1-external floating roof appendix C open book

2-Internal floating roof appendix H open book

3-permiability of bearer release prevention appendix I open book

4-Appenx C where sense are installed open book appendix C and L length open book

5-Pitting acceptable criteria < ½ of Tmin open book

6-Release prevention bearer very important (internal inspection 10 year ,thin lining add two years , CP
add 5 years , bearer add 10 years ) Chapter 6 min 20 questions.

7-Tank settlement who will perform >any person who is good in measurement

8-Edge settlement

9-which settlement effect on piping

10-Min points of settlement > 8

11-Graph tank and radius which will tell acceptability of settlement

12-how will check swinging lines and rock > Appendix C

13-Leaks in rivets ( Make photograph) open book

14-how check thin linn

15-how will check thick lining

16-zinc silicate thickness 305 mm and that is no part or prieming.

17-anchor 1.5 – 4

18-Microbiological corrosion

19-Asphalt bacteria found in which corrosion ( anaerobic

20-Surface preparation ( white and near white from linning)

21-how to check lining .if corrosivity increased resistivity will decrease

22-Grounding connection how to perform . after checking voltage

25-grounding connection reisitance 25 oham

26-Patch vertical 48 “” horizontal 72 max

27-for vertical joint cut horizontal joint for 12 ‘’

28-in hot tapping plate will be put in two parts

29-frangible roof thickness

30-if want to change material get approval from design


31-filling rate hydrotest

32-radiu tolerances

33-champter 4 L 3.72 wala

34-RCA 2N

35-RCA 4n

36-2 questions from suitability service if less than ½ inch not sutiable for service

37-LAP patch in critical zone on existing patch can not until engineer approval ( can do or no

28-Vaccume testing of reconstruing tanks extent

29-Vaccume test pressure

30-leak test pressure

31-MPI data obtain

32-UT quantify that MPI DATA

33-repair definition

34-who will keep construction record

35-construction record time

36-who will qualify welders

37-RT filim interpretation which standard

38-RT procedure which standard

39-ASME 5 wole size and IQI

39-lighat meter when calibrate (prior to use )

40-calibration difference between two equipment shall not exceed 25 F

41-if one tank have 5 shell course and every shall have 22 verticle joints number of hardness test

42-how to test do testing of unknown material (chemical mechanical and charpy)

43-tenssion test of unknown location from opposite end