2"
CROWN
PT-1
MOULDING
31 4"
4"
8"
1
4"
1361 2"
PT-2
4"
IN-WALL BLOCKING
3
18"
1411 4" A.F.F.
PT-1
BY OTHERS
13 8"
1
11 2"
8"
8"
18"
3
PT-2
92"
98"
1
2"
11 2"
581 4" CAB. HEIGHT
PT-2
SCALE: 1'-0"=1'-0" ARCH REF: NONE
611 2" A.F.F.
LIBRARY BOOKCASE
Scope Description
11 2"
LIBRARY 103
21 2"
LEVEL 1
1
2"
PT-1
18"
PT-2
4"
1
00FP1A 00RCP1A
SERIES
GROUP
00CS
4"
AREA
3
2"
1"
1"
1
GRADE REQUIREMENTS:
51 4"
6"
6"
4"
Drawn By
1
09C
G:\Dropbox\Dropbox\0001 IN-PROGRESS PROJECTS\03- JOINED PROJECTS\20-0302 - ORNO RESTAURANT\01-Working Set (Most Current)\3413 - ORNO RESTAURANT - S-09 - 03-30-20.dwg
FINISH SCHEDULE
INT
EL. 13'-0"
1 TO GYPSUM BOARD A.F.F.
DATE
EL. 19'-1"
10A CLG-03
TO EXISTING EXPOSED CEILING
DESCRIPTION
HARDWARE SCHEDULE
310" V.I.F.
REV
131 4" 2781 8" 185 8"
D
A
F
Architect Name and Address
131 4"
4"
TYP.
31 2"
10"
TYP.
31 2"
R2 3
4"
156" A.F.F. D1
CEILING HEIGHT
EQ.
10A
R1
Scope Description
LIBRARY CEILING
LIBRARY 103
LEVEL 1
31 2" 00FP1A 00RCP1A
SERIES
00CS
GROUP
AREA
3
4"
GRADE REQUIREMENTS:
8"
PREMIUM
Drawn By Date
X CUSTOM ECONOMY
3
HD 04/15/20
ALL V.I.F. DIMENSIONS TO BE Project # Submittal #
PAINT GRADE TRIM.
VERIFIED IN THE FIELD
DETAIL
PAINT
BY OTHERS 3413 01
D1 SCALE: 12"=1'-0" ARCH REF: NONE Drawing #
10A
G:\Dropbox\Dropbox\0001 IN-PROGRESS PROJECTS\03- JOINED PROJECTS\20-0302 - ORNO RESTAURANT\01-Working Set (Most Current)\3413 - ORNO RESTAURANT - S-10 - 03-30-20.dwg
FINISH SCHEDULE
16
INTERIOR CABINET FINISH
MEL-1
MELAMINE: COLOR BLACK
MAIN DINING STAINED HARDWOOD & VENEER AMERICAN WALNUT
SEATING III
WD-01
A: 3,437 SQ.F 106 STAIN FINISH TO MATCH CONTROL SAMPLE
5
11A
12
INT
3 30" 3
4" 4"
281 2"
6
4"
DATE
3
53 4"
OUTDOOR
8
1 SEATING I
18"
4 11A 107
INDICATES
111 2"
11A
SHELF ABOVE
DESCRIPTION
HARDWARE SCHEDULE
WD-01 VENEER TOP
AMI HINGE 75T1580 - AMI ITEM #153168015
BELOW
H-1.0
PLATE BLUM 174H7100E - AMI ITEM #153168016
3
DRAWER SLIDE - AMI ITEM #153211003
11A LOCATION PLAN - FIRST FLOOR H-3.2
K1 SCALE: 1/8"=1'-0" ARCH REF: 1/ID1.01
KV TRU TRACK, 100LBS FULL E., TEL., SIDE MOUNTED, 14"
