Distribution Substation Ss.40464, Fp-01: Notes
Distribution Substation Ss.40464, Fp-01: Notes
GOLF
310+580.326
DISTRICT
GDW-01
GOLF
COURSE
WEST
213593.8
GCR-01
RESIDEN
06
TIAL
T 1/6 R50
T 1/6 R50
RESIDENTIAL
WFR-03
WATERFRONT
212097.142
T 1/6 R50
T 1/6 R50
WATERFRONT
FR0M 11kV
211+092.967
WFR-02
RESIDENTIAL
SWITCHGEAR,
GSD-03
05
R
1
6/
T
DISTRICT
GOLF
GSD-03
612+030.712
GOLF
T 1/6 R50
DISTRICT
GDS-02
611+233
.550
T 1/6 R50
S/S 40464
FOX
412+321.9
FXH-05
HILLS 87
WATERFRONT
210046.655
WFR-01
RESIDENTIAL
GOLF
GDS-01
610+485.
DISTRIC
738 T
T
1/6
R50
R50
1/6
T
EDUCATION
510+844.130
EDD-03
MEDICAL
DISTRICT
312+728.251
MEC-01
DISTRICT
T 1/6 R50
T 1/6 R50
T 1/6 R50
T 1/6 R50
FOX
411+843.970
FXH-04
HILLS
T 1/6 R50
DISTRICT
EDUCATION
EDD-02
313+342.335
WATERFR
112+416.57
WFC-04
ONT
T 1/6 R50
COMMER
5
T 1/6 R50
CIAL
411+337.899
FOX
FXH-03
HILLS
05R 6/1 T
EDUCATION
R50
1/6
T
314+176.193
EDD-01
05R 6/1 T
DISTRICT
WATERFRONT
111+799.483
WFC-03
CENTRAL
COMMERCIAL
810+000.000
PZC-01
PZC-01
PLAZA
NORTH
BOULEVARD
BLN-01
810+921.731
T 1/6 R50
R50
1/6
T
410+850.520
FOX HILLS
FXH-02
NORTH
BLN-02
BOULEVARD
811+264.678
810+911.858
BLS-01SOUTH
BOULEVARD
T 1/6 R50
811+254.805
T 1/6 R50 BLS-02 SOUTH
BOULEVARD
05R 6/1 T
05R 6/1 T
T 1/6 R50
T 1/6 R50
T 1/6 R50
WATER
T 1/6 R50
05R 6/1 T
05R 6/1 T
T 1/6 R50
FRONT
111+19
WFC-02
COMME
6.254
RCIAL
05R 6/1 T
410+355.752
FOX HILLS
FXH-01
05R 6/1 T
WATERF
RONTWFC-01 .935
ENERGY
512+678.033
EC2-01
110+786
COMME
CITY
RCIAL
QATAR
ENTERTAINMEN
110+231.879
QEC-02
S/S 40464
T CITY
TX-1
Sn= 1600kVA
11/0.433 kV
(OIL TYPE)
z=(6.00%)
7x1c 800mm²
FEEDER PILLAR-1 (LOCATED INSIDE THE SS)
(INDOOR TYPE)
TCL = 3120
TO BE 3C 16mm²
kVA
MDL = 1974 CONNECTED TO VD=0.9% NOTES:
kVA AUX. SUPPLY DB-SS - THE LOCATION OF PRIVATE SUBSTATIONS ARE
DMDL = 1264 (10kW) INDICATIVE ONLY. THE EXACT LOCATION SHALL BE
kVA FINALIZED DURING RESPECTIVE BP PROCESSING.
- ALL 11KV CABLES ARE 3C-300mm² XLPE+ FO CABLES.
THE 3C-300mm² CABLES ARE LAID AT A SPACING OF
FEEDER PILLAR AS PER 50CM THUS REDUCING THE CURRENT CARRYING
KAHRAMAA SPECIFICATION
CAPACITY TO THAT OF 3C-240mm².
2500A; 40kA, 1 sec; 415V, 3Ph+N+E, - IN ALL SECONDARY SUBSTATION FEEDER BREAKERS
50Hz. Cu BUSBAR SHALL BE PROVIDED WITH DIRECTIONAL
F1 F2 F3 F4 F5 F6 OVER CURRENT AND DIRECTIONAL EARTH FAULT
HRC HRC HRC HRC HRC HRC PROTECTION (TYPE4).
