Download as pdf or txt
Download as pdf or txt
You are on page 1of 5

RUSUME

Mailing Address :- Mohammed.arby85@gmail.com

MOHAMMED ABDEL SATTAR

OBJECTIVE

To be sincere with my profession and to achieve the highest of my field, looking


forward toward working for an interactive media and being effective and
beneficial in its business promotion. Desiring to work in rapidly changing
environment requiring high analytic and decision-making skills at a challenging
position

PERSONAL PROFILE:

Father’ Name : Abdel Sattar


Date of Birth : 07-03-1985
Nationality : Egypt
Passport No : A14631144
Marital Status : Married

Professional Qualifications

Bachelor of Commerce from South Valley University 2007.

WORK EXPERIENCE:

14 Years works in (XTRA MIX CONCRETE SOLUTIONS ABU DHABI – QATAR ) A MEMBER
OF AL JABER GROUP)

Position Period
Dispatcher June 2008 : March 2010
Plant & Site foreman March 2010 : August 2013
Plant supervisor August 2013 : January 2015
Plant Manager January 2015 : May 2018
Production & Logistic Manager May 2018 till now
Company : XTRAMIX CONCRETE SOLUTIONS – ABU DHABI
POSITION : DISPATCHER
PERIOD : june 2008 to March 2010

· Fully understand the Routes & Traffic of the area and Customers’ needs
· Knowledge of the Customers and the area, in conjunction with the
instructions from direct manager, to prioritize all orders received for the
following day & to make the daily Branch Dispatch Programs
· Setting the Daily Plant Based Programs for all batching Plants in the Area.
· Establish fleet requirements (TM”S & Pumps) for each Program and ensure
all Branches share resources to each achieve efficient distribution.
· Quickly react to break-downs or customer order changes, to reschedule and
minimize disruption to the overall program.
· Coordination between the departments (maintenance, Sales and technical).

COMPANY : XTRAMIX CONCRETE SOLUTIONS –ABU DHABI


POSITION : Plant & Site Foreman
PERIOD : March 2010 :August 2013

1. To follow up on all sites allocated, to ensure the smooth and efficient supply of concrete to
sites.
This will involve
v Coordination with Customers if they are delaying on site
v Pre-delivery site inspections to establish suitability of access, roads and pump
requirements
v Coordination with Dispatcher
v Checking Pumps Drivers performance
v Checking Transit Mixer Drivers performance
v Co-ordination with other departments, particularly

· To report daily to the management on all events witnessed on sites, through the daily report.
· To ensure Pumps shift correctly and quickly between sites in the Daily Program
· Collect all signed delivery notes from each site daily, to be submitted to the Branch
Accountant’s office, and ensure any quantity issues are resolved by reporting them to the
Production Manager daily.
· Enhance the reputation of the company, through good and reliable conduct on sites.
· To make joint measurements on site, either before or after casting, if required.
· To frequently advise Dispatcher of Pour Progress and the final likely quantity requirements
on sites
· Frequent visits to customer sites both before and during Concrete delivery
· Effective communication with all relevant divisions to ensure smooth operations and
minimal delays.
· Decision making to resolve unexpected changes/modifications in Pumps / requirements.
· Foresee and react to potential problems in the supply, in time.
· Providing support to other departments incl. production in decision making .

COMPANY : XTRAMIX CONCRETE SOLUTIONS – ABU DHABI


POSITION : Plant Supervisor
PERIOD : August 2013 : January 2015

· Prepare daily concrete schedule including the requirement (pumps and Transmit mixer)
· Obtain the availability of raw materials and the amount to be ordered in the plant.
· Supervise the arrangement of the delivery of ready mix concrete to the sites and maintaining
the records of operation activities.
· Maintain contact with the mixers driver, foreman, pumps and site foreman, dispatcher and
pump crews to obtain all relevant information customer site such as location, site distance
and suitability , Equipment breakdown , rejected concrete , pouring status and time interval
between pours .
· Prepare production Reports

COMPANY : XTRAMIX CONCRETE SOLUTION – QATAR


POSITION : PLANT MANAGER
PERIOD : January 2015: MAY2018

· Ensure smooth operations of daily activities against the long term plan
· Review the prevailing system, identify the shortfalls and establish/ maintain appropriate
System for measuring necessary aspects of plant management and improvement.
· Monitor measure and report on plant related issues/development plans / achievements within
Timescales.
· Manage and control department expenditure within permissible budgets.
· Ensure the periodic calibrations are carried to meet the technical department requirements.
· Ensure software functions of plants are checked in periodic intervals, backup stored and extra
Copies of software are kept in stock.
· Ensure the quality of repairs and maintenance in manufactures standards with market
Reputations.
· Preventive maintenance should be done in scheduled time in coordination with the
production related people so as to ensure that immediate interruption to production is
avoided.
· Ensure all records/catalogues related to equipment’s and machineries are maintained properly
.