REV
4" CASTERS - (2) AT FRONT TO BE LOCKABLE
D
A
F
HW-04
HEAVY DUTY
18"
61 8" 117 8"
111 2"
WD-01
15"
30"
31 2"
"
R3 R1"
WD-01
MEL-1
18"
WD-01 SHELF
50"
WD-01
CASTERS SECURED WITH 54"
HW-04 18"
THRU-BOLTS
35"
3
4"
53 4"
4"
3
HW-04
3" 3" INDICATES
3 SIDE PANEL BEYOND
4"
4"
11A WD-01
20"
161 4"
PLAN SECTION - OUTDOOR POS STATION SIDE ELEVATION - OUTDOOR POS STATION
2 SCALE: 3/4"=1'-0" ARCH REF: NONE
4 SCALE: 3/4"=1'-0" ARCH REF: 2/ID4.08
4"
11A
3
CUTLERY
4"
1
A WD-01 SHELF DRAWER W/
11A 30" 14" DIVIDERS
23 4"
3
3 4"
6"
4"
4"
1 281 2" H-3.2
30" 11A
54"
8"
3"
1
1
HW-01
11A MLE-1
CUTLERY
17"
DRAWER W/
VENEEER TOP WD-01 DIVIDERS. 161 4" CAB. DEPTH
3
22"
HW-01
491 4"
Scope Description
H-4.0
54"
54"
331
WD-01 WD-01
POS STATION
2
EQ. EQ. EQ. EQ. WD-01
2 11A
OUTDOOR
11A
30"
LEVEL 1
H-1.0
4" 8"
1
3" 3" HW-04 3" 3"
3
4"
SERIES
GROUP
HW-04 00CS
3
4"
AREA
4"
4"
11A
C:\Users\yilmera.Lenovo-PC\Dropbox\01 HIDDEN DRAFTSMAN LLC\0001 IN-PROGRESS PROJECTS\03- JOINED PROJECTS\20-0302 - ORNO RESTAURANT\01-Working Set (Most Current)\3413 - ORNO RESTAURANT - S-11 - 03-30-20.dwg
FINISH SCHEDULE
10
FIBER REINFORCED PLASTIC
FRP-01
BLACK COLOR
OPEN BACK POWDERCOATED METAL - BRASS FINISH
KITCHEN
MT-01
110 AGED BRASS LOOK CONTINGENT UPON C.O. APPROVAL
2CM QUARTZ
MAIN DINING
SEATING II
Q-01
10
TAJ MAHAL QUARTZITE - FINISH TO MATCH CONTROL SAMPLE
INT
105
STAINED HARDWOOD & VENEER AMERICAN WALNUT
6
WD-01
STAIN FINISH TO MATCH CONTROL SAMPLE
1 OPEN FRONT
DATE
KITCHEN
12A
109
16
MAIN DINING
SEATING III
G
106
DESCRIPTION
HARDWARE SCHEDULE
12
A&M 1" CONCEALED BRACKET - AMI PART #173269068
H-7.81
W/18" SUPPORT ARM WHITE 1/4" STEEL
REV
D
A
F
8"
4
63
R9
12B
36" A.F.F.
H-7.158
301 2"
363 4"
4"
36" A.F.F.
363
18"
2"
31 1
543 4"
R1
12B
48" A.F.F.
61 4"
18"
2"
H-7.81
R1
FIELD SEAM
176"
3 4"
E
1" 1"
86 7
65" VERIFY 49" VERIFY 49" VERIFY
FRONT COUNTER
Scope Description
8"
705 8"
102 1
4"
5 12 "
LEVEL 1
BY OTHERS BY OTHERS BY OTHERS 12B
R1
45 3
4" E
Q.
137 1
211 2"
8"
FINISHED
WD-01
END 00FP1A 00RCP1A
SERIES
GROUP
00CS
45 3 "
