HOLD-3

WELL NUMBER :
WELL ID :
SCOPE OF PROJECT

HOLDS:
THIS DRAWING IS BASED ON MASTER DRAWING:
YIB-81-104265-PX-2365-00200-0001 REV-01
AND NOW IT IS THE PART OF PROJECT ID:P20C0124005
WBS No.:XXXXXXXX

15. VERIFY FROM THE SITE 1500# RATING OF THE EXISTING HOOK-UP.
14. A SUITABLE VENTING ARRANGEMENT TO BE PROVIDED AT REGULAR INTERVAILS ALONG THE FLOWLINE LENGTH TO VENT GAS PERMEATED THROUGH THE PE-LINER. This document is issued for the party which commissioned
13. THIS DRAWING IS BASED ON SAP DATA FOR EBV PROJECT AND NOT AS PER SITE CONDITIONS. NOTES BELOW ARE NOT VERIFIED it and for specific purposes connected with the captioned
WITH SITE CONDITIONS. project only. It should not be relied upon by any other party Rock International Engineering Consultancy,
Al Nahda Towers 2, Office:601,Ghala
12. (10D & 5D) STRAIGHT RUNS AT UPSTREAM AND DOWNSTREAM OF TURBINE FLOW METER IS MAINTAINED. or used for any other purpose. We accept no responsibility secivrS
em
u
elortP
ea
ht id
H
aAl S.A.O.C P.O.Box No. 3968, P.C:111, AL Khuwair,
for the consequences of this document being relied upon Muscat, Sultanate of Oman.
11. GASKET, BODY CENTER RINGS, SPREADER NUTS, ALL THRD BOLTS & NUTS IS USED WITH 2", 600# ANSI FLANGE.
T +968 24504335
10. 2" DRAIN VALVE IS PROVIDED UPSTREAM OF FLOW TRANSMITTER. by any other party, or being used for any other purpose,
F +968 24117318
9. TAG NUMBER NOT AVAILABLE AT SITE. or containing any error or omission which is due to an W www.rockoman.com P20C0124005
error or omission in data supplied to us by other parties.
8. RV IS LOCATED BETWEEN CHOKE VALVE AND CHECK VALVE.
7. EXISTING RTU CONFIGURED FOR THE NEW FUNCTIONALITY. NTS
YIBAL
6. TURBINE FLOW METER IS 1/2'' WITH 2" MATTING FLANGE.
5. PROVISION FOR TANKER LOADING, SPECIAL PIPING ITEM IS CONNECTED BY PDO.
WELLHEAD
4. ADEQUATE STRAIGHT RUNS IS PROVIDED 2D DOWNSTREAM OF ELECTROMAGNETIC FLOW METER.
3. RTU TO TRANSMIT BOTH FLOW & PRESSURE TO TELEMETRY. SET POINT FOR FLOW ADJUSTABLE FROM SCADA. 01 17.09.23 PSN AS BUILT FOR EBV PROJECT NCO000CO1275-AF
P E F S (CONSTRUCTION)
2. CONNECTION TO TELEMETRY BY SCADA GROUP.
1. DUE TO EXCESSIVE VIBRATIONS EXPECTED DURING WELL SURGING, PROPER ANCHOR/ SUPPORTS SHOULD BE PROVIDED.
6"-600# WI WELL PAD HOOK-UP
Y-330 YIB 81 104265 PX 2365 00200 0001 01