COPMANY : XTRAMIX CONCRETE SOLUTIONS – QATAR


POSITION : Logistic Manager
PERIOD : MAY2018: TILL NOW
· Hire vehicles based on requisitions from user dept.
· Maintain an approved hiring suppliers list using the standard format.
· Responsible for hiring of all vehicles in area
· Maintain all quotations and records pertaining to Hiring of equipment are and in case of non-
availability of hired suppliers from approved supplier list to check from the stand and hire
only after getting approval from the management
· Process all requisitions, delivery notes, invoice etc. for the hired equipment’s on time as per
company policy
· Coordinate with the petty cash accountant for cash payment to cash suppliers.
· Check for new suppliers negotiate and get confirmation from the manager.
· Maintain register for supplier details, payment and supplier information.
· Responded to incoming customer calls to address equipment, service and contract issues.
· Provided timely review of service related paperwork to determination eligibility for billing
when required
· Track and analyze vehicles movements through GPS and update the same to management if
any abnormality observed
· Organize Vehicle Safety Stickers & Registration keep tracking of legal documents of the
fleet.
· Maintain daily fleet breakdown status and forwarding to maintenance department
· Coordinate with maintenance department for vehicle repairs and timely follow the repair job
card system
· Responsible to schedule transportation for workers and staff as per the requirements
· Any other duties as directed by the Management.
· Proven ability to manage and coordinate multiple projects in a fast-paced, highly professional
environment
· Intermediate mathematical skills, basic organization skills, good written and verbal
communication skills and basic problem solving skills
· Excellent attention to detail and planning ability
· Excellent customer focus and strong professional expertise
· Excellent organizational, analytical and attention to detail skills with 6.the ability to handle
multiple queries at one time
· .Strong written and verbal communication skills, analytical ability, leadership strength and
ability to work effectively with all levels of the organization
· Excellent communicative and problem solving skills with strong time management ability
· Having Records Management skills
· Self-motivation
· Flexible in work timings.

Company : XTRAMIX CONCRETE SOLUTIONS – QATAR


POSITION : Production Manager .
PERIOD : MAY 2018 TILL NOW
· Ensure smooth operations of daily activities against the long term plan
· Review the prevailing system, identify the shortfalls and establish/ maintain appropriate
System for measuring necessary aspects of plant management and improvement.
· Monitor measure and report on plant related issues/development plans / achievements within
Timescales.
· Manage and control department expenditure within permissible budgets.
· Ensure the periodic calibrations are carried to meet the technical department requirements.
· Ensure software functions of plants are checked in periodic intervals, backup stored and extra
Copies of software are kept in stock.
· Ensure the quality of repairs and maintenance in manufactures standards with market
Reputations.
· Preventive maintenance should be done in scheduled time in coordination with the
production related people so as to ensure that immediate interruption to production is
avoided.
· Ensure all records/catalogues related to equipment’s and machineries are maintained properly
· Monthly budget requirement of plant division for the coming month to be submitted 10 days
prior to the month end for approval.
· Ensure maximum manpower utilization to achieve operational efficiency and reduce idle
time.
· Study / forecast submit the additional manpower requirements of Division on regularly.
· Ensuring that health and safety guidelines are followed.
· Identifying training needs.
· prepare monthly report to the management
· Accurately identifying customer requirements in parallel with the company capacity to
supply
· Achieve full utilization of the plants resources and ensures equipment performance are at its
confidence level.
· Ensures availability of resources for smooth operations.
· Compliance to departmental process and procedures
· Achievement of customer satisfaction level. Providing and implementing corrective actions
for
· Continual improvement.
· Ensures compliance of the management system for Quality, Health, Safety, Security and
Environmental requirements
· Ensures effective supervision and development of team.
· Evaluation of personnel for development and training needs.

COMPUTER KNOWLEDGE

WORD, EXCEL

MOHAMMED ABDEL SATTAR ARABY ALY

You might also like