AREA
4 EQ.
11 2"
DIVIDER SUPPORTS
GRADE REQUIREMENTS:
WD-01 WD-01 SHELVES
LOCATIONS COORDINATED W/ DESIGNERS
PREMIUM X CUSTOM ECONOMY
Drawn By Date
HD 04/15/20
321 2" 321 2" 321 2" 321 2" 37"
11 2" 11 2" 11 2" 11 2" 11 2" 11 2" ALL V.I.F. DIMENSIONS TO BE Project # Submittal #
1371
VERIFIED IN THE FIELD
2" FOOTRAIL
2CM QUARTZ
Q-01
TAJ MAHAL QUARTZITE - FINISH TO MATCH CONTROL SAMPLE
INT
C A B STAINED HARDWOOD & VENEER AMERICAN WALNUT
12C Q-01 TOPS 12C 12C Q-01 ADA TOP WD-01
STAIN FINISH TO MATCH CONTROL SAMPLE
DATE
140" 36" 1
12A
Q-01 TOP
6"
12"
6"
8"
11 2" TYP. 2
12A
DESCRIPTION
SHELVES WD-01
48"
HARDWARE SCHEDULE
42"
36"
34"
A&M 1" CONCEALED BRACKET - AMI PART #173269068
H-7.81
W/18" SUPPORT ARM WHITE 1/4" STEEL
1371 2" FOOTRAIL
453 4" EQ. 453 4" EQ. 453 4" EQ. CENTERLINE STEEL PLATE - AMI PART #153168310
FE FE H-7.158
WITH 4 OFF SET MOUNTING HOLES, 18" WHITE
53 4" 1371 8" 321 2" 321 2" 321 2" 321 2" 37"
11 2" 11 2" 11 2" 11 2" 11 2" 11 2"
1427 8" 176"
REV
FRAME FOOTRAIL
BASE MT-01 WD-01 MT-01 MT-01 BASE
D
A
E
DIVIDER SUPPORTS
F
WD-01 FLATTENED ELEVATION - KITCHEN COUNTER EXPO & LOUVERS & BRACKETS
LOCATIONS COORDINATED W/ DESIGNERS
3 SCALE: 1/2"=1'-0" ARCH REF: 3/ID4.12
63 4"
2
12A
36"
223 4"
FINISHED
WD-01
411 4" 411 4" 411 4" 411 4" 437 16" 437 16" END
FE FE
4"
49" 49" 65"
1" 1"
51 2" 165" 51 2" 867 8" 53 4"
MT-01 BASE
176" 925 8"
REMOVABLE REMOVABLE
FRP-01 1" x 1" STAINLESS LEGS FRP-01
PANELS PANELS
FLATTENED ELEVATION - KITCHEN COUNTER EXPO
543 4"
18" 363 4" 1
FRONT COUNTER
Scope Description
2
161 2" 12A
48"
48"
34"
FINISHED
LEVEL 1
WD-01
END
363 4"
00FP1A 00RCP1A
SERIES
GROUP
00CS
AREA
MT-01 BASE
GRADE REQUIREMENTS:
12B
G:\Dropbox\Dropbox\0001 IN-PROGRESS PROJECTS\03- JOINED PROJECTS\20-0302 - ORNO RESTAURANT\01-Working Set (Most Current)\3413 - ORNO RESTAURANT - S-12 - 03-30-20.dwg
FINISH SCHEDULE
TOP Q-01
FIBER REINFORCED PLASTIC
FRP-01
BLACK COLOR
543 4"
POWDERCOATED METAL - BRASS FINISH
301 2" 61 4" 18" MT-01
AGED BRASS LOOK CONTINGENT UPON C.O. APPROVAL
2CM QUARTZ
Q-01
TAJ MAHAL QUARTZITE - FINISH TO MATCH CONTROL SAMPLE
INT
1 1
8" x 8" QUIRK STAINED HARDWOOD & VENEER AMERICAN WALNUT
WD-01
STAIN FINISH TO MATCH CONTROL SAMPLE
6"
WD-01 - Q-01 TOP LED LIGHTING
DATE
BY OTHERS
12"
21 2"
11 2"
18"
TOP Q-01
H-7.81
21 2"
WD-01 FRAME
DESCRIPTION
HARDWARE SCHEDULE
281 4"
1" 1" 1"
71 2"
A&M 1" CONCEALED BRACKET - AMI PART #173269068
H-7.81
W/18" SUPPORT ARM WHITE 1/4" STEEL
1" x 1" BEHIND FRAMED
STAINLESS LEGS WD-01 CENTERLINE STEEL PLATE - AMI PART #153168310
LOUVERS
H-7.158