355 355 355 355 355 355
STRIP FUSE WAY STRIP FUSE WAY STRIP FUSE WAY STRIP FUSE WAY STRIP FUSE WAY STRIP FUSE WAY - THE LOCATION OF ALL ELECTRICAL EQUIPMENT SUCH
SIZE 3 SIZE 3 SIZE 3 SIZE 3 SIZE 3 SIZE 3 AS FEEDER PILLAR, KWHR METER, SERVICE CABINET,
MINI PILLAR ETC, ARE INDICATIVE ONLY. THE EXACT
LOCATION WILL BE AS PER THE AS-BUILT DRAWINGS.
4C 300
4C 300
4C 300
4C 300
4C 300
4C 300
144m
208m
238m
249m
20m
80m
- IN CASE DETAILS/ MATERIALS ON THE DRAWINGS
3m 3m
3m CONTRADICT WITH KM STANDARDS AND
200A 4C 120
SPECIFICATION, THEN THE LATER SHALL PREVAIL.
150A 4C 70
150A 4C 70
4C 300
4C 300
22m
17m
4C 300
THE INFRASTRUCTURE CONSULTANT.
18m
kWh 3m kWh 3m - CLIENT TO APPOINT A KM APPROVED
kWh 3m CONTRACTOR TO EXECUTE WORK AT SITE.
VD=2.30%
VD=1.97%
200A 4C 120
VD=0.31%
150A 4C 70
- TARIFF METERING FOR ALL LUSAIL PROJECTS ARE AT
4C 300
TCL=199 kVA MDL=126 kVA
TCL= kVA MDL= kVA
150A 4C 70
2m
TCL=166 kVA MDL=105kVA
105
PE - LV CABLES ARE LAID AT A SPACING OF 40CM.
4C 300
4C 300
REF: Bb-01-0007
REF: Ca-01-0054
- ALL PERMANENT SECONDARY SUBSTATIONS ARE
16m
kWh
16m
kWh
REF: Ca-01-0046
kWh
VD=2.39%
VD=2.22%
INDOOR TYPE.
VD=0.52%
166
- ALL 11KV SWITCHGEARS SHOULD BE KM STANDARD
3m
3m WITH 31.5 KA/3SEC FAULT RATING.
- THIS SCHEME IS SUBJECT TO ALL CONDITIONS
150A 4C 70
REF: Ba-01-0160
REF: Ca-01-0055
150A 4C 70
4C 300
22m
4C 300
VD=2.35%
VD=0.65%
150A 4C 70
4C 300
4x 6W FSFP, WITH NATURAL VENTILATION,
TCL=166 kVA MDL=105kVA
150A 4C 70
4C 300
2m
TCL= kVA MDL= kVA
2m
PE
PE
REF: Ca-01-0056
kWh
REF: Ca-01-0048
VD=2.43%
VD=0.73%
REF: Ca-01-0057
REF: Ca-01-0049
3m
3m
200A 4C 120
3m
150A 4C 70
4C 300
21m
150A 4C 70
Las sa e : Tue, 3 Oc 2023 08:24 am
4C 300
4C 300
22m
22m
kWh 3m
VD=2.40%
kWh
LUS-CP28B-QDSBG-DWG-EL-01304-013
200A 4C 120
kWh 3m
VD=1.41%
4C 300
TCL=199 kVA MDL=126 kVA
2m
VD=1.11%
3m
TCL=166 kVA MDL=105kVA
150A 4C 70
TCL=166 kVA MDL=105kVA
PE
REF: Ba-01-0161
150A 4C 70
kWh
4C 300
REF: Ca-01-0058
VD=2.52%
4C 300
16m
2m
REF: Ca-01-0050
kWh
PE kWh
TCL=166 kVA MDL=105kVA
VD=1.50%
3m
REF: Ba-01-0162
TCL=166 kVA MDL=105kVA
150A 4C 70
REF: Ca-01-0051
4C 300
21m
REF: Ca-01-0059
CAD Re : e ec bs01 R a Scheme LUSAIL 4-415-2023 4-415-2023-P36-P131.
kWh 3m
VD=1.49%
4C 300
150A 4C 70
TCL=166 kVA MDL=105kVA
2m
PE
REF: Ca-01-0052
kWh
VD=1.57%
TCL=166 kVA MDL=105kVA
REF: Ca-01-0053
AA For/
HW
MM
ZONE: 69
4-415-2023
0 48/158