30°
8"
WITH 4 OFF SET MOUNTING HOLES, 18" WHITE
1
WD-01 LOUVERS
48"
WD-01 LOUVERS
321 2"
42"
REMOVABLE
FRP-01
PANELS
REV
13 4"
2"
D
A
F
36"
331 2"
223 4"
EQUIPMENT D1
2"
RIBS
11 2"
8"
1
BEHIND FRAMED
WD-01
51 2"
6" LOUVERS
4"
4"
51 2"
MT-01 BASE
SECTION DETAIL
A D1
TOP Q-01
543 4"
1
8" x 1 8" QUIRK
TOP Q-01
14"
21 4"
21 2"
21 2"
281 4"
1" 1" 1" H-7.158
71 2"
71 2"
11 2"
18"
1" x 1"
123 8"
STAINLESS LEGS H-7.81
8"
WD-01 FRAME
8"
1
WD-01 SHELVES
48"
BEHIND FRAMED
WD-01 211 4"
FRONT COUNTER
Scope Description
LOUVERS
REMOVABLE
21 2"
FRP-01
PANELS
293 4"
WD-01 LOUVERS
241 2"
36"
36"
333 4"
331 2"
34"
223 4"
223 4"
LEVEL 1
EQUIPMENT D1
BY OTHERS WD-01 FACE FRAME
12C
123 8"
FOOTRAIL
MT-01 REMOVABLE
& BRACKETS FRP-01
PANELS 00FP1A 00RCP1A
SERIES
GROUP
00CS
AREA
RIBS RIBS GRADE REQUIREMENTS:
21 2"
8"
8"
Drawn By Date
1
HD 04/15/20
6"
4"
4"
4"
4"
11 2" ALL V.I.F. DIMENSIONS TO BE Project # Submittal #
VERIFIED IN THE FIELD
51 2" 93 4" 43 4" 221 4"
3413 01
MT-01 BASE MT-01 BASE
Drawing #
SECTION SECTION
B C
SCALE: 1-1/2"=1'-0" ARCH REF: 5/ID4.12 SCALE: 1-1/2"=1'-0" ARCH REF: 4/ID4.12
12C
G:\Dropbox\Dropbox\0001 IN-PROGRESS PROJECTS\03- JOINED PROJECTS\20-0302 - ORNO RESTAURANT\01-Working Set (Most Current)\3413 - ORNO RESTAURANT - S-12 - 03-30-20.dwg
EL. 9'-0"
TO GYPSUM BOARD A.F.F. FINISH SCHEDULE
8" WOOD PLANK CLADDING
CLG-02
SOLID WOOD - FIRE TREATED WALNUT
CLG-04
HOLLOW METAL STEEL FRAME
MT-04
CLG-02 GALBANIZED FINISH
CHEMETAL
1 MT-05
KITCHEN HOOD PLEASE PROVIDE FINISH
INT
13A
DATE
CLG-02
KITCHEN
HOOD
DESCRIPTION
HARDWARE SCHEDULE
REV
D
A
F
Architect Name and Address
3
4" PLYWOOD FRAMING
1805 8"
92
1 16"
30"
92 1
16 "
3107 8"
METAL LAMINATE
2 MT-05
FACE
13A
KITCHEN CANOPY
Scope Description
1 21" SQUARE TUBING
ANCHORING SYSTEM
BY AMI
LEVEL 1
451 2"
1
00FP1A 00RCP1A
SERIES
GROUP
13A 00CS
AREA
GRADE REQUIREMENTS:
8"
8"
108" A.F.F.
PREMIUM X CUSTOM ECONOMY
Drawn By Date
3107 8" 3 HD 04/15/20
METAL LAMINATE 13B
FACE
MT-05 ALL V.I.F. DIMENSIONS TO BE Project # Submittal #
VERIFIED IN THE FIELD
3413 01
ELEVATION - KITCHEN CANOPY @ OPEN FRONT KITCHEN Drawing #
2 SCALE: 1/2"=1'-0" 1/ID3.03
13A
G:\Dropbox\Dropbox\0001 IN-PROGRESS PROJECTS\03- JOINED PROJECTS\20-0302 - ORNO RESTAURANT\01-Working Set (Most Current)\3413 - ORNO RESTAURANT - S-13 - 03-30-20.dwg
FINISH SCHEDULE
8" WOOD PLANK CLADDING
CLG-02
SOLID WOOD - FIRE TREATED WALNUT
CHEMETAL
MT-05
PLEASE PROVIDE FINISH
INT
DATE
DESCRIPTION
HARDWARE SCHEDULE
REV
D
A
F
Architect Name and Address
G.C Name and Address
793 8"
541 8"
108" A.F.F.
1121 2"
773 8"
KITCHEN CANOPY
Scope Description
LEVEL 1
8"
TYP.
1305 16" 1809 16"
3107 8"
00FP1A 00RCP1A
SERIES
GROUP
00CS
CLG-02 WOOD PLANK
AREA
2
13A GRADE REQUIREMENTS:
13B
G:\Dropbox\Dropbox\0001 IN-PROGRESS PROJECTS\03- JOINED PROJECTS\20-0302 - ORNO RESTAURANT\01-Working Set (Most Current)\3413 - ORNO RESTAURANT - S-13 - 03-30-20.dwg
FINISH SCHEDULE
8" WOOD PLANK CLADDING
CLG-02
SOLID WOOD - FIRE TREATED WALNUT
CHEMETAL
MT-05
PLEASE PROVIDE FINISH
INT
DATE
STEEL PLATE POWDER
COATED IN AGED BRASS FINISH.
ATTACHED TO IN-WALL STRUCTURAL
SUPPORTS BY G.C.
2X10 SOLID WOOD BLOCKING BY G.C. AMI TO COORDINATE LOCATIONS WITH G.C.
DESCRIPTION
HARDWARE SCHEDULE
REV
BY AMI
D
A
F
Architect Name and Address
475 8"
1
4" PLATE STEEL SADDLE AT EACH
SUPPORT LOCATION. BOLTED WITH
8"
773 8"
SECTION
A SCALE: 1-1/2"=1'-0" ARCH REF: NONE
2"
1
4"
6"
SUBSTRATE
71
8"
KITCHEN CANOPY
Scope Description
METAL LAMINATE
MT-05
FACE
4"
3
2"
LEVEL 1
1
4"
1
VENEER STAINED
CLG-02 WOOD PLANK TO MATCH CLG-02
00FP1A 00RCP1A
SERIES
GROUP
00CS
AREA
GRADE REQUIREMENTS:
13C
G:\Dropbox\Dropbox\0001 IN-PROGRESS PROJECTS\03- JOINED PROJECTS\20-0302 - ORNO RESTAURANT\01-Working Set (Most Current)\3413 - ORNO RESTAURANT - S-13 - 03-30-20.dwg
FINISH SCHEDULE
1
14A POWDERCOATED METAL - BRASS FINISH
MT-01
AGED BRASS LOOK CONTINGENT UPON C.O. APPROVAL
H
STAINED HARDWOOD & VENEER AMERICAN WALNUT
C WD-01
H STAIN FINISH TO MATCH CONTROL SAMPLE
D
KITCHEN
SCULLERY
111
1"
4/6
INT
D
BACK PREP
KITCHEN
113
DATE
157 8"
H
PREP
C
KITCHEN WALK-IN
COOLER
OPEN BACK 112
KITCHEN
110
DESCRIPTION
HARDWARE SCHEDULE
1" 3 "
4
LOCATION PLAN - FIRST FLOOR
46" V.I.F. K1 SCALE: 1/8"=1'-0" ARCH REF: 1/ID1.01
43" SHELF METAL TAB WELDED TO FRAME
TO FIX SHLEVES
161 8"
1"
REV
WD-01
D
A
F
181 2" V.I.F.
18" SHELF
18" SHELF
16"
1" 1"
16"
2
14A
161 8"
PLAN VIEW - KITCHEN SHELVING UNIT (4 EA REQ'D)
1 SCALE: 3/4"=1'-0" ARCH REF: 1/ID1.01
WD-01 TYP.
A 1''X1'' STEEL
1" 3 "
4
14A MT-01 TUBE FRAME
OPEN
157 8"
161 8"
134"
161 8"
OPEN
1" 3 "
4
METAL TAB
WELDED TO FRAME
OPEN
161 8"
TO FIX SHELVED
WD-01
161 8"
13 4"
108"
161 8"
OPEN
1
1" 3 "
Scope Description
161 8"
OPEN
161 8"
134"
LEVEL 1
1''X1'' STEEL
MT-01 TUBE FRAME
STRUCTURE
OPEN
161 8"
HEAVY DUTY
LEVELERS
1" 3 "
00FP1A 00RCP1A
SERIES
GROUP
00CS
4
AREA
134"
43"
1" 1" 16"
45" FRAME 1" 1"
18" OVERALL
PREMIUM X CUSTOM ECONOMY
Drawn By Date
46" V.I.F.
HD 03/13/20
ALL V.I.F. DIMENSIONS TO BE Project # Submittal #
VERIFIED IN THE FIELD
SECTION
2
ELEVATION - KITCHEN SHELVING UNIT (4 EA REQ'D)
SCALE: 3/4"=1'-0" ARCH REF: 3/ID4.11
A SCALE: 1-1/2"=1'-0" ARCH REF: 4/ID4.11
3413 01
Drawing #
14A
C:\Users\yilmera.Lenovo-PC\Dropbox\01 HIDDEN DRAFTSMAN LLC\0001 IN-PROGRESS PROJECTS\03- JOINED PROJECTS\20-0302 - ORNO RESTAURANT\01-Working Set (Most Current)\3413 - ORNO RESTAURANT - S-14 - 03-30-20.dwg
FINISH SCHEDULE
POWDERCOATED METAL - BRASS FINISH .
MT-01
AGED BRASS LOOK CONTINGENT UPON C.O. APPROVAL
H
C
H
STAINED HARDWOOD & VENEER AMERICAN WALNUT
D WD-01
KITCHEN
STAIN FINISH TO MATCH CONTROL SAMPLE
16
SCULLERY
1 111
4/6
15A
INT
BACK PREP
KITCHEN
113
DATE
10
H
PREP
C
KITCHEN WALK-IN
COOLER
OPEN BACK 112
KITCHEN
110
DESCRIPTION
GAP BETWEEN WOOD SHELVES. HARDWARE SCHEDULE
6
STEEL TUBE EXPOSED BEYOND
OPEN FRONT
METAL TAB WELDED TO FRAME
1''X1'' STEEL TUBE FRAME TO FIX SHLEVES
MT-01
STRUCTURE LOCATION PLAN - FIRST FLOOR
K1 SCALE: 1/8"=1'-0" ARCH REF: 1/ID1.01
1"
WD-01
20"
18"
15A
REV
D
A
F
1"
1
1''X1'' STEEL TUBE FRAME
131 4"
STRUCTURE
1/ 2'' X1/ 2'' STEEL
MT-01 TUBE SCREWED TO
1" METAL FRAME
13 4"
131 4"
WD-01
45"
13 4"
108" A.F.F.
131 4"
131 4"
1 1 1 1 1 1
2" 2" 2" 2" 2" 2"
60" 60" 60"
1" 1" 1" 1" WD-01
184"
1" 3 4"
45"
WD-01
Scope Description
108" A.F.F.
1''X1'' STEEL TUBE FRAME
MT-01
STRUCTURE
131 4"
1" 3 4"
LEVEL 1
1''X1'' STEEL
13 4"
131 4"
FRAME
45"
00FP1A 00RCP1A
SERIES
GROUP
WD-01
00CS
2"
AREA
1
WD-01
13 4"
2"
1" 3 4"
1" METAL FRAME
HD 03/30/20
1"
18" 1" ALL V.I.F. DIMENSIONS TO BE Project # Submittal #
13 4"
15A
C:\Users\yilmera.Lenovo-PC\Dropbox\01 HIDDEN DRAFTSMAN LLC\0001 IN-PROGRESS PROJECTS\03- JOINED PROJECTS\20-0302 - ORNO RESTAURANT\01-Working Set (Most Current)\3413 - ORNO RESTAURANT - S-15 - 03-30-20.dwg